Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Alton Tower - 1891 ( Notes regarding boilers for Alton Tower, 26 December 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 25 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 21 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 4 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 3 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 22 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 3 November 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 17 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 7 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 23 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 24 October 1890 1890, Memo from B Waymouth, Secretary at Lloyd's Register, to the Surveyors at Middlesbrough regarding the donkey boiler of Alton Tower, 18 November 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Alton Tower, 5 March 1891 1891, Note regarding plans and first entry report for Alton Tower, 13 March 1891 1891, Report of Ship Forgings for Alton Tower, 20 February 1891 1891, Letter from A S Forster, Ropner & Sons, to the Secretary of Lloyd's Register, regarding the classification certificate for Alton Tower, 11 March 1891 1891, Elevation of Alton Tower, 2 July 1891 1891, Query Form between the Secretary of Lloyd's Register, and the Surveyors at Middlesbrough regarding the dimensions and horsepower of Alton Tower, 16 March 1891 1891, Report of Iron or Steel Ship for Alton Tower, 9 March 1891 1891, Report on Machinery for Alton Tower, 27 February 1891 1891, Plan of boiler for Alton Tower no date, Midship Section of Alton Tower no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

27/01/1891 ( Notes regarding boilers for Alton Tower, 26 December 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 25 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 21 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 4 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 3 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 22 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 3 November 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 17 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 7 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 23 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 24 October 1890 1890, Memo from B Waymouth, Secretary at Lloyd's Register, to the Surveyors at Middlesbrough regarding the donkey boiler of Alton Tower, 18 November 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Alton Tower, 5 March 1891 1891, Note regarding plans and first entry report for Alton Tower, 13 March 1891 1891, Report of Ship Forgings for Alton Tower, 20 February 1891 1891, Letter from A S Forster, Ropner & Sons, to the Secretary of Lloyd's Register, regarding the classification certificate for Alton Tower, 11 March 1891 1891, Elevation of Alton Tower, 2 July 1891 1891, Query Form between the Secretary of Lloyd's Register, and the Surveyors at Middlesbrough regarding the dimensions and horsepower of Alton Tower, 16 March 1891 1891, Report of Iron or Steel Ship for Alton Tower, 9 March 1891 1891, Report on Machinery for Alton Tower, 27 February 1891 1891, Plan of boiler for Alton Tower no date, Midship Section of Alton Tower no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

256 ( Notes regarding boilers for Alton Tower, 26 December 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 25 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 21 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 4 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 3 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 22 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 3 November 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 17 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 7 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 23 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 24 October 1890 1890, Memo from B Waymouth, Secretary at Lloyd's Register, to the Surveyors at Middlesbrough regarding the donkey boiler of Alton Tower, 18 November 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Alton Tower, 5 March 1891 1891, Note regarding plans and first entry report for Alton Tower, 13 March 1891 1891, Report of Ship Forgings for Alton Tower, 20 February 1891 1891, Letter from A S Forster, Ropner & Sons, to the Secretary of Lloyd's Register, regarding the classification certificate for Alton Tower, 11 March 1891 1891, Elevation of Alton Tower, 2 July 1891 1891, Query Form between the Secretary of Lloyd's Register, and the Surveyors at Middlesbrough regarding the dimensions and horsepower of Alton Tower, 16 March 1891 1891, Report of Iron or Steel Ship for Alton Tower, 9 March 1891 1891, Report on Machinery for Alton Tower, 27 February 1891 1891, Plan of boiler for Alton Tower no date, Midship Section of Alton Tower no date )

The country in which the vessel’s construction took place, at the time of writing.

