Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

26/03/1840

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

__/__/1840

The name of the yard where the vessel was built.

Yard name

Stobcross

A unique number allocated to a specific vessel by an official registration authority of the country of registry (flag) that the vessel belongs to (post. 1855).

Official number

26620

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

Undefined

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Master

John Potter

Location where the document is written.

Location of Document Creation

Glasgow

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

A1 for 10 years

Recorded information related to a vessel’s movements.

Voyage information

Clyde

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Cargo

A vessel’s means of propulsion.

Propulsion

Sail

System of admeasurement referred to as ‘Builder’s Old Measurement’ (BM or BOM) in place between 1786 and 1836.

Gross Register Tonnage (OM)

310

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Physical extent of a record.

Number of parts

1

The year in which a vessel’s construction is completed.

Year of ship completion

1840

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Robert Barclay & Co

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Glasgow

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

832

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

U

Name of the individual/entity/organisation responsible for authoring the record

Document author

John Barr Cumming

Location where a vessel’s survey was undertaken.

Location of Survey

Glasgow

The name of the port/place from which a vessel’s voyage originated.

Voyage from

Clyde

The name of the port/place of destination given.

Destined voyage

Sydney

Physical arrangement of a ship’s masts, sails and rigging.

Rig

S - Ship

Is the steamer assisted by sail?

Sail assisted steamer

No

System of measurement that replaced ‘Builder’s Old Measurement’, taking a vessel’s internal capacity as the standard. Vessels built between 1836 and 1854 were legally required to display both tonnages.

Gross Register Tonnage (NM)

343

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.