Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
__/__/0000
The year in which a vessel’s construction is completed.
1919
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
British India Steam Navigation Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Stockton
Additional numbers that feature on a given record that may be used for identification.
Lloyd's 7180 WM-WC
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Name of the individual/entity/organisation responsible for authoring the record
William Campbell; William Morrison
Name of surveyor.
William Campbell; William Morrison
Is the steamer assisted by sail?
No
Blair & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Submarine
Recorded date for the vessel’s loss or disposal.
08/04/1942
Pertinent, useful or interesting recorded content.
Engine Forgings No 16662; Manufactured by John Spencer & Sons of Newburn
Name of ship as recorded on the record
Gandara
The process of transferring a vessel to water, but not necessarily her completion.
28/08/1919
Unique identifier for a given ship, it is assigned by a builder.
219
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
7 Engine Forgings
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Middlesbrough 10517
The date of first visit by a surveyor.
15/05/1919
Location where the document is written.
Newcastle
A vessel’s means of propulsion.
Steam
Location of construction for a vessel’s engines.
Stockton
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Sunk
Vessel’s place of loss or disposal/last known recorded location.
Bay of Bengal
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?