Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
City of Rome ( Copy of Midship Section for City of Rome, December 1879 1879, Plan of Collision Bulkhead and Double Bottom for City of Rome, 23 June 1880 1880, Longitudinal Plan Showing Bulkhead Positions for Engine Room and Boiler Space, 31 July 1880 1880, Section Showing Plate Frames in Engine and Boiler Space for City of Rome, 31 July 1880 1880, Upper Deck Plan and Main Deck Plan for City of Rome, 31 July 1880 1880, Lower Deck Plan and Orlop Deck Plan for City of Rome, 31 July 1880 1880, First Entry Report, Iron Ship Survey, for City of Rome, 8 October 1881 1881, Report on Machinery for City of Rome, 13 October 1881 1881, Report of Survey for Repairs of Engines and Boilers for City of Rome, 3 February 1882 1882, Annual Survey for City of Rome, 4 April 1882 1882, Report on Machinery for City of Rome, 13 June 1882 1882, Telegram from Barrow Shipbuilding Co to Lloyd's Register Committee enquiring why boiler pressure for City of Rome is listed as 80 lbs, 2 September 1882. Note on back submits that enquiries be made of Liverpool surveyor, 4 September 1882 1882, Transcribed copy of telegram, noting enquiry from Barrow Shipbuilding Co, 4 September 1882 1882, Longitudinal plan of boiler room arrangement showing position of boilers, valves and pipes for City of Rome, 3 March 1882 1882, Telegram from Light, Lloyd's Register Liverpool, to Gillespie, Lloyd's Register Cornhill London, on subject of City of Rome boiler pressure, 4 September 1882 1882, Plan for Double Ended Boiler for City of Rome, 30 October 1882 1882, Detailed memorandum on boiler pressure issue regarding City of Rome, 4 September 1882 1882, Plan for Single Ended Boiler for City of Rome, 30 October 1882 1882, Copy of reply telegram wired from Lloyd's Register Cornhill to Barrow Shipbuilding Co on subject of boiler pressure for City of Rome, 4 September 1882 1882, Plan for Superheater for City of Rome, 6 November 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to R. Gillespie, London, further to his earlier wire, updating Gillespie regarding boiler pressure for City of Rome after speaking with surveyor Mr Kinghorn, 4 September 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to B Waymouth, London, enclosing a letter from Mr Kinghorn regarding boiler pressure for City of Rome. Detailed note on reverse regarding decisions re case, 4 September 1882 1882, Machinery plan for renewal of pipework to superheater for City of Rome, 3 March 1882 1882, Letter from J G Kinghorn, Lloyd's Register Liverpool, to J F Light, regretting his clerical error in recording boiler pressure for City of Rome, 4 September 1882 1882, Copy of telegram from Assistant Secretary, Lloyd's Register London, to Barrow Shipbuilding Co, Barrow in Furness, noting that further enquiry has found the auxiliary boilers passed for 90 lbs pressure, the same as the main boilers, stating that the Regist 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, requesting further clarity regarding boiler pressure for City of Rome, 6 September 1882 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, thanking him for his explanatory letter, 8 September 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 31 October 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 30 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, December 1882 1882, Plan of Arrangement of Boiler Room for City of Room, 2 February 1883 1883, Tests of Boiler Steel for Boiler no. 77 for City of Rome, 16 January 1883 1883, Letter from Duncan Ritchie, Lloyd's Register Barrow-in-Furness, to the Secretary, Lloyd's Register London, recommending alterations to City of Rome before she leaves port, 2 May 1883 1883, Report on Machinery for City of Rome, 3 May 1883 1883, Report of Survey for Repairs for City of Rome, 3 May 1883 1883, Annual Survey report on City of Rome, 10 May 1883 1883, Report of Survey for Repairs of Engines and Boilers for City of Rome, 10 May 1883 1883, Annual Surveys report for City of Rome, 7 March 1884 1884, Report of Survey for Repairs for City of Rome, 28 February 1885 1885, Report of Survey for Repairs for City of Rome, 1886 1886 )
The process of transferring a vessel to water, but not necessarily her completion.
14/06/1881 ( Copy of Midship Section for City of Rome, December 1879 1879, Plan of Collision Bulkhead and Double Bottom for City of Rome, 23 June 1880 1880, Longitudinal Plan Showing Bulkhead Positions for Engine Room and Boiler Space, 31 July 1880 1880, Section Showing Plate Frames in Engine and Boiler Space for City of Rome, 31 July 1880 1880, Upper Deck Plan and Main Deck Plan for City of Rome, 31 July 1880 1880, Lower Deck Plan and Orlop Deck Plan for City of Rome, 31 July 1880 1880, First Entry Report, Iron Ship Survey, for City of Rome, 8 October 1881 1881, Report on Machinery for City of Rome, 13 October 1881 1881, Report of Survey for Repairs of Engines and Boilers for City of Rome, 3 February 1882 1882, Annual Survey for City of Rome, 4 April 1882 1882, Report on Machinery for City of Rome, 13 June 1882 1882, Telegram from Barrow Shipbuilding Co to Lloyd's Register Committee enquiring why boiler pressure for City of Rome is listed as 80 lbs, 2 September 1882. Note on back submits that enquiries be made of Liverpool surveyor, 4 September 1882 1882, Transcribed copy of telegram, noting enquiry from Barrow Shipbuilding Co, 4 September 1882 1882, Longitudinal plan of boiler room arrangement showing position of boilers, valves and pipes for City of Rome, 3 March 1882 1882, Telegram from Light, Lloyd's Register Liverpool, to Gillespie, Lloyd's Register Cornhill London, on subject of City of Rome boiler pressure, 4 September 1882 1882, Plan for Double Ended Boiler for City of Rome, 30 October 1882 1882, Detailed memorandum on boiler pressure issue regarding City of Rome, 4 September 1882 1882, Plan for Single Ended Boiler for City of Rome, 30 October 1882 1882, Copy of reply telegram wired from Lloyd's Register Cornhill to Barrow Shipbuilding Co on subject of boiler pressure for City of Rome, 4 September 1882 1882, Plan for Superheater for City of Rome, 6 November 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to R. Gillespie, London, further to his earlier wire, updating Gillespie regarding boiler pressure for City of Rome after speaking with surveyor Mr Kinghorn, 4 September 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to B Waymouth, London, enclosing a letter from Mr Kinghorn regarding boiler pressure for City of Rome. Detailed note on reverse regarding decisions re case, 4 September 1882 1882, Machinery plan for renewal of pipework to superheater for City of Rome, 3 March 1882 1882, Letter from J G Kinghorn, Lloyd's Register Liverpool, to J F Light, regretting his clerical error in recording boiler pressure for City of Rome, 4 September 1882 1882, Copy of telegram from Assistant Secretary, Lloyd's Register London, to Barrow Shipbuilding Co, Barrow in Furness, noting that further enquiry has found the auxiliary boilers passed for 90 lbs pressure, the same as the main boilers, stating that the Regist 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, requesting further clarity regarding boiler pressure for City of Rome, 6 September 1882 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, thanking him for his explanatory letter, 8 September 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 31 October 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 30 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, December 1882 1882, Plan of Arrangement of Boiler Room for City of Room, 2 February 1883 1883, Tests of Boiler Steel for Boiler no. 77 for City of Rome, 16 January 1883 1883, Letter from Duncan Ritchie, Lloyd's Register Barrow-in-Furness, to the Secretary, Lloyd's Register London, recommending alterations to City of Rome before she leaves port, 2 May 1883 1883, Report on Machinery for City of Rome, 3 May 1883 1883, Report of Survey for Repairs for City of Rome, 3 May 1883 1883, Annual Survey report on City of Rome, 10 May 1883 1883, Report of Survey for Repairs of Engines and Boilers for City of Rome, 10 May 1883 1883, Annual Surveys report for City of Rome, 7 March 1884 1884, Report of Survey for Repairs for City of Rome, 28 February 1885 1885, Report of Survey for Repairs for City of Rome, 1886 1886 )
The port or place in which the vessel’s construction took place, at the time of writing.
