Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Wallasey ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Wallasey, 21st August 1903 1903, Steel Steamer Report for Wallasey, 20th August 1903 1903, Report on Machinery for Wallasey, 14th August 1903 1903, Ship Forgings Form for Wallasey, 29th June 1903 1903, Half Midship Section Plan for Wallasey, 23rd February 1903 1903 )
Cambrian ( Longitudinal Section Plan for Cambrian, 23rd February 1903 1903, Remarks of the Chief Ship Surveyor, regarding class of Cambrian, 28th July 1958 1958, Report of Survey for Repairs, &c for Cambrian, 30th June 1958 1958, Copy of a Certificate of Survey of Damage & Repairs for Cambrian, 3rd July 1958 1958, Copy of a Certificate of Survey of Part of the Machinery for Cambrian, 3rd July 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class of Cambrian, 31st July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Cambrian, 2nd July 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Cambrian, 3rd March 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959, Report of Total Loss, Casualty, &c for Cambrian, 26th February 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959 )
The process of transferring a vessel to water, but not necessarily her completion.
13/07/1903 ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Wallasey, 21st August 1903 1903, Steel Steamer Report for Wallasey, 20th August 1903 1903, Report on Machinery for Wallasey, 14th August 1903 1903, Ship Forgings Form for Wallasey, 29th June 1903 1903, Half Midship Section Plan for Wallasey, 23rd February 1903 1903, Longitudinal Section Plan for Cambrian, 23rd February 1903 1903, Remarks of the Chief Ship Surveyor, regarding class of Cambrian, 28th July 1958 1958, Report of Survey for Repairs, &c for Cambrian, 30th June 1958 1958, Copy of a Certificate of Survey of Damage & Repairs for Cambrian, 3rd July 1958 1958, Copy of a Certificate of Survey of Part of the Machinery for Cambrian, 3rd July 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class of Cambrian, 31st July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Cambrian, 2nd July 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Cambrian, 3rd March 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959, Report of Total Loss, Casualty, &c for Cambrian, 26th February 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959 )
Unique identifier for a given ship, it is assigned by a builder.
246 ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Wallasey, 21st August 1903 1903, Steel Steamer Report for Wallasey, 20th August 1903 1903, Report on Machinery for Wallasey, 14th August 1903 1903, Ship Forgings Form for Wallasey, 29th June 1903 1903, Half Midship Section Plan for Wallasey, 23rd February 1903 1903, Longitudinal Section Plan for Cambrian, 23rd February 1903 1903, Remarks of the Chief Ship Surveyor, regarding class of Cambrian, 28th July 1958 1958, Report of Survey for Repairs, &c for Cambrian, 30th June 1958 1958, Copy of a Certificate of Survey of Damage & Repairs for Cambrian, 3rd July 1958 1958, Copy of a Certificate of Survey of Part of the Machinery for Cambrian, 3rd July 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class of Cambrian, 31st July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Cambrian, 2nd July 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Cambrian, 3rd March 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959, Report of Total Loss, Casualty, &c for Cambrian, 26th February 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959 )
Broad categories and subdivisions of vessels related to their purpose or function.
Tug ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Wallasey, 21st August 1903 1903, Steel Steamer Report for Wallasey, 20th August 1903 1903, Report on Machinery for Wallasey, 14th August 1903 1903, Half Midship Section Plan for Wallasey, 23rd February 1903 1903, Report of Survey for Repairs, &c for Cambrian, 30th June 1958 1958, Copy of a Certificate of Survey of Damage & Repairs for Cambrian, 3rd July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Cambrian, 2nd July 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Cambrian, 3rd March 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959 )
undefined ( Ship Forgings Form for Wallasey, 29th June 1903 1903, Longitudinal Section Plan for Cambrian, 23rd February 1903 1903, Remarks of the Chief Ship Surveyor, regarding class of Cambrian, 28th July 1958 1958, Copy of a Certificate of Survey of Part of the Machinery for Cambrian, 3rd July 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class of Cambrian, 31st July 1958 1958, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959, Report of Total Loss, Casualty, &c for Cambrian, 26th February 1959 1959 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Wallasey, 21st August 1903 1903, Steel Steamer Report for Wallasey, 20th August 1903 1903, Report on Machinery for Wallasey, 14th August 1903 1903, Ship Forgings Form for Wallasey, 29th June 1903 1903, Half Midship Section Plan for Wallasey, 23rd February 1903 1903, Longitudinal Section Plan for Cambrian, 23rd February 1903 1903, Remarks of the Chief Ship Surveyor, regarding class of Cambrian, 28th July 1958 1958, Report of Survey for Repairs, &c for Cambrian, 30th June 1958 1958, Copy of a Certificate of Survey of Damage & Repairs for Cambrian, 3rd July 1958 1958, Copy of a Certificate of Survey of Part of the Machinery for Cambrian, 3rd July 