Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
28/12/1956
The year in which a vessel’s construction is completed.
1956
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
RS Hayes Ltd
Unique identifier for a given ship, it is assigned by a builder.
505
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mil
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4b First Entry Report on Internal Combustion Machi
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
10/12/1956
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
F W Ingram
Location where the document is written.
Milford Haven
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 12,56
Broad categories and subdivisions of vessels related to their purpose or function.
Trawler
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
167
Location of construction for a vessel’s engines.
Keighley
W Widdop & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Name of ship as recorded on the record
Norrard Star
The process of transferring a vessel to water, but not necessarily her completion.
09/07/1956
Name of the shipbuilder as it appears on the record.
J C Dickinson
The port or place in which the vessel’s construction took place, at the time of writing.
Pembroke Dock
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
8137
The port in which a vessel is registered or permanently based.
Milford Haven
The date of first visit by a surveyor.
19/07/1956
The individual and/or organisation listed
Norrard Trawlers Ltd
Name of the individual/entity/organisation responsible for authoring the record
S D Hemmings; F R Dale
Location where a vessel’s survey was undertaken.
Pembroke Dock
Date of the meeting of the Classing Committee.
08/02/1957
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
GMB4
Date in which construction of a vessel’s engines were completed.
1955
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
2
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.