Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Achilles ( Half Midship Section Plan for Achilles, 3rd June 1890 1890, Plan of Pumping Arrangement for Achilles, 11th July 1890 1890, Letter from W Rowell to the Secretary of Lloyd's Register forwarding the Midship Section for Achilles, 24th October 1890 1890, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Achilles, 28th October 1890 1890, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 7th July 1890 1890, Press Copy of Note regarding Steel Plate for Achilles, 29th August 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 10th June 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 30th June 1890 1890, Receipt for materials manufactured by William Beardmore & Co for Achilles, 9th July 1890 1890, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 22nd July 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 14th June 1890 1890, Iron Steamer Report for Achilles, 18th October 1890 1890, Form of Particulars for Record of Material of Boilers for Achilles, October 1890 1890, Report on Machinery for Achilles, 10th October 1890 1890, Plan of Boiler for Archilles, Undated no date, Note for Achilles, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
20/09/1890 ( Half Midship Section Plan for Achilles, 3rd June 1890 1890, Plan of Pumping Arrangement for Achilles, 11th July 1890 1890, Letter from W Rowell to the Secretary of Lloyd's Register forwarding the Midship Section for Achilles, 24th October 1890 1890, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Achilles, 28th October 1890 1890, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 7th July 1890 1890, Press Copy of Note regarding Steel Plate for Achilles, 29th August 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 10th June 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 30th June 1890 1890, Receipt for materials manufactured by William Beardmore & Co for Achilles, 9th July 1890 1890, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 22nd July 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 14th June 1890 1890, Iron Steamer Report for Achilles, 18th October 1890 1890, Form of Particulars for Record of Material of Boilers for Achilles, October 1890 1890, Report on Machinery for Achilles, 10th October 1890 1890, Plan of Boiler for Archilles, Undated no date, Note for Achilles, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
342 ( Half Midship Section Plan for Achilles, 3rd June 1890 1890, Plan of Pumping Arrangement for Achilles, 11th July 1890 1890, Letter from W Rowell to the Secretary of Lloyd's Register forwarding the Midship Section for Achilles, 24th October 1890 1890, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Achilles, 28th October 1890 1890, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 7th July 1890 1890, Press Copy of Note regarding Steel Plate for Achilles, 29th August 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 10th June 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 30th June 1890 1890, Receipt for materials manufactured by William Beardmore & Co for Achilles, 9th July 1890 1890, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 22nd July 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 14th June 1890 1890, Iron Steamer Report for Achilles, 18th October 1890 1890, Form of Particulars for Record of Material of Boilers for Achilles, October 1890 1890, Report on Machinery for Achilles, 10th October 1890 1890, Plan of Boiler for Archilles, Undated no date, Note for Achilles, Undated no date )
Location where a vessel’s survey was undertaken.
Hull ( Half Midship Section Plan for Achilles, 3rd June 1890 1890, Plan of Pumping Arrangement for Achilles, 11th July 1890 1890, Letter from W Rowell to the Secretary of Lloyd's Register forwarding the Midship Section for Achilles, 24th October 1890 1890, Press Copy of Note regarding Steel Plate for Achilles, 29th August 1890 1890, Iron Steamer Report for Achilles, 18th October 1890 1890, Report on Machinery for Achilles, 10th October 1890 1890 )
Stockton on Tees; Hull ( Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 7th July 1890 1890, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 22nd July 1890 1890 )
Motherwell; Hull ( Receipt for materials manufactured by David Colville & Sons for Achilles, 10th June 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 30th June 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 14th June 1890 1890 )
Glasgow ( Receipt for materials manufactured by William Beardmore & Co for Achilles, 9th July 1890 1890 )
Predominant material(s) utilised in a vessel’s construction.
