Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Araby ( Plan of Half Midship Section for Araby, 29th October 1920 1920, Profile & Deck Plan for Araby, 29th October 1920 1920, Request for Special Survey for Araby, 24th June 1921 1921, Report on Air Reservoirs for Araby, 7th December 1922 1922, Note submitting that further action is unnecessary until Boiler is fitted on board Araby, 6th November 1922 1922, Report on Boilers for Araby, 28th October 1922 1922, Memo to the Chief Ship Surveyor regarding classification & First Entry Survey for Araby, 3rd April 1923 1923, Freeboard Verification Form for Steamers for Araby, 18th January 1923 1923, Steel Steamer Report for Araby, 16th March 1923 1923, Form for Vessels of 100 Tons & Upwards for Araby, 2nd March 1923 1923, Report on Oil Engine Machinery for Araby, 17th March 1923 1923, List of Spare Gear for Araby, 13th March 1923 1923, Report on Electric Fittings for Araby, 20th March 1923 1923, Letter from the Chief Marine Superintendent, for Royal Mail Lines Ltd, London, to the Secretary for Lloyd's Register, Wokingham, requesting arrangements for the Annual Load Line Survey for Araby, 17th December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding examinations & repairs to Araby, 3rd September 1940 1940, Report of Survey for Repairs, &c for Araby, 14th August 1940 1940, Certificate of Survey of Damage & Temporary Repairs for Araby, 15th August 1940 1940, Certificate of Survey of Boiler & Part Machinery for Araby, 27th August 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of engines partly held for SS No 1 of Araby, 6th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Araby, 26th August 1940 1940, Memo regarding the loss of Araby, 2nd January 1941 1941, Report of Total Loss, Casualty, &c for Araby, Undated no date, Plan of Cochran Patent Vertical Multitubular Boiler for Araby, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
01/02/1923 ( Plan of Half Midship Section for Araby, 29th October 1920 1920, Profile & Deck Plan for Araby, 29th October 1920 1920, Request for Special Survey for Araby, 24th June 1921 1921, Report on Air Reservoirs for Araby, 7th December 1922 1922, Note submitting that further action is unnecessary until Boiler is fitted on board Araby, 6th November 1922 1922, Report on Boilers for Araby, 28th October 1922 1922, Memo to the Chief Ship Surveyor regarding classification & First Entry Survey for Araby, 3rd April 1923 1923, Freeboard Verification Form for Steamers for Araby, 18th January 1923 1923, Steel Steamer Report for Araby, 16th March 1923 1923, Form for Vessels of 100 Tons & Upwards for Araby, 2nd March 1923 1923, Report on Oil Engine Machinery for Araby, 17th March 1923 1923, List of Spare Gear for Araby, 13th March 1923 1923, Report on Electric Fittings for Araby, 20th March 1923 1923, Letter from the Chief Marine Superintendent, for Royal Mail Lines Ltd, London, to the Secretary for Lloyd's Register, Wokingham, requesting arrangements for the Annual Load Line Survey for Araby, 17th December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding examinations & repairs to Araby, 3rd September 1940 1940, Report of Survey for Repairs, &c for Araby, 14th August 1940 1940, Certificate of Survey of Damage & Temporary Repairs for Araby, 15th August 1940 1940, Certificate of Survey of Boiler & Part Machinery for Araby, 27th August 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of engines partly held for SS No 1 of Araby, 6th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Araby, 26th August 1940 1940, Memo regarding the loss of Araby, 2nd January 1941 1941, Report of Total Loss, Casualty, &c for Araby, Undated no date, Plan of Cochran Patent Vertical Multitubular Boiler for Araby, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
630 ( Plan of Half Midship Section for Araby, 29th October 1920 1920, Profile & Deck Plan for Araby, 29th October 1920 1920, Request for Special Survey for Araby, 24th June 1921 1921, Report on Air Reservoirs for Araby, 7th December 1922 1922, Note submitting that further action is unnecessary until Boiler is fitted on board Araby, 6th November 1922 1922, Report on Boilers for Araby, 28th October 1922 1922, Memo to the Chief Ship Surveyor regarding classification & First Entry Survey for Araby, 3rd April 1923 1923, Freeboard Verification Form for Steamers for Araby, 18th January 1923 1923, Steel Steamer Report for Araby, 16th March 1923 1923, Form for Vessels of 100 Tons & Upwards for Araby, 2nd March 1923 1923, Report on Oil Engine Machinery for Araby, 17th March 1923 1923, List of Spare Gear for Araby, 13th March 1923 1923, Report on Electric Fittings for Araby, 20th March 1923 1923, Letter from the Chief Marine Superintendent, for Royal Mail Lines Ltd, London, to the Secretary for Lloyd's Register, Wokingham, requesting arrangements for the Annual Load Line Survey for Araby, 17th December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding examinations & repairs to Araby, 3rd September 1940 1940, Report of Survey for Repairs, &c for Araby, 14th August 1940 1940, Certificate of Survey of Damage & Temporary Repairs for Araby, 15th August 1940 1940, Certificate of Survey of Boiler & Part Machinery for Araby, 27th August 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of engines partly held for SS No 1 of Araby, 6th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Araby, 26th August 1940 1940, Memo regarding the loss of Araby, 2nd January 1941 1941, Report of Total Loss, Casualty, &c for Araby, Undated no date, Plan of Cochran Patent Vertical Multitubular Boiler for Araby, Undated no date )
Location where a vessel’s survey was undertaken.
