Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
28/01/1939
The year in which a vessel’s construction is completed.
1930
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Palmers Shipbuilding & Iron Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Jarrow on Tyne
The port in which a vessel is registered or permanently based.
Newcastle
Name of the individual/entity/organisation responsible for authoring the record
A E Munro
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
8825
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Shelled by submarine, abandoned & then sunk by British destroyer
Recorded date for the vessel’s loss or disposal.
15/09/1939
Pertinent, useful or interesting recorded content.
Title of document has been altered
Name of ship as recorded on the record
Cheyenne
The process of transferring a vessel to water, but not necessarily her completion.
22/08/1930
Unique identifier for a given ship, it is assigned by a builder.
1001
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Certificate of Survey of Boiler & Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Location where the document is written.
Newcastle on Tyne
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Sunk
Vessel’s area of loss or disposal/last known recorded location.
Atlantic
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.