Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Big Horn ( Half Midship Section Plan for Big Horn, 14th August 1935 1935, Plan of Stern Frame & Contra Propeller for Big Horn, 22nd October 1935 1935, Half Midship Section Plan for Big Horn, 10th February 1941 1941, Profile & Deck Plan for Big Horn, 11th September 1945 1945, Copy of a Letter from Clerk to the Classification Committee, to The Principal Surveyor, New York, regarding Big Horn, 20th September 1947 1947, Letter from William Bennett, Principal Surveyor in U S A, to The Secretary, London, regarding Big Horn, 10th September 1947 1947, Steel Steamer Report for Big Horn, 8th November 1947 1947, Application for Classification Survey for Big Horn, 26th August 1947 1947, Report of Survey for Repairs, &c for Big Horn, 8th November 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Big Horn, 8th November 1947 1947, Report on Steam Turbine Machinery for Big Horn, 8th November 1947 1947, Certificate for Engines & Boilers for Big Horn, 20th February 1948 1948, Certificate of Class for Big Horn, 20th February 1948 1948, Memo to the Chief Ship Surveyor regarding Classification, Alterations, Damage & Repairs for Big Horn, 19th February 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Big Horn, 25th February 1948 1948 )

Gulfdawn ( Report of Surveys for Freeboard for Culfdown, 8th October 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 14th October 1947 1947, Copy of a Certificate of Survey of Part Machinery for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Boilers & Machinery for Gulfdawn, 14th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Gulfdawn, 16th October 1947 1947, Report on Water Tube Boilers for Gulfdawn, 8th November 1947 1947, Report on Electrical Equipment for Gulfdawn, 8th November 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 5th January 1948 1948 )

C B Watson ( Report of Surveys for Freeboard- Conditions of Assignment for C B Watson, 8th October 1947 1947, Letter from William Bennett, to R J Sladden, Esq, London, regarding C B Watson, 17th May 1948 1948, Report of Survey for Repairs, &c for C B Watson, 6th January 1948 1948 )

R A Hummel ( Plan of Main Deck for R A Hummel, 1st November 1956 1956 )

Oswego Trader ( Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being Demolition, 20th July 1960 1960, Memo for Oswego Trader, 20th July 1960 1960, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being broken up, 27th June 1960 1960, Report of Total Loss, Casualty, &c for Oswego Trader, 17th August 1960 1960 )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

__/__/1936 ( Half Midship Section Plan for Big Horn, 14th August 1935 1935, Plan of Stern Frame & Contra Propeller for Big Horn, 22nd October 1935 1935, Half Midship Section Plan for Big Horn, 10th February 1941 1941, Profile & Deck Plan for Big Horn, 11th September 1945 1945, Report of Surveys for Freeboard for Culfdown, 8th October 1947 1947, Report of Surveys for Freeboard- Conditions of Assignment for C B Watson, 8th October 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Principal Surveyor, New York, regarding Big Horn, 20th September 1947 1947, Letter from William Bennett, Principal Surveyor in U S A, to The Secretary, London, regarding Big Horn, 10th September 1947 1947, Steel Steamer Report for Big Horn, 8th November 1947 1947, Application for Classification Survey for Big Horn, 26th August 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c for Big Horn, 8th November 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 14th October 1947 1947, Copy of a Certificate of Survey of Part Machinery for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Boilers & Machinery for Gulfdawn, 14th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Big Horn, 8th November 1947 1947, Report on Steam Turbine Machinery for Big Horn, 8th November 1947 1947, Report on Water Tube Boilers for Gulfdawn, 8th November 1947 1947, Report on Electrical Equipment for Gulfdawn, 8th November 1947 1947, Certificate for Engines & Boilers for Big Horn, 20th February 1948 1948, Certificate of Class for Big Horn, 20th February 1948 1948, Letter from William Bennett, to R J Sladden, Esq, London, regarding C B Watson, 17th May 1948 1948, Memo to the Chief Ship Surveyor regarding Classification, Alterations, Damage & Repairs for Big Horn, 19th February 1948 1948, Report of Survey for Repairs, &c for C B Watson, 6th January 1948 1948, Copy of a Certificate of Survey of Repairs for Gulfdawn, 5th January 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Big Horn, 25th February 1948 1948, Plan of Main Deck for R A Hummel, 1st November 1956 1956, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being Demolition, 20th July 1960 1960, Memo for Oswego Trader, 20th July 1960 1960, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being broken up, 27th June 1960 1960, Report of Total Loss, Casualty, &c for Oswego Trader, 17th August 1960 1960 )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

154 ( Half Midship Section Plan for Big Horn, 14th August 1935 1935, Plan of Stern Frame & Contra Propeller for Big Horn, 22nd October 1935 1935, Half Midship Section Plan for Big Horn, 10th February 1941 1941, Profile & Deck Plan for Big Horn, 11th September 1945 1945, Report of Surveys for Freeboard for Culfdown, 8th October 1947 1947, Report of Surveys for Freeboard- Conditions of Assignment for C B Watson, 8th October 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Principal Surveyor, New York, regarding Big Horn, 20th September 1947 1947, Letter from William Bennett, Principal Surveyor in U S A, to The Secretary, London, regarding Big Horn, 10th September 1947 1947, Steel Steamer Report for Big Horn, 8th November 1947 1947, Application for Classification Survey for Big Horn, 26th August 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c for Big Horn, 8th November 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 14th October 1947 1947, Copy of a Certificate of Survey of Part Machinery for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Boilers & Machinery for Gulfdawn, 14th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Big Horn, 8th November 1947 1947, Report on Steam Turbine Machinery for Big Horn, 8th November 1947 1947, Report on Water Tube Boilers for Gulfdawn, 8th November 1947 1947, Report on Electrical Equipment for Gulfdawn, 8th November 1947 1947, Certificate for Engines & Boilers for Big Horn, 20th February 1948 1948, Certificate of Class for Big Horn, 20th February 1948 1948, Letter from William Bennett, to R J Sladden, Esq, London, regarding C B Watson, 17th May 1948 1948, Memo to the Chief Ship Surveyor regarding Classification, Alterations, Damage & Repairs for Big Horn, 19th February 1948 1948, Report of Survey for Repairs, &c for C B Watson, 6th January 1948 1948, Copy of a Certificate of Survey of Repairs for Gulfdawn, 5th January 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Big Horn, 25th February 1948 1948, Plan of Main Deck for R A Hummel, 1st November 1956 1956, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being Demolition, 20th July 1960 1960, Memo for Oswego Trader, 20th July 1960 1960, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being broken up, 27th June 1960 1960, Report of Total Loss, Casualty, &c for Oswego Trader, 17th August 1960 1960 )

Location where a vessel’s survey was undertaken.