Country of build

United Kingdom ( Notes regarding boilers for Alton Tower, 26 December 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 25 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 21 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 4 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 3 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 22 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 3 November 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 17 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 7 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 23 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 24 October 1890 1890, Memo from B Waymouth, Secretary at Lloyd's Register, to the Surveyors at Middlesbrough regarding the donkey boiler of Alton Tower, 18 November 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Alton Tower, 5 March 1891 1891, Note regarding plans and first entry report for Alton Tower, 13 March 1891 1891, Report of Ship Forgings for Alton Tower, 20 February 1891 1891, Letter from A S Forster, Ropner & Sons, to the Secretary of Lloyd's Register, regarding the classification certificate for Alton Tower, 11 March 1891 1891, Elevation of Alton Tower, 2 July 1891 1891, Query Form between the Secretary of Lloyd's Register, and the Surveyors at Middlesbrough regarding the dimensions and horsepower of Alton Tower, 16 March 1891 1891, Report of Iron or Steel Ship for Alton Tower, 9 March 1891 1891, Report on Machinery for Alton Tower, 27 February 1891 1891, Plan of boiler for Alton Tower no date, Midship Section of Alton Tower no date )

A vessel’s means of propulsion.

Propulsion

Steam ( Notes regarding boilers for Alton Tower, 26 December 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 25 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 21 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 4 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 3 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 22 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 3 November 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 17 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 7 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 23 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 24 October 1890 1890, Memo from B Waymouth, Secretary at Lloyd's Register, to the Surveyors at Middlesbrough regarding the donkey boiler of Alton Tower, 18 November 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Alton Tower, 5 March 1891 1891, Note regarding plans and first entry report for Alton Tower, 13 March 1891 1891, Report of Ship Forgings for Alton Tower, 20 February 1891 1891, Letter from A S Forster, Ropner & Sons, to the Secretary of Lloyd's Register, regarding the classification certificate for Alton Tower, 11 March 1891 1891, Elevation of Alton Tower, 2 July 1891 1891, Query Form between the Secretary of Lloyd's Register, and the Surveyors at Middlesbrough regarding the dimensions and horsepower of Alton Tower, 16 March 1891 1891, Report of Iron or Steel Ship for Alton Tower, 9 March 1891 1891, Report on Machinery for Alton Tower, 27 February 1891 1891, Plan of boiler for Alton Tower no date, Midship Section of Alton Tower no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Notes regarding boilers for Alton Tower, 26 December 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 25 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 21 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 4 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 3 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 22 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 3 November 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 17 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 7 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 23 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 24 October 1890 1890, Memo from B Waymouth, Secretary at Lloyd's Register, to the Surveyors at Middlesbrough regarding the donkey boiler of Alton Tower, 18 November 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Alton Tower, 5 March 1891 1891, Note regarding plans and first entry report for Alton Tower, 13 March 1891 1891, Report of Ship Forgings for Alton Tower, 20 February 1891 1891, Letter from A S Forster, Ropner & Sons, to the Secretary of Lloyd's Register, regarding the classification certificate for Alton Tower, 11 March 1891 1891, Elevation of Alton Tower, 2 July 1891 1891, Query Form between the Secretary of Lloyd's Register, and the Surveyors at Middlesbrough regarding the dimensions and horsepower of Alton Tower, 16 March 1891 1891, Report of Iron or Steel Ship for Alton Tower, 9 March 1891 1891, Report on Machinery for Alton Tower, 27 February 1891 1891, Plan of boiler for Alton Tower no date, Midship Section of Alton Tower no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Notes regarding boilers for Alton Tower, 26 December 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 25 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 21 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 4 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 3 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 22 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 3 November 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 17 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 7 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 23 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 24 October 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Alton Tower, 5 March 1891 1891, Note regarding plans and first entry report for Alton Tower, 13 March 1891 1891, Report of Ship Forgings for Alton Tower, 20 February 1891 1891, Letter from A S Forster, Ropner & Sons, to the Secretary of Lloyd's Register, regarding the classification certificate for Alton Tower, 11 March 1891 1891, Elevation of Alton Tower, 2 July 1891 1891, Query Form between the Secretary of Lloyd's Register, and the Surveyors at Middlesbrough regarding the dimensions and horsepower of Alton Tower, 16 March 1891 1891, Report of Iron or Steel Ship for Alton Tower, 9 March 1891 1891, Report on Machinery for Alton Tower, 27 February 1891 1891, Plan of boiler for Alton Tower no date, Midship Section of Alton Tower no date )

