Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
23/12/1857
The year in which a vessel’s construction is completed.
1839
The port or place in which the vessel’s construction took place, at the time of writing.
Bowling Bay
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
1413
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Glasgow 1392
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
R Walker
Location where the document is written.
Glasgow
Location where a vessel’s survey was undertaken.
Glasgow
Recorded information related to a vessel’s movements.
Glasgow; Spain
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Archibald
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
MacGill
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report of Survey for Repairs
The listed port to which a given vessel belongs.
Glasgow
The individual and/or organisation listed
McKean & Lamont
Name of the individual/entity/organisation responsible for authoring the record
Richard Robertson; Thomas Luke
Name of surveyor.
Richard Robertson; Thomas Luke
Date of the meeting of the Classing Committee.
29/12/1857
The name of the port/place of destination given.
Spain
A vessel’s means of propulsion.
Sail
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
77
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.