Dumbarton ( Plan of Half Midship Section for Araby, 29th October 1920 1920, Profile & Deck Plan for Araby, 29th October 1920 1920 )
Glasgow ( Request for Special Survey for Araby, 24th June 1921 1921, Freeboard Verification Form for Steamers for Araby, 18th January 1923 1923, Report on Oil Engine Machinery for Araby, 17th March 1923 1923, List of Spare Gear for Araby, 13th March 1923 1923, Report on Electric Fittings for Araby, 20th March 1923 1923 )
Belfast ( Report on Air Reservoirs for Araby, 7th December 1922 1922 )
Annan; Glasgow ( Report on Boilers for Araby, 28th October 1922 1922 )
Dumbarton; Glasgow ( Steel Steamer Report for Araby, 16th March 1923 1923 )
Liverpool ( Form for Vessels of 100 Tons & Upwards for Araby, 2nd March 1923 1923 )
London ( Letter from the Chief Marine Superintendent, for Royal Mail Lines Ltd, London, to the Secretary for Lloyd's Register, Wokingham, requesting arrangements for the Annual Load Line Survey for Araby, 17th December 1940 1940, Report of Survey for Repairs, &c for Araby, 14th August 1940 1940, Certificate of Survey of Damage & Temporary Repairs for Araby, 15th August 1940 1940, Certificate of Survey of Boiler & Part Machinery for Araby, 27th August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Araby, 26th August 1940 1940, Memo regarding the loss of Araby, 2nd January 1941 1941 )
Annan Scotland ( Plan of Cochran Patent Vertical Multitubular Boiler for Araby, Undated no date )
A vessel’s means of propulsion.
Motor (internal combustion) ( Plan of Half Midship Section for Araby, 29th October 1920 1920, Profile & Deck Plan for Araby, 29th October 1920 1920, Request for Special Survey for Araby, 24th June 1921 1921, Report on Air Reservoirs for Araby, 7th December 1922 1922, Report on Boilers for Araby, 28th October 1922 1922, Memo to the Chief Ship Surveyor regarding classification & First Entry Survey for Araby, 3rd April 1923 1923, Steel Steamer Report for Araby, 16th March 1923 1923, Form for Vessels of 100 Tons & Upwards for Araby, 2nd March 1923 1923, Report on Oil Engine Machinery for Araby, 17th March 1923 1923, Report on Electric Fittings for Araby, 20th March 1923 1923, Certificate of Survey of Boiler & Part Machinery for Araby, 27th August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Araby, 26th August 1940 1940, Report of Total Loss, Casualty, &c for Araby, Undated no date )
undefined ( Note submitting that further action is unnecessary until Boiler is fitted on board Araby, 6th November 1922 1922, List of Spare Gear for Araby, 13th March 1923 1923, Letter from the Chief Marine Superintendent, for Royal Mail Lines Ltd, London, to the Secretary for Lloyd's Register, Wokingham, requesting arrangements for the Annual Load Line Survey for Araby, 17th December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding examinations & repairs to Araby, 3rd September 1940 1940, Report of Survey for Repairs, &c for Araby, 14th August 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of engines partly held for SS No 1 of Araby, 6th September 1940 1940, Plan of Cochran Patent Vertical Multitubular Boiler for Araby, Undated no date )
Steam ( Freeboard Verification Form for Steamers for Araby, 18th January 1923 1923, Certificate of Survey of Damage & Temporary Repairs for Araby, 15th August 1940 1940, Memo regarding the loss of Araby, 2nd January 1941 1941 )
Is the steamer assisted by sail?
No ( Plan of Half Midship Section for Araby, 29th October 1920 1920, Profile & Deck Plan for Araby, 29th October 1920 1920, Request for Special Survey for Araby, 24th June 1921 1921, Report on Air Reservoirs for Araby, 7th December 1922 1922, Note submitting that further action is unnecessary until Boiler is fitted on board Araby, 6th November 1922 1922, Report on Boilers for Araby, 28th October 1922 1922, Memo to the Chief Ship Surveyor regarding classification & First Entry Survey for Araby, 3rd April 1923 1923, Freeboard Verification Form for Steamers for Araby, 18th January 1923 1923, Steel Steamer Report for Araby, 16th March 1923 1923, Form for Vessels of 100 Tons & Upwards for Araby, 2nd March 1923 1923, Report on Oil Engine Machinery for Araby, 17th March 1923 1923, List of Spare Gear for Araby, 13th March 1923 1923, Report on Electric Fittings for Araby, 20th March 1923 1923, Letter from the Chief Marine Superintendent, for Royal Mail Lines Ltd, London, to the Secretary for Lloyd's Register, Wokingham, requesting arrangements for the Annual Load Line Survey for Araby, 17th December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding examinations & repairs to Araby, 3rd September 1940 1940, Report of Survey for Repairs, &c for Araby, 14th August 1940 1940, Certificate of Survey of Damage & Temporary Repairs for Araby, 15th August 1940 1940, Certificate of Survey of Boiler & Part Machinery for Araby, 27th August 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of engines partly held for SS No 1 of Araby, 6th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Araby, 26th August 1940 1940, Memo regarding the loss of Araby, 2nd January 1941 1941, Report of Total Loss, Casualty, &c for Araby, Undated no date, Plan of Cochran Patent Vertical Multitubular Boiler for Araby, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Plan of Half Midship Section for Araby, 29th October 1920 1920, Profile & Deck Plan for Araby, 29th October 1920 1920, Request for Special Survey for Araby, 24th June 1921 1921, Report on Air Reservoirs for Araby, 7th December 1922 1922, Note submitting that further action is unnecessary until Boiler is fitted on board Araby, 6th November 1922 1922, Report on Boilers for Araby, 28th October 1922 1922, Memo to the Chief Ship Surveyor regarding classification & First Entry Survey for Araby, 3rd April 1923 1923, Freeboard Verification Form for Steamers for Araby, 18th January 1923 1923, Steel Steamer Report for Araby, 16th March 1923 1923, Form for Vessels of 100 Tons & Upwards for Araby, 2nd March 1923 1923, Report on Oil Engine Machinery for Araby, 17th March 1923 1923, List of Spare Gear for Araby, 13th March 1923 1923, Report on Electric Fittings for Araby, 20th March 1923 1923, Letter from the Chief Marine Superintendent, for Royal Mail Lines Ltd, London, to the Secretary for Lloyd's Register, Wokingham, requesting arrangements for the Annual Load Line Survey for Araby, 17th