Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

British Patience ( Rudder Plan for British Patience, 11th July 1941 1941, Plan of Stern Frame for British Patience, 11th July 1941 1941, Request for Special Survey for British Patience, 9th July 1941 1941, Report on Boilers for British Patience, 31st December 1942 1942, Report on Boilers for British Patience, 31st December 1942 1942, Half Midship Section Plan for British Patience, 7th June 1943 1943, Memo to the Chief Ship Surveyor regarding First Entry for British Patience, 9th July 1943 1943, Steel Motorship Report for British Patience, 22nd June 1943 1943, Form for Vessels of 100 Tons & Upwards for British Patience, 4th June 1943 1943, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Patience, 6th July 1943 1943, Report on Oil Engine Machinery for British Patience, 15th June 1943 1943, Report on Electrical Equipment for British Patience, 16th June 1943 1943, Report on Annual Load Line Survey for British Patience, 26th March 1956 1956, Copy of a letter from the Deputy Clerk to the Classification Committee to the Secretary for Lloyd's Register regarding British Patience, 6th July 1961 1961, Copy of a letter from BP Tanker Co Ltd to the Secretary for Lloyd's Register regarding British Patience, 14th June 1961 1961, Report of Total Loss, Casualty, &c for British Patience, 21st June 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for British Patience, 18th April 1961 1961, Copy of a Certificate of Survey of Machinery for British Patience, 13th March 1961 1961, Report of Periodical Surveys & Repairs of Machinery for British Patience, 13th March 1961 1961, Report of Surveys for Freeboard - Conditions of Assignment for British Patience, Undated no date, Report of Surveys for Freeboard for British Patience, Undated no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

23/03/1943 ( Rudder Plan for British Patience, 11th July 1941 1941, Plan of Stern Frame for British Patience, 11th July 1941 1941, Request for Special Survey for British Patience, 9th July 1941 1941, Report on Boilers for British Patience, 31st December 1942 1942, Report on Boilers for British Patience, 31st December 1942 1942, Half Midship Section Plan for British Patience, 7th June 1943 1943, Memo to the Chief Ship Surveyor regarding First Entry for British Patience, 9th July 1943 1943, Steel Motorship Report for British Patience, 22nd June 1943 1943, Form for Vessels of 100 Tons & Upwards for British Patience, 4th June 1943 1943, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Patience, 6th July 1943 1943, Report on Oil Engine Machinery for British Patience, 15th June 1943 1943, Report on Electrical Equipment for British Patience, 16th June 1943 1943, Report on Annual Load Line Survey for British Patience, 26th March 1956 1956, Copy of a letter from the Deputy Clerk to the Classification Committee to the Secretary for Lloyd's Register regarding British Patience, 6th July 1961 1961, Copy of a letter from BP Tanker Co Ltd to the Secretary for Lloyd's Register regarding British Patience, 14th June 1961 1961, Report of Total Loss, Casualty, &c for British Patience, 21st June 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for British Patience, 18th April 1961 1961, Copy of a Certificate of Survey of Machinery for British Patience, 13th March 1961 1961, Report of Periodical Surveys & Repairs of Machinery for British Patience, 13th March 1961 1961, Report of Surveys for Freeboard - Conditions of Assignment for British Patience, Undated no date, Report of Surveys for Freeboard for British Patience, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