Wood ( Half Midship Section Plan for Achilles, 3rd June 1890 1890, Plan of Pumping Arrangement for Achilles, 11th July 1890 1890, Plan of Boiler for Archilles, Undated no date )
Iron ( Letter from W Rowell to the Secretary of Lloyd's Register forwarding the Midship Section for Achilles, 24th October 1890 1890, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Achilles, 28th October 1890 1890, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 7th July 1890 1890, Press Copy of Note regarding Steel Plate for Achilles, 29th August 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 10th June 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 30th June 1890 1890, Receipt for materials manufactured by William Beardmore & Co for Achilles, 9th July 1890 1890, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 22nd July 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 14th June 1890 1890, Iron Steamer Report for Achilles, 18th October 1890 1890, Form of Particulars for Record of Material of Boilers for Achilles, October 1890 1890, Report on Machinery for Achilles, 10th October 1890 1890, Note for Achilles, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Half Midship Section Plan for Achilles, 3rd June 1890 1890, Plan of Pumping Arrangement for Achilles, 11th July 1890 1890, Letter from W Rowell to the Secretary of Lloyd's Register forwarding the Midship Section for Achilles, 24th October 1890 1890, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Achilles, 28th October 1890 1890, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 7th July 1890 1890, Press Copy of Note regarding Steel Plate for Achilles, 29th August 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 10th June 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 30th June 1890 1890, Receipt for materials manufactured by William Beardmore & Co for Achilles, 9th July 1890 1890, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 22nd July 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 14th June 1890 1890, Iron Steamer Report for Achilles, 18th October 1890 1890, Form of Particulars for Record of Material of Boilers for Achilles, October 1890 1890, Report on Machinery for Achilles, 10th October 1890 1890, Plan of Boiler for Archilles, Undated no date, Note for Achilles, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Half Midship Section Plan for Achilles, 3rd June 1890 1890, Plan of Pumping Arrangement for Achilles, 11th July 1890 1890, Letter from W Rowell to the Secretary of Lloyd's Register forwarding the Midship Section for Achilles, 24th October 1890 1890, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Achilles, 28th October 1890 1890, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 7th July 1890 1890, Press Copy of Note regarding Steel Plate for Achilles, 29th August 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 10th June 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 30th June 1890 1890, Receipt for materials manufactured by William Beardmore & Co for Achilles, 9th July 1890 1890, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 22nd July 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 14th June 1890 1890, Iron Steamer Report for Achilles, 18th October 1890 1890, Form of Particulars for Record of Material of Boilers for Achilles, October 1890 1890, Report on Machinery for Achilles, 10th October 1890 1890, Plan of Boiler for Archilles, Undated no date, Note for Achilles, Undated no date )
Is electric lighting fitted to the vessel?
No ( Half Midship Section Plan for Achilles, 3rd June 1890 1890, Plan of Pumping Arrangement for Achilles, 11th July 1890 1890, Letter from W Rowell to the Secretary of Lloyd's Register forwarding the Midship Section for Achilles, 24th October 1890 1890, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Achilles, 28th October 1890 1890, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 7th July 1890 1890, Press Copy of Note regarding Steel Plate for Achilles, 29th August 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 10th June 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 30th June 1890 1890, Receipt for materials manufactured by William Beardmore & Co for Achilles, 9th July 1890 1890, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 22nd July 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 14th June 1890 1890, Iron Steamer Report for Achilles, 18th October 1890 1890, Form of Particulars for Record of Material of Boilers for Achilles, October 1890 1890, Report on Machinery for Achilles, 10th October 1890 1890, Plan of Boiler for Archilles, Undated no date, Note for Achilles, Undated no date )
Name of surveyor.
Robert Williamson ( Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Achilles, 28th October 1890 1890, Iron Steamer Report for Achilles, 18th October 1890 1890 )
W J Smith ( Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 7th July 1890 1890, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 22nd July 1890 1890 )
A McKeand ( Press Copy of Note regarding Steel Plate for Achilles, 29th August 1890 1890 )
James Innes ( Form of Particulars for Record of Material of Boilers for Achilles, October 1890 1890, Report on Machinery for Achilles, 10th October 1890 1890 )
The listed port to which a given vessel belongs.
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
J Cotteral ( Iron Steamer Report for Achilles, 18th October 1890 1890 )
Cotteral ( Report on Machinery for Achilles, 10th October 1890 1890 )
Physical arrangement of a ship’s masts, sails and rigging.
K - Ketch ( Iron Steamer Report for Achilles, 18th October 1890 1890 )
Recorded information related to a vessel’s movements.
Hull ( Report on Machinery for Achilles, 10th October 1890 1890 )
Location of construction for a vessel’s engines.
Hull ( Report on Machinery for Achilles, 10th October 1890 1890 )
The year in which a vessel’s construction is completed.