December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding examinations & repairs to Araby, 3rd September 1940 1940, Report of Survey for Repairs, &c for Araby, 14th August 1940 1940, Certificate of Survey of Damage & Temporary Repairs for Araby, 15th August 1940 1940, Certificate of Survey of Boiler & Part Machinery for Araby, 27th August 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of engines partly held for SS No 1 of Araby, 6th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Araby, 26th August 1940 1940, Memo regarding the loss of Araby, 2nd January 1941 1941, Report of Total Loss, Casualty, &c for Araby, Undated no date, Plan of Cochran Patent Vertical Multitubular Boiler for Araby, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Plan of Half Midship Section for Araby, 29th October 1920 1920, Profile & Deck Plan for Araby, 29th October 1920 1920, Request for Special Survey for Araby, 24th June 1921 1921, Report on Air Reservoirs for Araby, 7th December 1922 1922, Note submitting that further action is unnecessary until Boiler is fitted on board Araby, 6th November 1922 1922, Report on Boilers for Araby, 28th October 1922 1922, Memo to the Chief Ship Surveyor regarding classification & First Entry Survey for Araby, 3rd April 1923 1923, Freeboard Verification Form for Steamers for Araby, 18th January 1923 1923, Steel Steamer Report for Araby, 16th March 1923 1923, Form for Vessels of 100 Tons & Upwards for Araby, 2nd March 1923 1923, Report on Oil Engine Machinery for Araby, 17th March 1923 1923, List of Spare Gear for Araby, 13th March 1923 1923, Report on Electric Fittings for Araby, 20th March 1923 1923, Letter from the Chief Marine Superintendent, for Royal Mail Lines Ltd, London, to the Secretary for Lloyd's Register, Wokingham, requesting arrangements for the Annual Load Line Survey for Araby, 17th December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding examinations & repairs to Araby, 3rd September 1940 1940, Report of Survey for Repairs, &c for Araby, 14th August 1940 1940, Certificate of Survey of Damage & Temporary Repairs for Araby, 15th August 1940 1940, Certificate of Survey of Boiler & Part Machinery for Araby, 27th August 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of engines partly held for SS No 1 of Araby, 6th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Araby, 26th August 1940 1940, Memo regarding the loss of Araby, 2nd January 1941 1941, Report of Total Loss, Casualty, &c for Araby, Undated no date, Plan of Cochran Patent Vertical Multitubular Boiler for Araby, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Plan of Half Midship Section for Araby, 29th October 1920 1920, Profile & Deck Plan for Araby, 29th October 1920 1920, Request for Special Survey for Araby, 24th June 1921 1921, Report on Air Reservoirs for Araby, 7th December 1922 1922, Note submitting that further action is unnecessary until Boiler is fitted on board Araby, 6th November 1922 1922, Report on Boilers for Araby, 28th October 1922 1922, Memo to the Chief Ship Surveyor regarding classification & First Entry Survey for Araby, 3rd April 1923 1923, Freeboard Verification Form for Steamers for Araby, 18th January 1923 1923, Steel Steamer Report for Araby, 16th March 1923 1923, Form for Vessels of 100 Tons & Upwards for Araby, 2nd March 1923 1923, Report on Oil Engine Machinery for Araby, 17th March 1923 1923, List of Spare Gear for Araby, 13th March 1923 1923, Report on Electric Fittings for Araby, 20th March 1923 1923, Letter from the Chief Marine Superintendent, for Royal Mail Lines Ltd, London, to the Secretary for Lloyd's Register, Wokingham, requesting arrangements for the Annual Load Line Survey for Araby, 17th December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding examinations & repairs to Araby, 3rd September 1940 1940, Report of Survey for Repairs, &c for Araby, 14th August 1940 1940, Certificate of Survey of Damage & Temporary Repairs for Araby, 15th August 1940 1940, Certificate of Survey of Boiler & Part Machinery for Araby, 27th August 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of engines partly held for SS No 1 of Araby, 6th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Araby, 26th August 1940 1940, Memo regarding the loss of Araby, 2nd January 1941 1941, Report of Total Loss, Casualty, &c for Araby, Undated no date, Plan of Cochran Patent Vertical Multitubular Boiler for Araby, Undated no date )
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Mine ( Plan of Half Midship Section for Araby, 29th October 1920 1920, Profile & Deck Plan for Araby, 29th October 1920 1920, Request for Special Survey for Araby, 24th June 1921 1921, Report on Air Reservoirs for Araby, 7th December 1922 1922, Note submitting that further action is unnecessary until Boiler is fitted on board Araby, 6th November 1922 1922, Report on Boilers for Araby, 28th October 1922 1922, Memo to the Chief Ship Surveyor regarding classification & First Entry Survey for Araby, 3rd April 1923 1923, Freeboard Verification Form for Steamers for Araby, 18th January 1923 1923, Steel Steamer Report for Araby, 16th March 1923 1923, Form for Vessels of 100 Tons & Upwards for Araby, 2nd March 1923 1923, Report on Oil Engine Machinery for Araby, 17th March 1923 1923, List of Spare Gear for Araby, 13th March 1923 1923, Report on Electric Fittings for Araby, 20th March 1923 1923, Letter from the Chief Marine Superintendent, for Royal Mail Lines Ltd, London, to the Secretary for Lloyd's Register, Wokingham, requesting arrangements for the Annual Load Line Survey for Araby, 17th December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding examinations & repairs to Araby, 3rd September 1940 1940, Report of Survey for Repairs, &c for Araby, 14th August 1940 1940, Certificate of Survey of Damage & Temporary Repairs for Araby, 15th August 1940 1940, Certificate of Survey of Boiler & Part Machinery for Araby, 27th August 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of engines partly held for SS No 1 of Araby, 6th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Araby, 26th August 1940 1940, Memo regarding the loss of Araby, 2nd January 1941 1941, Report of Total Loss, Casualty, &c for Araby, Undated no date, Plan of Cochran Patent Vertical Multitubular Boiler for Araby, Undated no date )
Recorded date for the vessel’s loss or disposal.
