Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

23/03/1943

The year in which a vessel’s construction is completed.

Year of ship completion

1930

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Lubecker Maschinenbau Gesellschaft

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Lübeck

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

5745

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

Rotterdam 28519

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

23/03/1943

Name of the individual/entity/organisation responsible for authoring the record

Document author

Per Bjorn Roli

Location where a vessel’s survey was undertaken.

Location of Survey

Trondheim

Date of the meeting of the Classing Committee.

Date of Classing committee

10/10/1945

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Location of construction for a vessel’s engines.

Location of engine build

Berlin

Engine builder as written

A Borsig G m b H

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Name of ship as recorded on the record

Ship name

Lasbek

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

14/06/1930

Unique identifier for a given ship, it is assigned by a builder.

Yard no

302

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Osl

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

9 Report of Survey for Repairs, &c., of Engines & Boilers

The port in which a vessel is registered or permanently based.

Port of registry

Hamburg

The date of first visit by a surveyor.

Date of first survey

23/03/1943

The individual and/or organisation listed

Ship owner

Knohr & Burchard Nfl

Location where the document is written.

Location of Document Creation

Oslo

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

8,39; ss Ham No 2-38; Cruiser stern; Strengthened for Navigation in Ice

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Screw Steamer

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

2159

Date in which construction of a vessel’s engines were completed.

Year of engine build

1930

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Physical extent of a record.

Number of parts

1