Location of Survey

Chester Pa ( Half Midship Section Plan for Big Horn, 14th August 1935 1935 )

Chester, Pa, U S A ( Plan of Stern Frame & Contra Propeller for Big Horn, 22nd October 1935 1935 )

Oregon ( Half Midship Section Plan for Big Horn, 10th February 1941 1941 )

Chester, Pennsylvania ( Profile & Deck Plan for Big Horn, 11th September 1945 1945 )

Port Arthur Texas ( Report of Surveys for Freeboard for Culfdown, 8th October 1947 1947, Report of Surveys for Freeboard- Conditions of Assignment for C B Watson, 8th October 1947 1947, Application for Classification Survey for Big Horn, 26th August 1947 1947 )

New York ( Letter from William Bennett, Principal Surveyor in U S A, to The Secretary, London, regarding Big Horn, 10th September 1947 1947, Letter from William Bennett, to R J Sladden, Esq, London, regarding C B Watson, 17th May 1948 1948 )

Port Arthur Texas; Mobile; Galveston Texas ( Steel Steamer Report for Big Horn, 8th November 1947 1947 )

Texas City Texas; Galveston Texas ( Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947 )

Port Arthur Texas; Galveston Texas ( Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Big Horn, 8th November 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Big Horn, 8th November 1947 1947, Report on Steam Turbine Machinery for Big Horn, 8th November 1947 1947, Report on Water Tube Boilers for Gulfdawn, 8th November 1947 1947, Report on Electrical Equipment for Gulfdawn, 8th November 1947 1947 )

Mobile Alabama ( Report of Survey for Repairs, &c for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Part Machinery for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Gulfdawn, 16th October 1947 1947 )

Galveston Texas ( Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 14th October 1947 1947, Copy of a Certificate of Survey of Boilers & Machinery for Gulfdawn, 14th October 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 5th January 1948 1948 )

London ( Certificate for Engines & Boilers for Big Horn, 20th February 1948 1948, Certificate of Class for Big Horn, 20th February 1948 1948 )

Port Neches Texas; Galveston Texas ( Report of Survey for Repairs, &c for C B Watson, 6th January 1948 1948 )

Mobile Ala ( Plan of Main Deck for R A Hummel, 1st November 1956 1956 )

London; Kobe ( Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being Demolition, 20th July 1960 1960, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being broken up, 27th June 1960 1960 )

