Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Bagnoli I ( Plan in Italian Language of Auxiliary Boiler for Bagnoli I, 28th June 1918 1918, Plan of Main Boiler for Bagnoli I, 12th March 1919 1919, Plan in Italian language of Midship Section for Bagnoli I, 1920 1920, Plan in Italian language of Awning Deck for Bagnoli I, 1920 1920, Plan in Italian Language of Main Deck for Bagnoli I, 1920 1920, Plan in Italian Language of Thrust & Tail Shaft for Bagnoli I, 9th October 1920 1920, Plan in Italian language of Reducing Gear for Bagnoli I, 1921 1921, Freeboard Verification Form for Steamers for Bagnoli I, 28th September 1922 1922, Report on Electric Lighting Installation for Bagnoli I, 8th January 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Bagnoli I, 22nd February 1923 1923, Letter from W A Roberts, the Surveyors, Lloyd\'s Register, Naples to Lloyd\'s Register to the Secretary, London, regarding partial third deck, floors , scantlings & steel wire for Bagnoli I, 15th February 1923 1923, Letter from Secretary, Lloyd\'s Register, London to the Surveyors, Naples, regarding deck, solid floors, propeller posts & wire for Bagnoli I, 6th February 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Bagnoli I, 5th February 1923 1923, Letter from W H Roberts, the Surveyors to Lloyd\'s Register to the Secretary, London, regarding forwarding of approved plans for Bagnoli I, 19th January 1923 1923, Certificate of Survey for Bagnoli I, 12th January 1923 1923, Steel Steamer Report for Bagnoli I, 8th January 1923 1923, Certificate of Survey of Boilers & Machinery for Bagnoli I, 12th January 1923 1923, Report on Machinery for Bagnoli I, 9th January 1923 1923, Note Concerning Fees Details for Bagnoli I, 22nd January 1923 1923, Memo regarding classification for Bagnoli I, 2nd February 1923 1923, Report on Boilers for Bagnoli I, 3rd January 1923 1923, Certificate of Testing for Bagnoli I, 21st June 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 21st June 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 22nd May 1926 1926, Fees for Duel Classification Surveys form for Bagnoli I, 23rd August 1927 1927, Note Concerning the Rudder Post for Bagnoli I, Undated no date, Plan of Profile for Bagnoli I, undated no date )
Valtellina ( Certificate of Testing for Valtellina, 22nd May 1926 1926, Engine Forgings Form for Valtellina, 21st January 1926 1926, Engine Forgings Form for Valtellina, 19th January 1926 1926, Engine Forgings Form for Valtellina, 20th October 1926 1926, Engine Forgings Form for Valtellina, 4th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 10th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 30th January 1928 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928 )
Chisone ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Chisone, 21st May 1928 1928, Letter from G Clark Vaux, the Surveyors, Lloyd's Register of Shipping, Genoa to Lloyd's Register to the Secretary, London, regarding first entry report fees & expanses for Chisone, 14th March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 1st March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 7th March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 1st March 1926 1928, Report of Survey for Repairs, &c for Chisone, 23rd February 1928 1928, Report on Oil Engine Machinery for Chisone, 5th March 1928 1928, Report on Boilers for Chisone, 5th March 1928 1928, Plan in Italian Language of Donkey Boiler for Chisone, 1928 1928, Memo regarding classification for Chisone, 1st May 1930 1930, Memo for the Chief Surveyors with their annotations regarding the SS No 2 for Chisone, 14th April 1930 1930, Question & Answer Memo between London & Genoa Office regarding Special Survey for Chisone, 19th March 1930 1930, Report of Survey for Repairs, &c for Chisone, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
22/09/1921 ( Plan in Italian Language of Auxiliary Boiler for Bagnoli I, 28th June 1918 1918, Plan of Main Boiler for Bagnoli I, 12th March 1919 1919, Plan in Italian language of Midship Section for Bagnoli I, 1920 1920, Plan in Italian language of Awning Deck for Bagnoli I, 1920 1920, Plan in Italian Language of Main Deck for Bagnoli I, 1920 1920, Plan in Italian Language of Thrust & Tail Shaft for Bagnoli I, 9th October 1920 1920, Plan in Italian language of Reducing Gear for Bagnoli I, 1921 1921, Freeboard Verification Form for Steamers for Bagnoli I, 28th September 1922 1922, Report on Electric Lighting Installation for Bagnoli I, 8th January 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Bagnoli I, 22nd February 1923 1923, Letter from W A Roberts, the Surveyors, Lloyd\'s Register, Naples to Lloyd\'s Register to the Secretary, London, regarding partial third deck, floors , scantlings & steel wire for Bagnoli I, 15th February 1923 1923, Letter from Secretary, Lloyd\'s Register, London to the Surveyors, Naples, regarding deck, solid floors, propeller posts & wire for Bagnoli I, 6th February 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Bagnoli I, 5th February 1923 1923, Letter from W H Roberts, the Surveyors to Lloyd\'s Register to the Secretary, London, regarding forwarding of approved plans for Bagnoli I, 19th January 1923 1923, Certificate of Survey for Bagnoli I, 12th January 1923 1923, Steel Steamer Report for Bagnoli I, 8th January 1923 1923, Certificate of Survey of Boilers & Machinery for Bagnoli I, 12th January 1923 1923, Report on Machinery for Bagnoli I, 9th January 1923 1923, Note Concerning Fees Details for Bagnoli I, 22nd January 1923 1923, Memo regarding classification for Bagnoli I, 2nd February 1923 1923, Report on Boilers for Bagnoli I, 3rd January 1923 1923, Certificate of Testing for Bagnoli I, 21st June 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 21st June 1926 1926, Certificate of Testing for Valtellina, 22nd May 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 22nd May 1926 1926, Engine Forgings Form for Valtellina, 21st January 1926 1926, Engine Forgings Form for Valtellina, 19th January 1926 1926, Engine Forgings Form for Valtellina, 20th October 1926 1926, Fees for Duel Classification Surveys form for Bagnoli I, 23rd August 1927 1927, Engine Forgings Form for Valtellina, 4th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 10th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Chisone, 21st May 1928 1928, Letter from G Clark Vaux, the Surveyors, Lloyd's Register of Shipping, Genoa to Lloyd's Register to the Secretary, London, regarding first entry report fees & expanses for Chisone, 14th March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 1st March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 7th March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 1st March 1926 1928, Report of Survey for Repairs, &c for Chisone, 23rd February 1928 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928, Report on Oil Engine Machinery for Chisone, 5th March 1928 1928, Report on Boilers for Chisone, 5th March 1928 1928, Plan in Italian Language of Donkey Boiler for Chisone, 1928 1928, Memo regarding classification for Chisone, 1st May 1930 1930, Memo for the Chief Surveyors with their annotations regarding the SS No 2 for Chisone, 14th April 1930 1930, Question & Answer Memo between London & Genoa Office regarding Special Survey for Chisone, 19th March 1930 1930, Report of Survey for Repairs, &c for Chisone, Undated no date, Note Concerning the Rudder Post for Bagnoli I, Undated no date, Plan of Profile for Bagnoli I, undated no date )
Unique identifier for a given ship, it is assigned by a builder.