27/12/1940 ( Plan of Half Midship Section for Araby, 29th October 1920 1920, Profile & Deck Plan for Araby, 29th October 1920 1920, Request for Special Survey for Araby, 24th June 1921 1921, Report on Air Reservoirs for Araby, 7th December 1922 1922, Note submitting that further action is unnecessary until Boiler is fitted on board Araby, 6th November 1922 1922, Report on Boilers for Araby, 28th October 1922 1922, Memo to the Chief Ship Surveyor regarding classification & First Entry Survey for Araby, 3rd April 1923 1923, Freeboard Verification Form for Steamers for Araby, 18th January 1923 1923, Steel Steamer Report for Araby, 16th March 1923 1923, Form for Vessels of 100 Tons & Upwards for Araby, 2nd March 1923 1923, Report on Oil Engine Machinery for Araby, 17th March 1923 1923, List of Spare Gear for Araby, 13th March 1923 1923, Report on Electric Fittings for Araby, 20th March 1923 1923, Letter from the Chief Marine Superintendent, for Royal Mail Lines Ltd, London, to the Secretary for Lloyd's Register, Wokingham, requesting arrangements for the Annual Load Line Survey for Araby, 17th December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding examinations & repairs to Araby, 3rd September 1940 1940, Report of Survey for Repairs, &c for Araby, 14th August 1940 1940, Certificate of Survey of Damage & Temporary Repairs for Araby, 15th August 1940 1940, Certificate of Survey of Boiler & Part Machinery for Araby, 27th August 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of engines partly held for SS No 1 of Araby, 6th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Araby, 26th August 1940 1940, Memo regarding the loss of Araby, 2nd January 1941 1941, Report of Total Loss, Casualty, &c for Araby, Undated no date, Plan of Cochran Patent Vertical Multitubular Boiler for Araby, Undated no date )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5020 ( Request for Special Survey for Araby, 24th June 1921 1921 )
4936 ( Report on Air Reservoirs for Araby, 7th December 1922 1922, Report on Boilers for Araby, 28th October 1922 1922, Steel Steamer Report for Araby, 16th March 1923 1923, Form for Vessels of 100 Tons & Upwards for Araby, 2nd March 1923 1923, Report on Oil Engine Machinery for Araby, 17th March 1923 1923, Report on Electric Fittings for Araby, 20th March 1923 1923, Report of Survey for Repairs, &c for Araby, 14th August 1940 1940, Certificate of Survey of Damage & Temporary Repairs for Araby, 15th August 1940 1940, Certificate of Survey of Boiler & Part Machinery for Araby, 27th August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Araby, 26th August 1940 1940, Report of Total Loss, Casualty, &c for Araby, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Bel ( Report on Air Reservoirs for Araby, 7th December 1922 1922 )
Gls ( Report on Boilers for Araby, 28th October 1922 1922, Steel Steamer Report for Araby, 16th March 1923 1923, Report on Oil Engine Machinery for Araby, 17th March 1923 1923, Report on Electric Fittings for Araby, 20th March 1923 1923 )
Lon ( Report of Survey for Repairs, &c for Araby, 14th August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Araby, 26th August 1940 1940 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See Gls Rpt No 42568 ( Report on Air Reservoirs for Araby, 7th December 1922 1922, Report on Boilers for Araby, 28th October 1922 1922 )
+100A1 Shelter Dk wfbd 3,23; Lloyds A & Cp; +LMC 3,23 ( Steel Steamer Report for Araby, 16th March 1923 1923 )
+LMC 3,23 ( Report on Oil Engine Machinery for Araby, 17th March 1923 1923 )
Elec Light ( Report on Electric Fittings for Araby, 20th March 1923 1923 )
Deferred for Comp 2d No 1 & C ( Report of Survey for Repairs, &c for Araby, 14th August 1940 1940 )
Deferred ( Report of Survey for Repairs, &c, of Engines & Boilers for Araby, 26th August 1940 1940 )
+100A1; Shelter Deck With Freeboard 2,39; SS Lon No 3-1,36; Oil Engines; +LMC CS 10,35; 6,37; DBS 5,40; TS 4,40 CL Carrying Vegetable Oil in Deep Tank ( Report of Total Loss, Casualty, &c for Araby, Undated no date )
Name of surveyor.