Kobe ( Memo for Oswego Trader, 20th July 1960 1960 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Half Midship Section Plan for Big Horn, 14th August 1935 1935, Plan of Stern Frame & Contra Propeller for Big Horn, 22nd October 1935 1935, Half Midship Section Plan for Big Horn, 10th February 1941 1941, Profile & Deck Plan for Big Horn, 11th September 1945 1945, Report of Surveys for Freeboard for Culfdown, 8th October 1947 1947, Report of Surveys for Freeboard- Conditions of Assignment for C B Watson, 8th October 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Principal Surveyor, New York, regarding Big Horn, 20th September 1947 1947, Letter from William Bennett, Principal Surveyor in U S A, to The Secretary, London, regarding Big Horn, 10th September 1947 1947, Steel Steamer Report for Big Horn, 8th November 1947 1947, Application for Classification Survey for Big Horn, 26th August 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c for Big Horn, 8th November 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 14th October 1947 1947, Copy of a Certificate of Survey of Part Machinery for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Boilers & Machinery for Gulfdawn, 14th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Big Horn, 8th November 1947 1947, Report on Steam Turbine Machinery for Big Horn, 8th November 1947 1947, Report on Water Tube Boilers for Gulfdawn, 8th November 1947 1947, Report on Electrical Equipment for Gulfdawn, 8th November 1947 1947, Certificate for Engines & Boilers for Big Horn, 20th February 1948 1948, Certificate of Class for Big Horn, 20th February 1948 1948, Letter from William Bennett, to R J Sladden, Esq, London, regarding C B Watson, 17th May 1948 1948, Memo to the Chief Ship Surveyor regarding Classification, Alterations, Damage & Repairs for Big Horn, 19th February 1948 1948, Report of Survey for Repairs, &c for C B Watson, 6th January 1948 1948, Copy of a Certificate of Survey of Repairs for Gulfdawn, 5th January 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Big Horn, 25th February 1948 1948, Plan of Main Deck for R A Hummel, 1st November 1956 1956, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being Demolition, 20th July 1960 1960, Memo for Oswego Trader, 20th July 1960 1960, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being broken up, 27th June 1960 1960, Report of Total Loss, Casualty, &c for Oswego Trader, 17th August 1960 1960 )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Half Midship Section Plan for Big Horn, 14th August 1935 1935, Plan of Stern Frame & Contra Propeller for Big Horn, 22nd October 1935 1935, Half Midship Section Plan for Big Horn, 10th February 1941 1941, Profile & Deck Plan for Big Horn, 11th September 1945 1945, Report of Surveys for Freeboard for Culfdown, 8th October 1947 1947, Report of Surveys for Freeboard- Conditions of Assignment for C B Watson, 8th October 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Principal Surveyor, New York, regarding Big Horn, 20th September 1947 1947, Letter from William Bennett, Principal Surveyor in U S A, to The Secretary, London, regarding Big Horn, 10th September 1947 1947, Steel Steamer Report for Big Horn, 8th November 1947 1947, Application for Classification Survey for Big Horn, 26th August 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c for Big Horn, 8th November 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 14th October 1947 1947, Copy of a Certificate of Survey of Part Machinery for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Boilers & Machinery for Gulfdawn, 14th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Big Horn, 8th November 1947 1947, Report on Steam Turbine Machinery for Big Horn, 8th November 1947 1947, Report on Water Tube Boilers for Gulfdawn, 8th November 1947 1947, Report on Electrical Equipment for Gulfdawn, 8th November 1947 1947, Certificate for Engines & Boilers for Big Horn, 20th February 1948 1948, Certificate of Class for Big Horn, 20th February 1948 1948, Letter from William Bennett, to R J Sladden, Esq, London, regarding C B Watson, 17th May 1948 1948, Memo to the Chief Ship Surveyor regarding Classification, Alterations, Damage & Repairs for Big Horn, 19th February 1948 1948, Report of Survey for Repairs, &c for C B Watson, 6th January 1948 1948, Copy of a Certificate of Survey of Repairs for Gulfdawn, 5th January 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Big Horn, 25th February 1948 1948, Plan of Main Deck for R A Hummel, 1st November 1956 1956, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being Demolition, 20th July 1960 1960, Memo for Oswego Trader, 20th July 1960 1960, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being broken up, 27th June 1960 1960, Report of Total Loss, Casualty, &c for Oswego Trader, 17th August 1960 1960 )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Half Midship Section Plan for Big Horn, 14th August 1935 1935, Plan of Stern Frame & Contra Propeller for Big Horn, 22nd October 1935 1935, Half Midship Section Plan for Big Horn, 10th February 1941 1941, Profile & Deck Plan for Big Horn, 11th September 1945 1945, Report of Surveys for Freeboard for Culfdown, 8th October 1947 1947, Report of Surveys for Freeboard- Conditions of Assignment for C B Watson, 8th October 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Principal Surveyor, New York, regarding Big Horn, 20th September 1947 1947, Letter from William Bennett, Principal Surveyor in U S A, to The Secretary, London, regarding Big Horn, 10th September 1947 1947, Steel Steamer Report for Big Horn, 8th November 1947 1947, Application for Classification Survey for Big Horn, 26th August 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c for Big Horn, 8th November 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 14th October 1947 1947, Copy of a Certificate of Survey of Part Machinery for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Boilers & Machinery for Gulfdawn, 14th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Big Horn, 8th November 1947 1947, Report on Steam Turbine Machinery for Big Horn, 8th November 1947 1947, Report on Water Tube Boilers for Gulfdawn, 8th November 1947 1947, Report on Electrical Equipment for Gulfdawn, 8th November 1947 1947, Certificate for Engines & Boilers for Big Horn, 20th February 1948 1948, Certificate of Class for Big Horn, 20th February 1948 1948, Letter from William Bennett, to R J Sladden, Esq, London, regarding C B Watson, 17th May 1948 1948, Memo to the Chief Ship Surveyor regarding Classification, Alterations, Damage & Repairs for Big Horn, 19th February 1948 1948, Report of Survey for Repairs, &c for C B Watson, 6th January 1948 1948, Copy of a Certificate of Survey of Repairs for Gulfdawn, 5th January 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Big Horn, 25th February 1948 1948, Plan of Main Deck for R A Hummel, 1st November 1956 1956, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being Demolition, 20th July 1960 1960, Memo for Oswego Trader, 20th July 1960 1960, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being broken up, 27th June 1960 1960, Report of Total Loss, Casualty, &c for Oswego Trader, 17th August 1960 1960 )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Half Midship Section Plan for Big Horn, 14th August 1935 1935, Plan of Stern Frame & Contra Propeller for Big Horn, 22nd October 1935 1935, Half Midship Section Plan for Big Horn, 10th February 1941 1941, Profile & Deck Plan for Big Horn, 11th September 1945 1945, Report of Surveys for Freeboard for Culfdown, 8th October 1947 1947, Report of Surveys for Freeboard- Conditions of Assignment for C B Watson, 8th October 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Principal Surveyor, New York, regarding Big Horn, 20th September 1947 1947, Letter from William Bennett, Principal Surveyor in U S A, to The Secretary, London, regarding Big Horn, 10th September 1947 1947, Steel Steamer Report for Big Horn, 8th November 1947 1947, Application for Classification Survey for Big Horn, 26th August 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c for Big Horn, 8th November 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 14th October 1947 1947, Copy of a Certificate of Survey of Part Machinery for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Boilers & Machinery for Gulfdawn, 14th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Big Horn, 8th November 1947 1947, Report on Steam Turbine Machinery for Big Horn, 8th November 1947 1947, Report on Water Tube Boilers for Gulfdawn, 8th November 1947 1947, Report on Electrical Equipment for Gulfdawn, 8th November 1947 1947, Certificate for Engines & Boilers for Big Horn, 20th February 1948 1948, Certificate of Class for Big Horn, 20th February 1948 1948, Letter from William Bennett, to R J Sladden, Esq, London, regarding C B Watson, 17th May 1948 1948, Memo to the Chief Ship Surveyor regarding Classification, Alterations, Damage & Repairs for Big Horn, 19th February 1948 1948, Report of Survey for Repairs, &c for C B Watson, 6th January 1948 1948, Copy of a Certificate of Survey of Repairs for Gulfdawn, 5th January 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Big Horn, 25th February 1948 1948, Plan of Main Deck for R A Hummel, 1st November 1956 1956, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being Demolition, 20th July 1960 1960, Memo for Oswego Trader, 20th July 1960 1960, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being broken up, 27th June 1960 1960, Report of Total Loss, Casualty, &c for Oswego Trader, 17th August 1960 1960 )

