Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

26/10/1934

The year in which a vessel’s construction is completed.

Year of ship completion

1907

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Harland & Wolff

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Bel

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

8 Report of Survey for Repairs, &c.

The listed port to which a given vessel belongs.

Port belonging to

Belfast

The date of first visit by a surveyor.

Date of first survey

21/06/1934

The individual and/or organisation listed

Ship owner

Anglo American Oil Co Ltd

Name of the individual/entity/organisation responsible for authoring the record

Document author

F C Cocks; R W Busue

Location where a vessel’s survey was undertaken.

Location of Survey

Belfast

Date of the meeting of the Classing Committee.

Date of Classing committee

23/11/1934

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

8937

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Tanker has been sold for breaking

Vessel’s area of loss or disposal/last known recorded location.

Area of ship loss

River Clyde

Physical extent of a record.

Number of parts

1

Name of ship as recorded on the record

Ship name

Iroquois

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

27/06/1907

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Belfast

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

11404

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

New Orleans 4287

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

26/10/1934

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Ship manager

F J Wolfe

Location where the document is written.

Location of Document Creation

Belfast

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1 Subject; S(S)10,34; Carrying Petroleum in Bulk; Fitt for oil Fuels; S S 2nd No 3-10, 34 +LMC 10,34 Subject

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

The official record pronounced by the Committee

Loss or disposal

Broken up

Vessel’s place of loss or disposal/last known recorded location.

Place of ship loss

Dalmuir

Recorded information relating the specific cargo being conveyed.

Cargo

Petroleum in bulk

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.