1 ( Plan in Italian Language of Auxiliary Boiler for Bagnoli I, 28th June 1918 1918, Plan of Main Boiler for Bagnoli I, 12th March 1919 1919, Plan in Italian language of Midship Section for Bagnoli I, 1920 1920, Plan in Italian language of Awning Deck for Bagnoli I, 1920 1920, Plan in Italian Language of Main Deck for Bagnoli I, 1920 1920, Plan in Italian Language of Thrust & Tail Shaft for Bagnoli I, 9th October 1920 1920, Plan in Italian language of Reducing Gear for Bagnoli I, 1921 1921, Freeboard Verification Form for Steamers for Bagnoli I, 28th September 1922 1922, Report on Electric Lighting Installation for Bagnoli I, 8th January 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Bagnoli I, 22nd February 1923 1923, Letter from W A Roberts, the Surveyors, Lloyd\'s Register, Naples to Lloyd\'s Register to the Secretary, London, regarding partial third deck, floors , scantlings & steel wire for Bagnoli I, 15th February 1923 1923, Letter from Secretary, Lloyd\'s Register, London to the Surveyors, Naples, regarding deck, solid floors, propeller posts & wire for Bagnoli I, 6th February 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Bagnoli I, 5th February 1923 1923, Letter from W H Roberts, the Surveyors to Lloyd\'s Register to the Secretary, London, regarding forwarding of approved plans for Bagnoli I, 19th January 1923 1923, Certificate of Survey for Bagnoli I, 12th January 1923 1923, Steel Steamer Report for Bagnoli I, 8th January 1923 1923, Certificate of Survey of Boilers & Machinery for Bagnoli I, 12th January 1923 1923, Report on Machinery for Bagnoli I, 9th January 1923 1923, Note Concerning Fees Details for Bagnoli I, 22nd January 1923 1923, Memo regarding classification for Bagnoli I, 2nd February 1923 1923, Report on Boilers for Bagnoli I, 3rd January 1923 1923, Certificate of Testing for Bagnoli I, 21st June 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 21st June 1926 1926, Certificate of Testing for Valtellina, 22nd May 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 22nd May 1926 1926, Engine Forgings Form for Valtellina, 21st January 1926 1926, Engine Forgings Form for Valtellina, 19th January 1926 1926, Engine Forgings Form for Valtellina, 20th October 1926 1926, Fees for Duel Classification Surveys form for Bagnoli I, 23rd August 1927 1927, Engine Forgings Form for Valtellina, 4th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 10th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Chisone, 21st May 1928 1928, Letter from G Clark Vaux, the Surveyors, Lloyd's Register of Shipping, Genoa to Lloyd's Register to the Secretary, London, regarding first entry report fees & expanses for Chisone, 14th March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 1st March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 7th March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 1st March 1926 1928, Report of Survey for Repairs, &c for Chisone, 23rd February 1928 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928, Report on Oil Engine Machinery for Chisone, 5th March 1928 1928, Report on Boilers for Chisone, 5th March 1928 1928, Plan in Italian Language of Donkey Boiler for Chisone, 1928 1928, Memo regarding classification for Chisone, 1st May 1930 1930, Memo for the Chief Surveyors with their annotations regarding the SS No 2 for Chisone, 14th April 1930 1930, Question & Answer Memo between London & Genoa Office regarding Special Survey for Chisone, 19th March 1930 1930, Report of Survey for Repairs, &c for Chisone, Undated no date, Note Concerning the Rudder Post for Bagnoli I, Undated no date, Plan of Profile for Bagnoli I, undated no date )
Broad categories and subdivisions of vessels related to their purpose or function.
Cargo ( Plan in Italian Language of Auxiliary Boiler for Bagnoli I, 28th June 1918 1918, Plan in Italian language of Midship Section for Bagnoli I, 1920 1920 )
undefined ( Plan of Main Boiler for Bagnoli I, 12th March 1919 1919, Plan in Italian language of Awning Deck for Bagnoli I, 1920 1920, Plan in Italian Language of Main Deck for Bagnoli I, 1920 1920, Plan in Italian Language of Thrust & Tail Shaft for Bagnoli I, 9th October 1920 1920, Plan in Italian language of Reducing Gear for Bagnoli I, 1921 1921, Freeboard Verification Form for Steamers for Bagnoli I, 28th September 1922 1922, Report on Electric Lighting Installation for Bagnoli I, 8th January 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Bagnoli I, 22nd February 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Bagnoli I, 5th February 1923 1923, Letter from W H Roberts, the Surveyors to Lloyd\'s Register to the Secretary, London, regarding forwarding of approved plans for Bagnoli I, 19th January 1923 1923, Certificate of Survey for Bagnoli I, 12th January 1923 1923, Certificate of Survey of Boilers & Machinery for Bagnoli I, 12th January 1923 1923, Report on Machinery for Bagnoli I, 9th January 1923 1923, Note Concerning Fees Details for Bagnoli I, 22nd January 1923 1923, Memo regarding classification for Bagnoli I, 2nd February 1923 1923, Report on Boilers for Bagnoli I, 3rd January 1923 1923, Certificate of Testing for Bagnoli I, 21st June 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 21st June 1926 1926, Certificate of Testing for Valtellina, 22nd May 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 22nd May 1926 1926, Engine Forgings Form for Valtellina, 21st January 1926 1926, Engine Forgings Form for Valtellina, 19th January 1926 1926, Engine Forgings Form for Valtellina, 20th October 1926 1926, Fees for Duel Classification Surveys form for Bagnoli I, 23rd August 1927 1927, Engine Forgings Form for Valtellina, 4th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 10th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Chisone, 21st May 1928 1928, Letter from G Clark Vaux, the Surveyors, Lloyd's Register of Shipping, Genoa to Lloyd's Register to the Secretary, London, regarding first entry report fees & expanses for Chisone, 14th March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 1st March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 7th March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 1st March 1926 1928, Report of Survey for Repairs, &c for Chisone, 23rd February 1928 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928, Report on Oil Engine Machinery for Chisone, 5th March 1928 1928, Report on Boilers for Chisone, 5th March 1928 1928, Plan in Italian Language of Donkey Boiler for Chisone, 1928 1928, Memo regarding classification for Chisone, 1st May 1930 1930, Memo for the Chief Surveyors with their annotations regarding the SS No 2 for Chisone, 14th April 1930 1930, Question & Answer Memo between London & Genoa Office regarding Special Survey for Chisone, 19th March 1930 1930, Report of Survey for Repairs, &c for Chisone, Undated no date, Note Concerning the Rudder Post for Bagnoli I, Undated no date, Plan of Profile for Bagnoli I, undated no date )
Screw Steamer ( Letter from W A Roberts, the Surveyors, Lloyd\'s Register, Naples to Lloyd\'s Register to the Secretary, London, regarding partial third deck, floors , scantlings & steel wire for Bagnoli I, 15th February 1923 1923, Letter from Secretary, Lloyd\'s Register, London to the Surveyors, Naples, regarding deck, solid floors, propeller posts & wire for Bagnoli I, 6th February 1923 1923, Steel Steamer Report for Bagnoli I, 8th January 1923 1923 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Plan in Italian Language of Auxiliary Boiler for Bagnoli I, 28th June 1918 1918, Plan of Main Boiler for Bagnoli I, 12th March 1919 1919, Plan in Italian language of Midship Section for Bagnoli I, 1920 1920, Plan in Italian language of Awning Deck for Bagnoli I, 1920 1920, Plan in Italian Language of Main Deck for Bagnoli I, 1920 1920, Plan in Italian Language of Thrust & Tail Shaft for Bagnoli I, 9th October 1920 1920, Plan in Italian language of Reducing Gear for Bagnoli I, 1921 1921, Freeboard Verification Form for Steamers for Bagnoli I, 28th September 1922 1922, Report on Electric Lighting Installation for Bagnoli I, 8th January 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Bagnoli I, 22nd February 1923 1923, Letter from W A Roberts, the Surveyors, Lloyd\'s Register, Naples to Lloyd\'s Register to the Secretary, London, regarding partial third deck, floors , scantlings & steel wire for Bagnoli I, 15th February 1923 1923, Letter from Secretary, Lloyd\'s Register, London to the Surveyors, Naples, regarding deck, solid floors, propeller posts & wire for Bagnoli I, 6th February 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Bagnoli I, 5th February 1923 1923, Letter from W H Roberts, the Surveyors to Lloyd\'s Register to the Secretary, London, regarding forwarding of approved plans for Bagnoli I, 19th January 1923 1923, Certificate of Survey for Bagnoli I, 12th January 1923 1923, Steel Steamer Report for Bagnoli I, 8th January 1923 1923, Certificate of Survey of Boilers & Machinery for Bagnoli I, 12th January 1923 1923, Report on Machinery for Bagnoli I, 9th January 1923 1923, Note Concerning Fees Details for Bagnoli I, 22nd January 1923 1923, Memo regarding classification for Bagnoli I, 2nd February 1923 1923, Report on Boilers for Bagnoli I, 3rd January 1923 