H C Forster ( Report on Boilers for Araby, 28th October 1922 1922 )
J S Rankin ( Report on Electric Fittings for Araby, 20th March 1923 1923 )
The name of the port/place of destination given.
Liverpool to Load ( Steel Steamer Report for Araby, 16th March 1923 1923 )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
KNQP ( Form for Vessels of 100 Tons & Upwards for Araby, 2nd March 1923 1923 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Peter Henry Roscoe ( Form for Vessels of 100 Tons & Upwards for Araby, 2nd March 1923 1923 )
Type and configuration of the engine(s) supplied for a vessel.
Reciprocating Internal Combustion Single Direct Acting Vertical ( Form for Vessels of 100 Tons & Upwards for Araby, 2nd March 1923 1923 )
Diesel ( Report on Oil Engine Machinery for Araby, 17th March 1923 1923 )
The year in which a vessel’s construction is completed.
1923 ( Plan of Half Midship Section for Araby, 29th October 1920 1920, Profile & Deck Plan for Araby, 29th October 1920 1920, Request for Special Survey for Araby, 24th June 1921 1921, Report on Air Reservoirs for Araby, 7th December 1922 1922, Note submitting that further action is unnecessary until Boiler is fitted on board Araby, 6th November 1922 1922, Report on Boilers for Araby, 28th October 1922 1922, Memo to the Chief Ship Surveyor regarding classification & First Entry Survey for Araby, 3rd April 1923 1923, Freeboard Verification Form for Steamers for Araby, 18th January 1923 1923, Steel Steamer Report for Araby, 16th March 1923 1923, Form for Vessels of 100 Tons & Upwards for Araby, 2nd March 1923 1923, Report on Oil Engine Machinery for Araby, 17th March 1923 1923, List of Spare Gear for Araby, 13th March 1923 1923, Report on Electric Fittings for Araby, 20th March 1923 1923, Letter from the Chief Marine Superintendent, for Royal Mail Lines Ltd, London, to the Secretary for Lloyd's Register, Wokingham, requesting arrangements for the Annual Load Line Survey for Araby, 17th December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding examinations & repairs to Araby, 3rd September 1940 1940, Report of Survey for Repairs, &c for Araby, 14th August 1940 1940, Certificate of Survey of Damage & Temporary Repairs for Araby, 15th August 1940 1940, Certificate of Survey of Boiler & Part Machinery for Araby, 27th August 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of engines partly held for SS No 1 of Araby, 6th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Araby, 26th August 1940 1940, Memo regarding the loss of Araby, 2nd January 1941 1941, Report of Total Loss, Casualty, &c for Araby, Undated no date, Plan of Cochran Patent Vertical Multitubular Boiler for Araby, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Archibald McMillan & Son Ltd ( Plan of Half Midship Section for Araby, 29th October 1920 1920, Profile & Deck Plan for Araby, 29th October 1920 1920, Request for Special Survey for Araby, 24th June 1921 1921, Report on Air Reservoirs for Araby, 7th December 1922 1922, Note submitting that further action is unnecessary until Boiler is fitted on board Araby, 6th November 1922 1922, Report on Boilers for Araby, 28th October 1922 1922, Memo to the Chief Ship Surveyor regarding classification & First Entry Survey for Araby, 3rd April 1923 1923, Freeboard Verification Form for Steamers for Araby, 18th January 1923 1923, Steel Steamer Report for Araby, 16th March 1923 1923, Form for Vessels of 100 Tons & Upwards for Araby, 2nd March 1923 1923, Report on Oil Engine Machinery for Araby, 17th March 1923 1923, List of Spare Gear for Araby, 13th March 1923 1923, Report on Electric Fittings for Araby, 20th March 1923 1923, Letter from the Chief Marine Superintendent, for Royal Mail Lines Ltd, London, to the Secretary for Lloyd's Register, Wokingham, requesting arrangements for the Annual Load Line Survey for Araby, 17th December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding examinations & repairs to Araby, 3rd September 1940 1940, Report of Survey for Repairs, &c for Araby, 14th August 1940 1940, Certificate of Survey of Damage & Temporary Repairs for Araby, 15th August 1940 1940, Certificate of Survey of Boiler & Part Machinery for Araby, 27th August 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of engines partly held for SS No 1 of Araby, 6th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Araby, 26th August 1940 1940, Memo regarding the loss of Araby, 2nd January 1941 1941, Report of Total Loss, Casualty, &c for Araby, Undated no date, Plan of Cochran Patent Vertical Multitubular Boiler for Araby, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Dumbarton ( Plan of Half Midship Section for Araby, 29th October 1920 1920, Profile & Deck Plan for Araby, 29th October 1920 1920, Request for Special Survey for Araby, 24th June 1921 1921, Report on Air Reservoirs for Araby, 7th December 1922 1922, Note submitting that further action is unnecessary until Boiler is fitted on board Araby, 6th November 1922 1922, Report on Boilers for Araby, 28th October 1922 1922, Memo to the Chief Ship Surveyor regarding classification & First Entry Survey for Araby, 3rd April 1923 1923, Freeboard Verification Form for Steamers for Araby, 18th January 1923 1923, Steel Steamer Report for Araby, 16th March 1923 1923, Form for Vessels of 100 Tons & Upwards for Araby, 2nd March 1923 1923, Report on Oil Engine Machinery for Araby, 17th March 1923 1923, List of Spare Gear for Araby, 13th March 1923 1923, Report on Electric Fittings for Araby, 20th March 1923 1923, Letter from the Chief Marine Superintendent, for Royal Mail Lines Ltd, London, to the Secretary for Lloyd's Register, Wokingham, requesting arrangements for the Annual Load Line Survey for Araby, 17th December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding examinations & repairs to Araby, 3rd September 1940 1940, Report of Survey for Repairs, &c for Araby, 14th August 1940 1940, Certificate of Survey of Damage & Temporary Repairs for Araby, 15th August 1940 1940, Certificate of Survey of Boiler & Part Machinery for Araby, 27th August 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of engines partly held for SS No 1 of Araby, 6th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Araby, 26th August 1940 1940, Memo regarding the loss of Araby, 2nd January 1941 1941, Report of Total Loss, Casualty, &c for Araby, Undated no date, Plan of Cochran Patent Vertical Multitubular Boiler for Araby, Undated no date )
Broad categories and subdivisions of vessels related to their purpose or function.
