Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
07/02/1928
The year in which a vessel’s construction is completed.
1927
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Sir W G Armstrong, Whitworth & Co Ltd
The name of the yard where the vessel was built.
Naval Yard
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4b Report on Oil Engine Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
06/02/1928
Name of the individual/entity/organisation responsible for authoring the record
George Murdoch
Name of surveyor.
George Murdoch
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+LMC 2,28; Oil Engines; 2DB 150lb
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
3214
Location of construction for a vessel’s engines.
Elswick; Newcastle
W G Armstrong Whitworth & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
The official record pronounced by the Committee
Sunk
Recorded date for the vessel’s loss or disposal.
30/06/1940
Physical extent of a record.
1
Name of ship as recorded on the record
Belmoira
The process of transferring a vessel to water, but not necessarily her completion.
12/10/1927
Unique identifier for a given ship, it is assigned by a builder.
1027
The port or place in which the vessel’s construction took place, at the time of writing.
Walker on Tyne
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
82383
The listed port to which a given vessel belongs.
Oslo
The date of first visit by a surveyor.
08/02/1927
The individual and/or organisation listed
A/S Rederiet Belmoira
Location where the document is written.
Newcastle on Tyne
Location where a vessel’s survey was undertaken.
Newcastle on Tyne
Date of the meeting of the Classing Committee.
06/03/1928
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Armstrong Lulzer 4 cylinder
Date in which construction of a vessel’s engines were completed.
1928
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1928
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Enemy Action
1928
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.