1923, Certificate of Testing for Bagnoli I, 21st June 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 21st June 1926 1926, Certificate of Testing for Valtellina, 22nd May 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 22nd May 1926 1926, Engine Forgings Form for Valtellina, 21st January 1926 1926, Engine Forgings Form for Valtellina, 19th January 1926 1926, Engine Forgings Form for Valtellina, 20th October 1926 1926, Fees for Duel Classification Surveys form for Bagnoli I, 23rd August 1927 1927, Engine Forgings Form for Valtellina, 4th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 10th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Chisone, 21st May 1928 1928, Letter from G Clark Vaux, the Surveyors, Lloyd's Register of Shipping, Genoa to Lloyd's Register to the Secretary, London, regarding first entry report fees & expanses for Chisone, 14th March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 1st March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 7th March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 1st March 1926 1928, Report of Survey for Repairs, &c for Chisone, 23rd February 1928 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928, Report on Oil Engine Machinery for Chisone, 5th March 1928 1928, Report on Boilers for Chisone, 5th March 1928 1928, Plan in Italian Language of Donkey Boiler for Chisone, 1928 1928, Memo regarding classification for Chisone, 1st May 1930 1930, Memo for the Chief Surveyors with their annotations regarding the SS No 2 for Chisone, 14th April 1930 1930, Question & Answer Memo between London & Genoa Office regarding Special Survey for Chisone, 19th March 1930 1930, Report of Survey for Repairs, &c for Chisone, Undated no date, Note Concerning the Rudder Post for Bagnoli I, Undated no date, Plan of Profile for Bagnoli I, undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Plan in Italian Language of Auxiliary Boiler for Bagnoli I, 28th June 1918 1918, Plan of Main Boiler for Bagnoli I, 12th March 1919 1919, Plan in Italian language of Midship Section for Bagnoli I, 1920 1920, Plan in Italian language of Awning Deck for Bagnoli I, 1920 1920, Plan in Italian Language of Main Deck for Bagnoli I, 1920 1920, Plan in Italian Language of Thrust & Tail Shaft for Bagnoli I, 9th October 1920 1920, Plan in Italian language of Reducing Gear for Bagnoli I, 1921 1921, Freeboard Verification Form for Steamers for Bagnoli I, 28th September 1922 1922, Report on Electric Lighting Installation for Bagnoli I, 8th January 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Bagnoli I, 22nd February 1923 1923, Letter from W A Roberts, the Surveyors, Lloyd\'s Register, Naples to Lloyd\'s Register to the Secretary, London, regarding partial third deck, floors , scantlings & steel wire for Bagnoli I, 15th February 1923 1923, Letter from Secretary, Lloyd\'s Register, London to the Surveyors, Naples, regarding deck, solid floors, propeller posts & wire for Bagnoli I, 6th February 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Bagnoli I, 5th February 1923 1923, Letter from W H Roberts, the Surveyors to Lloyd\'s Register to the Secretary, London, regarding forwarding of approved plans for Bagnoli I, 19th January 1923 1923, Certificate of Survey for Bagnoli I, 12th January 1923 1923, Steel Steamer Report for Bagnoli I, 8th January 1923 1923, Certificate of Survey of Boilers & Machinery for Bagnoli I, 12th January 1923 1923, Report on Machinery for Bagnoli I, 9th January 1923 1923, Note Concerning Fees Details for Bagnoli I, 22nd January 1923 1923, Memo regarding classification for Bagnoli I, 2nd February 1923 1923, Report on Boilers for Bagnoli I, 3rd January 1923 1923, Certificate of Testing for Bagnoli I, 21st June 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 21st June 1926 1926, Certificate of Testing for Valtellina, 22nd May 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 22nd May 1926 1926, Engine Forgings Form for Valtellina, 21st January 1926 1926, Engine Forgings Form for Valtellina, 19th January 1926 1926, Engine Forgings Form for Valtellina, 20th October 1926 1926, Fees for Duel Classification Surveys form for Bagnoli I, 23rd August 1927 1927, Engine Forgings Form for Valtellina, 4th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 10th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Chisone, 21st May 1928 1928, Letter from G Clark Vaux, the Surveyors, Lloyd's Register of Shipping, Genoa to Lloyd's Register to the Secretary, London, regarding first entry report fees & expanses for Chisone, 14th March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 1st March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 7th March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 1st March 1926 1928, Report of Survey for Repairs, &c for Chisone, 23rd February 1928 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928, Report on Oil Engine Machinery for Chisone, 5th March 1928 1928, Report on Boilers for Chisone, 5th March 1928 1928, Plan in Italian Language of Donkey Boiler for Chisone, 1928 1928, Memo regarding classification for Chisone, 1st May 1930 1930, Memo for the Chief Surveyors with their annotations regarding the SS No 2 for Chisone, 14th April 1930 1930, Question & Answer Memo between London & Genoa Office regarding Special Survey for Chisone, 19th March 1930 1930, Report of Survey for Repairs, &c for Chisone, Undated no date, Note Concerning the Rudder Post for Bagnoli I, Undated no date, Plan of Profile for Bagnoli I, undated no date )
Does the vessel possess an auxiliary power source?
No ( Plan in Italian Language of Auxiliary Boiler for Bagnoli I, 28th June 1918 1918, Plan of Main Boiler for Bagnoli I, 12th March 1919 1919, Plan in Italian language of Midship Section for Bagnoli I, 1920 1920, Plan in Italian language of Awning Deck for Bagnoli I, 1920 1920, Plan in Italian Language of Main Deck for Bagnoli I, 1920 1920, Plan in Italian Language of Thrust & Tail Shaft for Bagnoli I, 9th October 1920 1920, Plan in Italian language of Reducing Gear for Bagnoli I, 1921 1921, Freeboard Verification Form for Steamers for Bagnoli I, 28th September 1922 1922, Report on Electric Lighting Installation for Bagnoli I, 8th January 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Bagnoli I, 22nd February 1923 1923, Letter from W A Roberts, the Surveyors, Lloyd\'s Register, Naples to Lloyd\'s Register to the Secretary, London, regarding partial third deck, floors , scantlings & steel wire for Bagnoli I, 15th February 1923 1923, Letter from Secretary, Lloyd\'s Register, London to the Surveyors, Naples, regarding deck, solid floors, propeller posts & wire for Bagnoli I, 6th February 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Bagnoli I, 5th February 1923 1923, Letter from W H Roberts, the Surveyors to Lloyd\'s Register to the Secretary, London, regarding forwarding of approved plans for Bagnoli I, 19th January 1923 1923, Certificate of Survey for Bagnoli I, 12th January 1923 1923, Steel Steamer Report for Bagnoli I, 8th January 1923 1923, Certificate of Survey of Boilers & Machinery for Bagnoli I, 12th January 1923 1923, Report on Machinery for Bagnoli I, 9th January 1923 1923, Note Concerning Fees Details for Bagnoli I, 22nd January 1923 1923, Memo regarding classification for Bagnoli I, 2nd February 1923 1923, Report on Boilers for Bagnoli I, 3rd January 1923 1923, Certificate of Testing for Bagnoli I, 21st June 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 21st June 1926 1926, Certificate of Testing for Valtellina, 22nd May 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 22nd May 1926 1926, Engine Forgings Form for Valtellina, 21st January 1926 1926, Engine Forgings Form for Valtellina, 19th January 1926 1926, Engine Forgings Form for Valtellina, 20th October 1926 1926, Fees for Duel Classification Surveys form for Bagnoli I, 23rd August 1927 1927, Engine Forgings Form for Valtellina, 4th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 10th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Chisone, 21st May 1928 1928, Letter from G Clark Vaux, the Surveyors, Lloyd's Register of Shipping, Genoa to Lloyd's Register to the Secretary, London, regarding first entry report fees & expanses for Chisone, 14th March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 1st March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 7th March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 1st March 1926 1928, Report of Survey for Repairs, &c for Chisone, 23rd February 1928 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928, Report on Oil Engine Machinery for Chisone, 5th March 1928 1928, Report on Boilers for Chisone, 5th March 1928 1928, Plan in Italian Language of Donkey Boiler for Chisone, 1928 1928, Memo regarding classification for Chisone, 1st May 1930 1930, Memo for the Chief Surveyors with their annotations regarding the SS No 2 for Chisone, 14th April 1930 1930, Question & Answer Memo between London & Genoa Office regarding Special Survey for Chisone, 19th March 1930 1930, Report of Survey for Repairs, &c for Chisone, Undated no date, Note Concerning the Rudder Post for Bagnoli I, Undated no date, Plan of Profile for Bagnoli I, undated no date )
Is electric lighting fitted to the vessel?