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class of Cambrian, 31st July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Cambrian, 2nd July 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Cambrian, 3rd March 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959, Report of Total Loss, Casualty, &c for Cambrian, 26th February 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Wallasey, 21st August 1903 1903, Steel Steamer Report for Wallasey, 20th August 1903 1903, Report on Machinery for Wallasey, 14th August 1903 1903, Ship Forgings Form for Wallasey, 29th June 1903 1903, Half Midship Section Plan for Wallasey, 23rd February 1903 1903, Longitudinal Section Plan for Cambrian, 23rd February 1903 1903, Remarks of the Chief Ship Surveyor, regarding class of Cambrian, 28th July 1958 1958, Report of Survey for Repairs, &c for Cambrian, 30th June 1958 1958, Copy of a Certificate of Survey of Damage & Repairs for Cambrian, 3rd July 1958 1958, Copy of a Certificate of Survey of Part of the Machinery for Cambrian, 3rd July 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class of Cambrian, 31st July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Cambrian, 2nd July 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Cambrian, 3rd March 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959, Report of Total Loss, Casualty, &c for Cambrian, 26th February 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959 )
Does the vessel possess an auxiliary power source?
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Wallasey, 21st August 1903 1903, Steel Steamer Report for Wallasey, 20th August 1903 1903, Report on Machinery for Wallasey, 14th August 1903 1903, Ship Forgings Form for Wallasey, 29th June 1903 1903, Half Midship Section Plan for Wallasey, 23rd February 1903 1903, Longitudinal Section Plan for Cambrian, 23rd February 1903 1903, Remarks of the Chief Ship Surveyor, regarding class of Cambrian, 28th July 1958 1958, Report of Survey for Repairs, &c for Cambrian, 30th June 1958 1958, Copy of a Certificate of Survey of Damage & Repairs for Cambrian, 3rd July 1958 1958, Copy of a Certificate of Survey of Part of the Machinery for Cambrian, 3rd July 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class of Cambrian, 31st July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Cambrian, 2nd July 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Cambrian, 3rd March 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959, Report of Total Loss, Casualty, &c for Cambrian, 26th February 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959 )
Is electric lighting fitted to the vessel?
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Wallasey, 21st August 1903 1903, Steel Steamer Report for Wallasey, 20th August 1903 1903, Report on Machinery for Wallasey, 14th August 1903 1903, Ship Forgings Form for Wallasey, 29th June 1903 1903, Half Midship Section Plan for Wallasey, 23rd February 1903 1903, Longitudinal Section Plan for Cambrian, 23rd February 1903 1903, Remarks of the Chief Ship Surveyor, regarding class of Cambrian, 28th July 1958 1958, Report of Survey for Repairs, &c for Cambrian, 30th June 1958 1958, Copy of a Certificate of Survey of Damage & Repairs for Cambrian, 3rd July 1958 1958, Copy of a Certificate of Survey of Part of the Machinery for Cambrian, 3rd July 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class of Cambrian, 31st July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Cambrian, 2nd July 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Cambrian, 3rd March 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959, Report of Total Loss, Casualty, &c for Cambrian, 26th February 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959 )
The official record pronounced by the Committee
To be broken up ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Wallasey, 21st August 1903 1903, Steel Steamer Report for Wallasey, 20th August 1903 1903, Report on Machinery for Wallasey, 14th August 1903 1903, Ship Forgings Form for Wallasey, 29th June 1903 1903, Half Midship Section Plan for Wallasey, 23rd February 1903 1903, Longitudinal Section Plan for Cambrian, 23rd February 1903 1903, Remarks of the Chief Ship Surveyor, regarding class of Cambrian, 28th July 1958 1958, Report of Survey for Repairs, &c for Cambrian, 30th June 1958 1958, Copy of a Certificate of Survey of Damage & Repairs for Cambrian, 3rd July 1958 1958, Copy of a Certificate of Survey of Part of the Machinery for Cambrian, 3rd July 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class of Cambrian, 31st July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Cambrian, 2nd July 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Cambrian, 3rd March 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959, Report of Total Loss, Casualty, &c for Cambrian, 26th February 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc ( Steel Steamer Report for Wallasey, 20th August 1903 1903, Report on Machinery for Wallasey, 14th August 1903 1903 )
Sws ( Report of Survey for Repairs, &c for Cambrian, 30th June 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Cambrian, 2nd July 1958 1958 )
The individual and/or organisation listed
Alexandra Towing Co Ltd ( Steel Steamer Report for Wallasey, 20th August 1903 1903, Report on Machinery for Wallasey, 14th August 1903 1903, Report of Survey for Repairs, &c for Cambrian, 30th June 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Cambrian, 2nd July 1958 1958 )
Name of surveyor.