Screw Motor Vessel ( Plan of Half Midship Section for Araby, 29th October 1920 1920 )
undefined ( Profile & Deck Plan for Araby, 29th October 1920 1920, Request for Special Survey for Araby, 24th June 1921 1921, Report on Air Reservoirs for Araby, 7th December 1922 1922, Note submitting that further action is unnecessary until Boiler is fitted on board Araby, 6th November 1922 1922, Report on Boilers for Araby, 28th October 1922 1922, Memo to the Chief Ship Surveyor regarding classification & First Entry Survey for Araby, 3rd April 1923 1923, Freeboard Verification Form for Steamers for Araby, 18th January 1923 1923, Steel Steamer Report for Araby, 16th March 1923 1923, Report on Oil Engine Machinery for Araby, 17th March 1923 1923, List of Spare Gear for Araby, 13th March 1923 1923, Report on Electric Fittings for Araby, 20th March 1923 1923, Letter from the Chief Marine Superintendent, for Royal Mail Lines Ltd, London, to the Secretary for Lloyd's Register, Wokingham, requesting arrangements for the Annual Load Line Survey for Araby, 17th December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding examinations & repairs to Araby, 3rd September 1940 1940, Report of Survey for Repairs, &c for Araby, 14th August 1940 1940, Certificate of Survey of Damage & Temporary Repairs for Araby, 15th August 1940 1940, Certificate of Survey of Boiler & Part Machinery for Araby, 27th August 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of engines partly held for SS No 1 of Araby, 6th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Araby, 26th August 1940 1940, Memo regarding the loss of Araby, 2nd January 1941 1941, Report of Total Loss, Casualty, &c for Araby, Undated no date, Plan of Cochran Patent Vertical Multitubular Boiler for Araby, Undated no date )
Cargo ( Form for Vessels of 100 Tons & Upwards for Araby, 2nd March 1923 1923 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Plan of Half Midship Section for Araby, 29th October 1920 1920, Profile & Deck Plan for Araby, 29th October 1920 1920, Request for Special Survey for Araby, 24th June 1921 1921, Report on Air Reservoirs for Araby, 7th December 1922 1922, Note submitting that further action is unnecessary until Boiler is fitted on board Araby, 6th November 1922 1922, Report on Boilers for Araby, 28th October 1922 1922, Memo to the Chief Ship Surveyor regarding classification & First Entry Survey for Araby, 3rd April 1923 1923, Freeboard Verification Form for Steamers for Araby, 18th January 1923 1923, Steel Steamer Report for Araby, 16th March 1923 1923, Form for Vessels of 100 Tons & Upwards for Araby, 2nd March 1923 1923, Report on Oil Engine Machinery for Araby, 17th March 1923 1923, List of Spare Gear for Araby, 13th March 1923 1923, Report on Electric Fittings for Araby, 20th March 1923 1923, Letter from the Chief Marine Superintendent, for Royal Mail Lines Ltd, London, to the Secretary for Lloyd's Register, Wokingham, requesting arrangements for the Annual Load Line Survey for Araby, 17th December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding examinations & repairs to Araby, 3rd September 1940 1940, Report of Survey for Repairs, &c for Araby, 14th August 1940 1940, Certificate of Survey of Damage & Temporary Repairs for Araby, 15th August 1940 1940, Certificate of Survey of Boiler & Part Machinery for Araby, 27th August 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of engines partly held for SS No 1 of Araby, 6th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Araby, 26th August 1940 1940, Memo regarding the loss of Araby, 2nd January 1941 1941, Report of Total Loss, Casualty, &c for Araby, Undated no date, Plan of Cochran Patent Vertical Multitubular Boiler for Araby, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Plan of Half Midship Section for Araby, 29th October 1920 1920, Profile & Deck Plan for Araby, 29th October 1920 1920, Request for Special Survey for Araby, 24th June 1921 1921, Report on Air Reservoirs for Araby, 7th December 1922 1922, Note submitting that further action is unnecessary until Boiler is fitted on board Araby, 6th November 1922 1922, Report on Boilers for Araby, 28th October 1922 1922, Memo to the Chief Ship Surveyor regarding classification & First Entry Survey for Araby, 3rd April 1923 1923, Freeboard Verification Form for Steamers for Araby, 18th January 1923 1923, Steel Steamer Report for Araby, 16th March 1923 1923, Form for Vessels of 100 Tons & Upwards for Araby, 2nd March 1923 1923, Report on Oil Engine Machinery for Araby, 17th March 1923 1923, List of Spare Gear for Araby, 13th March 1923 1923, Report on Electric Fittings for Araby, 20th March 1923 1923, Letter from the Chief Marine Superintendent, for Royal Mail Lines Ltd, London, to the Secretary for Lloyd's Register, Wokingham, requesting arrangements for the Annual Load Line Survey for Araby, 17th December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding examinations & repairs to Araby, 3rd September 1940 1940, Report of Survey for Repairs, &c for Araby, 14th August 1940 1940, Certificate of Survey of Damage & Temporary Repairs for Araby, 15th August 1940 1940, Certificate of Survey of Boiler & Part Machinery for Araby, 27th August 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of engines partly held for SS No 1 of Araby, 6th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Araby, 26th August 1940 1940, Memo regarding the loss of Araby, 2nd January 1941 1941, Report of Total Loss, Casualty, &c for Araby, Undated no date, Plan of Cochran Patent Vertical Multitubular Boiler for Araby, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Plan