No ( Plan in Italian Language of Auxiliary Boiler for Bagnoli I, 28th June 1918 1918, Plan of Main Boiler for Bagnoli I, 12th March 1919 1919, Plan in Italian language of Midship Section for Bagnoli I, 1920 1920, Plan in Italian language of Awning Deck for Bagnoli I, 1920 1920, Plan in Italian Language of Main Deck for Bagnoli I, 1920 1920, Plan in Italian Language of Thrust & Tail Shaft for Bagnoli I, 9th October 1920 1920, Plan in Italian language of Reducing Gear for Bagnoli I, 1921 1921, Freeboard Verification Form for Steamers for Bagnoli I, 28th September 1922 1922, Report on Electric Lighting Installation for Bagnoli I, 8th January 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Bagnoli I, 22nd February 1923 1923, Letter from W A Roberts, the Surveyors, Lloyd\'s Register, Naples to Lloyd\'s Register to the Secretary, London, regarding partial third deck, floors , scantlings & steel wire for Bagnoli I, 15th February 1923 1923, Letter from Secretary, Lloyd\'s Register, London to the Surveyors, Naples, regarding deck, solid floors, propeller posts & wire for Bagnoli I, 6th February 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Bagnoli I, 5th February 1923 1923, Letter from W H Roberts, the Surveyors to Lloyd\'s Register to the Secretary, London, regarding forwarding of approved plans for Bagnoli I, 19th January 1923 1923, Certificate of Survey for Bagnoli I, 12th January 1923 1923, Steel Steamer Report for Bagnoli I, 8th January 1923 1923, Certificate of Survey of Boilers & Machinery for Bagnoli I, 12th January 1923 1923, Report on Machinery for Bagnoli I, 9th January 1923 1923, Note Concerning Fees Details for Bagnoli I, 22nd January 1923 1923, Memo regarding classification for Bagnoli I, 2nd February 1923 1923, Report on Boilers for Bagnoli I, 3rd January 1923 1923, Certificate of Testing for Bagnoli I, 21st June 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 21st June 1926 1926, Certificate of Testing for Valtellina, 22nd May 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 22nd May 1926 1926, Engine Forgings Form for Valtellina, 21st January 1926 1926, Engine Forgings Form for Valtellina, 19th January 1926 1926, Engine Forgings Form for Valtellina, 20th October 1926 1926, Fees for Duel Classification Surveys form for Bagnoli I, 23rd August 1927 1927, Engine Forgings Form for Valtellina, 4th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 10th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Chisone, 21st May 1928 1928, Letter from G Clark Vaux, the Surveyors, Lloyd's Register of Shipping, Genoa to Lloyd's Register to the Secretary, London, regarding first entry report fees & expanses for Chisone, 14th March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 1st March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 7th March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 1st March 1926 1928, Report of Survey for Repairs, &c for Chisone, 23rd February 1928 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928, Report on Oil Engine Machinery for Chisone, 5th March 1928 1928, Report on Boilers for Chisone, 5th March 1928 1928, Plan in Italian Language of Donkey Boiler for Chisone, 1928 1928, Memo regarding classification for Chisone, 1st May 1930 1930, Memo for the Chief Surveyors with their annotations regarding the SS No 2 for Chisone, 14th April 1930 1930, Question & Answer Memo between London & Genoa Office regarding Special Survey for Chisone, 19th March 1930 1930, Report of Survey for Repairs, &c for Chisone, Undated no date, Note Concerning the Rudder Post for Bagnoli I, Undated no date, Plan of Profile for Bagnoli I, undated no date )
Location where a vessel’s survey was undertaken.
Bagnoli, Naples ( Plan in Italian language of Midship Section for Bagnoli I, 1920 1920, Plan in Italian language of Awning Deck for Bagnoli I, 1920 1920, Plan in Italian Language of Main Deck for Bagnoli I, 1920 1920 )
Legnano ( Plan in Italian Language of Thrust & Tail Shaft for Bagnoli I, 9th October 1920 1920, Plan in Italian language of Reducing Gear for Bagnoli I, 1921 1921 )
Naples ( Freeboard Verification Form for Steamers for Bagnoli I, 28th September 1922 1922, Report on Electric Lighting Installation for Bagnoli I, 8th January 1922 1922, Letter from W A Roberts, the Surveyors, Lloyd\'s Register, Naples to Lloyd\'s Register to the Secretary, London, regarding partial third deck, floors , scantlings & steel wire for Bagnoli I, 15th February 1923 1923, Letter from W H Roberts, the Surveyors to Lloyd\'s Register to the Secretary, London, regarding forwarding of approved plans for Bagnoli I, 19th January 1923 1923, Certificate of Survey for Bagnoli I, 12th January 1923 1923, Steel Steamer Report for Bagnoli I, 8th January 1923 1923, Certificate of Survey of Boilers & Machinery for Bagnoli I, 12th January 1923 1923, Report on Boilers for Bagnoli I, 3rd January 1923 1923 )
London ( Letter from Secretary, Lloyd\'s Register, London to the Surveyors, Naples, regarding deck, solid floors, propeller posts & wire for Bagnoli I, 6th February 1923 1923, Question & Answer Memo between London & Genoa Office regarding Special Survey for Chisone, 19th March 1930 1930 )
Legnano; Naples; Genoa ( Report on Machinery for Bagnoli I, 9th January 1923 1923 )
Genoa ( Certificate of Testing for Bagnoli I, 21st June 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 21st June 1926 1926, Certificate of Testing for Valtellina, 22nd May 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 22nd May 1926 1926, Engine Forgings Form for Valtellina, 20th October 1926 1926, Fees for Duel Classification Surveys form for Bagnoli I, 23rd August 1927 1927, Engine Forgings Form for Valtellina, 4th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 10th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Letter from G Clark Vaux, the Surveyors, Lloyd's Register of Shipping, Genoa to Lloyd's Register to the Secretary, London, regarding first entry report fees & expanses for Chisone, 14th March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 1st March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 7th March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 1st March 1926 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928 )
Leghorn ( Engine Forgings Form for Valtellina, 21st January 1926 1926, Engine Forgings Form for Valtellina, 19th January 1926 1926 )
Spezia; Genoa ( Report of Survey for Repairs, &c for Chisone, 23rd February 1928 1928, Report on Boilers for Chisone, 5th March 1928 1928 )
Turin; Spezia; Genoa ( Report on Oil Engine Machinery for Chisone, 5th March 1928 1928 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nap ( Report on Electric Lighting Installation for Bagnoli I, 8th January 1922 1922, Steel Steamer Report for Bagnoli I, 8th January 1923 1923, Report on Boilers for Bagnoli I, 3rd January 1923 1923 )
Gen ( Report on Machinery for Bagnoli I, 9th January 1923 1923, Report of Survey for Repairs, &c for Chisone, 23rd February 1928 1928, Report on Oil Engine Machinery for Chisone, 5th March 1928 1928, Report on Boilers for Chisone, 5th March 1928 1928 )
The individual and/or organisation listed
Ilva Alti Forni & Acciaierie d Italia ( Report on Electric Lighting Installation for Bagnoli I, 8th January 1922 1922, Steel Steamer Report for Bagnoli I, 8th January 1923 1923, Report on Machinery for Bagnoli I, 9th January 1923 1923, Report on Boilers for Bagnoli I, 3rd January 1923 1923 )
Soc Commerciale di Navigation ( Report of Survey for Repairs, &c for Chisone, 23rd February 1928 1928, Report on Oil Engine Machinery for Chisone, 5th March 1928 1928, Report on Boilers for Chisone, 5th March 1928 1928, Report of Survey for Repairs, &c for Chisone, Undated no date )
Societa Commercial ( Memo regarding classification for Chisone, 1st May 1930 1930 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Awn dk With fbd; Lloyds A & CP; LMC 1,23; FD; CL ( Steel Steamer Report for Bagnoli I, 8th January 1923 1923 )
+LMC 1,23; FD; CL ( Report on Machinery for Bagnoli I, 9th January 1923 1923 )
+100A1; Awn dk W fbd; SS Gen 1-28; +LMC 2,28; S 2,28; +NE 2,28; Oil Engine ( Report of Survey for Repairs, &c for Chisone, 23rd February 1928 1928 )
+LMC 2,28; +NE 2,28; S 2,28; Oil Engine ( Report on Oil Engine Machinery for Chisone, 5th March 1928 1928 )
DB Re Fitted 28,100 LB ( Report on Boilers for Chisone, 5th March 1928 1928 )
Withdraw Class & Insert... ( Report of Survey for Repairs, &c for Chisone, Undated no date )
The name of the port/place of destination given.