1166G ( Rudder Plan for British Patience, 11th July 1941 1941, Plan of Stern Frame for British Patience, 11th July 1941 1941, Request for Special Survey for British Patience, 9th July 1941 1941, Report on Boilers for British Patience, 31st December 1942 1942, Report on Boilers for British Patience, 31st December 1942 1942, Half Midship Section Plan for British Patience, 7th June 1943 1943, Memo to the Chief Ship Surveyor regarding First Entry for British Patience, 9th July 1943 1943, Steel Motorship Report for British Patience, 22nd June 1943 1943, Form for Vessels of 100 Tons & Upwards for British Patience, 4th June 1943 1943, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Patience, 6th July 1943 1943, Report on Oil Engine Machinery for British Patience, 15th June 1943 1943, Report on Electrical Equipment for British Patience, 16th June 1943 1943, Report on Annual Load Line Survey for British Patience, 26th March 1956 1956, Copy of a letter from the Deputy Clerk to the Classification Committee to the Secretary for Lloyd's Register regarding British Patience, 6th July 1961 1961, Copy of a letter from BP Tanker Co Ltd to the Secretary for Lloyd's Register regarding British Patience, 14th June 1961 1961, Report of Total Loss, Casualty, &c for British Patience, 21st June 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for British Patience, 18th April 1961 1961, Copy of a Certificate of Survey of Machinery for British Patience, 13th March 1961 1961, Report of Periodical Surveys & Repairs of Machinery for British Patience, 13th March 1961 1961, Report of Surveys for Freeboard - Conditions of Assignment for British Patience, Undated no date, Report of Surveys for Freeboard for British Patience, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Glasgow ( Rudder Plan for British Patience, 11th July 1941 1941, Plan of Stern Frame for British Patience, 11th July 1941 1941, Request for Special Survey for British Patience, 9th July 1941 1941, Half Midship Section Plan for British Patience, 7th June 1943 1943, Steel Motorship Report for British Patience, 22nd June 1943 1943, Report on Oil Engine Machinery for British Patience, 15th June 1943 1943, Report on Electrical Equipment for British Patience, 16th June 1943 1943, Report of Surveys for Freeboard - Conditions of Assignment for British Patience, Undated no date, Report of Surveys for Freeboard for British Patience, Undated no date )

Hyde; Manchester ( Report on Boilers for British Patience, 31st December 1942 1942, Report on Boilers for British Patience, 31st December 1942 1942 )

London ( Form for Vessels of 100 Tons & Upwards for British Patience, 4th June 1943 1943, Copy of a letter from the Deputy Clerk to the Classification Committee to the Secretary for Lloyd's Register regarding British Patience, 6th July 1961 1961, Copy of a letter from BP Tanker Co Ltd to the Secretary for Lloyd's Register regarding British Patience, 14th June 1961 1961 )

Falmouth ( Report on Annual Load Line Survey for British Patience, 26th March 1956 1956 )

Fremantle W A ( Copy of a Certificate of Survey of Machinery for British Patience, 13th March 1961 1961 )

