Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
08/10/1921
The year in which a vessel’s construction is completed.
1912
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Northumberland Shipbuilding Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Howdon on Tyne
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
41423
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Liverpool 80599
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
05/10/1921
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
T Dunlop & Sons
Location where the document is written.
Glasgow
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 10,21; SS No 3-10,21; +LMC 10,21; Fitted With Cylindrical Tanks for Carrying Petroleum; Fitted For oil Fuel 10,21 FP Above 150 F
Recorded information related to a vessel’s movements.
Glasgow; United States
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
4879
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Stranded, Sold for breaking up
The country or national waters where a vessel is lost/disposed of, or last recorded.
United Kingdom
Physical extent of a record.
4
Name of ship as recorded on the record
Queen Louise
The process of transferring a vessel to water, but not necessarily her completion.
03/02/1912
Unique identifier for a given ship, it is assigned by a builder.
191
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
8 Report of Survey for Repairs, &c.
The listed port to which a given vessel belongs.
Glasgow
The date of first visit by a surveyor.
20/01/1921
The individual and/or organisation listed
The Dunlop Steam Ship Co Ltd
Name of the individual/entity/organisation responsible for authoring the record
C J Millar; Henry A Gibbs
Location where a vessel’s survey was undertaken.
Glasgow
Date of the meeting of the Classing Committee.
11/10/1921
The name of the port/place of destination given.
United States
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Stranded & Broken Up
Vessel’s area of loss or disposal/last known recorded location.
Holy Head Bay
Recorded date for the vessel’s loss or disposal.
23/01/1924
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.