of Half Midship Section for Araby, 29th October 1920 1920, Profile & Deck Plan for Araby, 29th October 1920 1920, Request for Special Survey for Araby, 24th June 1921 1921, Report on Air Reservoirs for Araby, 7th December 1922 1922, Note submitting that further action is unnecessary until Boiler is fitted on board Araby, 6th November 1922 1922, Report on Boilers for Araby, 28th October 1922 1922, Memo to the Chief Ship Surveyor regarding classification & First Entry Survey for Araby, 3rd April 1923 1923, Freeboard Verification Form for Steamers for Araby, 18th January 1923 1923, Steel Steamer Report for Araby, 16th March 1923 1923, Form for Vessels of 100 Tons & Upwards for Araby, 2nd March 1923 1923, Report on Oil Engine Machinery for Araby, 17th March 1923 1923, List of Spare Gear for Araby, 13th March 1923 1923, Report on Electric Fittings for Araby, 20th March 1923 1923, Letter from the Chief Marine Superintendent, for Royal Mail Lines Ltd, London, to the Secretary for Lloyd's Register, Wokingham, requesting arrangements for the Annual Load Line Survey for Araby, 17th December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding examinations & repairs to Araby, 3rd September 1940 1940, Report of Survey for Repairs, &c for Araby, 14th August 1940 1940, Certificate of Survey of Damage & Temporary Repairs for Araby, 15th August 1940 1940, Certificate of Survey of Boiler & Part Machinery for Araby, 27th August 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of engines partly held for SS No 1 of Araby, 6th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Araby, 26th August 1940 1940, Memo regarding the loss of Araby, 2nd January 1941 1941, Report of Total Loss, Casualty, &c for Araby, Undated no date, Plan of Cochran Patent Vertical Multitubular Boiler for Araby, Undated no date )
Is electric lighting fitted to the vessel?
No ( Plan of Half Midship Section for Araby, 29th October 1920 1920, Profile & Deck Plan for Araby, 29th October 1920 1920, Request for Special Survey for Araby, 24th June 1921 1921, Report on Air Reservoirs for Araby, 7th December 1922 1922, Note submitting that further action is unnecessary until Boiler is fitted on board Araby, 6th November 1922 1922, Report on Boilers for Araby, 28th October 1922 1922, Memo to the Chief Ship Surveyor regarding classification & First Entry Survey for Araby, 3rd April 1923 1923, Freeboard Verification Form for Steamers for Araby, 18th January 1923 1923, Steel Steamer Report for Araby, 16th March 1923 1923, Form for Vessels of 100 Tons & Upwards for Araby, 2nd March 1923 1923, Report on Oil Engine Machinery for Araby, 17th March 1923 1923, List of Spare Gear for Araby, 13th March 1923 1923, Report on Electric Fittings for Araby, 20th March 1923 1923, Letter from the Chief Marine Superintendent, for Royal Mail Lines Ltd, London, to the Secretary for Lloyd's Register, Wokingham, requesting arrangements for the Annual Load Line Survey for Araby, 17th December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding examinations & repairs to Araby, 3rd September 1940 1940, Report of Survey for Repairs, &c for Araby, 14th August 1940 1940, Certificate of Survey of Damage & Temporary Repairs for Araby, 15th August 1940 1940, Certificate of Survey of Boiler & Part Machinery for Araby, 27th August 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of engines partly held for SS No 1 of Araby, 6th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Araby, 26th August 1940 1940, Memo regarding the loss of Araby, 2nd January 1941 1941, Report of Total Loss, Casualty, &c for Araby, Undated no date, Plan of Cochran Patent Vertical Multitubular Boiler for Araby, Undated no date )
The official record pronounced by the Committee
Sunk by mine ( Plan of Half Midship Section for Araby, 29th October 1920 1920, Profile & Deck Plan for Araby, 29th October 1920 1920, Request for Special Survey for Araby, 24th June 1921 1921, Report on Air Reservoirs for Araby, 7th December 1922 1922, Note submitting that further action is unnecessary until Boiler is fitted on board Araby, 6th November 1922 1922, Report on Boilers for Araby, 28th October 1922 1922, Memo to the Chief Ship Surveyor regarding classification & First Entry Survey for Araby, 3rd April 1923 1923, Freeboard Verification Form for Steamers for Araby, 18th January 1923 1923, Steel Steamer Report for Araby, 16th March 1923 1923, Form for Vessels of 100 Tons & Upwards for Araby, 2nd March 1923 1923, Report on Oil Engine Machinery for Araby, 17th March 1923 1923, List of Spare Gear for Araby, 13th March 1923 1923, Report on Electric Fittings for Araby, 20th March 1923 1923, Letter from the Chief Marine Superintendent, for Royal Mail Lines Ltd, London, to the Secretary for Lloyd's Register, Wokingham, requesting arrangements for the Annual Load Line Survey for Araby, 17th December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding examinations & repairs to Araby, 3rd September 1940 1940, Report of Survey for Repairs, &c for Araby, 14th August 1940 1940, Certificate of Survey of Damage & Temporary Repairs for Araby, 15th August 1940 1940, Certificate of Survey of Boiler & Part Machinery for Araby, 27th August 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of engines partly held for SS No 1 of Araby, 6th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Araby, 26th August 1940 1940, Memo regarding the loss of Araby, 2nd January 1941 1941, Report of Total Loss, Casualty, &c for Araby, Undated no date, Plan of Cochran Patent Vertical Multitubular Boiler for Araby, Undated no date )
Vessel’s area of loss or disposal/last known recorded location.