The official record pronounced by the Committee

Loss or disposal

Broken up ( Half Midship Section Plan for Big Horn, 14th August 1935 1935, Plan of Stern Frame & Contra Propeller for Big Horn, 22nd October 1935 1935, Half Midship Section Plan for Big Horn, 10th February 1941 1941, Profile & Deck Plan for Big Horn, 11th September 1945 1945, Report of Surveys for Freeboard for Culfdown, 8th October 1947 1947, Report of Surveys for Freeboard- Conditions of Assignment for C B Watson, 8th October 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Principal Surveyor, New York, regarding Big Horn, 20th September 1947 1947, Letter from William Bennett, Principal Surveyor in U S A, to The Secretary, London, regarding Big Horn, 10th September 1947 1947, Steel Steamer Report for Big Horn, 8th November 1947 1947, Application for Classification Survey for Big Horn, 26th August 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c for Big Horn, 8th November 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 14th October 1947 1947, Copy of a Certificate of Survey of Part Machinery for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Boilers & Machinery for Gulfdawn, 14th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Big Horn, 8th November 1947 1947, Report on Steam Turbine Machinery for Big Horn, 8th November 1947 1947, Report on Water Tube Boilers for Gulfdawn, 8th November 1947 1947, Report on Electrical Equipment for Gulfdawn, 8th November 1947 1947, Certificate for Engines & Boilers for Big Horn, 20th February 1948 1948, Certificate of Class for Big Horn, 20th February 1948 1948, Letter from William Bennett, to R J Sladden, Esq, London, regarding C B Watson, 17th May 1948 1948, Memo to the Chief Ship Surveyor regarding Classification, Alterations, Damage & Repairs for Big Horn, 19th February 1948 1948, Report of Survey for Repairs, &c for C B Watson, 6th January 1948 1948, Copy of a Certificate of Survey of Repairs for Gulfdawn, 5th January 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Big Horn, 25th February 1948 1948, Plan of Main Deck for R A Hummel, 1st November 1956 1956, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being Demolition, 20th July 1960 1960, Memo for Oswego Trader, 20th July 1960 1960, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being broken up, 27th June 1960 1960, Report of Total Loss, Casualty, &c for Oswego Trader, 17th August 1960 1960 )

Vessel’s place of loss or disposal/last known recorded location.

Place of ship loss

Kure ( Half Midship Section Plan for Big Horn, 14th August 1935 1935, Plan of Stern Frame & Contra Propeller for Big Horn, 22nd October 1935 1935, Half Midship Section Plan for Big Horn, 10th February 1941 1941, Profile & Deck Plan for Big Horn, 11th September 1945 1945, Report of Surveys for Freeboard for Culfdown, 8th October 1947 1947, Report of Surveys for Freeboard- Conditions of Assignment for C B Watson, 8th October 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Principal Surveyor, New York, regarding Big Horn, 20th September 1947 1947, Letter from William Bennett, Principal Surveyor in U S A, to The Secretary, London, regarding Big Horn, 10th September 1947 1947, Steel Steamer Report for Big Horn, 8th November 1947 1947, Application for Classification Survey for Big Horn, 26th August 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c for Big Horn, 8th November 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 14th October 1947 1947, Copy of a Certificate of Survey of Part Machinery for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Boilers & Machinery for Gulfdawn, 14th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Big Horn, 8th November 1947 1947, Report on Steam Turbine Machinery for Big Horn, 8th November 1947 1947, Report on Water Tube Boilers for Gulfdawn, 8th November 1947 1947, Report on Electrical Equipment for Gulfdawn, 8th November 1947 1947, Certificate for Engines & Boilers for Big Horn, 20th February 1948 1948, Certificate of Class for Big Horn, 20th February 1948 1948, Letter from William Bennett, to R J Sladden, Esq, London, regarding C B Watson, 17th May 1948 1948, Memo to the Chief Ship Surveyor regarding Classification, Alterations, Damage & Repairs for Big Horn, 19th February 1948 1948, Report of Survey for Repairs, &c for C B Watson, 6th January 1948 1948, Copy of a Certificate of Survey of Repairs for Gulfdawn, 5th January 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Big Horn, 25th February 1948 1948, Plan of Main Deck for R A Hummel, 1st November 1956 1956, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being Demolition, 20th July 1960 1960, Memo for Oswego Trader, 20th July 1960 1960, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being broken up, 27th June 1960 1960, Report of Total Loss, Casualty, &c for Oswego Trader, 17th August 1960 1960 )

Name of surveyor.

Surveyor

James Findlay ( Report of Surveys for Freeboard for Culfdown, 8th October 1947 1947, Report of Surveys for Freeboard- Conditions of Assignment for C B Watson, 8th October 1947 1947, Steel Steamer Report for Big Horn, 8th November 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Big Horn, 8th November 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 14th October 1947 1947, Copy of a Certificate of Survey of Boilers & Machinery for Gulfdawn, 14th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Big Horn, 8th November 1947 1947, Report on Steam Turbine Machinery for Big Horn, 8th November 1947 1947, Report on Water Tube Boilers for Gulfdawn, 8th November 1947 1947, Report on Electrical Equipment for Gulfdawn, 8th November 1947 1947, Report of Survey for Repairs, &c for C B Watson, 6th January 1948 1948, Copy of a Certificate of Survey of Repairs for Gulfdawn, 5th January 1948 1948 )

William Bennett ( Letter from William Bennett, Principal Surveyor in U S A, to The Secretary, London, regarding Big Horn, 10th September 1947 1947, Letter from William Bennett, to R J Sladden, Esq, London, regarding C B Watson, 17th May 1948 1948 )

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

7096 ( Report of Surveys for Freeboard for Culfdown, 8th October 1947 1947, Steel Steamer Report for Big Horn, 8th November 1947 1947, Application for Classification Survey for Big Horn, 26th August 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c for Big Horn, 8th November 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 14th October 1947 1947, Copy of a Certificate of Survey of Part Machinery for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Boilers & Machinery for Gulfdawn, 14th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Big Horn, 8th November 1947 1947, Report on Steam Turbine Machinery for Big Horn, 8th November 1947 1947, Report on Water Tube Boilers for Gulfdawn, 8th November 1947 1947, Report on Electrical Equipment for Gulfdawn, 8th November 1947 1947, Certificate of Class for Big Horn, 20th February 1948 1948, Report of Survey for Repairs, &c for C B Watson, 6th January 1948 1948, Copy of a Certificate of Survey of Repairs for Gulfdawn, 5th January 1948 1948, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being Demolition, 20th July 1960 1960, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being broken up, 27th June 1960 1960, Report of Total Loss, Casualty, &c for Oswego Trader, 17th August 1960 1960 )

The year in which a vessel’s construction is completed.