Yes ( Memo from B Waymouth, Secretary at Lloyd's Register, to the Surveyors at Middlesbrough regarding the donkey boiler of Alton Tower, 18 November 1890 1890 )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Notes regarding boilers for Alton Tower, 26 December 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 25 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 21 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 4 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 3 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 22 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 3 November 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 17 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 7 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 23 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 24 October 1890 1890, Memo from B Waymouth, Secretary at Lloyd's Register, to the Surveyors at Middlesbrough regarding the donkey boiler of Alton Tower, 18 November 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Alton Tower, 5 March 1891 1891, Note regarding plans and first entry report for Alton Tower, 13 March 1891 1891, Report of Ship Forgings for Alton Tower, 20 February 1891 1891, Letter from A S Forster, Ropner & Sons, to the Secretary of Lloyd's Register, regarding the classification certificate for Alton Tower, 11 March 1891 1891, Elevation of Alton Tower, 2 July 1891 1891, Query Form between the Secretary of Lloyd's Register, and the Surveyors at Middlesbrough regarding the dimensions and horsepower of Alton Tower, 16 March 1891 1891, Report of Iron or Steel Ship for Alton Tower, 9 March 1891 1891, Report on Machinery for Alton Tower, 27 February 1891 1891, Plan of boiler for Alton Tower no date, Midship Section of Alton Tower no date )

Maximum length of a vessel’s hull measured parallel to the waterline.

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

100A1 steel; 1 dk (iron) 2 trs B & web frames well deck; +LMC 2/91; a & cp ( Report of Iron or Steel Ship for Alton Tower, 9 March 1891 1891 )

+LMC 2/91 ( Report on Machinery for Alton Tower, 27 February 1891 1891 )

Predominant material(s) utilised in a vessel’s construction.

A ship’s total internal capacity of a ship measured in register tons from the top of the floors to the tonnage deck.

Prescribed by flag/registration authorities, and usually excludes a small part of the stern. It is measured from the foreside of the stern at the extreme top to the afterside of the stern post.

Measurement from the underside of the upper deck on the centre line to the upper side of the bottom plating.

Location of construction for a vessel’s engines.

Date in which construction of a vessel’s engines were completed.

The year in which a vessel’s construction is completed.

Year of ship completion

1891 ( Notes regarding boilers for Alton Tower, 26 December 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 25 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 21 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 4 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 3 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 22 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 3 November 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 17 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 7 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 23 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 24 October 1890 1890, Memo from B Waymouth, Secretary at Lloyd's Register, to the Surveyors at Middlesbrough regarding the donkey boiler of Alton Tower, 18 November 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Alton Tower, 5 March 1891 1891, Note regarding plans and first entry report for Alton Tower, 13 March 1891 1891, Report of Ship Forgings for Alton Tower, 20 February 1891 1891, Letter from A S Forster, Ropner & Sons, to the Secretary of Lloyd's Register, regarding the classification certificate for Alton Tower, 11 March 1891 1891, Elevation of Alton Tower, 2 July 1891 1891, Query Form between the Secretary of Lloyd's Register, and the Surveyors at Middlesbrough regarding the dimensions and horsepower of Alton Tower, 16 March 1891 1891, Report of Iron or Steel Ship for Alton Tower, 9 March 1891 1891, Report on Machinery for Alton Tower, 27 February 1891 1891, Plan of boiler for Alton Tower no date, Midship Section of Alton Tower no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Ropner & Sons ( Notes regarding boilers for Alton Tower, 26 December 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 25 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 21 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 4 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 3 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 22 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 3 November 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 17 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 7 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 23 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 24 October 1890 1890, Memo from B Waymouth, Secretary at Lloyd's Register, to the Surveyors at Middlesbrough regarding the donkey boiler of Alton Tower, 18 November 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Alton Tower, 5 March 1891 1891, Note regarding plans and first entry report for Alton Tower, 13 March 1891 1891, Report of Ship Forgings for Alton Tower, 20 February 1891 1891, Letter from A S Forster, Ropner & Sons, to the Secretary of Lloyd's Register, regarding the classification certificate for Alton Tower, 11 March 1891 1891, Elevation of Alton Tower, 2 July 1891 1891, Query Form between the Secretary of Lloyd's Register, and the Surveyors at Middlesbrough regarding the dimensions and horsepower of Alton Tower, 16 March 1891 1891, Report of Iron or Steel Ship for Alton Tower, 9 March 1891 1891, Report on Machinery for Alton Tower, 27 February 1891 1891, Plan of boiler for Alton Tower no date, Midship Section of Alton Tower no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Stockton ( Notes regarding boilers for Alton Tower, 26 December 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 25 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 21 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 4 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 3 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 22 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 3 November 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 17 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 7 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 23 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 24 October 1890 1890, Memo from B Waymouth, Secretary at Lloyd's Register, to the Surveyors at Middlesbrough regarding the donkey boiler of Alton Tower, 18 November 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Alton Tower, 5 March 1891 1891, Note regarding plans and first entry report for Alton Tower, 13 March 1891 1891, Report of Ship Forgings for Alton Tower, 20 February 1891 1891, Letter from A S Forster, Ropner & Sons, to the Secretary of Lloyd's Register, regarding the classification certificate for Alton Tower, 11 March 1891 1891, Elevation of Alton Tower, 2 July 1891 1891, Query Form between the Secretary of Lloyd's Register, and the Surveyors at Middlesbrough regarding the dimensions and horsepower of Alton Tower, 16 March 1891 1891, Report of Iron or Steel Ship for Alton Tower, 9 March 1891 1891, Report on Machinery for Alton Tower, 27 February 1891 1891, Plan of boiler for Alton Tower no date, Midship Section of Alton Tower no date )

