Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
18/02/1907
The year in which a vessel’s construction is completed.
1907
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Sir W G Armstrong & Whitworth & Co Ltd
Unique identifier for a given ship, it is assigned by a builder.
786
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Steel Steamer
The listed port to which a given vessel belongs.
Hamburg
The date of first visit by a surveyor.
03/07/1906
The individual and/or organisation listed
Deutsche Dampfsfahrts-Ges-Kosmos
Name of the individual/entity/organisation responsible for authoring the record
James McNeil
Name of surveyor.
James McNeil
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Shelter dk with fbd S 4 1; Lloyds A & CP; +LMC 2,07; FD Elec Light
Recorded information related to a vessel’s movements.
Newcastle; Hamburg
Broad categories and subdivisions of vessels related to their purpose or function.
Screw Steamer
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
2
Name of ship as recorded on the record
Sisak
The process of transferring a vessel to water, but not necessarily her completion.
14/12/1906
Name of the shipbuilder as it appears on the record.
R Saxton White
The port or place in which the vessel’s construction took place, at the time of writing.
Newcastle
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
52390
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Newcastle 51609
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
13/02/1907
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Dincklage
Location where the document is written.
Newcastle on Tyne
Location where a vessel’s survey was undertaken.
Newcastle on Tyne
Date of the meeting of the Classing Committee.
22/02/1907
The name of the port/place of destination given.
Hamburg
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
4657
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Pertinent, useful or interesting recorded content.
Also refers to vessel Sakkarah
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.