Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
22/12/1917
The year in which a vessel’s construction is completed.
1910
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
S P Austin & Sons Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Sunderland
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
70561
The port in which a vessel is registered or permanently based.
Newcastle
The date of first visit by a surveyor.
19/12/1917
The individual and/or organisation listed
Pelton Steamship Co Ltd
Name of the individual/entity/organisation responsible for authoring the record
F H Osbon; Reginald A Bain
Name of surveyor.
Reginald A Bain
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
BS 12,17
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1764
Date in which construction of a vessel’s engines were completed.
1910
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Largo
The process of transferring a vessel to water, but not necessarily her completion.
23/03/1910
Unique identifier for a given ship, it is assigned by a builder.
253
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report of Survey for Repairs, &c., of Engines & Boilers
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
22/12/1917
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Snowdon
Location where the document is written.
Newcastle on Tyne
Location where a vessel’s survey was undertaken.
North Shields
Date of the meeting of the Classing Committee.
08/01/1918
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Sunderland
G Clark Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.