Fremantle WA ( Report of Periodical Surveys & Repairs of Machinery for British Patience, 13th March 1961 1961 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Rudder Plan for British Patience, 11th July 1941 1941, Plan of Stern Frame for British Patience, 11th July 1941 1941, Request for Special Survey for British Patience, 9th July 1941 1941, Report on Boilers for British Patience, 31st December 1942 1942, Report on Boilers for British Patience, 31st December 1942 1942, Half Midship Section Plan for British Patience, 7th June 1943 1943, Memo to the Chief Ship Surveyor regarding First Entry for British Patience, 9th July 1943 1943, Steel Motorship Report for British Patience, 22nd June 1943 1943, Form for Vessels of 100 Tons & Upwards for British Patience, 4th June 1943 1943, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Patience, 6th July 1943 1943, Report on Oil Engine Machinery for British Patience, 15th June 1943 1943, Report on Electrical Equipment for British Patience, 16th June 1943 1943, Report on Annual Load Line Survey for British Patience, 26th March 1956 1956, Copy of a letter from the Deputy Clerk to the Classification Committee to the Secretary for Lloyd's Register regarding British Patience, 6th July 1961 1961, Copy of a letter from BP Tanker Co Ltd to the Secretary for Lloyd's Register regarding British Patience, 14th June 1961 1961, Report of Total Loss, Casualty, &c for British Patience, 21st June 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for British Patience, 18th April 1961 1961, Copy of a Certificate of Survey of Machinery for British Patience, 13th March 1961 1961, Report of Periodical Surveys & Repairs of Machinery for British Patience, 13th March 1961 1961, Report of Surveys for Freeboard - Conditions of Assignment for British Patience, Undated no date, Report of Surveys for Freeboard for British Patience, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Rudder Plan for British Patience, 11th July 1941 1941, Plan of Stern Frame for British Patience, 11th July 1941 1941, Request for Special Survey for British Patience, 9th July 1941 1941, Report on Boilers for British Patience, 31st December 1942 1942, Report on Boilers for British Patience, 31st December 1942 1942, Half Midship Section Plan for British Patience, 7th June 1943 1943, Memo to the Chief Ship Surveyor regarding First Entry for British Patience, 9th July 1943 1943, Steel Motorship Report for British Patience, 22nd June 1943 1943, Form for Vessels of 100 Tons & Upwards for British Patience, 4th June 1943 1943, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Patience, 6th July 1943 1943, Report on Oil Engine Machinery for British Patience, 15th June 1943 1943, Report on Electrical Equipment for British Patience, 16th June 1943 1943, Report on Annual Load Line Survey for British Patience, 26th March 1956 1956, Copy of a letter from the Deputy Clerk to the Classification Committee to the Secretary for Lloyd's Register regarding British Patience, 6th July 1961 1961, Copy of a letter from BP Tanker Co Ltd to the Secretary for Lloyd's Register regarding British Patience, 14th June 1961 1961, Report of Total Loss, Casualty, &c for British Patience, 21st June 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for British Patience, 18th April 1961 1961, Copy of a Certificate of Survey of Machinery for British Patience, 13th March 1961 1961, Report of Periodical Surveys & Repairs of Machinery for British Patience, 13th March 1961 1961, Report of Surveys for Freeboard - Conditions of Assignment for British Patience, Undated no date, Report of Surveys for Freeboard for British Patience, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Rudder Plan for British Patience, 11th July 1941 1941, Plan of Stern Frame for British Patience, 11th July 1941 1941, Request for Special Survey for British Patience, 9th July 1941 1941, Report on Boilers for British Patience, 31st December 1942 1942, Report on Boilers for British Patience, 31st December 1942 1942, Half Midship Section Plan for British Patience, 7th June 1943 1943, Memo to the Chief Ship Surveyor regarding First Entry for British Patience, 9th July 1943 1943, Steel Motorship Report for British Patience, 22nd June 1943 1943, Form for Vessels of 100 Tons & Upwards for British Patience, 4th June 1943 1943, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Patience, 6th July 1943 1943, Report on Oil Engine Machinery for British Patience, 15th June 1943 1943, Report on Electrical Equipment for British Patience, 16th June 1943 1943, Report on Annual Load Line Survey for British Patience, 26th March 1956 1956, Copy of a letter from the Deputy Clerk to the Classification Committee to the Secretary for Lloyd's Register regarding British Patience, 6th July 1961 1961, Copy of a letter from BP Tanker Co Ltd to the Secretary for Lloyd's Register regarding British Patience, 14th June 1961 1961, Report of Total Loss, Casualty, &c for British Patience, 21st June 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for British Patience, 18th April 1961 1961, Copy of a Certificate of Survey of Machinery for British Patience, 13th March 1961 1961, Report of Periodical Surveys & Repairs of Machinery for British Patience, 13th March 1961 1961, Report of Surveys for Freeboard - Conditions of Assignment for British Patience, Undated no date, Report of Surveys for Freeboard for British Patience, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Rudder Plan for British Patience, 11th July 1941 1941, Plan of Stern Frame for British Patience, 11th July 1941 1941, Request for Special Survey for British Patience, 9th July 1941 1941, Report on Boilers for British Patience, 31st December 1942 1942, Report on Boilers for British Patience, 31st December 1942 1942, Half Midship Section Plan for British Patience, 7th June 1943 1943, Memo to the Chief Ship Surveyor regarding First Entry for British Patience, 9th July 1943 1943, Steel Motorship Report for British Patience, 22nd June 1943 1943, Form for Vessels of 100 Tons & Upwards for British Patience, 4th June 1943 1943, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Patience, 6th July 1943 1943, Report on Oil Engine Machinery for British Patience, 15th June 1943 1943, Report on Electrical Equipment for British Patience, 16th June 1943 1943, Report on Annual Load Line Survey for British Patience, 26th March 1956 1956, Copy of a letter from the Deputy Clerk to the Classification Committee to the Secretary for Lloyd's Register regarding British Patience, 6th July 1961 1961, Copy of a letter from BP Tanker Co Ltd to the Secretary for Lloyd's Register regarding British Patience, 14th June 1961 1961, Report of Total Loss, Casualty, &c for British Patience, 21st June 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for British Patience, 18th April 1961 1961, Copy of a Certificate of Survey of Machinery for British Patience, 13th March 1961 1961, Report of Periodical Surveys & Repairs of Machinery for British Patience, 13th March 1961 1961, Report of Surveys for Freeboard - Conditions of Assignment for British Patience, Undated no date, Report of Surveys for Freeboard for British Patience, Undated no date )

