Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
03/07/0000
The year in which a vessel’s construction is completed.
1917
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
The Kawasaki Dockyard Co Ltd
Unique identifier for a given ship, it is assigned by a builder.
395
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Kob
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
13 Report on Electric Lighting Installation
The date of first visit by a surveyor.
02/06/0000
The individual and/or organisation listed
Furness Withy & Co Ltd
Location where the document is written.
Kobe
Location where a vessel’s survey was undertaken.
Kobe
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
War Council
The process of transferring a vessel to water, but not necessarily her completion.
06/06/1917
Name of the shipbuilder as it appears on the record.
Kawasaki Dockyard Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Kobe
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
2046
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
03/07/0000
Name of the individual/entity/organisation responsible for authoring the record
Arthur L Jones
Name of surveyor.
Arthur L Jones
Date of the meeting of the Classing Committee.
28/08/1917
Predominant material(s) utilised in a vessel’s construction.
Steel
Type and configuration of the engine(s) supplied for a vessel.
Vertical Enclosed Engine
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.