Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

21/07/1917

The year in which a vessel’s construction is completed.

Year of ship completion

1917

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Palmer's Shipbuilding & Iron Co Ltd

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Hebburn on Tyne

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

70065

The listed port to which a given vessel belongs.

Port belonging to

Liverpool

The date of first visit by a surveyor.

Date of first survey

13/10/1914

The individual and/or organisation listed

Ship owner

Hall Line Ltd

Location where the document is written.

Location of Document Creation

Newcastle on Tyne

Location where a vessel’s survey was undertaken.

Location of Survey

Jarrow

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

5872

Date in which construction of a vessel’s engines were completed.

Year of engine build

1917

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

A vessel’s calculated maximum speed.

Speed (knots)

1917

Physical extent of a record.

Number of parts

1

Name of ship as recorded on the record

Ship name

Croxteth Hall

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

08/05/1917

Unique identifier for a given ship, it is assigned by a builder.

Yard no

847

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Nwc

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

5a Report on Boilers

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

19/07/1917

Name of the individual/entity/organisation responsible for authoring the record

Document author

George Murdoch

Name of surveyor.

Surveyor

George Murdoch

Date of the meeting of the Classing Committee.

Date of Classing committee

03/08/1917

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Location of construction for a vessel’s engines.

Location of engine build

Jarrow

Engine builder as written

Palmers Ship Building & Iron Co Ltd

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Draft

1917

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.