Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
25/03/1918
The year in which a vessel’s construction is completed.
1918
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
The Northumberland Shipbuilding Co Ltd
Unique identifier for a given ship, it is assigned by a builder.
244
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Steel Steamer
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
25/03/1918
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Cayzer Irvine Co Ltd
Name of the individual/entity/organisation responsible for authoring the record
James Gregory; E J Milton
Name of surveyor.
E J Milton
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Shelter Dk with Fbd; Lloyds A & Cp; Cargo Battens not Fitted in Shelter Tween Dks; +LMC 3,18; FD
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk as a Block Ship
Pertinent, useful or interesting recorded content.
; Also refers to Vessels Carlow Castle & Clan Macvey
Name of ship as recorded on the record
Clan Macvicar
The process of transferring a vessel to water, but not necessarily her completion.
15/12/1917
Name of the shipbuilder as it appears on the record.
R Garlick
The port or place in which the vessel’s construction took place, at the time of writing.
Howdon, Newcastle on Tyne
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
70821
The listed port to which a given vessel belongs.
Glasgow
The date of first visit by a surveyor.
23/04/1917
The individual and/or organisation listed
Cayzer Irvine Co Ltd
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Q C Pagan
Location where the document is written.
Newcastle
Location where a vessel’s survey was undertaken.
Howdon
Date of the meeting of the Classing Committee.
09/04/1918
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5815
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Physical extent of a record.
2
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.