Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
24/08/1918
The year in which a vessel’s construction is completed.
1919
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Scottish Concrete Ship Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Greenock
Additional numbers that feature on a given record that may be used for identification.
Lloyd's 412
The date of first visit by a surveyor.
31/07/1918
Location where the document is written.
Sheffield
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
1918
Pertinent, useful or interesting recorded content.
Ship Forgings or Castings No 3038; Manufactured by Hill & Smith Ltd of Brierley Hill
Name of ship as recorded on the record
Cretehaven
The process of transferring a vessel to water, but not necessarily her completion.
14/08/1919
Unique identifier for a given ship, it is assigned by a builder.
2
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
6 Ship Forgings or Castings
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Name of the individual/entity/organisation responsible for authoring the record
J Pringle; John A McGilvray
Broad categories and subdivisions of vessels related to their purpose or function.
Barge
Predominant material(s) utilised in a vessel’s construction.
Ferro-concrete
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1918
Physical extent of a record.
1