Glasgow ( Steel Steamer Report for Bagnoli I, 8th January 1923 1923 )
Rotterdam ( Report of Survey for Repairs, &c for Chisone, 23rd February 1928 1928 )
Type and configuration of the engine(s) supplied for a vessel.
Double Reduction Geared Turbines ( Report on Machinery for Bagnoli I, 9th January 1923 1923 )
Fiat Diesel ( Report on Oil Engine Machinery for Chisone, 5th March 1928 1928 )
Date in which construction of a vessel’s engines were completed.
The year in which a vessel’s construction is completed.
1922 ( Plan in Italian Language of Auxiliary Boiler for Bagnoli I, 28th June 1918 1918, Plan of Main Boiler for Bagnoli I, 12th March 1919 1919, Plan in Italian language of Midship Section for Bagnoli I, 1920 1920, Plan in Italian language of Awning Deck for Bagnoli I, 1920 1920, Plan in Italian Language of Main Deck for Bagnoli I, 1920 1920, Plan in Italian Language of Thrust & Tail Shaft for Bagnoli I, 9th October 1920 1920, Plan in Italian language of Reducing Gear for Bagnoli I, 1921 1921, Freeboard Verification Form for Steamers for Bagnoli I, 28th September 1922 1922, Report on Electric Lighting Installation for Bagnoli I, 8th January 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Bagnoli I, 22nd February 1923 1923, Letter from W A Roberts, the Surveyors, Lloyd\'s Register, Naples to Lloyd\'s Register to the Secretary, London, regarding partial third deck, floors , scantlings & steel wire for Bagnoli I, 15th February 1923 1923, Letter from Secretary, Lloyd\'s Register, London to the Surveyors, Naples, regarding deck, solid floors, propeller posts & wire for Bagnoli I, 6th February 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Bagnoli I, 5th February 1923 1923, Letter from W H Roberts, the Surveyors to Lloyd\'s Register to the Secretary, London, regarding forwarding of approved plans for Bagnoli I, 19th January 1923 1923, Certificate of Survey for Bagnoli I, 12th January 1923 1923, Steel Steamer Report for Bagnoli I, 8th January 1923 1923, Certificate of Survey of Boilers & Machinery for Bagnoli I, 12th January 1923 1923, Report on Machinery for Bagnoli I, 9th January 1923 1923, Note Concerning Fees Details for Bagnoli I, 22nd January 1923 1923, Memo regarding classification for Bagnoli I, 2nd February 1923 1923, Report on Boilers for Bagnoli I, 3rd January 1923 1923, Certificate of Testing for Bagnoli I, 21st June 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 21st June 1926 1926, Certificate of Testing for Valtellina, 22nd May 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 22nd May 1926 1926, Engine Forgings Form for Valtellina, 21st January 1926 1926, Engine Forgings Form for Valtellina, 19th January 1926 1926, Engine Forgings Form for Valtellina, 20th October 1926 1926, Fees for Duel Classification Surveys form for Bagnoli I, 23rd August 1927 1927, Engine Forgings Form for Valtellina, 4th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 10th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Chisone, 21st May 1928 1928, Letter from G Clark Vaux, the Surveyors, Lloyd's Register of Shipping, Genoa to Lloyd's Register to the Secretary, London, regarding first entry report fees & expanses for Chisone, 14th March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 1st March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 7th March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 1st March 1926 1928, Report of Survey for Repairs, &c for Chisone, 23rd February 1928 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928, Report on Oil Engine Machinery for Chisone, 5th March 1928 1928, Report on Boilers for Chisone, 5th March 1928 1928, Plan in Italian Language of Donkey Boiler for Chisone, 1928 1928, Memo regarding classification for Chisone, 1st May 1930 1930, Memo for the Chief Surveyors with their annotations regarding the SS No 2 for Chisone, 14th April 1930 1930, Question & Answer Memo between London & Genoa Office regarding Special Survey for Chisone, 19th March 1930 1930, Report of Survey for Repairs, &c for Chisone, Undated no date, Note Concerning the Rudder Post for Bagnoli I, Undated no date, Plan of Profile for Bagnoli I, undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Ilva Alti Forni e Acciaierie d' Italia ( Plan in Italian Language of Auxiliary Boiler for Bagnoli I, 28th June 1918 1918, Plan of Main Boiler for Bagnoli I, 12th March 1919 1919, Plan in Italian language of Midship Section for Bagnoli I, 1920 1920, Plan in Italian language of Awning Deck for Bagnoli I, 1920 1920, Plan in Italian Language of Main Deck for Bagnoli I, 1920 1920, Plan in Italian Language of Thrust & Tail Shaft for Bagnoli I, 9th October 1920 1920, Plan in Italian language of Reducing Gear for Bagnoli I, 1921 1921, Freeboard Verification Form for Steamers for Bagnoli I, 28th September 1922 1922, Report on Electric Lighting Installation for Bagnoli I, 8th January 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Bagnoli I, 22nd February 1923 1923, Letter from W A Roberts, the Surveyors, Lloyd\'s Register, Naples to Lloyd\'s Register to the Secretary, London, regarding partial third deck, floors , scantlings & steel wire for Bagnoli I, 15th February 1923 1923, Letter from Secretary, Lloyd\'s Register, London to the Surveyors, Naples, regarding deck, solid floors, propeller posts & wire for Bagnoli I, 6th February 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Bagnoli I, 5th February 1923 1923, Letter from W H Roberts, the Surveyors to Lloyd\'s Register to the Secretary, London, regarding forwarding of approved plans for Bagnoli I, 19th January 1923 1923, Certificate of Survey for Bagnoli I, 12th January 1923 1923, Steel Steamer Report for Bagnoli I, 8th January 1923 1923, Certificate of Survey of Boilers & Machinery for Bagnoli I, 12th January 1923 1923, Report on Machinery for Bagnoli I, 9th January 1923 1923, Note Concerning Fees Details for Bagnoli I, 22nd January 1923 1923, Memo regarding classification for Bagnoli I, 2nd February 1923 1923, Report on Boilers for Bagnoli I, 3rd January 1923 1923, Certificate of Testing for Bagnoli I, 21st June 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 21st June 1926 1926, Certificate of Testing for Valtellina, 22nd May 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 22nd May 1926 1926, Engine Forgings Form for Valtellina, 21st January 1926 1926, Engine Forgings Form for Valtellina, 19th January 1926 1926, Engine Forgings Form for Valtellina, 20th October 1926 1926, Fees for Duel Classification Surveys form for Bagnoli I, 23rd August 1927 1927, Engine Forgings Form for Valtellina, 4th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 10th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Chisone, 21st May 1928 1928, Letter from G Clark Vaux, the Surveyors, Lloyd's Register of Shipping, Genoa to Lloyd's Register to the Secretary, London, regarding first entry report fees & expanses for Chisone, 14th March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 1st March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 7th March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 1st March 1926 1928, Report of Survey for Repairs, &c for Chisone, 23rd February 1928 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928, Report on Oil Engine Machinery for Chisone, 5th March 1928 1928, Report on Boilers for Chisone, 5th March 1928 1928, Plan in Italian Language of Donkey Boiler for Chisone, 1928 1928, Memo regarding classification for Chisone, 1st May 1930 1930, Memo for the Chief Surveyors with their annotations regarding the SS No 2 for Chisone, 14th April 1930 1930, Question & Answer Memo between London & Genoa Office regarding Special Survey for Chisone, 19th March 1930 