Thomas Shaw ( Steel Steamer Report for Wallasey, 20th August 1903 1903 )
Frank Cook ( Ship Forgings Form for Wallasey, 29th June 1903 1903 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 Steel for Towing Purposes; Lloyds A & CP; +LMC 8,03 ( Steel Steamer Report for Wallasey, 20th August 1903 1903 )
+LMC 8,03 ( Report on Machinery for Wallasey, 14th August 1903 1903 )
TS 6,58 ( Report of Survey for Repairs, &c for Cambrian, 30th June 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Cambrian, 2nd July 1958 1958 )
+100A1 for towing Services 6,58; SS (Dr) 9,49; Sws 7,57; +LMC 7,57; BS M6,58; TS 6,58 ( Report of Total Loss, Casualty, &c for Cambrian, 26th February 1959 1959 )
The name of the port/place of destination given.
Liverpool ( Steel Steamer Report for Wallasey, 20th August 1903 1903 )
Type and configuration of the engine(s) supplied for a vessel.
Vertical Compound Surface Condensing ( Report on Machinery for Wallasey, 14th August 1903 1903 )
C 2 Cy 16 1/4 & 42 1/2 27 ( Report of Periodical Surveys & Repairs of Machinery for Cambrian, 2nd July 1958 1958 )
Date in which construction of a vessel’s engines were completed.
The year in which a vessel’s construction is completed.
1903 ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Wallasey, 21st August 1903 1903, Steel Steamer Report for Wallasey, 20th August 1903 1903, Report on Machinery for Wallasey, 14th August 1903 1903, Ship Forgings Form for Wallasey, 29th June 1903 1903, Half Midship Section Plan for Wallasey, 23rd February 1903 1903, Longitudinal Section Plan for Cambrian, 23rd February 1903 1903, Remarks of the Chief Ship Surveyor, regarding class of Cambrian, 28th July 1958 1958, Report of Survey for Repairs, &c for Cambrian, 30th June 1958 1958, Copy of a Certificate of Survey of Damage & Repairs for Cambrian, 3rd July 1958 1958, Copy of a Certificate of Survey of Part of the Machinery for Cambrian, 3rd July 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class of Cambrian, 31st July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Cambrian, 2nd July 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Cambrian, 3rd March 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959, Report of Total Loss, Casualty, &c for Cambrian, 26th February 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Joseph T Eltringham & Co ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Wallasey, 21st August 1903 1903, Steel Steamer Report for Wallasey, 20th August 1903 1903, Report on Machinery for Wallasey, 14th August 1903 1903, Ship Forgings Form for Wallasey, 29th June 1903 1903, Half Midship Section Plan for Wallasey, 23rd February 1903 1903, Longitudinal Section Plan for Cambrian, 23rd February 1903 1903, Remarks of the Chief Ship Surveyor, regarding class of Cambrian, 28th July 1958 1958, Report of Survey for Repairs, &c for Cambrian, 30th June 1958 1958, Copy of a Certificate of Survey of Damage & Repairs for Cambrian, 3rd July 1958 1958, Copy of a Certificate of Survey of Part of the Machinery for Cambrian, 3rd July 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class of Cambrian, 31st July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Cambrian, 2nd July 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Cambrian, 3rd March 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959, Report of Total Loss, Casualty, &c for Cambrian, 26th February 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959 )
The port or place in which the vessel’s construction took place, at the time of writing.
