Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
29/07/1891
The year in which a vessel’s construction is completed.
1891
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Ropner & Sons
The port or place in which the vessel’s construction took place, at the time of writing.
Stockton
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Midship section
Name of the individual/entity/organisation responsible for authoring the record
Ropner & Son
Broad categories and subdivisions of vessels related to their purpose or function.
Cargo
Predominant material(s) utilised in a vessel’s construction.
Steel
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Length of a ship along the summer load line from the vessel’s stem to the sternpost.
312
Physical extent of a record.
1
Name of ship as recorded on the record
Lammermoor - 1891
The process of transferring a vessel to water, but not necessarily her completion.
24/02/1891
Unique identifier for a given ship, it is assigned by a builder.
257
The country in which the vessel’s construction took place, at the time of writing.
United Kingdom
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Location where the document is written.
Stockton-on-Tees
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Moulded dimensions breadth- Also referred to as moulded beam. The distance from the inside of the starboard side plating to the inside of the port side plating.
40.3 14/20
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.