Year of ship completion

1936 ( Half Midship Section Plan for Big Horn, 14th August 1935 1935, Plan of Stern Frame & Contra Propeller for Big Horn, 22nd October 1935 1935, Half Midship Section Plan for Big Horn, 10th February 1941 1941, Profile & Deck Plan for Big Horn, 11th September 1945 1945, Report of Surveys for Freeboard for Culfdown, 8th October 1947 1947, Report of Surveys for Freeboard- Conditions of Assignment for C B Watson, 8th October 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Principal Surveyor, New York, regarding Big Horn, 20th September 1947 1947, Letter from William Bennett, Principal Surveyor in U S A, to The Secretary, London, regarding Big Horn, 10th September 1947 1947, Steel Steamer Report for Big Horn, 8th November 1947 1947, Application for Classification Survey for Big Horn, 26th August 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c for Big Horn, 8th November 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 14th October 1947 1947, Copy of a Certificate of Survey of Part Machinery for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Boilers & Machinery for Gulfdawn, 14th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Big Horn, 8th November 1947 1947, Report on Steam Turbine Machinery for Big Horn, 8th November 1947 1947, Report on Water Tube Boilers for Gulfdawn, 8th November 1947 1947, Report on Electrical Equipment for Gulfdawn, 8th November 1947 1947, Certificate for Engines & Boilers for Big Horn, 20th February 1948 1948, Certificate of Class for Big Horn, 20th February 1948 1948, Letter from William Bennett, to R J Sladden, Esq, London, regarding C B Watson, 17th May 1948 1948, Memo to the Chief Ship Surveyor regarding Classification, Alterations, Damage & Repairs for Big Horn, 19th February 1948 1948, Report of Survey for Repairs, &c for C B Watson, 6th January 1948 1948, Copy of a Certificate of Survey of Repairs for Gulfdawn, 5th January 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Big Horn, 25th February 1948 1948, Plan of Main Deck for R A Hummel, 1st November 1956 1956, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being Demolition, 20th July 1960 1960, Memo for Oswego Trader, 20th July 1960 1960, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being broken up, 27th June 1960 1960, Report of Total Loss, Casualty, &c for Oswego Trader, 17th August 1960 1960 )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Sun Shipbuilding & Dry Dock Co ( Half Midship Section Plan for Big Horn, 14th August 1935 1935, Plan of Stern Frame & Contra Propeller for Big Horn, 22nd October 1935 1935, Half Midship Section Plan for Big Horn, 10th February 1941 1941, Profile & Deck Plan for Big Horn, 11th September 1945 1945, Report of Surveys for Freeboard for Culfdown, 8th October 1947 1947, Report of Surveys for Freeboard- Conditions of Assignment for C B Watson, 8th October 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Principal Surveyor, New York, regarding Big Horn, 20th September 1947 1947, Letter from William Bennett, Principal Surveyor in U S A, to The Secretary, London, regarding Big Horn, 10th September 1947 1947, Steel Steamer Report for Big Horn, 8th November 1947 1947, Application for Classification Survey for Big Horn, 26th August 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c for Big Horn, 8th November 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 14th October 1947 1947, Copy of a Certificate of Survey of Part Machinery for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Boilers & Machinery for Gulfdawn, 14th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Big Horn, 8th November 1947 1947, Report on Steam Turbine Machinery for Big Horn, 8th November 1947 1947, Report on Water Tube Boilers for Gulfdawn, 8th November 1947 1947, Report on Electrical Equipment for Gulfdawn, 8th November 1947 1947, Certificate for Engines & Boilers for Big Horn, 20th February 1948 1948, Certificate of Class for Big Horn, 20th February 1948 1948, Letter from William Bennett, to R J Sladden, Esq, London, regarding C B Watson, 17th May 1948 1948, Memo to the Chief Ship Surveyor regarding Classification, Alterations, Damage & Repairs for Big Horn, 19th February 1948 1948, Report of Survey for Repairs, &c for C B Watson, 6th January 1948 1948, Copy of a Certificate of Survey of Repairs for Gulfdawn, 5th January 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Big Horn, 25th February 1948 1948, Plan of Main Deck for R A Hummel, 1st November 1956 1956, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being Demolition, 20th July 1960 1960, Memo for Oswego Trader, 20th July 1960 1960, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being broken up, 27th June 1960 1960, Report of Total Loss, Casualty, &c for Oswego Trader, 17th August 1960 1960 )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Chester, Pennsylvania ( Half Midship Section Plan for Big Horn, 14th August 1935 1935, Plan of Stern Frame & Contra Propeller for Big Horn, 22nd October 1935 1935, Half Midship Section Plan for Big Horn, 10th February 1941 1941, Profile & Deck Plan for Big Horn, 11th September 1945 1945, Report of Surveys for Freeboard for Culfdown, 8th October 1947 1947, Report of Surveys for Freeboard- Conditions of Assignment for C B Watson, 8th October 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Principal Surveyor, New York, regarding Big Horn, 20th September 1947 1947, Letter from William Bennett, Principal Surveyor in U S A, to The Secretary, London, regarding Big Horn, 10th September 1947 1947, Steel Steamer Report for Big Horn, 8th November 1947 1947, Application for Classification Survey for Big Horn, 26th August 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c for Big Horn, 8th November 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 14th October 1947 1947, Copy of a Certificate of Survey of Part Machinery for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Boilers & Machinery for Gulfdawn, 14th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Big Horn, 8th November 1947 1947, Report on Steam Turbine Machinery for Big Horn, 8th November 1947 1947, Report on Water Tube Boilers for Gulfdawn, 8th November 1947 1947, Report on Electrical Equipment for Gulfdawn, 8th November 1947 1947, Certificate for Engines & Boilers for Big Horn, 20th February 1948 1948, Certificate of Class for Big Horn, 20th February 1948 1948, Letter from William Bennett, to R J Sladden, Esq, London, regarding C B Watson, 17th May 1948 1948, Memo to the Chief Ship Surveyor regarding Classification, Alterations, Damage & Repairs for Big Horn, 19th February 1948 1948, Report of Survey for Repairs, &c for C B Watson, 6th January 1948 1948, Copy of a Certificate of Survey of Repairs for Gulfdawn, 5th January 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Big Horn, 25th February 1948 1948, Plan of Main Deck for R A Hummel, 1st November 1956 1956, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being Demolition, 20th July 1960 1960, Memo for Oswego Trader, 20th July 1960 1960, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being broken up, 27th June 1960 1960, Report of Total Loss, Casualty, &c for Oswego Trader, 17th August 1960 1960 )

A vessel’s means of propulsion.