South Shields ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Wallasey, 21st August 1903 1903, Steel Steamer Report for Wallasey, 20th August 1903 1903, Report on Machinery for Wallasey, 14th August 1903 1903, Ship Forgings Form for Wallasey, 29th June 1903 1903, Half Midship Section Plan for Wallasey, 23rd February 1903 1903, Longitudinal Section Plan for Cambrian, 23rd February 1903 1903, Remarks of the Chief Ship Surveyor, regarding class of Cambrian, 28th July 1958 1958, Report of Survey for Repairs, &c for Cambrian, 30th June 1958 1958, Copy of a Certificate of Survey of Damage & Repairs for Cambrian, 3rd July 1958 1958, Copy of a Certificate of Survey of Part of the Machinery for Cambrian, 3rd July 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class of Cambrian, 31st July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Cambrian, 2nd July 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Cambrian, 3rd March 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959, Report of Total Loss, Casualty, &c for Cambrian, 26th February 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959 )
A vessel’s means of propulsion.
Steam ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Wallasey, 21st August 1903 1903, Steel Steamer Report for Wallasey, 20th August 1903 1903, Ship Forgings Form for Wallasey, 29th June 1903 1903, Half Midship Section Plan for Wallasey, 23rd February 1903 1903, Longitudinal Section Plan for Cambrian, 23rd February 1903 1903, Copy of a Certificate of Survey of Damage & Repairs for Cambrian, 3rd July 1958 1958, Copy of a Certificate of Survey of Part of the Machinery for Cambrian, 3rd July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Cambrian, 2nd July 1958 1958, Report of Total Loss, Casualty, &c for Cambrian, 26th February 1959 1959 )
undefined ( Report on Machinery for Wallasey, 14th August 1903 1903, Remarks of the Chief Ship Surveyor, regarding class of Cambrian, 28th July 1958 1958, Report of Survey for Repairs, &c for Cambrian, 30th June 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class of Cambrian, 31st July 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Cambrian, 3rd March 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959 )
Is the steamer assisted by sail?
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Wallasey, 21st August 1903 1903, Steel Steamer Report for Wallasey, 20th August 1903 1903, Report on Machinery for Wallasey, 14th August 1903 1903, Ship Forgings Form for Wallasey, 29th June 1903 1903, Half Midship Section Plan for Wallasey, 23rd February 1903 1903, Longitudinal Section Plan for Cambrian, 23rd February 1903 1903, Remarks of the Chief Ship Surveyor, regarding class of Cambrian, 28th July 1958 1958, Report of Survey for Repairs, &c for Cambrian, 30th June 1958 1958, Copy of a Certificate of Survey of Damage & Repairs for Cambrian, 3rd July 1958 1958, Copy of a Certificate of Survey of Part of the Machinery for Cambrian, 3rd July 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class of Cambrian, 31st July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Cambrian, 2nd July 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Cambrian, 3rd March 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959, Report of Total Loss, Casualty, &c for Cambrian, 26th February 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959 )
Is machinery fitted at the aft of the vessel?
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Wallasey, 21st August 1903 1903, Steel Steamer Report for Wallasey, 20th August 1903 1903, Report on Machinery for Wallasey, 14th August 1903 1903, Ship Forgings Form for Wallasey, 29th June 1903 1903, Half Midship Section Plan for Wallasey, 23rd February 1903 1903, Longitudinal Section Plan for Cambrian, 23rd February 1903 1903, Remarks of the Chief Ship Surveyor, regarding class of Cambrian, 28th July 1958 1958, Report of Survey for Repairs, &c for Cambrian, 30th June 1958 1958, Copy of a Certificate of Survey of Damage & Repairs for Cambrian, 3rd July 1958 1958, Copy of a Certificate of Survey of Part of the Machinery for Cambrian, 3rd July 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class of Cambrian, 31st July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Cambrian, 2nd July 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Cambrian, 3rd March 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959, Report of Total Loss, Casualty, &c for Cambrian, 26th February 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Wallasey, 21st August 1903 1903, Steel Steamer Report for Wallasey, 20th August 1903 1903, Report on Machinery for Wallasey, 14th August 1903 1903, Ship Forgings Form for Wallasey, 29th June 1903 1903, Half Midship Section Plan for Wallasey, 23rd February 1903 1903, Longitudinal Section Plan for Cambrian, 23rd February 1903 1903, Remarks of the Chief Ship Surveyor, regarding class of Cambrian, 28th July 1958 1958, Report of Survey for Repairs, &c for Cambrian, 30th June 1958 1958, Copy of a Certificate of Survey of Damage & Repairs for Cambrian, 3rd July 1958 1958, Copy of a Certificate of Survey of Part of the Machinery for Cambrian, 3rd July 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class of Cambrian, 31st July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Cambrian, 2nd July 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Cambrian, 3rd March 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959, Report of Total Loss, Casualty, &c for Cambrian, 26th February 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Wallasey, 21st August 1903 1903, Steel Steamer Report for Wallasey, 20th August 1903 1903, Report on Machinery for Wallasey, 14th August 1903 1903, Ship Forgings Form for Wallasey, 29th June 1903 1903, Half Midship Section Plan for Wallasey, 23rd February 1903 1903, Longitudinal Section Plan for Cambrian, 23rd February 1903 1903, Remarks of the Chief Ship Surveyor, regarding class of Cambrian, 28th July 1958 1958, Report of Survey for Repairs, &c for Cambrian, 30th June 1958 1958, Copy of a Certificate of Survey of Damage & Repairs for Cambrian, 3rd July 1958 1958, Copy of a Certificate of Survey of Part of the Machinery for Cambrian, 3rd July 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class of Cambrian, 31st July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Cambrian, 2nd July 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Cambrian, 3rd March 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959, Report of Total Loss, Casualty, &c for Cambrian, 26th February 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959 )
Contextual information related to the reasons of the vessel’s loss or disposal.