Barrow-in-Furness ( Copy of Midship Section for City of Rome, December 1879 1879, Plan of Collision Bulkhead and Double Bottom for City of Rome, 23 June 1880 1880, Longitudinal Plan Showing Bulkhead Positions for Engine Room and Boiler Space, 31 July 1880 1880, Section Showing Plate Frames in Engine and Boiler Space for City of Rome, 31 July 1880 1880, Upper Deck Plan and Main Deck Plan for City of Rome, 31 July 1880 1880, Lower Deck Plan and Orlop Deck Plan for City of Rome, 31 July 1880 1880, First Entry Report, Iron Ship Survey, for City of Rome, 8 October 1881 1881, Report on Machinery for City of Rome, 13 October 1881 1881, Report of Survey for Repairs of Engines and Boilers for City of Rome, 3 February 1882 1882, Annual Survey for City of Rome, 4 April 1882 1882, Report on Machinery for City of Rome, 13 June 1882 1882, Telegram from Barrow Shipbuilding Co to Lloyd's Register Committee enquiring why boiler pressure for City of Rome is listed as 80 lbs, 2 September 1882. Note on back submits that enquiries be made of Liverpool surveyor, 4 September 1882 1882, Transcribed copy of telegram, noting enquiry from Barrow Shipbuilding Co, 4 September 1882 1882, Longitudinal plan of boiler room arrangement showing position of boilers, valves and pipes for City of Rome, 3 March 1882 1882, Telegram from Light, Lloyd's Register Liverpool, to Gillespie, Lloyd's Register Cornhill London, on subject of City of Rome boiler pressure, 4 September 1882 1882, Plan for Double Ended Boiler for City of Rome, 30 October 1882 1882, Detailed memorandum on boiler pressure issue regarding City of Rome, 4 September 1882 1882, Plan for Single Ended Boiler for City of Rome, 30 October 1882 1882, Copy of reply telegram wired from Lloyd's Register Cornhill to Barrow Shipbuilding Co on subject of boiler pressure for City of Rome, 4 September 1882 1882, Plan for Superheater for City of Rome, 6 November 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to R. Gillespie, London, further to his earlier wire, updating Gillespie regarding boiler pressure for City of Rome after speaking with surveyor Mr Kinghorn, 4 September 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to B Waymouth, London, enclosing a letter from Mr Kinghorn regarding boiler pressure for City of Rome. Detailed note on reverse regarding decisions re case, 4 September 1882 1882, Machinery plan for renewal of pipework to superheater for City of Rome, 3 March 1882 1882, Letter from J G Kinghorn, Lloyd's Register Liverpool, to J F Light, regretting his clerical error in recording boiler pressure for City of Rome, 4 September 1882 1882, Copy of telegram from Assistant Secretary, Lloyd's Register London, to Barrow Shipbuilding Co, Barrow in Furness, noting that further enquiry has found the auxiliary boilers passed for 90 lbs pressure, the same as the main boilers, stating that the Regist 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, requesting further clarity regarding boiler pressure for City of Rome, 6 September 1882 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, thanking him for his explanatory letter, 8 September 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 31 October 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 30 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, December 1882 1882, Plan of Arrangement of Boiler Room for City of Room, 2 February 1883 1883, Tests of Boiler Steel for Boiler no. 77 for City of Rome, 16 January 1883 1883, Letter from Duncan Ritchie, Lloyd's Register Barrow-in-Furness, to the Secretary, Lloyd's Register London, recommending alterations to City of Rome before she leaves port, 2 May 1883 1883, Report on Machinery for City of Rome, 3 May 1883 1883, Report of Survey for Repairs for City of Rome, 3 May 1883 1883, Annual Survey report on City of Rome, 10 May 1883 1883, Report of Survey for Repairs of Engines and Boilers for City of Rome, 10 May 1883 1883, Annual Surveys report for City of Rome, 7 March 1884 1884, Report of Survey for Repairs for City of Rome, 28 February 1885 1885, Report of Survey for Repairs for City of Rome, 1886 1886 )
The country (flag) that a vessel is registered to, at the time of writing.
United Kingdom ( Copy of Midship Section for City of Rome, December 1879 1879, Plan of Collision Bulkhead and Double Bottom for City of Rome, 23 June 1880 1880, Longitudinal Plan Showing Bulkhead Positions for Engine Room and Boiler Space, 31 July 1880 1880, Section Showing Plate Frames in Engine and Boiler Space for City of Rome, 31 July 1880 1880, Upper Deck Plan and Main Deck Plan for City of Rome, 31 July 1880 1880, Lower Deck Plan and Orlop Deck Plan for City of Rome, 31 July 1880 1880, First Entry Report, Iron Ship Survey, for City of Rome, 8 October 1881 1881, Report on Machinery for City of Rome, 13 October 1881 1881, Report of Survey for Repairs of Engines and Boilers for City of Rome, 3 February 1882 1882, Annual Survey for City of Rome, 4 April 1882 1882, Report on Machinery for City of Rome, 13 June 1882 1882, Telegram from Barrow Shipbuilding Co to Lloyd's Register Committee enquiring why boiler pressure for City of Rome is listed as 80 lbs, 2 September 1882. Note on back submits that enquiries be made of Liverpool surveyor, 4 September 1882 1882, Transcribed copy of telegram, noting enquiry from Barrow Shipbuilding Co, 4 September 1882 1882, Longitudinal plan of boiler room arrangement showing position of boilers, valves and pipes for City of Rome, 3 March 1882 1882, Telegram from Light, Lloyd's Register Liverpool, to Gillespie, Lloyd's Register Cornhill London, on subject of City of Rome boiler pressure, 4 September 1882 1882, Plan for Double Ended Boiler for City of Rome, 30 October 1882 1882, Detailed memorandum on boiler pressure issue regarding City of Rome, 4 September 1882 1882, Plan for Single Ended Boiler for City of Rome, 30 October 1882 1882, Copy of reply telegram wired from Lloyd's Register Cornhill to Barrow Shipbuilding Co on subject of boiler pressure for City of Rome, 4 September 1882 1882, Plan for Superheater for City of Rome, 6 November 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to R. Gillespie, London, further to his earlier wire, updating Gillespie regarding boiler pressure for City of Rome after speaking with surveyor Mr Kinghorn, 4 September 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to B Waymouth, London, enclosing a letter from Mr Kinghorn regarding boiler pressure for City of Rome. Detailed note on reverse regarding decisions re case, 4 September 1882 1882, Letter from J G Kinghorn, Lloyd's Register Liverpool, to J F Light, regretting his clerical error in recording boiler pressure for City of Rome, 4 September 1882 1882, Copy of telegram from Assistant Secretary, Lloyd's Register London, to Barrow Shipbuilding Co, Barrow in Furness, noting that further enquiry has found the auxiliary boilers passed for 90 lbs pressure, the same as the main boilers, stating that the Regist 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, requesting further clarity regarding boiler pressure for City of Rome, 6 September 1882 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, thanking him for his explanatory letter, 8 September 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 31 October 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 30 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, December 1882 1882, Plan of Arrangement of Boiler Room for City of Room, 2 February 1883 1883, Report on Machinery for City of Rome, 3 May 1883 1883, Report of Survey for Repairs for City of Rome, 3 May 1883 1883, Annual Survey report on City of Rome, 10 May 1883 1883, Report of Survey for Repairs for City of Rome, 28 February 1885 1885, Report of Survey for Repairs for City of Rome, 1886 1886 )
The individual and/or organisation listed