1930, Report of Survey for Repairs, &c for Chisone, Undated no date, Note Concerning the Rudder Post for Bagnoli I, Undated no date, Plan of Profile for Bagnoli I, undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Bagnoli, Naples ( Plan in Italian Language of Auxiliary Boiler for Bagnoli I, 28th June 1918 1918, Plan of Main Boiler for Bagnoli I, 12th March 1919 1919, Plan in Italian language of Midship Section for Bagnoli I, 1920 1920, Plan in Italian language of Awning Deck for Bagnoli I, 1920 1920, Plan in Italian Language of Main Deck for Bagnoli I, 1920 1920, Plan in Italian Language of Thrust & Tail Shaft for Bagnoli I, 9th October 1920 1920, Plan in Italian language of Reducing Gear for Bagnoli I, 1921 1921, Freeboard Verification Form for Steamers for Bagnoli I, 28th September 1922 1922, Report on Electric Lighting Installation for Bagnoli I, 8th January 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Bagnoli I, 22nd February 1923 1923, Letter from W A Roberts, the Surveyors, Lloyd\'s Register, Naples to Lloyd\'s Register to the Secretary, London, regarding partial third deck, floors , scantlings & steel wire for Bagnoli I, 15th February 1923 1923, Letter from Secretary, Lloyd\'s Register, London to the Surveyors, Naples, regarding deck, solid floors, propeller posts & wire for Bagnoli I, 6th February 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Bagnoli I, 5th February 1923 1923, Letter from W H Roberts, the Surveyors to Lloyd\'s Register to the Secretary, London, regarding forwarding of approved plans for Bagnoli I, 19th January 1923 1923, Certificate of Survey for Bagnoli I, 12th January 1923 1923, Steel Steamer Report for Bagnoli I, 8th January 1923 1923, Certificate of Survey of Boilers & Machinery for Bagnoli I, 12th January 1923 1923, Report on Machinery for Bagnoli I, 9th January 1923 1923, Note Concerning Fees Details for Bagnoli I, 22nd January 1923 1923, Memo regarding classification for Bagnoli I, 2nd February 1923 1923, Report on Boilers for Bagnoli I, 3rd January 1923 1923, Certificate of Testing for Bagnoli I, 21st June 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 21st June 1926 1926, Certificate of Testing for Valtellina, 22nd May 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 22nd May 1926 1926, Engine Forgings Form for Valtellina, 21st January 1926 1926, Engine Forgings Form for Valtellina, 19th January 1926 1926, Engine Forgings Form for Valtellina, 20th October 1926 1926, Fees for Duel Classification Surveys form for Bagnoli I, 23rd August 1927 1927, Engine Forgings Form for Valtellina, 4th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 10th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Chisone, 21st May 1928 1928, Letter from G Clark Vaux, the Surveyors, Lloyd's Register of Shipping, Genoa to Lloyd's Register to the Secretary, London, regarding first entry report fees & expanses for Chisone, 14th March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 1st March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 7th March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 1st March 1926 1928, Report of Survey for Repairs, &c for Chisone, 23rd February 1928 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928, Report on Oil Engine Machinery for Chisone, 5th March 1928 1928, Report on Boilers for Chisone, 5th March 1928 1928, Plan in Italian Language of Donkey Boiler for Chisone, 1928 1928, Memo regarding classification for Chisone, 1st May 1930 1930, Memo for the Chief Surveyors with their annotations regarding the SS No 2 for Chisone, 14th April 1930 1930, Question & Answer Memo between London & Genoa Office regarding Special Survey for Chisone, 19th March 1930 1930, Report of Survey for Repairs, &c for Chisone, Undated no date, Note Concerning the Rudder Post for Bagnoli I, Undated no date, Plan of Profile for Bagnoli I, undated no date )
A vessel’s means of propulsion.
Steam ( Plan in Italian Language of Auxiliary Boiler for Bagnoli I, 28th June 1918 1918, Plan in Italian language of Midship Section for Bagnoli I, 1920 1920, Plan in Italian language of Awning Deck for Bagnoli I, 1920 1920, Plan in Italian Language of Main Deck for Bagnoli I, 1920 1920, Plan in Italian Language of Thrust & Tail Shaft for Bagnoli I, 9th October 1920 1920, Plan in Italian language of Reducing Gear for Bagnoli I, 1921 1921, Freeboard Verification Form for Steamers for Bagnoli I, 28th September 1922 1922, Report on Electric Lighting Installation for Bagnoli I, 8th January 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Bagnoli I, 22nd February 1923 1923, Letter from W A Roberts, the Surveyors, Lloyd\'s Register, Naples to Lloyd\'s Register to the Secretary, London, regarding partial third deck, floors , scantlings & steel wire for Bagnoli I, 15th February 1923 1923, Letter from Secretary, Lloyd\'s Register, London to the Surveyors, Naples, regarding deck, solid floors, propeller posts & wire for Bagnoli I, 6th February 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Bagnoli I, 5th February 1923 1923, Letter from W H Roberts, the Surveyors to Lloyd\'s Register to the Secretary, London, regarding forwarding of approved plans for Bagnoli I, 19th January 1923 1923, Certificate of Survey for Bagnoli I, 12th January 1923 1923, Steel Steamer Report for Bagnoli I, 8th January 1923 1923, Certificate of Survey of Boilers & Machinery for Bagnoli I, 12th January 1923 1923, Note Concerning Fees Details for Bagnoli I, 22nd January 1923 1923, Memo regarding classification for Bagnoli I, 2nd February 1923 1923, Report on Boilers for Bagnoli I, 3rd January 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Chisone, 21st May 1928 1928, Letter from G Clark Vaux, the Surveyors, Lloyd's Register of Shipping, Genoa to Lloyd's Register to the Secretary, London, regarding first entry report fees & expanses for Chisone, 14th March 1928 1928, Memo regarding classification for Chisone, 1st May 1930 1930, Memo for the Chief Surveyors with their annotations regarding the SS No 2 for Chisone, 14th April 1930 1930, Report of Survey for Repairs, &c for Chisone, Undated no date )
undefined ( Plan of Main Boiler for Bagnoli I, 12th March 1919 1919, Report on Machinery for Bagnoli I, 9th January 1923 1923, Certificate of Testing for Bagnoli I, 21st June 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 21st June 1926 1926, Certificate of Testing for Valtellina, 22nd May 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 22nd May 1926 1926, Engine Forgings Form for Valtellina, 19th January 1926 1926, Engine Forgings Form for Valtellina, 20th October 1926 1926, Fees for Duel Classification Surveys form for Bagnoli I, 23rd August 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 10th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Fees for Duel Classification Surveys form for Chisone, 1st March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 7th March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 1st March 1926 1928, Report of Survey for Repairs, &c for Chisone, 23rd February 1928 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928, Plan in Italian Language of Donkey Boiler for Chisone, 1928 1928, Note Concerning the Rudder Post for Bagnoli I, Undated no date, Plan of Profile for Bagnoli I, undated no date )
Motor (internal combustion) ( Engine Forgings Form for Valtellina, 21st January 1926 1926, Engine Forgings Form for Valtellina, 4th November 1927 1927, Report on Oil Engine Machinery for Chisone, 5th March 1928 1928, Report on Boilers for Chisone, 5th March 1928 1928, Question & Answer Memo between London & Genoa Office regarding Special Survey for Chisone, 19th March 1930 1930 )
Is the steamer assisted by sail?