Propulsion

undefined ( Half Midship Section Plan for Big Horn, 14th August 1935 1935, Report of Surveys for Freeboard for Culfdown, 8th October 1947 1947, Application for Classification Survey for Big Horn, 26th August 1947 1947, Memo to the Chief Engineer Surveyor regarding Classification for Big Horn, 25th February 1948 1948 )

Steam ( Plan of Stern Frame & Contra Propeller for Big Horn, 22nd October 1935 1935, Profile & Deck Plan for Big Horn, 11th September 1945 1945, Report of Surveys for Freeboard- Conditions of Assignment for C B Watson, 8th October 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Principal Surveyor, New York, regarding Big Horn, 20th September 1947 1947, Letter from William Bennett, Principal Surveyor in U S A, to The Secretary, London, regarding Big Horn, 10th September 1947 1947, Steel Steamer Report for Big Horn, 8th November 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c for Big Horn, 8th November 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 14th October 1947 1947, Copy of a Certificate of Survey of Part Machinery for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Boilers & Machinery for Gulfdawn, 14th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Big Horn, 8th November 1947 1947, Report on Steam Turbine Machinery for Big Horn, 8th November 1947 1947, Report on Water Tube Boilers for Gulfdawn, 8th November 1947 1947, Report on Electrical Equipment for Gulfdawn, 8th November 1947 1947, Certificate for Engines & Boilers for Big Horn, 20th February 1948 1948, Certificate of Class for Big Horn, 20th February 1948 1948, Letter from William Bennett, to R J Sladden, Esq, London, regarding C B Watson, 17th May 1948 1948, Memo to the Chief Ship Surveyor regarding Classification, Alterations, Damage & Repairs for Big Horn, 19th February 1948 1948, Report of Survey for Repairs, &c for C B Watson, 6th January 1948 1948, Copy of a Certificate of Survey of Repairs for Gulfdawn, 5th January 1948 1948, Plan of Main Deck for R A Hummel, 1st November 1956 1956, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being Demolition, 20th July 1960 1960, Memo for Oswego Trader, 20th July 1960 1960, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being broken up, 27th June 1960 1960, Report of Total Loss, Casualty, &c for Oswego Trader, 17th August 1960 1960 )