The official record pronounced by the Committee

Loss or disposal

To be broken up ( Rudder Plan for British Patience, 11th July 1941 1941, Plan of Stern Frame for British Patience, 11th July 1941 1941, Request for Special Survey for British Patience, 9th July 1941 1941, Report on Boilers for British Patience, 31st December 1942 1942, Report on Boilers for British Patience, 31st December 1942 1942, Half Midship Section Plan for British Patience, 7th June 1943 1943, Memo to the Chief Ship Surveyor regarding First Entry for British Patience, 9th July 1943 1943, Steel Motorship Report for British Patience, 22nd June 1943 1943, Form for Vessels of 100 Tons & Upwards for British Patience, 4th June 1943 1943, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Patience, 6th July 1943 1943, Report on Oil Engine Machinery for British Patience, 15th June 1943 1943, Report on Electrical Equipment for British Patience, 16th June 1943 1943, Report on Annual Load Line Survey for British Patience, 26th March 1956 1956, Copy of a letter from the Deputy Clerk to the Classification Committee to the Secretary for Lloyd's Register regarding British Patience, 6th July 1961 1961, Copy of a letter from BP Tanker Co Ltd to the Secretary for Lloyd's Register regarding British Patience, 14th June 1961 1961, Report of Total Loss, Casualty, &c for British Patience, 21st June 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for British Patience, 18th April 1961 1961, Copy of a Certificate of Survey of Machinery for British Patience, 13th March 1961 1961, Report of Periodical Surveys & Repairs of Machinery for British Patience, 13th March 1961 1961, Report of Surveys for Freeboard - Conditions of Assignment for British Patience, Undated no date, Report of Surveys for Freeboard for British Patience, Undated no date )

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

The year in which a vessel’s construction is completed.

Year of ship completion

1943 ( Rudder Plan for British Patience, 11th July 1941 1941, Plan of Stern Frame for British Patience, 11th July 1941 1941, Request for Special Survey for British Patience, 9th July 1941 1941, Report on Boilers for British Patience, 31st December 1942 1942, Report on Boilers for British Patience, 31st December 1942 1942, Half Midship Section Plan for British Patience, 7th June 1943 1943, Memo to the Chief Ship Surveyor regarding First Entry for British Patience, 9th July 1943 1943, Steel Motorship Report for British Patience, 22nd June 1943 1943, Form for Vessels of 100 Tons & Upwards for British Patience, 4th June 1943 1943, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Patience, 6th July 1943 1943, Report on Oil Engine Machinery for British Patience, 15th June 1943 1943, Report on Electrical Equipment for British Patience, 16th June 1943 1943, Report on Annual Load Line Survey for British Patience, 26th March 1956 1956, Copy of a letter from the Deputy Clerk to the Classification Committee to the Secretary for Lloyd's Register regarding British Patience, 6th July 1961 1961, Copy of a letter from BP Tanker Co Ltd to the Secretary for Lloyd's Register regarding British Patience, 14th June 1961 1961, Report of Total Loss, Casualty, &c for British Patience, 21st June 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for British Patience, 18th April 1961 1961, Copy of a Certificate of Survey of Machinery for British Patience, 13th March 1961 1961, Report of Periodical Surveys & Repairs of Machinery for British Patience, 13th March 1961 1961, Report of Surveys for Freeboard - Conditions of Assignment for British Patience, Undated no date, Report