Barrow Steam Ship Co Ltd ( Copy of Midship Section for City of Rome, December 1879 1879, Plan of Collision Bulkhead and Double Bottom for City of Rome, 23 June 1880 1880, Longitudinal Plan Showing Bulkhead Positions for Engine Room and Boiler Space, 31 July 1880 1880, Section Showing Plate Frames in Engine and Boiler Space for City of Rome, 31 July 1880 1880, Upper Deck Plan and Main Deck Plan for City of Rome, 31 July 1880 1880, Lower Deck Plan and Orlop Deck Plan for City of Rome, 31 July 1880 1880, Longitudinal plan of boiler room arrangement showing position of boilers, valves and pipes for City of Rome, 3 March 1882 1882, Plan for Double Ended Boiler for City of Rome, 30 October 1882 1882, Plan for Single Ended Boiler for City of Rome, 30 October 1882 1882, Plan for Superheater for City of Rome, 6 November 1882 1882, Plan of Arrangement of Boiler Room for City of Room, 2 February 1883 1883, Report on Machinery for City of Rome, 3 May 1883 1883, Report of Survey for Repairs for City of Rome, 3 May 1883 1883, Annual Survey report on City of Rome, 10 May 1883 1883, Report of Survey for Repairs of Engines and Boilers for City of Rome, 10 May 1883 1883, Report of Survey for Repairs for City of Rome, 28 February 1885 1885, Report of Survey for Repairs for City of Rome, 1886 1886 )
Inman Steamship Co Ltd ( First Entry Report, Iron Ship Survey, for City of Rome, 8 October 1881 1881, Report on Machinery for City of Rome, 13 October 1881 1881, Report of Survey for Repairs of Engines and Boilers for City of Rome, 3 February 1882 1882, Annual Survey for City of Rome, 4 April 1882 1882, Report on Machinery for City of Rome, 13 June 1882 1882, Telegram from Barrow Shipbuilding Co to Lloyd's Register Committee enquiring why boiler pressure for City of Rome is listed as 80 lbs, 2 September 1882. Note on back submits that enquiries be made of Liverpool surveyor, 4 September 1882 1882, Transcribed copy of telegram, noting enquiry from Barrow Shipbuilding Co, 4 September 1882 1882, Telegram from Light, Lloyd's Register Liverpool, to Gillespie, Lloyd's Register Cornhill London, on subject of City of Rome boiler pressure, 4 September 1882 1882, Detailed memorandum on boiler pressure issue regarding City of Rome, 4 September 1882 1882, Copy of reply telegram wired from Lloyd's Register Cornhill to Barrow Shipbuilding Co on subject of boiler pressure for City of Rome, 4 September 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to R. Gillespie, London, further to his earlier wire, updating Gillespie regarding boiler pressure for City of Rome after speaking with surveyor Mr Kinghorn, 4 September 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to B Waymouth, London, enclosing a letter from Mr Kinghorn regarding boiler pressure for City of Rome. Detailed note on reverse regarding decisions re case, 4 September 1882 1882, Letter from J G Kinghorn, Lloyd's Register Liverpool, to J F Light, regretting his clerical error in recording boiler pressure for City of Rome, 4 September 1882 1882, Copy of telegram from Assistant Secretary, Lloyd's Register London, to Barrow Shipbuilding Co, Barrow in Furness, noting that further enquiry has found the auxiliary boilers passed for 90 lbs pressure, the same as the main boilers, stating that the Regist 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, requesting further clarity regarding boiler pressure for City of Rome, 6 September 1882 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, thanking him for his explanatory letter, 8 September 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 31 October 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 30 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, December 1882 1882 )
Type of fuel used onboard a vessel.
Steam - Coal ( Copy of Midship Section for City of Rome, December 1879 1879, Plan of Collision Bulkhead and Double Bottom for City of Rome, 23 June 1880 1880, Longitudinal Plan Showing Bulkhead Positions for Engine Room and Boiler Space, 31 July 1880 1880, Section Showing Plate Frames in Engine and Boiler Space for City of Rome, 31 July 1880 1880, Upper Deck Plan and Main Deck Plan for City of Rome, 31 July 1880 1880, Lower Deck Plan and Orlop Deck Plan for City of Rome, 31 July 1880 1880, First Entry Report, Iron Ship Survey, for City of Rome, 8 October 1881 1881, Report on Machinery for City of Rome, 13 October 1881 1881, Report of Survey for Repairs of Engines and Boilers for City of Rome, 3 February 1882 1882, Annual Survey for City of Rome, 4 April 1882 1882, Report on Machinery for City of Rome, 13 June 1882 1882, Telegram from Barrow Shipbuilding Co to Lloyd's Register Committee enquiring why boiler pressure for City of Rome is listed as 80 lbs, 2 September 1882. Note on back submits that enquiries be made of Liverpool surveyor, 4 September 1882 1882, Transcribed copy of telegram, noting enquiry from Barrow Shipbuilding Co, 4 September 1882 1882, Longitudinal plan of boiler room arrangement showing position of boilers, valves and pipes for City of Rome, 3 March 1882 1882, Telegram from Light, Lloyd's Register Liverpool, to Gillespie, Lloyd's Register Cornhill London, on subject of City of Rome boiler pressure, 4 September 1882 1882, Plan for Double Ended Boiler for City of Rome, 30 October 1882 1882, Detailed memorandum on boiler pressure issue regarding City of Rome, 4 September 1882 1882, Plan for Single Ended Boiler for City of Rome, 30 October 1882 1882, Copy of reply telegram wired from Lloyd's Register Cornhill to Barrow Shipbuilding Co on subject of boiler pressure for City of Rome, 4 September 1882 1882, Plan for Superheater for City of Rome, 6 November 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to R. Gillespie, London, further to his earlier wire, updating Gillespie regarding boiler pressure for City of Rome after speaking with surveyor Mr Kinghorn, 4 September 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to B Waymouth, London, enclosing a letter from Mr Kinghorn regarding boiler pressure for City of Rome. Detailed note on reverse regarding decisions re case, 4 September 1882 1882, Machinery plan for renewal of pipework to superheater for City of Rome, 3 March 1882 1882, Letter from J G Kinghorn, Lloyd's Register Liverpool, to J F Light, regretting his clerical error in recording boiler pressure for City of Rome, 4 September 1882 1882, Copy of telegram from Assistant Secretary, Lloyd's Register London, to Barrow Shipbuilding Co, Barrow in Furness, noting that further enquiry has found the auxiliary boilers passed for 90 lbs pressure, the same as the main boilers, stating that the Regist 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, requesting further clarity regarding boiler pressure for City of Rome, 6 September 1882 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, thanking him for his explanatory letter, 8 September 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 31 October 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 30 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, December 1882 1882, Plan of Arrangement of Boiler Room for City of Room, 2 February 1883 1883, Tests of Boiler Steel for Boiler no. 77 for City of Rome, 16 January 1883 1883, Letter from Duncan Ritchie, Lloyd's Register Barrow-in-Furness, to the Secretary, Lloyd's Register London, recommending alterations to City of Rome before she leaves port, 2 May 1883 1883, Report on Machinery for City of Rome, 3 May 1883 1883, Report of Survey for Repairs for City of Rome, 3 May 1883 1883, Annual Survey report on City of Rome, 10 May 1883 1883, Report of Survey for Repairs of Engines and Boilers for City of Rome, 10 May 1883 1883, Annual Surveys report for City of Rome, 7 March 1884 1884, Report of Survey for Repairs for City of Rome, 28 February 1885 1885, Report of Survey for Repairs for City of Rome, 1886 1886 )
Is the steamer assisted by sail?