Motor (internal combustion) ( Half Midship Section Plan for Big Horn, 10th February 1941 1941 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Half Midship Section Plan for Big Horn, 14th August 1935 1935, Plan of Stern Frame & Contra Propeller for Big Horn, 22nd October 1935 1935, Half Midship Section Plan for Big Horn, 10th February 1941 1941, Profile & Deck Plan for Big Horn, 11th September 1945 1945, Report of Surveys for Freeboard for Culfdown, 8th October 1947 1947, Report of Surveys for Freeboard- Conditions of Assignment for C B Watson, 8th October 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Principal Surveyor, New York, regarding Big Horn, 20th September 1947 1947, Letter from William Bennett, Principal Surveyor in U S A, to The Secretary, London, regarding Big Horn, 10th September 1947 1947, Steel Steamer Report for Big Horn, 8th November 1947 1947, Application for Classification Survey for Big Horn, 26th August 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c for Big Horn, 8th November 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 14th October 1947 1947, Copy of a Certificate of Survey of Part Machinery for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Boilers & Machinery for Gulfdawn, 14th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Big Horn, 8th November 1947 1947, Report on Steam Turbine Machinery for Big Horn, 8th November 1947 1947, Report on Water Tube Boilers for Gulfdawn, 8th November 1947 1947, Report on Electrical Equipment for Gulfdawn, 8th November 1947 1947, Certificate for Engines & Boilers for Big Horn, 20th February 1948 1948, Certificate of Class for Big Horn, 20th February 1948 1948, Letter from William Bennett, to R J Sladden, Esq, London, regarding C B Watson, 17th May 1948 1948, Memo to the Chief Ship Surveyor regarding Classification, Alterations, Damage & Repairs for Big Horn, 19th February 1948 1948, Report of Survey for Repairs, &c for C B Watson, 6th January 1948 1948, Copy of a Certificate of Survey of Repairs for Gulfdawn, 5th January 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Big Horn, 25th February 1948 1948, Plan of Main Deck for R A Hummel, 1st November 1956 1956, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being Demolition, 20th July 1960 1960, Memo for Oswego Trader, 20th July 1960 1960, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being broken up, 27th June 1960 1960, Report of Total Loss, Casualty, &c for Oswego Trader, 17th August 1960 1960 )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Half Midship Section Plan for Big Horn, 14th August 1935 1935, Plan of Stern Frame & Contra Propeller for Big Horn, 22nd October 1935 1935, Half Midship Section Plan for Big Horn, 10th February 1941 1941, Profile & Deck Plan for Big Horn, 11th September 1945 1945, Report of Surveys for Freeboard for Culfdown, 8th October 1947 1947, Report of Surveys for Freeboard- Conditions of Assignment for C B Watson, 8th October 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Principal Surveyor, New York, regarding Big Horn, 20th September 1947 1947, Letter from William Bennett, Principal Surveyor in U S A, to The Secretary, London, regarding Big Horn, 10th September 1947 1947, Steel Steamer Report for Big Horn, 8th November 1947 1947, Application for Classification Survey for Big Horn, 26th August 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c for Big Horn, 8th November 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 14th October 1947 1947, Copy of a Certificate of Survey of Part Machinery for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Boilers & Machinery for Gulfdawn, 14th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Big Horn, 8th November 1947 1947, Report on Steam Turbine Machinery for Big Horn, 8th November 1947 1947, Report on Water Tube Boilers for Gulfdawn, 8th November 1947 1947, Report on Electrical Equipment for Gulfdawn, 8th November 1947 1947, Certificate for Engines & Boilers for Big Horn, 20th February 1948 1948, Certificate of Class for Big Horn, 20th February 1948 1948, Letter from William Bennett, to R J Sladden, Esq, London, regarding C B Watson, 17th May 1948 1948, Memo to the Chief Ship Surveyor regarding Classification, Alterations, Damage & Repairs for Big Horn, 19th February 1948 1948, Report of Survey for Repairs, &c for C B Watson, 6th January 1948 1948, Copy of a Certificate of Survey of Repairs for Gulfdawn, 5th January 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Big Horn, 25th February 1948 1948, Plan of Main Deck for R A Hummel, 1st November 1956 1956, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being Demolition, 20th July 1960 1960, Memo for Oswego Trader, 20th July 1960 1960, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being broken up, 27th June 1960 1960, Report of Total Loss, Casualty, &c for Oswego Trader, 17th August 1960 1960 )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Half Midship Section Plan for Big Horn, 14th August 1935 1935, Plan of Stern Frame & Contra Propeller for Big Horn, 22nd October 1935 1935, Half Midship Section Plan for Big Horn, 10th February 1941 1941, Profile & Deck Plan for Big Horn, 11th September 1945 1945, Report of Surveys for Freeboard for Culfdown, 8th October 1947 1947, Report of Surveys for Freeboard- Conditions of Assignment for C B Watson, 8th October 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Principal Surveyor, New York, regarding Big Horn, 20th September 1947 1947, Letter from William Bennett, Principal Surveyor in U S A, to The Secretary, London, regarding Big Horn, 10th September 1947 1947, Steel Steamer Report for Big Horn, 8th November 1947 1947, Application for Classification Survey for Big Horn, 26th August 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c for Big Horn, 8th November 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 14th October 1947 1947, Copy of a Certificate of Survey of Part Machinery for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Boilers & Machinery for Gulfdawn, 14th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Big Horn, 8th November 1947 1947, Report on Steam Turbine Machinery for Big Horn, 8th November 1947 1947, Report on Water Tube Boilers for Gulfdawn, 8th November 1947 1947, Report on Electrical Equipment for Gulfdawn, 8th November 1947 1947, Certificate for Engines & Boilers for Big Horn, 20th February 1948 1948, Certificate of Class for Big Horn, 20th February 1948 1948, Letter from William Bennett, to R J Sladden, Esq, London, regarding C B Watson, 17th May 1948 1948, Memo to the Chief Ship Surveyor regarding Classification, Alterations, Damage & Repairs for Big Horn, 19th February 1948 1948, Report of Survey for Repairs, &c for C B Watson, 6th January 1948 1948, Copy of a Certificate of Survey of Repairs for Gulfdawn, 5th January 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Big Horn, 25th February 1948 1948, Plan of Main Deck for R A Hummel, 1st November 1956 1956, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being Demolition, 20th July 1960 1960, Memo for Oswego Trader, 20th July 1960 1960, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being broken up, 27th June 1960 1960, Report of Total Loss, Casualty, &c for Oswego Trader, 17th August 1960 1960 )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Half Midship Section Plan for Big Horn, 14th August 1935 1935, Plan of Stern Frame & Contra Propeller for Big Horn, 22nd October 1935 1935, Half Midship Section Plan for Big Horn, 10th February 1941 1941, Profile & Deck Plan for Big Horn, 11th September 1945 1945, Report of Surveys for Freeboard for Culfdown, 8th October 1947 1947, Report of Surveys for Freeboard- Conditions of Assignment for C B Watson, 8th October 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Principal Surveyor, New York, regarding Big Horn, 20th September 1947 1947, Letter from William Bennett, Principal Surveyor in U S A, to The Secretary, London, regarding Big Horn, 10th September 1947 1947, Steel Steamer Report for Big Horn, 8th November 1947 1947, Application for Classification Survey for Big Horn, 26th August 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c for Big Horn, 8th November 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 14th October 1947 1947, Copy of a Certificate of Survey of Part Machinery for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Boilers & Machinery for Gulfdawn, 14th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Big Horn, 8th November 1947 1947, Report on Steam Turbine Machinery for Big Horn, 8th November 1947 1947, Report on Water Tube Boilers for Gulfdawn, 8th November 1947 1947, Report on Electrical Equipment for Gulfdawn, 8th November 1947 1947, Certificate for Engines & Boilers for Big Horn, 20th February 1948 1948, Certificate of Class for Big Horn, 20th February 1948 1948, Letter from William Bennett, to R J Sladden, Esq, London, regarding C B Watson, 17th May 1948 1948, Memo to the Chief Ship Surveyor regarding Classification, Alterations, Damage & Repairs for Big Horn, 19th February 1948 1948, Report of Survey for Repairs, &c for C B Watson, 6th January 1948 1948, Copy of a Certificate of Survey of Repairs for Gulfdawn, 5th January 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Big Horn, 25th February 1948 1948, Plan of Main Deck for R A Hummel, 1st November 1956 1956, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being Demolition, 20th July 1960 1960, Memo for Oswego Trader, 20th July 1960 1960, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being broken up, 27th June 1960 1960, Report of Total Loss, Casualty, &c for Oswego Trader, 17th August 1960 1960 )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sold for Breaking Up, Demolition Commenced ( Half Midship Section Plan for Big Horn, 14th August 1935 1935, Plan of Stern Frame & Contra Propeller for Big Horn, 22nd October 1935 1935, Half Midship Section Plan for Big Horn, 10th February 1941 1941, Profile & Deck Plan for Big Horn, 11th September 1945 1945, Report of Surveys for Freeboard for Culfdown, 8th October 1947 1947, Report of Surveys for Freeboard- Conditions of Assignment for C B Watson, 8th October 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Principal Surveyor, New York, regarding Big Horn, 20th September 1947 1947, Letter from William Bennett, Principal Surveyor in U S A, to The Secretary, London, regarding Big Horn, 10th September 1947 1947, Steel Steamer Report for Big Horn, 8th November 1947 1947, Application for Classification Survey for Big Horn, 26th August 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c for Big Horn, 8th November 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 14th October 1947 1947, Copy of a Certificate of Survey of Part Machinery for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Boilers & Machinery for Gulfdawn, 14th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Big Horn, 8th November 1947 1947, Report on Steam Turbine Machinery for Big Horn, 8th November 1947 1947, Report on Water Tube Boilers for Gulfdawn, 8th November 1947 1947, Report on Electrical Equipment for Gulfdawn, 8th November 1947 1947, Certificate for Engines & Boilers for Big Horn, 20th February 1948 1948, Certificate of Class for Big Horn, 20th February 1948 1948, Letter from William Bennett, to R J Sladden, Esq, London, regarding C B Watson, 17th May 1948 1948, Memo to the Chief Ship Surveyor regarding Classification, Alterations, Damage & Repairs for Big Horn, 19th February 1948 1948, Report of Survey for Repairs, &c for C B Watson, 6th January 1948 1948, Copy of a Certificate of Survey of Repairs for Gulfdawn, 5th January 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Big Horn, 25th February 1948 1948, Plan of Main Deck for R A Hummel, 1st November 1956 1956, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being Demolition, 20th July 1960 1960, Memo for Oswego Trader, 20th July 1960 1960, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being broken up, 27th June 1960 1960, Report of Total Loss, Casualty, &c for Oswego Trader, 17th August 1960 1960 )

