Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

27/04/1923

The year in which a vessel’s construction is completed.

Year of ship completion

1880

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

William Gray & Co

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

West Hartlepool

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

21/04/1923

Location where the document is written.

Location of Document Creation

Liverpool

Location where a vessel’s survey was undertaken.

Location of Survey

Liverpool

Date of the meeting of the Classing Committee.

Date of Classing committee

27/04/1923

A vessel’s means of propulsion.

Propulsion

Steam

System of measurement that replaced ‘Builder’s Old Measurement’, taking a vessel’s internal capacity as the standard. Vessels built between 1836 and 1854 were legally required to display both tonnages.

Gross Register Tonnage (NM)

1608

Location of construction for a vessel’s engines.

Location of engine build

Stockton

Engine builder as written

Blair & Co Ltd

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Name of ship as recorded on the record

Ship name

Gulf of Suez

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

08/05/1880

Unique identifier for a given ship, it is assigned by a builder.

Yard no

212

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

9 Report of Survey for Repairs, &c., of Engines & Boilers

The date of first visit by a surveyor.

Date of first survey

21/04/1923

The individual and/or organisation listed

Ship owner

The Ellerman Lines Ld

Name of surveyor.

Surveyor

James Edward Milton; Charles William Reed

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

Deferred for SS No 1

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined

Is the steamer assisted by sail?

Sail assisted steamer

No

Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.

Net Register Tonnage

991

Date in which construction of a vessel’s engines were completed.

Year of engine build

1887/__/__

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Physical extent of a record.

Number of parts

1

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?