No ( Copy of Midship Section for City of Rome, December 1879 1879, Plan of Collision Bulkhead and Double Bottom for City of Rome, 23 June 1880 1880, Longitudinal Plan Showing Bulkhead Positions for Engine Room and Boiler Space, 31 July 1880 1880, Section Showing Plate Frames in Engine and Boiler Space for City of Rome, 31 July 1880 1880, Upper Deck Plan and Main Deck Plan for City of Rome, 31 July 1880 1880, Lower Deck Plan and Orlop Deck Plan for City of Rome, 31 July 1880 1880, First Entry Report, Iron Ship Survey, for City of Rome, 8 October 1881 1881, Report on Machinery for City of Rome, 13 October 1881 1881, Report of Survey for Repairs of Engines and Boilers for City of Rome, 3 February 1882 1882, Annual Survey for City of Rome, 4 April 1882 1882, Report on Machinery for City of Rome, 13 June 1882 1882, Telegram from Barrow Shipbuilding Co to Lloyd's Register Committee enquiring why boiler pressure for City of Rome is listed as 80 lbs, 2 September 1882. Note on back submits that enquiries be made of Liverpool surveyor, 4 September 1882 1882, Transcribed copy of telegram, noting enquiry from Barrow Shipbuilding Co, 4 September 1882 1882, Longitudinal plan of boiler room arrangement showing position of boilers, valves and pipes for City of Rome, 3 March 1882 1882, Telegram from Light, Lloyd's Register Liverpool, to Gillespie, Lloyd's Register Cornhill London, on subject of City of Rome boiler pressure, 4 September 1882 1882, Plan for Double Ended Boiler for City of Rome, 30 October 1882 1882, Detailed memorandum on boiler pressure issue regarding City of Rome, 4 September 1882 1882, Plan for Single Ended Boiler for City of Rome, 30 October 1882 1882, Copy of reply telegram wired from Lloyd's Register Cornhill to Barrow Shipbuilding Co on subject of boiler pressure for City of Rome, 4 September 1882 1882, Plan for Superheater for City of Rome, 6 November 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to R. Gillespie, London, further to his earlier wire, updating Gillespie regarding boiler pressure for City of Rome after speaking with surveyor Mr Kinghorn, 4 September 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to B Waymouth, London, enclosing a letter from Mr Kinghorn regarding boiler pressure for City of Rome. Detailed note on reverse regarding decisions re case, 4 September 1882 1882, Machinery plan for renewal of pipework to superheater for City of Rome, 3 March 1882 1882, Letter from J G Kinghorn, Lloyd's Register Liverpool, to J F Light, regretting his clerical error in recording boiler pressure for City of Rome, 4 September 1882 1882, Copy of telegram from Assistant Secretary, Lloyd's Register London, to Barrow Shipbuilding Co, Barrow in Furness, noting that further enquiry has found the auxiliary boilers passed for 90 lbs pressure, the same as the main boilers, stating that the Regist 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, requesting further clarity regarding boiler pressure for City of Rome, 6 September 1882 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, thanking him for his explanatory letter, 8 September 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 31 October 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 30 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, December 1882 1882, Plan of Arrangement of Boiler Room for City of Room, 2 February 1883 1883, Tests of Boiler Steel for Boiler no. 77 for City of Rome, 16 January 1883 1883, Letter from Duncan Ritchie, Lloyd's Register Barrow-in-Furness, to the Secretary, Lloyd's Register London, recommending alterations to City of Rome before she leaves port, 2 May 1883 1883, Report on Machinery for City of Rome, 3 May 1883 1883, Report of Survey for Repairs for City of Rome, 3 May 1883 1883, Annual Survey report on City of Rome, 10 May 1883 1883, Report of Survey for Repairs of Engines and Boilers for City of Rome, 10 May 1883 1883, Annual Surveys report for City of Rome, 7 March 1884 1884, Report of Survey for Repairs for City of Rome, 28 February 1885 1885, Report of Survey for Repairs for City of Rome, 1886 1886 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Copy of Midship Section for City of Rome, December 1879 1879, Plan of Collision Bulkhead and Double Bottom for City of Rome, 23 June 1880 1880, Longitudinal Plan Showing Bulkhead Positions for Engine Room and Boiler Space, 31 July 1880 1880, Section Showing Plate Frames in Engine and Boiler Space for City of Rome, 31 July 1880 1880, Upper Deck Plan and Main Deck Plan for City of Rome, 31 July 1880 1880, Lower Deck Plan and Orlop Deck Plan for City of Rome, 31 July 1880 1880, First Entry Report, Iron Ship Survey, for City of Rome, 8 October 1881 1881, Report on Machinery for City of Rome, 13 October 1881 1881, Report of Survey for Repairs of Engines and Boilers for City of Rome, 3 February 1882 1882, Annual Survey for City of Rome, 4 April 1882 1882, Report on Machinery for City of Rome, 13 June 1882 1882, Telegram from Barrow Shipbuilding Co to Lloyd's Register Committee enquiring why boiler pressure for City of Rome is listed as 80 lbs, 2 September 1882. Note on back submits that enquiries be made of Liverpool surveyor, 4 September 1882 1882, Transcribed copy of telegram, noting enquiry from Barrow Shipbuilding Co, 4 September 1882 1882, Longitudinal plan of boiler room arrangement showing position of boilers, valves and pipes for City of Rome, 3 March 1882 1882, Telegram from Light, Lloyd's Register Liverpool, to Gillespie, Lloyd's Register Cornhill London, on subject of City of Rome boiler pressure, 4 September 1882 1882, Plan for Double Ended Boiler for City of Rome, 30 October 1882 1882, Detailed memorandum on boiler pressure issue regarding City of Rome, 4 September 1882 1882, Plan for Single Ended Boiler for City of Rome, 30 October 1882 1882, Copy of reply telegram wired from Lloyd's Register Cornhill to Barrow Shipbuilding Co on subject of boiler pressure for City of Rome, 4 September 1882 1882, Plan for Superheater for City of Rome, 6 November 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to R. Gillespie, London, further to his earlier wire, updating Gillespie regarding boiler pressure for City of Rome after speaking with surveyor Mr Kinghorn, 4 September 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to B Waymouth, London, enclosing a letter from Mr Kinghorn regarding boiler pressure for City of Rome. Detailed note on reverse regarding decisions re case, 4 September 1882 1882, Machinery plan for renewal of pipework to superheater for City of Rome, 3 March 1882 1882, Letter from J G Kinghorn, Lloyd's Register Liverpool, to J F Light, regretting his clerical error in recording boiler pressure for City of Rome, 4 September 1882 1882, Copy of telegram from Assistant Secretary, Lloyd's Register London, to Barrow Shipbuilding Co, Barrow in Furness, noting that further enquiry has found the auxiliary boilers passed for 90 lbs pressure, the same as the main boilers, stating that the Regist 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, requesting further clarity regarding boiler pressure for City of Rome, 6 September 1882 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, thanking him for his explanatory letter, 8 September 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 31 October 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 30 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, December 1882 1882, Plan of Arrangement of Boiler Room for City of Room, 2 February 1883 1883, Tests of Boiler Steel for Boiler no. 77 for City of Rome, 16 January 1883 1883, Letter from Duncan Ritchie, Lloyd's Register Barrow-in-Furness, to the Secretary, Lloyd's Register London, recommending alterations to City of Rome before she leaves port, 2 May 1883 1883, Report on Machinery for City of Rome, 3 May 1883 1883, Report of Survey for Repairs for City of Rome, 3 May 1883 1883, Annual Survey report on City of Rome, 10 May 1883 1883, Report of Survey for Repairs of Engines and Boilers for City of Rome, 10 May 1883 1883, Annual Surveys report for City of Rome, 7 March 1884 1884, Report of Survey for Repairs for City of Rome, 28 February 1885 1885, Report of Survey for Repairs for City of Rome, 1886 1886 )
Does the vessel possess an auxiliary power source?