1890 ( Half Midship Section Plan for Achilles, 3rd June 1890 1890, Plan of Pumping Arrangement for Achilles, 11th July 1890 1890, Letter from W Rowell to the Secretary of Lloyd's Register forwarding the Midship Section for Achilles, 24th October 1890 1890, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Achilles, 28th October 1890 1890, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 7th July 1890 1890, Press Copy of Note regarding Steel Plate for Achilles, 29th August 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 10th June 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 30th June 1890 1890, Receipt for materials manufactured by William Beardmore & Co for Achilles, 9th July 1890 1890, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 22nd July 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 14th June 1890 1890, Iron Steamer Report for Achilles, 18th October 1890 1890, Form of Particulars for Record of Material of Boilers for Achilles, October 1890 1890, Report on Machinery for Achilles, 10th October 1890 1890, Plan of Boiler for Archilles, Undated no date, Note for Achilles, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Earle's Shipbuilding & Engineering Co Ltd ( Half Midship Section Plan for Achilles, 3rd June 1890 1890, Plan of Pumping Arrangement for Achilles, 11th July 1890 1890, Letter from W Rowell to the Secretary of Lloyd's Register forwarding the Midship Section for Achilles, 24th October 1890 1890, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Achilles, 28th October 1890 1890, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 7th July 1890 1890, Press Copy of Note regarding Steel Plate for Achilles, 29th August 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 10th June 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 30th June 1890 1890, Receipt for materials manufactured by William Beardmore & Co for Achilles, 9th July 1890 1890, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 22nd July 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 14th June 1890 1890, Iron Steamer Report for Achilles, 18th October 1890 1890, Form of Particulars for Record of Material of Boilers for Achilles, October 1890 1890, Report on Machinery for Achilles, 10th October 1890 1890, Plan of Boiler for Archilles, Undated no date, Note for Achilles, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Hull ( Half Midship Section Plan for Achilles, 3rd June 1890 1890, Plan of Pumping Arrangement for Achilles, 11th July 1890 1890, Letter from W Rowell to the Secretary of Lloyd's Register forwarding the Midship Section for Achilles, 24th October 1890 1890, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Achilles, 28th October 1890 1890, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 7th July 1890 1890, Press Copy of Note regarding Steel Plate for Achilles, 29th August 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 10th June 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 30th June 1890 1890, Receipt for materials manufactured by William Beardmore & Co for Achilles, 9th July 1890 1890, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 22nd July 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 14th June 1890 1890, Iron Steamer Report for Achilles, 18th October 1890 1890, Form of Particulars for Record of Material of Boilers for Achilles, October 1890 1890, Report on Machinery for Achilles, 10th October 1890 1890, Plan of Boiler for Archilles, Undated no date, Note for Achilles, Undated no date )
A vessel’s means of propulsion.
Steam ( Half Midship Section Plan for Achilles, 3rd June 1890 1890, Plan of Pumping Arrangement for Achilles, 11th July 1890 1890, Letter from W Rowell to the Secretary of Lloyd's Register forwarding the Midship Section for Achilles, 24th October 1890 1890, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Achilles, 28th October 1890 1890, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 7th July 1890 1890, Press Copy of Note regarding Steel Plate for Achilles, 29th August 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 10th June 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 30th June 1890 1890, Receipt for materials manufactured by William Beardmore & Co for Achilles, 9th July 1890 1890, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 22nd July 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 14th June 1890 1890, Iron Steamer Report for Achilles, 18th October 1890 1890, Form of Particulars for Record of Material of Boilers for Achilles, October 1890 1890, Report on Machinery for Achilles, 10th October 1890 1890, Plan of Boiler for Archilles, Undated no date, Note for Achilles, Undated no date )
Is the steamer assisted by sail?