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Cargo ( Notes regarding boilers for Alton Tower, 26 December 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 25 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 21 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 4 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 3 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 22 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 3 November 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 17 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 7 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 23 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 24 October 1890 1890, Memo from B Waymouth, Secretary at Lloyd's Register, to the Surveyors at Middlesbrough regarding the donkey boiler of Alton Tower, 18 November 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Alton Tower, 5 March 1891 1891, Note regarding plans and first entry report for Alton Tower, 13 March 1891 1891, Report of Ship Forgings for Alton Tower, 20 February 1891 1891, Letter from A S Forster, Ropner & Sons, to the Secretary of Lloyd's Register, regarding the classification certificate for Alton Tower, 11 March 1891 1891, Elevation of Alton Tower, 2 July 1891 1891, Query Form between the Secretary of Lloyd's Register, and the Surveyors at Middlesbrough regarding the dimensions and horsepower of Alton Tower, 16 March 1891 1891, Report of Iron or Steel Ship for Alton Tower, 9 March 1891 1891, Report on Machinery for Alton Tower, 27 February 1891 1891, Plan of boiler for Alton Tower no date, Midship Section of Alton Tower no date )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Notes regarding boilers for Alton Tower, 26 December 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 25 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 21 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 4 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 3 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 22 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 3 November 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 17 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 7 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 23 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 24 October 1890 1890, Memo from B Waymouth, Secretary at Lloyd's Register, to the Surveyors at Middlesbrough regarding the donkey boiler of Alton Tower, 18 November 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Alton Tower, 5 March 1891 1891, Note regarding plans and first entry report for Alton Tower, 13 March 1891 1891, Report of Ship Forgings for Alton Tower, 20 February 1891 1891, Letter from A S Forster, Ropner & Sons, to the Secretary of Lloyd's Register, regarding the classification certificate for Alton Tower, 11 March 1891 1891, Elevation of Alton Tower, 2 July 1891 1891, Query Form between the Secretary of Lloyd's Register, and the Surveyors at Middlesbrough regarding the dimensions and horsepower of Alton Tower, 16 March 1891 1891, Report of Iron or Steel Ship for Alton Tower, 9 March 1891 1891, Report on Machinery for Alton Tower, 27 February 1891 1891, Plan of boiler for Alton Tower no date, Midship Section of Alton Tower no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Notes regarding boilers for Alton Tower, 26 December 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 25 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 21 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 4 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 3 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 22 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 3 November 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 17 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 7 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 23 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 24 October 1890 1890, Memo from B Waymouth, Secretary at Lloyd's Register, to the Surveyors at Middlesbrough regarding the donkey boiler of Alton Tower, 18 November 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Alton Tower, 5 March 1891 1891, Note regarding plans and first entry report for Alton Tower, 13 March 1891 1891, Report of Ship Forgings for Alton Tower, 20 February 1891 1891, Letter from A S Forster, Ropner & Sons, to the Secretary of Lloyd's Register, regarding the classification certificate for Alton Tower, 11 March 1891 1891, Elevation of Alton Tower, 2 July 1891 1891, Query Form between the Secretary of Lloyd's