of Surveys for Freeboard for British Patience, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Harland & Wolff Ltd ( Rudder Plan for British Patience, 11th July 1941 1941, Plan of Stern Frame for British Patience, 11th July 1941 1941, Request for Special Survey for British Patience, 9th July 1941 1941, Report on Boilers for British Patience, 31st December 1942 1942, Report on Boilers for British Patience, 31st December 1942 1942, Half Midship Section Plan for British Patience, 7th June 1943 1943, Memo to the Chief Ship Surveyor regarding First Entry for British Patience, 9th July 1943 1943, Steel Motorship Report for British Patience, 22nd June 1943 1943, Form for Vessels of 100 Tons & Upwards for British Patience, 4th June 1943 1943, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Patience, 6th July 1943 1943, Report on Oil Engine Machinery for British Patience, 15th June 1943 1943, Report on Electrical Equipment for British Patience, 16th June 1943 1943, Report on Annual Load Line Survey for British Patience, 26th March 1956 1956, Copy of a letter from the Deputy Clerk to the Classification Committee to the Secretary for Lloyd's Register regarding British Patience, 6th July 1961 1961, Copy of a letter from BP Tanker Co Ltd to the Secretary for Lloyd's Register regarding British Patience, 14th June 1961 1961, Report of Total Loss, Casualty, &c for British Patience, 21st June 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for British Patience, 18th April 1961 1961, Copy of a Certificate of Survey of Machinery for British Patience, 13th March 1961 1961, Report of Periodical Surveys & Repairs of Machinery for British Patience, 13th March 1961 1961, Report of Surveys for Freeboard - Conditions of Assignment for British Patience, Undated no date, Report of Surveys for Freeboard for British Patience, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Glasgow ( Rudder Plan for British Patience, 11th July 1941 1941, Plan of Stern Frame for British Patience, 11th July 1941 1941, Request for Special Survey for British Patience, 9th July 1941 1941, Report on Boilers for British Patience, 31st December 1942 1942, Report on Boilers for British Patience, 31st December 1942 1942, Half Midship Section Plan for British Patience, 7th June 1943 1943, Memo to the Chief Ship Surveyor regarding First Entry for British Patience, 9th July 1943 1943, Steel Motorship Report for British Patience, 22nd June 1943 1943, Form for Vessels of 100 Tons & Upwards for British Patience, 4th June 1943 1943, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Patience, 6th July 1943 1943, Report on Oil Engine Machinery for British Patience, 15th June 1943 1943, Report on Electrical Equipment for British Patience, 16th June 1943 1943, Report on Annual Load Line Survey for British Patience, 26th March 1956 1956, Copy of a letter from the Deputy Clerk to the Classification Committee to the Secretary for Lloyd's Register regarding British Patience, 6th July 1961 1961, Copy of a letter from BP Tanker Co Ltd to the Secretary for Lloyd's Register regarding British Patience, 14th June 1961 1961, Report of Total Loss, Casualty, &c for British Patience, 21st June 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for British Patience, 18th April 1961 1961, Copy of a Certificate of Survey of Machinery for British Patience, 13th March 1961 1961, Report of Periodical Surveys & Repairs of Machinery for British Patience, 13th March 1961 1961, Report of Surveys for Freeboard - Conditions of Assignment for British Patience, Undated no date, Report of Surveys for Freeboard for British Patience, Undated no date )