No ( Copy of Midship Section for City of Rome, December 1879 1879, Plan of Collision Bulkhead and Double Bottom for City of Rome, 23 June 1880 1880, Longitudinal Plan Showing Bulkhead Positions for Engine Room and Boiler Space, 31 July 1880 1880, Section Showing Plate Frames in Engine and Boiler Space for City of Rome, 31 July 1880 1880, Upper Deck Plan and Main Deck Plan for City of Rome, 31 July 1880 1880, Lower Deck Plan and Orlop Deck Plan for City of Rome, 31 July 1880 1880, First Entry Report, Iron Ship Survey, for City of Rome, 8 October 1881 1881, Report on Machinery for City of Rome, 13 October 1881 1881, Report of Survey for Repairs of Engines and Boilers for City of Rome, 3 February 1882 1882, Annual Survey for City of Rome, 4 April 1882 1882, Report on Machinery for City of Rome, 13 June 1882 1882, Telegram from Barrow Shipbuilding Co to Lloyd's Register Committee enquiring why boiler pressure for City of Rome is listed as 80 lbs, 2 September 1882. Note on back submits that enquiries be made of Liverpool surveyor, 4 September 1882 1882, Transcribed copy of telegram, noting enquiry from Barrow Shipbuilding Co, 4 September 1882 1882, Longitudinal plan of boiler room arrangement showing position of boilers, valves and pipes for City of Rome, 3 March 1882 1882, Telegram from Light, Lloyd's Register Liverpool, to Gillespie, Lloyd's Register Cornhill London, on subject of City of Rome boiler pressure, 4 September 1882 1882, Plan for Double Ended Boiler for City of Rome, 30 October 1882 1882, Detailed memorandum on boiler pressure issue regarding City of Rome, 4 September 1882 1882, Plan for Single Ended Boiler for City of Rome, 30 October 1882 1882, Copy of reply telegram wired from Lloyd's Register Cornhill to Barrow Shipbuilding Co on subject of boiler pressure for City of Rome, 4 September 1882 1882, Plan for Superheater for City of Rome, 6 November 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to R. Gillespie, London, further to his earlier wire, updating Gillespie regarding boiler pressure for City of Rome after speaking with surveyor Mr Kinghorn, 4 September 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to B Waymouth, London, enclosing a letter from Mr Kinghorn regarding boiler pressure for City of Rome. Detailed note on reverse regarding decisions re case, 4 September 1882 1882, Machinery plan for renewal of pipework to superheater for City of Rome, 3 March 1882 1882, Letter from J G Kinghorn, Lloyd's Register Liverpool, to J F Light, regretting his clerical error in recording boiler pressure for City of Rome, 4 September 1882 1882, Copy of telegram from Assistant Secretary, Lloyd's Register London, to Barrow Shipbuilding Co, Barrow in Furness, noting that further enquiry has found the auxiliary boilers passed for 90 lbs pressure, the same as the main boilers, stating that the Regist 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, requesting further clarity regarding boiler pressure for City of Rome, 6 September 1882 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, thanking him for his explanatory letter, 8 September 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 31 October 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 30 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, December 1882 1882, Plan of Arrangement of Boiler Room for City of Room, 2 February 1883 1883, Tests of Boiler Steel for Boiler no. 77 for City of Rome, 16 January 1883 1883, Letter from Duncan Ritchie, Lloyd's Register Barrow-in-Furness, to the Secretary, Lloyd's Register London, recommending alterations to City of Rome before she leaves port, 2 May 1883 1883, Report on Machinery for City of Rome, 3 May 1883 1883, Report of Survey for Repairs for City of Rome, 3 May 1883 1883, Annual Survey report on City of Rome, 10 May 1883 1883, Report of Survey for Repairs of Engines and Boilers for City of Rome, 10 May 1883 1883, Annual Surveys report for City of Rome, 7 March 1884 1884, Report of Survey for Repairs for City of Rome, 28 February 1885 1885, Report of Survey for Repairs for City of Rome, 1886 1886 )
Is electric lighting fitted to the vessel?