Register, and the Surveyors at Middlesbrough regarding the dimensions and horsepower of Alton Tower, 16 March 1891 1891, Report of Iron or Steel Ship for Alton Tower, 9 March 1891 1891, Report on Machinery for Alton Tower, 27 February 1891 1891, Plan of boiler for Alton Tower no date, Midship Section of Alton Tower no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Notes regarding boilers for Alton Tower, 26 December 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 25 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 21 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 4 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 3 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 22 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 3 November 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 17 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 7 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 23 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 24 October 1890 1890, Memo from B Waymouth, Secretary at Lloyd's Register, to the Surveyors at Middlesbrough regarding the donkey boiler of Alton Tower, 18 November 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Alton Tower, 5 March 1891 1891, Note regarding plans and first entry report for Alton Tower, 13 March 1891 1891, Report of Ship Forgings for Alton Tower, 20 February 1891 1891, Letter from A S Forster, Ropner & Sons, to the Secretary of Lloyd's Register, regarding the classification certificate for Alton Tower, 11 March 1891 1891, Elevation of Alton Tower, 2 July 1891 1891, Query Form between the Secretary of Lloyd's Register, and the Surveyors at Middlesbrough regarding the dimensions and horsepower of Alton Tower, 16 March 1891 1891, Report of Iron or Steel Ship for Alton Tower, 9 March 1891 1891, Report on Machinery for Alton Tower, 27 February 1891 1891, Plan of boiler for Alton Tower no date, Midship Section of Alton Tower no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Notes regarding boilers for Alton Tower, 26 December 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 25 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 21 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 4 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 3 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 22 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 3 November 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 17 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 7 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 23 October 1890 1890, Receipt to Blair & Co relating to case of Alton Tower, 24 October 1890 1890, Memo from B Waymouth, Secretary at Lloyd's Register, to the Surveyors at Middlesbrough regarding the donkey boiler of Alton Tower, 18 November 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Alton Tower, 5 March 1891 1891, Note regarding plans and first entry report for Alton Tower, 13 March 1891 1891, Report of Ship Forgings for Alton Tower, 20 February 1891 1891, Letter from A S Forster, Ropner & Sons, to the Secretary of Lloyd's Register, regarding the classification certificate for Alton Tower, 11 March 1891 1891, Elevation of Alton Tower, 2 July 1891 1891, Query Form between the Secretary of Lloyd's Register, and the Surveyors at Middlesbrough regarding the dimensions and horsepower of Alton Tower, 16 March 1891 1891, Report of Iron or Steel Ship for Alton Tower, 9 March 1891 1891, Report on Machinery for Alton Tower, 27 February 1891 1891, Plan of boiler for Alton Tower no date, Midship Section of Alton Tower no date )

Moulded dimensions breadth- Also referred to as moulded beam. The distance from the inside of the starboard side plating to the inside of the port side plating.

The country (flag) that a vessel is registered to, at the time of writing.

The name of the port/place of destination given.

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.

Also referred to as extreme breadth. The distance from the extreme starboard side to the extreme port side.

Description/specifications listed of the vessel’s engines and machinery. (The engines/machinery may have been surveyed separately before being assigned to a vessel).

Engine/Machinery details

Inverted Direct Acting Triple Expansion ( Report on Machinery for Alton Tower, 27 February 1891 1891 )

The country, at the time of writing, where a vessel’s engines were constructed.

Country of engine build

United Kingdom ( Report on Machinery for Alton Tower, 27 February 1891 1891 )

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.