Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
11/04/1949
The year in which a vessel’s construction is completed.
1949
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Kalmar Varv
The port or place in which the vessel’s construction took place, at the time of writing.
Kalmar
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
13621
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
06/04/1949
Name of the individual/entity/organisation responsible for authoring the record
W A Cook
Location where a vessel’s survey was undertaken.
Manchester
Date of the meeting of the Classing Committee.
12/05/1950
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Altrincham
Russell Newbery & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Stranded, caught fire, completely gutted, total loss
Recorded date for the vessel’s loss or disposal.
25/04/1967
Name of ship as recorded on the record
Luciano Castro
The process of transferring a vessel to water, but not necessarily her completion.
13/12/1949
Unique identifier for a given ship, it is assigned by a builder.
364
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mch
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4c Report on Oil Engine Electric Generator Sets
The date of first visit by a surveyor.
15/02/1949
The individual and/or organisation listed
Scandanavian Steel & Shipping Agency
Location where the document is written.
Manchester
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See minute on FE Rpt
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
Type and configuration of the engine(s) supplied for a vessel.
Vertical Solid Injection Heavy Oil
Date in which construction of a vessel’s engines were completed.
1949
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Burnt after stranding
Vessel’s place of loss or disposal/last known recorded location.
Rio Grande
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.