No ( Plan in Italian Language of Auxiliary Boiler for Bagnoli I, 28th June 1918 1918, Plan of Main Boiler for Bagnoli I, 12th March 1919 1919, Plan in Italian language of Midship Section for Bagnoli I, 1920 1920, Plan in Italian language of Awning Deck for Bagnoli I, 1920 1920, Plan in Italian Language of Main Deck for Bagnoli I, 1920 1920, Plan in Italian Language of Thrust & Tail Shaft for Bagnoli I, 9th October 1920 1920, Plan in Italian language of Reducing Gear for Bagnoli I, 1921 1921, Freeboard Verification Form for Steamers for Bagnoli I, 28th September 1922 1922, Report on Electric Lighting Installation for Bagnoli I, 8th January 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Bagnoli I, 22nd February 1923 1923, Letter from W A Roberts, the Surveyors, Lloyd\'s Register, Naples to Lloyd\'s Register to the Secretary, London, regarding partial third deck, floors , scantlings & steel wire for Bagnoli I, 15th February 1923 1923, Letter from Secretary, Lloyd\'s Register, London to the Surveyors, Naples, regarding deck, solid floors, propeller posts & wire for Bagnoli I, 6th February 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Bagnoli I, 5th February 1923 1923, Letter from W H Roberts, the Surveyors to Lloyd\'s Register to the Secretary, London, regarding forwarding of approved plans for Bagnoli I, 19th January 1923 1923, Certificate of Survey for Bagnoli I, 12th January 1923 1923, Steel Steamer Report for Bagnoli I, 8th January 1923 1923, Certificate of Survey of Boilers & Machinery for Bagnoli I, 12th January 1923 1923, Report on Machinery for Bagnoli I, 9th January 1923 1923, Note Concerning Fees Details for Bagnoli I, 22nd January 1923 1923, Memo regarding classification for Bagnoli I, 2nd February 1923 1923, Report on Boilers for Bagnoli I, 3rd January 1923 1923, Certificate of Testing for Bagnoli I, 21st June 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 21st June 1926 1926, Certificate of Testing for Valtellina, 22nd May 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 22nd May 1926 1926, Engine Forgings Form for Valtellina, 21st January 1926 1926, Engine Forgings Form for Valtellina, 19th January 1926 1926, Engine Forgings Form for Valtellina, 20th October 1926 1926, Fees for Duel Classification Surveys form for Bagnoli I, 23rd August 1927 1927, Engine Forgings Form for Valtellina, 4th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 10th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Chisone, 21st May 1928 1928, Letter from G Clark Vaux, the Surveyors, Lloyd's Register of Shipping, Genoa to Lloyd's Register to the Secretary, London, regarding first entry report fees & expanses for Chisone, 14th March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 1st March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 7th March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 1st March 1926 1928, Report of Survey for Repairs, &c for Chisone, 23rd February 1928 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928, Report on Oil Engine Machinery for Chisone, 5th March 1928 1928, Report on Boilers for Chisone, 5th March 1928 1928, Plan in Italian Language of Donkey Boiler for Chisone, 1928 1928, Memo regarding classification for Chisone, 1st May 1930 1930, Memo for the Chief Surveyors with their annotations regarding the SS No 2 for Chisone, 14th April 1930 1930, Question & Answer Memo between London & Genoa Office regarding Special Survey for Chisone, 19th March 1930 1930, Report of Survey for Repairs, &c for Chisone, Undated no date, Note Concerning the Rudder Post for Bagnoli I, Undated no date, Plan of Profile for Bagnoli I, undated no date )
Is machinery fitted at the aft of the vessel?
No ( Plan in Italian Language of Auxiliary Boiler for Bagnoli I, 28th June 1918 1918, Plan of Main Boiler for Bagnoli I, 12th March 1919 1919, Plan in Italian language of Midship Section for Bagnoli I, 1920 1920, Plan in Italian language of Awning Deck for Bagnoli I, 1920 1920, Plan in Italian Language of Main Deck for Bagnoli I, 1920 1920, Plan in Italian Language of Thrust & Tail Shaft for Bagnoli I, 9th October 1920 1920, Plan in Italian language of Reducing Gear for Bagnoli I, 1921 1921, Freeboard Verification Form for Steamers for Bagnoli I, 28th September 1922 1922, Report on Electric Lighting Installation for Bagnoli I, 8th January 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Bagnoli I, 22nd February 1923 1923, Letter from W A Roberts, the Surveyors, Lloyd\'s Register, Naples to Lloyd\'s Register to the Secretary, London, regarding partial third deck, floors , scantlings & steel wire for Bagnoli I, 15th February 1923 1923, Letter from Secretary, Lloyd\'s Register, London to the Surveyors, Naples, regarding deck, solid floors, propeller posts & wire for Bagnoli I, 6th February 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Bagnoli I, 5th February 1923 1923, Letter from W H Roberts, the Surveyors to Lloyd\'s Register to the Secretary, London, regarding forwarding of approved plans for Bagnoli I, 19th January 1923 1923, Certificate of Survey for Bagnoli I, 12th January 1923 1923, Steel Steamer Report for Bagnoli I, 8th January 1923 1923, Certificate of Survey of Boilers & Machinery for Bagnoli I, 12th January 1923 1923, Report on Machinery for Bagnoli I, 9th January 1923 1923, Note Concerning Fees Details for Bagnoli I, 22nd January 1923 1923, Memo regarding classification for Bagnoli I, 2nd February 1923 1923, Report on Boilers for Bagnoli I, 3rd January 1923 1923, Certificate of Testing for Bagnoli I, 21st June 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 21st June 1926 1926, Certificate of Testing for Valtellina, 22nd May 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 22nd May 1926 1926, Engine Forgings Form for Valtellina, 21st January 1926 1926, Engine Forgings Form for Valtellina, 19th January 1926 1926, Engine Forgings Form for Valtellina, 20th October 1926 1926, Fees for Duel Classification Surveys form for Bagnoli I, 23rd August 1927 1927, Engine Forgings Form for Valtellina, 4th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 10th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Chisone, 21st May 1928 1928, Letter from G Clark Vaux, the Surveyors, Lloyd's Register of Shipping, Genoa to Lloyd's Register to the Secretary, London, regarding first entry report fees & expanses for Chisone, 14th March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 1st March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 7th March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 1st March 1926 1928, Report of Survey for Repairs, &c for Chisone, 23rd February 1928 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928, Report on Oil Engine Machinery for Chisone, 5th March 1928 1928, Report on Boilers for Chisone, 5th March 1928 1928, Plan in Italian Language of Donkey Boiler for Chisone, 1928 1928, Memo regarding classification for Chisone, 1st May 1930 1930, Memo for the Chief Surveyors with their annotations regarding the SS No 2 for Chisone, 14th April 1930 1930, Question & Answer Memo between London & Genoa Office regarding Special Survey for Chisone, 19th March 1930 1930, Report of Survey for Repairs, &c for Chisone, Undated no date, Note Concerning the Rudder Post for Bagnoli I, Undated no date, Plan of Profile for Bagnoli I, undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Plan in Italian Language of Auxiliary Boiler for Bagnoli I, 28th June 1918 1918, Plan of Main Boiler for Bagnoli I, 12th March 1919 1919, Plan in Italian language of Midship Section for Bagnoli I, 1920 1920, Plan in Italian language of Awning Deck for Bagnoli I, 1920 1920, Plan in Italian Language of Main Deck for Bagnoli I, 1920 1920, Plan in Italian Language of Thrust & Tail Shaft for Bagnoli I, 9th October 1920 1920, Plan in Italian language of Reducing Gear for Bagnoli I, 1921 1921, Freeboard Verification Form for Steamers for Bagnoli I, 28th September 1922 1922, Report on Electric Lighting Installation for Bagnoli I, 8th January 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Bagnoli I, 22nd February 1923 1923, Letter from W A Roberts, the Surveyors, Lloyd\'s Register, Naples to Lloyd\'s Register to the Secretary, London, regarding partial third deck, floors , scantlings & steel wire for Bagnoli I, 15th February 1923 1923, Letter from Secretary, Lloyd\'s Register, London to the Surveyors, Naples, regarding deck, solid floors, propeller posts & wire for Bagnoli I, 6th February 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Bagnoli I, 5th February 1923 1923, Letter from W H Roberts, the Surveyors to Lloyd\'s Register to the Secretary, London, regarding forwarding of approved plans for Bagnoli I, 19th January 1923 1923, Certificate of Survey for Bagnoli I, 12th January 1923 1923, Steel Steamer Report for Bagnoli I, 8th January 1923 1923, Certificate of Survey of Boilers & Machinery for Bagnoli I, 12th January 1923 1923, Report on Machinery for Bagnoli I, 9th January 1923 1923, Note Concerning Fees Details for Bagnoli I, 22nd January 1923 1923, Memo