No ( Copy of Midship Section for City of Rome, December 1879 1879, Plan of Collision Bulkhead and Double Bottom for City of Rome, 23 June 1880 1880, Longitudinal Plan Showing Bulkhead Positions for Engine Room and Boiler Space, 31 July 1880 1880, Section Showing Plate Frames in Engine and Boiler Space for City of Rome, 31 July 1880 1880, Upper Deck Plan and Main Deck Plan for City of Rome, 31 July 1880 1880, Lower Deck Plan and Orlop Deck Plan for City of Rome, 31 July 1880 1880, First Entry Report, Iron Ship Survey, for City of Rome, 8 October 1881 1881, Report on Machinery for City of Rome, 13 October 1881 1881, Report of Survey for Repairs of Engines and Boilers for City of Rome, 3 February 1882 1882, Annual Survey for City of Rome, 4 April 1882 1882, Report on Machinery for City of Rome, 13 June 1882 1882, Telegram from Barrow Shipbuilding Co to Lloyd's Register Committee enquiring why boiler pressure for City of Rome is listed as 80 lbs, 2 September 1882. Note on back submits that enquiries be made of Liverpool surveyor, 4 September 1882 1882, Transcribed copy of telegram, noting enquiry from Barrow Shipbuilding Co, 4 September 1882 1882, Longitudinal plan of boiler room arrangement showing position of boilers, valves and pipes for City of Rome, 3 March 1882 1882, Telegram from Light, Lloyd's Register Liverpool, to Gillespie, Lloyd's Register Cornhill London, on subject of City of Rome boiler pressure, 4 September 1882 1882, Plan for Double Ended Boiler for City of Rome, 30 October 1882 1882, Detailed memorandum on boiler pressure issue regarding City of Rome, 4 September 1882 1882, Plan for Single Ended Boiler for City of Rome, 30 October 1882 1882, Copy of reply telegram wired from Lloyd's Register Cornhill to Barrow Shipbuilding Co on subject of boiler pressure for City of Rome, 4 September 1882 1882, Plan for Superheater for City of Rome, 6 November 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to R. Gillespie, London, further to his earlier wire, updating Gillespie regarding boiler pressure for City of Rome after speaking with surveyor Mr Kinghorn, 4 September 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to B Waymouth, London, enclosing a letter from Mr Kinghorn regarding boiler pressure for City of Rome. Detailed note on reverse regarding decisions re case, 4 September 1882 1882, Machinery plan for renewal of pipework to superheater for City of Rome, 3 March 1882 1882, Letter from J G Kinghorn, Lloyd's Register Liverpool, to J F Light, regretting his clerical error in recording boiler pressure for City of Rome, 4 September 1882 1882, Copy of telegram from Assistant Secretary, Lloyd's Register London, to Barrow Shipbuilding Co, Barrow in Furness, noting that further enquiry has found the auxiliary boilers passed for 90 lbs pressure, the same as the main boilers, stating that the Regist 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, requesting further clarity regarding boiler pressure for City of Rome, 6 September 1882 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, thanking him for his explanatory letter, 8 September 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 31 October 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 30 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, December 1882 1882, Plan of Arrangement of Boiler Room for City of Room, 2 February 1883 1883, Tests of Boiler Steel for Boiler no. 77 for City of Rome, 16 January 1883 1883, Letter from Duncan Ritchie, Lloyd's Register Barrow-in-Furness, to the Secretary, Lloyd's Register London, recommending alterations to City of Rome before she leaves port, 2 May 1883 1883, Report on Machinery for City of Rome, 3 May 1883 1883, Report of Survey for Repairs for City of Rome, 3 May 1883 1883, Annual Survey report on City of Rome, 10 May 1883 1883, Report of Survey for Repairs of Engines and Boilers for City of Rome, 10 May 1883 1883, Annual Surveys report for City of Rome, 7 March 1884 1884, Report of Survey for Repairs for City of Rome, 28 February 1885 1885, Report of Survey for Repairs for City of Rome, 1886 1886 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Brw ( First Entry Report, Iron Ship Survey, for City of Rome, 8 October 1881 1881, Report on Machinery for City of Rome, 13 October 1881 1881, Report on Machinery for City of Rome, 3 May 1883 1883, Report of Survey for Repairs for City of Rome, 3 May 1883 1883 )
Liv ( Report of Survey for Repairs of Engines and Boilers for City of Rome, 3 February 1882 1882, Annual Survey for City of Rome, 4 April 1882 1882, Report on Machinery for City of Rome, 13 June 1882 1882, Annual Surveys report for City of Rome, 7 March 1884 1884, Report of Survey for Repairs for City of Rome, 28 February 1885 1885 )
Gls ( Annual Survey report on City of Rome, 10 May 1883 1883, Report of Survey for Repairs of Engines and Boilers for City of Rome, 10 May 1883 1883 )
Name of surveyor.
John Lawrence ( First Entry Report, Iron Ship Survey, for City of Rome, 8 October 1881 1881, Report of Survey for Repairs for City of Rome, 3 May 1883 1883 )
John George Kinghorn; J E Stoddart ( Report on Machinery for City of Rome, 13 October 1881 1881, Report of Survey for Repairs of Engines and Boilers for City of Rome, 3 February 1882 1882 )
William Moverly ( Annual Survey for City of Rome, 4 April 1882 1882 )
John George Kinghorn ( Report on Machinery for City of Rome, 13 June 1882 1882, Letter from J G Kinghorn, Lloyd's Register Liverpool, to J F Light, regretting his clerical error in recording boiler pressure for City of Rome, 4 September 1882 1882 )
John F Light ( Letter from J F Light, Lloyd's Register Liverpool, to R. Gillespie, London, further to his earlier wire, updating Gillespie regarding boiler pressure for City of Rome after speaking with surveyor Mr Kinghorn, 4 September 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to B Waymouth, London, enclosing a letter from Mr Kinghorn regarding boiler pressure for City of Rome. Detailed note on reverse regarding decisions re case, 4 September 1882 1882 )
Charles E Burney ( Tests of Boiler Steel for Boiler no. 77 for City of Rome, 16 January 1883 1883 )
Duncan Ritchie ( Letter from Duncan Ritchie, Lloyd's Register Barrow-in-Furness, to the Secretary, Lloyd's Register London, recommending alterations to City of Rome before she leaves port, 2 May 1883 1883, Report on Machinery for City of Rome, 3 May 1883 1883 )
William Davidson ( Annual Survey report on City of Rome, 10 May 1883 1883 )
Walter E Robson; James Mollison ( Report of Survey for Repairs of Engines and Boilers for City of Rome, 10 May 1883 1883 )
Edward C Wheeler ( Annual Surveys report for City of Rome, 7 March 1884 1884, Report of Survey for Repairs for City of Rome, 28 February 1885 1885 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 ( First Entry Report, Iron Ship Survey, for City of Rome, 8 October 1881 1881 )
+LMC 10,81 ( Report on Machinery for City of Rome, 13 October 1881 1881, Report of Survey for Repairs of Engines and Boilers for City of Rome, 3 February 1882 1882, Report on Machinery for City of Rome, 13 June 1882 1882 )
+100A1; +LMC 10,81 ( Annual Survey for City of Rome, 4 April 1882 1882 )
LMC 5,83 ( Report on Machinery for City of Rome, 3 May 1883 1883 )
100A1 ( Report of Survey for Repairs for City of Rome, 3 May 1883 1883, Annual Surveys report for City of Rome, 7 March 1884 1884 )
100A1; +LMC 10,81 ( Annual Survey report on City of Rome, 10 May 1883 1883, Report of Survey for Repairs of Engines and Boilers for City of Rome, 10 May 1883 1883, Report of Survey for Repairs for City of Rome, 28 February 1885 1885 )
Withdraw ( Report of Survey for Repairs for City of Rome, 1886 1886 )
The name of the port/place of destination given.
Liverpool; New York ( First Entry Report, Iron Ship Survey, for City of Rome, 8 October 1881 1881, Annual Survey report on City of Rome, 10 May 1883 1883 )
New York ( Annual Survey for City of Rome, 4 April 1882 1882, Annual Surveys report for City of Rome, 7 March 1884 1884, Report of Survey for Repairs for City of Rome, 28 February 1885 1885 )
Glasgow ( Report of Survey for Repairs for City of Rome, 3 May 1883 1883 )
Recorded date for the vessel’s loss or disposal.