A vessel’s means of propulsion.

Propulsion

undefined ( Rudder Plan for British Patience, 11th July 1941 1941, Plan of Stern Frame for British Patience, 11th July 1941 1941, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Patience, 6th July 1943 1943, Report on Annual Load Line Survey for British Patience, 26th March 1956 1956, Remarks of the Chief Engineer Surveyor regarding class for British Patience, 18th April 1961 1961, Report of Surveys for Freeboard - Conditions of Assignment for British Patience, Undated no date, Report of Surveys for Freeboard for British Patience, Undated no date )

Motor (internal combustion) ( Request for Special Survey for British Patience, 9th July 1941 1941, Report on Boilers for British Patience, 31st December 1942 1942, Report on Boilers for British Patience, 31st December 1942 1942, Half Midship Section Plan for British Patience, 7th June 1943 1943, Memo to the Chief Ship Surveyor regarding First Entry for British Patience, 9th July 1943 1943, Steel Motorship Report for British Patience, 22nd June 1943 1943, Form for Vessels of 100 Tons & Upwards for British Patience, 4th June 1943 1943, Report on Oil Engine Machinery for British Patience, 15th June 1943 1943, Report on Electrical Equipment for British Patience, 16th June 1943 1943, Copy of a letter from the Deputy Clerk to the Classification Committee to the Secretary for Lloyd's Register regarding British Patience, 6th July 1961 1961, Copy of a letter from BP Tanker Co Ltd to the Secretary for Lloyd's Register regarding British Patience, 14th June 1961 1961, Report of Total Loss, Casualty, &c for British Patience, 21st June 1961 1961, Copy of a Certificate of Survey of Machinery for British Patience, 13th March 1961 1961, Report of Periodical Surveys & Repairs of Machinery for British Patience, 13th March 1961 1961 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Rudder Plan for British Patience, 11th July 1941 1941, Plan of Stern Frame for British Patience, 11th July 1941 1941, Request for Special Survey for British Patience, 9th July 1941 1941, Report on Boilers for British Patience, 31st December 1942 1942, Report on Boilers for British Patience, 31st December 1942 1942, Half Midship Section Plan for British Patience, 7th June 1943 1943, Memo to the Chief Ship Surveyor regarding First Entry for British Patience, 9th July 1943 1943, Steel Motorship Report for British Patience, 22nd June 1943 1943, Form for Vessels of 100 Tons & Upwards for British Patience, 4th June 1943 1943, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Patience, 6th July 1943 1943, Report on Oil Engine Machinery for British Patience, 15th June 1943 1943, Report on Electrical Equipment for British Patience, 16th June 1943 1943, Report on Annual Load Line Survey for British Patience, 26th March 1956 1956, Copy of a letter from the Deputy Clerk to the Classification Committee to the Secretary for Lloyd's Register regarding British Patience, 6th July 1961 1961, Copy of a letter from BP Tanker Co Ltd to the Secretary for Lloyd's Register regarding British Patience, 14th June 1961 1961, Report of Total Loss, Casualty, &c for British Patience, 21st June 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for British Patience, 18th April 1961 1961, Copy of a Certificate of Survey of Machinery for British Patience, 13th March 1961 1961, Report of Periodical Surveys & Repairs of Machinery for British Patience, 13th March 1961 1961, Report of Surveys for Freeboard - Conditions of Assignment for British Patience, Undated no date, Report of Surveys for Freeboard for British Patience, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Rudder Plan for British Patience, 11th July 1941 1941, Plan of Stern Frame for British Patience, 11th July 1941 1941, Request for Special Survey for British Patience, 9th July 1941 1941, Report on Boilers for British Patience, 31st December 1942 1942, Report on Boilers for British Patience, 31st December 1942 1942, Half Midship Section Plan for British Patience, 7th June 1943 1943, Memo to the Chief Ship Surveyor regarding First Entry for British Patience, 9th July 1943 1943, Steel Motorship Report for British Patience, 22nd June 1943 1943, Form for Vessels of 100 Tons & Upwards for British Patience, 4th June 1943 1943, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Patience, 6th July 1943 1943, Report on Oil Engine Machinery for British Patience, 15th June 1943 1943, Report on Electrical Equipment for British Patience, 16th June 1943 1943, Report on Annual Load Line Survey for British Patience, 26th March 1956 1956, Copy of a letter from the Deputy Clerk to the Classification Committee to the Secretary for Lloyd's Register regarding British Patience, 6th July 1961 1961, Copy of a letter from BP Tanker Co Ltd to the Secretary for Lloyd's Register regarding British Patience, 14th June 1961 1961, Report of Total Loss, Casualty, &c for British Patience, 21st June 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for British Patience, 18th April 1961 1961, Copy of a Certificate of Survey of Machinery for British Patience, 13th March 1961 1961, Report of Periodical Surveys & Repairs of Machinery for British Patience, 13th March 1961 1961, Report of Surveys for Freeboard - Conditions of Assignment for British Patience, Undated no date, Report of Surveys for Freeboard for British Patience, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Rudder Plan for British Patience, 11th July 1941 1941, Plan of Stern Frame for British Patience, 11th July 1941 1941, Request for Special Survey for British Patience, 9th July 1941 1941, Report on Boilers for British Patience, 31st December 1942 1942, Report on Boilers for British Patience, 31st December 1942 1942, Half Midship Section Plan for British Patience, 7th June 1943 1943, Memo to the