North Sea ( Plan of Half Midship Section for Araby, 29th October 1920 1920, Profile & Deck Plan for Araby, 29th October 1920 1920, Request for Special Survey for Araby, 24th June 1921 1921, Report on Air Reservoirs for Araby, 7th December 1922 1922, Note submitting that further action is unnecessary until Boiler is fitted on board Araby, 6th November 1922 1922, Report on Boilers for Araby, 28th October 1922 1922, Memo to the Chief Ship Surveyor regarding classification & First Entry Survey for Araby, 3rd April 1923 1923, Freeboard Verification Form for Steamers for Araby, 18th January 1923 1923, Steel Steamer Report for Araby, 16th March 1923 1923, Form for Vessels of 100 Tons & Upwards for Araby, 2nd March 1923 1923, Report on Oil Engine Machinery for Araby, 17th March 1923 1923, List of Spare Gear for Araby, 13th March 1923 1923, Report on Electric Fittings for Araby, 20th March 1923 1923, Letter from the Chief Marine Superintendent, for Royal Mail Lines Ltd, London, to the Secretary for Lloyd's Register, Wokingham, requesting arrangements for the Annual Load Line Survey for Araby, 17th December 1940 1940, Remarks of the Chief Ship Surveyor to the Classing Committee regarding examinations & repairs to Araby, 3rd September 1940 1940, Report of Survey for Repairs, &c for Araby, 14th August 1940 1940, Certificate of Survey of Damage & Temporary Repairs for Araby, 15th August 1940 1940, Certificate of Survey of Boiler & Part Machinery for Araby, 27th August 1940 1940, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the special survey of engines partly held for SS No 1 of Araby, 6th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Araby, 26th August 1940 1940, Memo regarding the loss of Araby, 2nd January 1941 1941, Report of Total Loss, Casualty, &c for Araby, Undated no date, Plan of Cochran Patent Vertical Multitubular Boiler for Araby, Undated no date )
The individual and/or organisation listed
Lamport & Holt Ltd ( Request for Special Survey for Araby, 24th June 1921 1921 )
David MacIver & Co Ltd ( Report on Air Reservoirs for Araby, 7th December 1922 1922, Report on Boilers for Araby, 28th October 1922 1922, Steel Steamer Report for Araby, 16th March 1923 1923, Form for Vessels of 100 Tons & Upwards for Araby, 2nd March 1923 1923, Report on Oil Engine Machinery for Araby, 17th March 1923 1923, Report on Electric Fittings for Araby, 20th March 1923 1923 )
Royal Mail Lines Ltd ( Report of Survey for Repairs, &c for Araby, 14th August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Araby, 26th August 1940 1940 )
Location of construction for a vessel’s engines.
Glasgow ( Request for Special Survey for Araby, 24th June 1921 1921, Report on Air Reservoirs for Araby, 7th December 1922 1922, Form for Vessels of 100 Tons & Upwards for Araby, 2nd March 1923 1923, Report on Oil Engine Machinery for Araby, 17th March 1923 1923, Report of Survey for Repairs, &c, of Engines & Boilers for Araby, 26th August 1940 1940 )
The listed port to which a given vessel belongs.
Liverpool ( Report on Air Reservoirs for Araby, 7th December 1922 1922, Report on Boilers for Araby, 28th October 1922 1922, Steel Steamer Report for Araby, 16th March 1923 1923, Report on Oil Engine Machinery for Araby, 17th March 1923 1923, Report on Electric Fittings for Araby, 20th March 1923 1923, Report of Survey for Repairs, &c for Araby, 14th August 1940 1940 )
Date in which construction of a vessel’s engines were completed.
1923 ( Report on Air Reservoirs for Araby, 7th December 1922 1922, Form for Vessels of 100 Tons & Upwards for Araby, 2nd March 1923 1923, Report on Oil Engine Machinery for Araby, 17th March 1923 1923, Report of Survey for Repairs, &c, of Engines & Boilers for Araby, 26th August 1940 1940 )
Recorded information related to a vessel’s movements.
Dumbarton; Liverpool to Load ( Steel Steamer Report for Araby, 16th March 1923 1923 )
Physical arrangement of a ship’s masts, sails and rigging.
The port in which a vessel is registered or permanently based.
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
James Lee ( Form for Vessels of 100 Tons & Upwards for Araby, 2nd March 1923 1923 )
Recorded information relating the specific cargo being conveyed.
Vegetable Oil in Deep Tank ( Report of Total Loss, Casualty, &c for Araby, Undated no date )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.