// ( Annual Surveys report for City of Rome, 7 March 1884 1884 )
The year in which a vessel’s construction is completed.
1881 ( Copy of Midship Section for City of Rome, December 1879 1879, Plan of Collision Bulkhead and Double Bottom for City of Rome, 23 June 1880 1880, Longitudinal Plan Showing Bulkhead Positions for Engine Room and Boiler Space, 31 July 1880 1880, Section Showing Plate Frames in Engine and Boiler Space for City of Rome, 31 July 1880 1880, Upper Deck Plan and Main Deck Plan for City of Rome, 31 July 1880 1880, Lower Deck Plan and Orlop Deck Plan for City of Rome, 31 July 1880 1880, First Entry Report, Iron Ship Survey, for City of Rome, 8 October 1881 1881, Report on Machinery for City of Rome, 13 October 1881 1881, Report of Survey for Repairs of Engines and Boilers for City of Rome, 3 February 1882 1882, Annual Survey for City of Rome, 4 April 1882 1882, Report on Machinery for City of Rome, 13 June 1882 1882, Telegram from Barrow Shipbuilding Co to Lloyd's Register Committee enquiring why boiler pressure for City of Rome is listed as 80 lbs, 2 September 1882. Note on back submits that enquiries be made of Liverpool surveyor, 4 September 1882 1882, Transcribed copy of telegram, noting enquiry from Barrow Shipbuilding Co, 4 September 1882 1882, Longitudinal plan of boiler room arrangement showing position of boilers, valves and pipes for City of Rome, 3 March 1882 1882, Telegram from Light, Lloyd's Register Liverpool, to Gillespie, Lloyd's Register Cornhill London, on subject of City of Rome boiler pressure, 4 September 1882 1882, Plan for Double Ended Boiler for City of Rome, 30 October 1882 1882, Detailed memorandum on boiler pressure issue regarding City of Rome, 4 September 1882 1882, Plan for Single Ended Boiler for City of Rome, 30 October 1882 1882, Copy of reply telegram wired from Lloyd's Register Cornhill to Barrow Shipbuilding Co on subject of boiler pressure for City of Rome, 4 September 1882 1882, Plan for Superheater for City of Rome, 6 November 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to R. Gillespie, London, further to his earlier wire, updating Gillespie regarding boiler pressure for City of Rome after speaking with surveyor Mr Kinghorn, 4 September 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to B Waymouth, London, enclosing a letter from Mr Kinghorn regarding boiler pressure for City of Rome. Detailed note on reverse regarding decisions re case, 4 September 1882 1882, Machinery plan for renewal of pipework to superheater for City of Rome, 3 March 1882 1882, Letter from J G Kinghorn, Lloyd's Register Liverpool, to J F Light, regretting his clerical error in recording boiler pressure for City of Rome, 4 September 1882 1882, Copy of telegram from Assistant Secretary, Lloyd's Register London, to Barrow Shipbuilding Co, Barrow in Furness, noting that further enquiry has found the auxiliary boilers passed for 90 lbs pressure, the same as the main boilers, stating that the Regist 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, requesting further clarity regarding boiler pressure for City of Rome, 6 September 1882 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, thanking him for his explanatory letter, 8 September 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 31 October 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 30 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, December 1882 1882, Plan of Arrangement of Boiler Room for City of Room, 2 February 1883 1883, Tests of Boiler Steel for Boiler no. 77 for City of Rome, 16 January 1883 1883, Letter from Duncan Ritchie, Lloyd's Register Barrow-in-Furness, to the Secretary, Lloyd's Register London, recommending alterations to City of Rome before she leaves port, 2 May 1883 1883, Report on Machinery for City of Rome, 3 May 1883 1883, Report of Survey for Repairs for City of Rome, 3 May 1883 1883, Annual Survey report on City of Rome, 10 May 1883 1883, Report of Survey for Repairs of Engines and Boilers for City of Rome, 10 May 1883 1883, Annual Surveys report for City of Rome, 7 March 1884 1884, Report of Survey for Repairs for City of Rome, 28 February 1885 1885, Report of Survey for Repairs for City of Rome, 1886 1886 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Barrow Shipbuilding Co & Son ( Copy of Midship Section for City of Rome, December 1879 1879, Plan of Collision Bulkhead and Double Bottom for City of Rome, 23 June 1880 1880, Longitudinal Plan Showing Bulkhead Positions for Engine Room and Boiler Space, 31 July 1880 1880, Section Showing Plate Frames in Engine and Boiler Space for City of Rome, 31 July 1880 1880, Upper Deck Plan and Main Deck Plan for City of Rome, 31 July 1880 1880, Lower Deck Plan and Orlop Deck Plan for City of Rome, 31 July 1880 1880, First Entry Report, Iron Ship Survey, for City of Rome, 8 October 1881 1881, Report on Machinery for City of Rome, 13 October 1881 1881, Report of Survey for Repairs of Engines and Boilers for City of Rome, 3 February 1882 1882, Annual Survey for City of Rome, 4 April 1882 1882, Report on Machinery for City of Rome, 13 June 1882 1882, Telegram from Barrow Shipbuilding Co to Lloyd's Register Committee enquiring why boiler pressure for City of Rome is listed as 80 lbs, 2 September 1882. Note on back submits that enquiries be made of Liverpool surveyor, 4 September 1882 1882, Transcribed copy of telegram, noting enquiry from Barrow Shipbuilding Co, 4 September 1882 1882, Longitudinal plan of boiler room arrangement showing position of boilers, valves and pipes for City of Rome, 3 March 1882 1882, Telegram from Light, Lloyd's Register Liverpool, to Gillespie, Lloyd's Register Cornhill London, on subject of City of Rome boiler pressure, 4 September 1882 1882, Plan for Double Ended Boiler for City of Rome, 30 October 1882 1882, Detailed memorandum on boiler pressure issue regarding City of Rome, 4 September 1882 1882, Plan for Single Ended Boiler for City of Rome, 30 October 1882 1882, Copy of reply telegram wired from Lloyd's Register Cornhill to Barrow Shipbuilding Co on subject of boiler pressure for City of Rome, 4 September 1882 1882, Plan for Superheater for City of Rome, 6 November 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to R. Gillespie, London, further to his earlier wire, updating Gillespie regarding boiler pressure for City of Rome after speaking with surveyor Mr Kinghorn, 4 September 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to B Waymouth, London, enclosing a letter from Mr Kinghorn regarding boiler pressure for City of Rome. Detailed note on reverse regarding decisions re case, 4 September 1882 1882, Machinery plan for renewal of pipework to superheater for City of Rome, 3 March 1882 1882, Letter from J G Kinghorn, Lloyd's Register Liverpool, to J F Light, regretting his clerical error in recording boiler pressure for City of Rome, 4 September 1882 1882, Copy of telegram from Assistant Secretary, Lloyd's Register London, to Barrow Shipbuilding Co, Barrow in Furness, noting that further enquiry has found the auxiliary boilers passed for 90 lbs pressure, the same as the main boilers, stating that the Regist 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, requesting further clarity regarding boiler pressure for City of Rome, 6 September 1882 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, thanking him for his explanatory letter, 8 September 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 31 October 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 30 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, December 1882 1882, Plan of Arrangement of Boiler Room for City of Room, 2 February 1883 1883, Tests of Boiler Steel for Boiler no. 77 for City of Rome, 16 January 1883 1883, Letter from Duncan Ritchie, Lloyd's Register Barrow-in-Furness, to the Secretary, Lloyd's Register London, recommending alterations to City of Rome before she leaves port, 2 May 1883 1883, Report on Machinery for City of Rome, 3 May 1883 1883, Report of Survey for Repairs for City of Rome, 3 May 1883 1883, Annual Survey report on City of Rome, 10 May 1883 1883, Report of Survey for Repairs of Engines and Boilers for City of Rome, 10 May 1883 1883, Annual Surveys report for City of Rome, 7 March 1884 1884, Report of Survey for Repairs for City of Rome, 28 February 1885 1885, Report of Survey for Repairs for City of Rome, 1886 1886 )
The country in which the vessel’s construction took place, at the time of writing.
