Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

The process of transferring a vessel to water, but not necessarily her completion.

Unique identifier for a given ship, it is assigned by a builder.

A vessel’s means of propulsion.

Is the steamer assisted by sail?

Is machinery fitted at the aft of the vessel?

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sold to shipbreakers for breaking up ( Plan of Profile & Tank Top for Carpio, 9th March 1920 1920, Plan of Half Midship Section for Carpio, 25th March 1920 1920, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, Secretary of Lloyd's Register, enclosing a forwarded letter regarding Carpio, 3rd November 1921 1921, Letter from George L Lyle, Liverpool Surveyor, to the Liverpool Secretary of Lloyd's Register regarding omitted information on a report for Carpio, 3rd November 1921 1921, Letter from the London Secretary of Lloyd's Register to the Liverpool Secretary of Lloyd's Register regarding information needed for the classification certificate for Carpio, 2nd November 1921 1921, Memo from Chief Surveyors to the Classing Committee regarding class of Carpio, 27th October 1921 1921, Freeboard Verification Form for Steamers for Carpio, 13th October 1921 1921, Steel Steamer Report for Carpio, 24th October 1921 1921, Report on Machinery for Carpio, 21st October 1921 1921, Report on Machinery for Carpio, 14th March 1921 1921, Report on Boilers for Carpio, 24th February 1921 1921, Report on Boilers for Carpio, 24th February 1921 1921, Report on Electric Lighting Installation for Carpio, 21st October 1921 1921, Surveys for Freeboard Report for Carpio, April 1932 1932, Report of Total Loss, Casualty, &c for Carpio, 15th November 1954 1954, List of Plans Enclosed for Carpio, Undated no date, Copy of Freeboard Report for Carpio, Undated no date )

The country or national waters where a vessel is lost/disposed of, or last recorded.

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Physical arrangement of a ship’s masts, sails and rigging.

Type and configuration of the engine(s) supplied for a vessel.

Date in which construction of a vessel’s engines were completed.

The port in which a vessel is registered or permanently based.

The year in which a vessel’s construction is completed.

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

The port or place in which the vessel’s construction took place, at the time of writing.

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Plan of Profile & Tank Top for Carpio, 9th March 1920 1920, Plan of Half Midship Section for Carpio, 25th March 1920 1920, Letter from W L Clark, Secretary to the Liverpool Committee to A Scott Esq, Secretary of Lloyd's Register, enclosing a forwarded letter regarding Carpio, 3rd November 1921 1921, Letter from George L Lyle, Liverpool Surveyor, to the Liverpool Secretary of Lloyd's Register regarding omitted information on a report for Carpio, 3rd November 1921 1921, Letter from the London Secretary of Lloyd's Register to the Liverpool Secretary of Lloyd's Register regarding information needed for the classification certificate for Carpio, 2nd November 1921 1921, Memo from Chief Surveyors to the Classing Committee regarding class of Carpio, 27th October 1921 1921, Freeboard Verification Form for Steamers for Carpio, 13th October 1921 1921, Steel Steamer Report for Carpio, 24th October 1921 1921, Report on Machinery for Carpio, 21st October 1921 1921, Report on Machinery for Carpio, 14th March 1921 1921, Report on Boilers for Carpio, 24th February 1921 1921, Report on Boilers for Carpio, 24th February 1921 1921, Report on Electric Lighting Installation for Carpio, 21st October 1921 1921, Surveys for Freeboard Report for Carpio, April 1932 1932, Report of Total Loss, Casualty, &c for Carpio, 15th November 1954 1954, List of Plans Enclosed for Carpio, Undated no date, Copy of Freeboard Report for Carpio, Undated no date )

Does the vessel possess an auxiliary power source?

Is electric lighting fitted to the vessel?

The official record pronounced by the Committee

Vessel’s place of loss or disposal/last known recorded location.

Recorded date for the vessel’s loss or disposal.

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1; Shelter deck with freeboard; Fitted for oil fuel &c; Lloyd's A & CP when fee paid ( Steel Steamer Report for Carpio, 24th October 1921 1921 )

+LMC 10,21 ( Report on Machinery for Carpio, 21st October 1921 1921 )

Deferred ( Report on Machinery for Carpio, 14th March 1921 1921 )

Transmit to London ( Report on Boilers for Carpio, 24th February 1921 1921, Report on Boilers for Carpio, 24th February 1921 1921 )

Electric Light ( Report on Electric Lighting Installation for Carpio, 21st October 1921 1921 )

+100A1; Shelter deck with freeboard ( Surveys for Freeboard Report for Carpio, April 1932 1932 )

+100A1; Shelter deck with freeboard 5,53; S S Lon 11,46(Dr); S S Imm 11,50; +LMC 11,50; BS 10,53; TS 5,53 CL ( Report of Total Loss, Casualty, &c for Carpio, 15th November 1954 1954 )

Location of construction for a vessel’s engines.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.