Chief Ship Surveyor regarding First Entry for British Patience, 9th July 1943 1943, Steel Motorship Report for British Patience, 22nd June 1943 1943, Form for Vessels of 100 Tons & Upwards for British Patience, 4th June 1943 1943, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Patience, 6th July 1943 1943, Report on Oil Engine Machinery for British Patience, 15th June 1943 1943, Report on Electrical Equipment for British Patience, 16th June 1943 1943, Report on Annual Load Line Survey for British Patience, 26th March 1956 1956, Copy of a letter from the Deputy Clerk to the Classification Committee to the Secretary for Lloyd's Register regarding British Patience, 6th July 1961 1961, Copy of a letter from BP Tanker Co Ltd to the Secretary for Lloyd's Register regarding British Patience, 14th June 1961 1961, Report of Total Loss, Casualty, &c for British Patience, 21st June 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for British Patience, 18th April 1961 1961, Copy of a Certificate of Survey of Machinery for British Patience, 13th March 1961 1961, Report of Periodical Surveys & Repairs of Machinery for British Patience, 13th March 1961 1961, Report of Surveys for Freeboard - Conditions of Assignment for British Patience, Undated no date, Report of Surveys for Freeboard for British Patience, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Rudder Plan for British Patience, 11th July 1941 1941, Plan of Stern Frame for British Patience, 11th July 1941 1941, Request for Special Survey for British Patience, 9th July 1941 1941, Report on Boilers for British Patience, 31st December 1942 1942, Report on Boilers for British Patience, 31st December 1942 1942, Half Midship Section Plan for British Patience, 7th June 1943 1943, Memo to the Chief Ship Surveyor regarding First Entry for British Patience, 9th July 1943 1943, Steel Motorship Report for British Patience, 22nd June 1943 1943, Form for Vessels of 100 Tons & Upwards for British Patience, 4th June 1943 1943, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Patience, 6th July 1943 1943, Report on Oil Engine Machinery for British Patience, 15th June 1943 1943, Report on Electrical Equipment for British Patience, 16th June 1943 1943, Report on Annual Load Line Survey for British Patience, 26th March 1956 1956, Copy of a letter from the Deputy Clerk to the Classification Committee to the Secretary for Lloyd's Register regarding British Patience, 6th July 1961 1961, Copy of a letter from BP Tanker Co Ltd to the Secretary for Lloyd's Register regarding British Patience, 14th June 1961 1961, Report of Total Loss, Casualty, &c for British Patience, 21st June 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for British Patience, 18th April 1961 1961, Copy of a Certificate of Survey of Machinery for British Patience, 13th March 1961 1961, Report of Periodical Surveys & Repairs of Machinery for British Patience, 13th March 1961 1961, Report of Surveys for Freeboard - Conditions of Assignment for British Patience, Undated no date, Report of Surveys for Freeboard for British Patience, Undated no date )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sold for Breaking up ( Rudder Plan for British Patience, 11th July 1941 1941, Plan of Stern Frame for British Patience, 11th July 1941 1941, Request for Special Survey for British Patience, 9th July 1941 1941, Report on Boilers for British Patience, 31st December 1942 1942, Report on Boilers for British Patience, 31st December 1942 1942, Half Midship Section Plan for British Patience, 7th June 1943 1943, Memo to the Chief Ship Surveyor regarding First Entry for British Patience, 9th July 1943 1943, Steel Motorship Report for British Patience, 22nd June 1943 1943, Form for Vessels of 100 Tons & Upwards for British Patience, 4th June 1943 1943, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class for British Patience, 6th July 1943 1943, Report on Oil Engine Machinery for British Patience, 15th June 1943 1943, Report on Electrical Equipment for British Patience, 16th June 1943 1943, Report on Annual Load Line Survey for British Patience, 26th March 1956 1956, Copy of a letter from the Deputy Clerk to the Classification Committee to the Secretary for Lloyd's Register regarding British Patience, 6th July 1961 1961, Copy of a letter from BP Tanker Co Ltd to the Secretary for Lloyd's Register regarding British Patience, 14th June 1961 1961, Report of Total Loss, Casualty, &c for British Patience, 21st June 1961 1961, Remarks of the Chief Engineer Surveyor regarding class for British Patience, 18th April 1961 1961, Copy of a Certificate of Survey of Machinery for British Patience, 13th March 1961 1961, Report of Periodical Surveys & Repairs of Machinery for British Patience, 13th March 1961 1961, Report of Surveys for Freeboard - Conditions of Assignment for British Patience, Undated no date, Report of Surveys for Freeboard for British Patience, Undated no date )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1 6,43; Carrying Petroleum in Bulk; Longitudinal Framing at Batton & at Deck; +LMC 6,43 Oil Eng; 2 DB 150 Lb ; Lloyds A & CP ( Steel Motorship Report for British Patience, 22nd June 1943 1943 )

+LMC 6,43 Oil Eng; 2 DB 150 lb ( Report on Oil Engine Machinery for British Patience, 15th June 1943 1943 )

+100A1 Oil Tanker 7,60; SS 1,58; +LMC CS 1,58; BS A 7,60; Sp 1,58; TS 8,59; CL ( Report of Total Loss, Casualty, &c for British Patience, 21st June 1961 1961 )

+100A1; Oil Tanker; SS 1/58; +LMC CS 1/58; Boilers A 7/60; Tail Shaft CL 8/59 ( Report of Periodical Surveys & Repairs of Machinery for British Patience, 13th March 1961 1961 )

+100A1; Carrying Petroleum in Bulk; (Contemplated) ( Report of Surveys for Freeboard for British Patience, Undated no date )

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.