Withdrawn from service & scrap ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Wallasey, 21st August 1903 1903, Steel Steamer Report for Wallasey, 20th August 1903 1903, Report on Machinery for Wallasey, 14th August 1903 1903, Ship Forgings Form for Wallasey, 29th June 1903 1903, Half Midship Section Plan for Wallasey, 23rd February 1903 1903, Longitudinal Section Plan for Cambrian, 23rd February 1903 1903, Remarks of the Chief Ship Surveyor, regarding class of Cambrian, 28th July 1958 1958, Report of Survey for Repairs, &c for Cambrian, 30th June 1958 1958, Copy of a Certificate of Survey of Damage & Repairs for Cambrian, 3rd July 1958 1958, Copy of a Certificate of Survey of Part of the Machinery for Cambrian, 3rd July 1958 1958, Remarks of the Chief Engineer Surveyor, regarding class of Cambrian, 31st July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Cambrian, 2nd July 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Cambrian, 3rd March 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959, Report of Total Loss, Casualty, &c for Cambrian, 26th February 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959 )
The listed port to which a given vessel belongs.
Liverpool ( Steel Steamer Report for Wallasey, 20th August 1903 1903, Report on Machinery for Wallasey, 14th August 1903 1903 )
Swansea ( Report of Survey for Repairs, &c for Cambrian, 30th June 1958 1958 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
F W Staveley ( Steel Steamer Report for Wallasey, 20th August 1903 1903 )
Location where a vessel’s survey was undertaken.
South Shields; Newcastle on Tyne ( Steel Steamer Report for Wallasey, 20th August 1903 1903 )
Newcastle on Tyne ( Report on Machinery for Wallasey, 14th August 1903 1903 )
Sunderland ( Ship Forgings Form for Wallasey, 29th June 1903 1903 )
South Shields ( Half Midship Section Plan for Wallasey, 23rd February 1903 1903, Longitudinal Section Plan for Cambrian, 23rd February 1903 1903 )
Port Talbot; Swansea ( Report of Survey for Repairs, &c for Cambrian, 30th June 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Cambrian, 2nd July 1958 1958 )
Bilbao ( Copy of a Certificate of Survey of Damage & Repairs for Cambrian, 3rd July 1958 1958 )
Swansea ( Copy of a Certificate of Survey of Part of the Machinery for Cambrian, 3rd July 1958 1958 )
Liverpool ( Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Cambrian, 28th January 1959 1959 )
Recorded information related to a vessel’s movements.
South Shields; Liverpool ( Steel Steamer Report for Wallasey, 20th August 1903 1903 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
149 ( Steel Steamer Report for Wallasey, 20th August 1903 1903, Report on Machinery for Wallasey, 14th August 1903 1903, Report of Survey for Repairs, &c for Cambrian, 30th June 1958 1958, Copy of a Certificate of Survey of Damage & Repairs for Cambrian, 3rd July 1958 1958, Copy of a Certificate of Survey of Part of the Machinery for Cambrian, 3rd July 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Cambrian, 2nd July 1958 1958, Report of Total Loss, Casualty, &c for Cambrian, 26th February 1959 1959 )
Location of construction for a vessel’s engines.
South Shields ( Report on Machinery for Wallasey, 14th August 1903 1903, Report of Periodical Surveys & Repairs of Machinery for Cambrian, 2nd July 1958 1958 )
The port in which a vessel is registered or permanently based.
Swansea ( Report of Periodical Surveys & Repairs of Machinery for Cambrian, 2nd July 1958 1958 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.