No ( Half Midship Section Plan for Achilles, 3rd June 1890 1890, Plan of Pumping Arrangement for Achilles, 11th July 1890 1890, Letter from W Rowell to the Secretary of Lloyd's Register forwarding the Midship Section for Achilles, 24th October 1890 1890, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Achilles, 28th October 1890 1890, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 7th July 1890 1890, Press Copy of Note regarding Steel Plate for Achilles, 29th August 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 10th June 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 30th June 1890 1890, Receipt for materials manufactured by William Beardmore & Co for Achilles, 9th July 1890 1890, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 22nd July 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 14th June 1890 1890, Iron Steamer Report for Achilles, 18th October 1890 1890, Form of Particulars for Record of Material of Boilers for Achilles, October 1890 1890, Report on Machinery for Achilles, 10th October 1890 1890, Plan of Boiler for Archilles, Undated no date, Note for Achilles, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Half Midship Section Plan for Achilles, 3rd June 1890 1890, Plan of Pumping Arrangement for Achilles, 11th July 1890 1890, Letter from W Rowell to the Secretary of Lloyd's Register forwarding the Midship Section for Achilles, 24th October 1890 1890, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Achilles, 28th October 1890 1890, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 7th July 1890 1890, Press Copy of Note regarding Steel Plate for Achilles, 29th August 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 10th June 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 30th June 1890 1890, Receipt for materials manufactured by William Beardmore & Co for Achilles, 9th July 1890 1890, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 22nd July 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 14th June 1890 1890, Iron Steamer Report for Achilles, 18th October 1890 1890, Form of Particulars for Record of Material of Boilers for Achilles, October 1890 1890, Report on Machinery for Achilles, 10th October 1890 1890, Plan of Boiler for Archilles, Undated no date, Note for Achilles, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Half Midship Section Plan for Achilles, 3rd June 1890 1890, Plan of Pumping Arrangement for Achilles, 11th July 1890 1890, Letter from W Rowell to the Secretary of Lloyd's Register forwarding the Midship Section for Achilles, 24th October 1890 1890, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Achilles, 28th October 1890 1890, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 7th July 1890 1890, Press Copy of Note regarding Steel Plate for Achilles, 29th August 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 10th June 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 30th June 1890 1890, Receipt for materials manufactured by William Beardmore & Co for Achilles, 9th July 1890 1890, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 22nd July 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 14th June 1890 1890, Iron Steamer Report for Achilles, 18th October 1890 1890, Form of Particulars for Record of Material of Boilers for Achilles, October 1890 1890, Report on Machinery for Achilles, 10th October 1890 1890, Plan of Boiler for Archilles, Undated no date, Note for Achilles, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Half Midship Section Plan for Achilles, 3rd June 1890 1890, Plan of Pumping Arrangement for Achilles, 11th July 1890 1890, Letter from W Rowell to the Secretary of Lloyd's Register forwarding the Midship Section for Achilles, 24th October 1890 1890, Form for Particulars for Record of Double Bottoms, &c., in Lloyd's Register for Achilles, 28th October 1890 1890, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 7th July 1890 1890, Press Copy of Note regarding Steel Plate for Achilles, 29th August 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 10th June 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 30th June 1890 1890, Receipt for materials manufactured by William Beardmore & Co for Achilles, 9th July 1890 1890, Receipt for Steel Plates manufactured by Moor Steel & Iron Co Ltd for Achilles, 22nd July 1890 1890, Receipt for materials manufactured by David Colville & Sons for Achilles, 14th June 1890 1890, Iron Steamer Report for Achilles, 18th October 1890 1890, Form of Particulars for Record of Material of Boilers for Achilles, October 1890 1890, Report on Machinery for Achilles, 10th October 1890 1890, Plan of Boiler for Archilles, Undated no date, Note for Achilles, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Hul ( Iron Steamer Report for Achilles, 18th October 1890 1890, Report on Machinery for Achilles, 10th October 1890 1890 )
The individual and/or organisation listed
R Blades & H Rippon ( Iron Steamer Report for Achilles, 18th October 1890 1890, Report on Machinery for Achilles, 10th October 1890 1890 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 Steam Trawler; LA & CP; 1 Dk; +LMC 10/90 ( Iron Steamer Report for Achilles, 18th October 1890 1890 )
+LMC 10/90 ( Report on Machinery for Achilles, 10th October 1890 1890 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
148 ( Iron Steamer Report for Achilles, 18th October 1890 1890, Report on Machinery for Achilles, 10th October 1890 1890 )
Type and configuration of the engine(s) supplied for a vessel.
Triple Compound Inverted Direct Acting ( Report on Machinery for Achilles, 10th October 1890 1890 )
Date in which construction of a vessel’s engines were completed.
1890 ( Report on Machinery for Achilles, 10th October 1890 1890 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.