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

30/07/1960 ( Half Midship Section Plan for Big Horn, 14th August 1935 1935, Plan of Stern Frame & Contra Propeller for Big Horn, 22nd October 1935 1935, Half Midship Section Plan for Big Horn, 10th February 1941 1941, Profile & Deck Plan for Big Horn, 11th September 1945 1945, Report of Surveys for Freeboard for Culfdown, 8th October 1947 1947, Report of Surveys for Freeboard- Conditions of Assignment for C B Watson, 8th October 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Principal Surveyor, New York, regarding Big Horn, 20th September 1947 1947, Letter from William Bennett, Principal Surveyor in U S A, to The Secretary, London, regarding Big Horn, 10th September 1947 1947, Steel Steamer Report for Big Horn, 8th November 1947 1947, Application for Classification Survey for Big Horn, 26th August 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c for Big Horn, 8th November 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 13th December 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Repairs for Gulfdawn, 14th October 1947 1947, Copy of a Certificate of Survey of Part Machinery for Gulfdawn, 16th October 1947 1947, Copy of a Certificate of Survey of Boilers & Machinery for Gulfdawn, 14th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Gulfdawn, 16th October 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Big Horn, 8th November 1947 1947, Report on Steam Turbine Machinery for Big Horn, 8th November 1947 1947, Report on Water Tube Boilers for Gulfdawn, 8th November 1947 1947, Report on Electrical Equipment for Gulfdawn, 8th November 1947 1947, Certificate for Engines & Boilers for Big Horn, 20th February 1948 1948, Certificate of Class for Big Horn, 20th February 1948 1948, Letter from William Bennett, to R J Sladden, Esq, London, regarding C B Watson, 17th May 1948 1948, Memo to the Chief Ship Surveyor regarding Classification, Alterations, Damage & Repairs for Big Horn, 19th February 1948 1948, Report of Survey for Repairs, &c for C B Watson, 6th January 1948 1948, Copy of a Certificate of Survey of Repairs for Gulfdawn, 5th January 1948 1948, Memo to the Chief Engineer Surveyor regarding Classification for Big Horn, 25th February 1948 1948, Plan of Main Deck for R A Hummel, 1st November 1956 1956, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being Demolition, 20th July 1960 1960, Memo for Oswego Trader, 20th July 1960 1960, Question & Answer Memo between London & Kobe Offices, regarding Oswego Trader being broken up, 27th June 1960 1960, Report of Total Loss, Casualty, &c for Oswego Trader, 17th August 1960 1960 )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1 ( Report of Surveys for Freeboard for Culfdown, 8th October 1947 1947 )

+100A1; (Class Contemplated); Carrying Petroleum in bulk; Docking Date 10,47; MOB; LMC 10,47; TS (CL) 10,47 ( Steel Steamer Report for Big Horn, 8th November 1947 1947 )

+100A1; (Class Contemplated) ( Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947, Report of Survey for Repairs, &c for Gulfdawn, 15th December 1947 1947 )

Docking date 10,47 Mob; (See Also Gal Rpt No 4903 ( Report of Survey for Repairs, &c for Gulfdawn, 16th October 1947 1947 )

Class Contemplated ( Report of Survey for Repairs, &c for Big Horn, 8th November 1947 1947, Report on Steam Turbine Machinery for Big Horn, 8th November 1947 1947 )

LMC 10,47; TS (CL) 10,47 ( Report of Survey for Repairs, &c, of Engines & Boilers for Gulfdawn, 16th October 1947 1947 )

See Mob Rpt No 2315 ( Report of Survey for Repairs, &c, of Engines & Boilers for Big Horn, 8th November 1947 1947 )

WTB (Spt) 450 ibs ( Report on Water Tube Boilers for Gulfdawn, 8th November 1947 1947 )

Elec Light ( Report on Electrical Equipment for Gulfdawn, 8th November 1947 1947 )

+100A1; Carrying Petroleum in bulk; SS Gal 10,47; delete Classification Contemplated; Classed 10,47; Fitted for Oil Fuel Fp above 150F ( Report of Survey for Repairs, &c for C B Watson, 6th January 1948 1948 )

+100A1; Oil Tanker 12,59; SS (Dr) 12,56; Classed 10,47; LMC 12,56; BS M 12,59; Sp 7,56; TS 12,59 CL ( Report of Total Loss, Casualty, &c for Oswego Trader, 17th August 1960 1960 )

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

Type and configuration of the engine(s) supplied for a vessel.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.