Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
__/__/0000
The year in which a vessel’s construction is completed.
1938
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Lithgows Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Port Glasgow
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report of Total Loss for Classed Vessels only
The individual and/or organisation listed
Charente Steamship Co Ltd
Date of the meeting of the Classing Committee.
24/09/1940
Recorded information related to a vessel’s movements.
Durban; Liverpool
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
6199
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Not Heard of
Physical extent of a record.
1
Name of ship as recorded on the record
Scientist
The process of transferring a vessel to water, but not necessarily her completion.
30/05/1938
Unique identifier for a given ship, it is assigned by a builder.
911
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
10196
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 2,40; +LMC 8,38; TS CL
The name of the port/place from which a vessel’s voyage originated.
Durban
The name of the port/place of destination given.
Liverpool
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Missing
Recorded date for the vessel’s loss or disposal.
27/04/1940
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.