regarding classification for Bagnoli I, 2nd February 1923 1923, Report on Boilers for Bagnoli I, 3rd January 1923 1923, Certificate of Testing for Bagnoli I, 21st June 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 21st June 1926 1926, Certificate of Testing for Valtellina, 22nd May 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 22nd May 1926 1926, Engine Forgings Form for Valtellina, 21st January 1926 1926, Engine Forgings Form for Valtellina, 19th January 1926 1926, Engine Forgings Form for Valtellina, 20th October 1926 1926, Fees for Duel Classification Surveys form for Bagnoli I, 23rd August 1927 1927, Engine Forgings Form for Valtellina, 4th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 10th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Chisone, 21st May 1928 1928, Letter from G Clark Vaux, the Surveyors, Lloyd's Register of Shipping, Genoa to Lloyd's Register to the Secretary, London, regarding first entry report fees & expanses for Chisone, 14th March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 1st March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 7th March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 1st March 1926 1928, Report of Survey for Repairs, &c for Chisone, 23rd February 1928 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928, Report on Oil Engine Machinery for Chisone, 5th March 1928 1928, Report on Boilers for Chisone, 5th March 1928 1928, Plan in Italian Language of Donkey Boiler for Chisone, 1928 1928, Memo regarding classification for Chisone, 1st May 1930 1930, Memo for the Chief Surveyors with their annotations regarding the SS No 2 for Chisone, 14th April 1930 1930, Question & Answer Memo between London & Genoa Office regarding Special Survey for Chisone, 19th March 1930 1930, Report of Survey for Repairs, &c for Chisone, Undated no date, Note Concerning the Rudder Post for Bagnoli I, Undated no date, Plan of Profile for Bagnoli I, undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Plan in Italian Language of Auxiliary Boiler for Bagnoli I, 28th June 1918 1918, Plan of Main Boiler for Bagnoli I, 12th March 1919 1919, Plan in Italian language of Midship Section for Bagnoli I, 1920 1920, Plan in Italian language of Awning Deck for Bagnoli I, 1920 1920, Plan in Italian Language of Main Deck for Bagnoli I, 1920 1920, Plan in Italian Language of Thrust & Tail Shaft for Bagnoli I, 9th October 1920 1920, Plan in Italian language of Reducing Gear for Bagnoli I, 1921 1921, Freeboard Verification Form for Steamers for Bagnoli I, 28th September 1922 1922, Report on Electric Lighting Installation for Bagnoli I, 8th January 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Bagnoli I, 22nd February 1923 1923, Letter from W A Roberts, the Surveyors, Lloyd\'s Register, Naples to Lloyd\'s Register to the Secretary, London, regarding partial third deck, floors , scantlings & steel wire for Bagnoli I, 15th February 1923 1923, Letter from Secretary, Lloyd\'s Register, London to the Surveyors, Naples, regarding deck, solid floors, propeller posts & wire for Bagnoli I, 6th February 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Bagnoli I, 5th February 1923 1923, Letter from W H Roberts, the Surveyors to Lloyd\'s Register to the Secretary, London, regarding forwarding of approved plans for Bagnoli I, 19th January 1923 1923, Certificate of Survey for Bagnoli I, 12th January 1923 1923, Steel Steamer Report for Bagnoli I, 8th January 1923 1923, Certificate of Survey of Boilers & Machinery for Bagnoli I, 12th January 1923 1923, Report on Machinery for Bagnoli I, 9th January 1923 1923, Note Concerning Fees Details for Bagnoli I, 22nd January 1923 1923, Memo regarding classification for Bagnoli I, 2nd February 1923 1923, Report on Boilers for Bagnoli I, 3rd January 1923 1923, Certificate of Testing for Bagnoli I, 21st June 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 21st June 1926 1926, Certificate of Testing for Valtellina, 22nd May 1926 1926, Results of Tests of Steel for Bagnoli I undertaken by A S Mantelli at Societa Anonima Fiat, 22nd May 1926 1926, Engine Forgings Form for Valtellina, 21st January 1926 1926, Engine Forgings Form for Valtellina, 19th January 1926 1926, Engine Forgings Form for Valtellina, 20th October 1926 1926, Fees for Duel Classification Surveys form for Bagnoli I, 23rd August 1927 1927, Engine Forgings Form for Valtellina, 4th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 10th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Chisone, 21st May 1928 1928, Letter from G Clark Vaux, the Surveyors, Lloyd's Register of Shipping, Genoa to Lloyd's Register to the Secretary, London, regarding first entry report fees & expanses for Chisone, 14th March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 1st March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 7th March 1928 1928, Fees for Duel Classification Surveys form for Chisone, 1st March 1926 1928, Report of Survey for Repairs, &c for Chisone, 23rd February 1928 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928, Report on Oil Engine Machinery for Chisone, 5th March 1928 1928, Report on Boilers for Chisone, 5th March 1928 1928, Plan in Italian Language of Donkey Boiler for Chisone, 1928 1928, Memo regarding classification for Chisone, 1st May 1930 1930, Memo for the Chief Surveyors with their annotations regarding the SS No 2 for Chisone, 14th April 1930 1930, Question & Answer Memo between London & Genoa Office regarding Special Survey for Chisone, 19th March 1930 1930, Report of Survey for Repairs, &c for Chisone, Undated no date, Note Concerning the Rudder Post for Bagnoli I, Undated no date, Plan of Profile for Bagnoli I, undated no date )
The port in which a vessel is registered or permanently based.
Naples ( Freeboard Verification Form for Steamers for Bagnoli I, 28th September 1922 1922 )
The listed port to which a given vessel belongs.
Naples ( Report on Electric Lighting Installation for Bagnoli I, 8th January 1922 1922, Steel Steamer Report for Bagnoli I, 8th January 1923 1923, Report on Machinery for Bagnoli I, 9th January 1923 1923, Report on Boilers for Bagnoli I, 3rd January 1923 1923 )
Genoa ( Report of Survey for Repairs, &c for Chisone, 23rd February 1928 1928, Report on Oil Engine Machinery for Chisone, 5th March 1928 1928, Report on Boilers for Chisone, 5th March 1928 1928, Report of Survey for Repairs, &c for Chisone, Undated no date )
Name of surveyor.
W H Roberts ( Report on Electric Lighting Installation for Bagnoli I, 8th January 1922 1922, Letter from W A Roberts, the Surveyors, Lloyd\'s Register, Naples to Lloyd\'s Register to the Secretary, London, regarding partial third deck, floors , scantlings & steel wire for Bagnoli I, 15th February 1923 1923, Letter from W H Roberts, the Surveyors to Lloyd\'s Register to the Secretary, London, regarding forwarding of approved plans for Bagnoli I, 19th January 1923 1923, Certificate of Survey for Bagnoli I, 12th January 1923 1923, Steel Steamer Report for Bagnoli I, 8th January 1923 1923, Certificate of Survey of Boilers & Machinery for Bagnoli I, 12th January 1923 1923, Report on Machinery for Bagnoli I, 9th January 1923 1923, Report on Boilers for Bagnoli I, 3rd January 1923 1923 )
Alexander Lawrance ( Engine Forgings Form for Valtellina, 10th November 1927 1927, Report of Survey for Repairs, &c for Chisone, 23rd February 1928 1928, Report on Oil Engine Machinery for Chisone, 5th March 1928 1928, Report on Boilers for Chisone, 5th March 1928 1928 )
Recorded information related to a vessel’s movements.
Naples; Glasgow ( Steel Steamer Report for Bagnoli I, 8th January 1923 1923 )
Spezia; Genoa; Rotterdam ( Report of Survey for Repairs, &c for Chisone, 23rd February 1928 1928 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
6284 ( Steel Steamer Report for Bagnoli I, 8th January 1923 1923, Report on Machinery for Bagnoli I, 9th January 1923 1923, Report on Boilers for Bagnoli I, 3rd January 1923 1923, Report of Survey for Repairs, &c for Chisone, 23rd February 1928 1928, Report on Oil Engine Machinery for Chisone, 5th March 1928 1928, Report on Boilers for Chisone, 5th March 1928 1928, Report of Survey for Repairs, &c for Chisone, Undated no date )
Location of construction for a vessel’s engines.
Legnano ( Report on Machinery for Bagnoli I, 9th January 1923 1923, Report on Boilers for Bagnoli I, 3rd January 1923 1923 )
Torino ( Engine Forgings Form for Valtellina, 21st January 1926 1926, Engine Forgings Form for Valtellina, 19th January 1926 1926 )
Turin ( Engine Forgings Form for Valtellina, 20th October 1926 1926, Engine Forgings Form for Valtellina, 4th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 10th November 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 13th July 1927 1927, Engine Forgings Form for Valtellina, 30th January 1928 1928, Engine Forgings Form for Valtellina, 30th January 1928 1928, Report on Oil Engine Machinery for Chisone, 5th March 1928 1928, Report on Boilers for Chisone, 5th March 1928 1928 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.