United Kingdom ( Copy of Midship Section for City of Rome, December 1879 1879, Plan of Collision Bulkhead and Double Bottom for City of Rome, 23 June 1880 1880, Longitudinal Plan Showing Bulkhead Positions for Engine Room and Boiler Space, 31 July 1880 1880, Section Showing Plate Frames in Engine and Boiler Space for City of Rome, 31 July 1880 1880, Upper Deck Plan and Main Deck Plan for City of Rome, 31 July 1880 1880, Lower Deck Plan and Orlop Deck Plan for City of Rome, 31 July 1880 1880, First Entry Report, Iron Ship Survey, for City of Rome, 8 October 1881 1881, Report on Machinery for City of Rome, 13 October 1881 1881, Report of Survey for Repairs of Engines and Boilers for City of Rome, 3 February 1882 1882, Annual Survey for City of Rome, 4 April 1882 1882, Report on Machinery for City of Rome, 13 June 1882 1882, Telegram from Barrow Shipbuilding Co to Lloyd's Register Committee enquiring why boiler pressure for City of Rome is listed as 80 lbs, 2 September 1882. Note on back submits that enquiries be made of Liverpool surveyor, 4 September 1882 1882, Transcribed copy of telegram, noting enquiry from Barrow Shipbuilding Co, 4 September 1882 1882, Longitudinal plan of boiler room arrangement showing position of boilers, valves and pipes for City of Rome, 3 March 1882 1882, Telegram from Light, Lloyd's Register Liverpool, to Gillespie, Lloyd's Register Cornhill London, on subject of City of Rome boiler pressure, 4 September 1882 1882, Plan for Double Ended Boiler for City of Rome, 30 October 1882 1882, Detailed memorandum on boiler pressure issue regarding City of Rome, 4 September 1882 1882, Plan for Single Ended Boiler for City of Rome, 30 October 1882 1882, Copy of reply telegram wired from Lloyd's Register Cornhill to Barrow Shipbuilding Co on subject of boiler pressure for City of Rome, 4 September 1882 1882, Plan for Superheater for City of Rome, 6 November 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to R. Gillespie, London, further to his earlier wire, updating Gillespie regarding boiler pressure for City of Rome after speaking with surveyor Mr Kinghorn, 4 September 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to B Waymouth, London, enclosing a letter from Mr Kinghorn regarding boiler pressure for City of Rome. Detailed note on reverse regarding decisions re case, 4 September 1882 1882, Machinery plan for renewal of pipework to superheater for City of Rome, 3 March 1882 1882, Letter from J G Kinghorn, Lloyd's Register Liverpool, to J F Light, regretting his clerical error in recording boiler pressure for City of Rome, 4 September 1882 1882, Copy of telegram from Assistant Secretary, Lloyd's Register London, to Barrow Shipbuilding Co, Barrow in Furness, noting that further enquiry has found the auxiliary boilers passed for 90 lbs pressure, the same as the main boilers, stating that the Regist 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, requesting further clarity regarding boiler pressure for City of Rome, 6 September 1882 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, thanking him for his explanatory letter, 8 September 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 31 October 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 30 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, December 1882 1882, Plan of Arrangement of Boiler Room for City of Room, 2 February 1883 1883, Tests of Boiler Steel for Boiler no. 77 for City of Rome, 16 January 1883 1883, Letter from Duncan Ritchie, Lloyd's Register Barrow-in-Furness, to the Secretary, Lloyd's Register London, recommending alterations to City of Rome before she leaves port, 2 May 1883 1883, Report on Machinery for City of Rome, 3 May 1883 1883, Report of Survey for Repairs for City of Rome, 3 May 1883 1883, Annual Survey report on City of Rome, 10 May 1883 1883, Report of Survey for Repairs of Engines and Boilers for City of Rome, 10 May 1883 1883, Annual Surveys report for City of Rome, 7 March 1884 1884, Report of Survey for Repairs for City of Rome, 28 February 1885 1885, Report of Survey for Repairs for City of Rome, 1886 1886 )
The listed port to which a given vessel belongs.
Liverpool ( Copy of Midship Section for City of Rome, December 1879 1879, Plan of Collision Bulkhead and Double Bottom for City of Rome, 23 June 1880 1880, Longitudinal Plan Showing Bulkhead Positions for Engine Room and Boiler Space, 31 July 1880 1880, Section Showing Plate Frames in Engine and Boiler Space for City of Rome, 31 July 1880 1880, Upper Deck Plan and Main Deck Plan for City of Rome, 31 July 1880 1880, Lower Deck Plan and Orlop Deck Plan for City of Rome, 31 July 1880 1880, First Entry Report, Iron Ship Survey, for City of Rome, 8 October 1881 1881, Report on Machinery for City of Rome, 13 October 1881 1881, Report of Survey for Repairs of Engines and Boilers for City of Rome, 3 February 1882 1882, Annual Survey for City of Rome, 4 April 1882 1882, Report on Machinery for City of Rome, 13 June 1882 1882, Telegram from Barrow Shipbuilding Co to Lloyd's Register Committee enquiring why boiler pressure for City of Rome is listed as 80 lbs, 2 September 1882. Note on back submits that enquiries be made of Liverpool surveyor, 4 September 1882 1882, Transcribed copy of telegram, noting enquiry from Barrow Shipbuilding Co, 4 September 1882 1882, Longitudinal plan of boiler room arrangement showing position of boilers, valves and pipes for City of Rome, 3 March 1882 1882, Telegram from Light, Lloyd's Register Liverpool, to Gillespie, Lloyd's Register Cornhill London, on subject of City of Rome boiler pressure, 4 September 1882 1882, Plan for Double Ended Boiler for City of Rome, 30 October 1882 1882, Detailed memorandum on boiler pressure issue regarding City of Rome, 4 September 1882 1882, Plan for Single Ended Boiler for City of Rome, 30 October 1882 1882, Copy of reply telegram wired from Lloyd's Register Cornhill to Barrow Shipbuilding Co on subject of boiler pressure for City of Rome, 4 September 1882 1882, Plan for Superheater for City of Rome, 6 November 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to R. Gillespie, London, further to his earlier wire, updating Gillespie regarding boiler pressure for City of Rome after speaking with surveyor Mr Kinghorn, 4 September 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to B Waymouth, London, enclosing a letter from Mr Kinghorn regarding boiler pressure for City of Rome. Detailed note on reverse regarding decisions re case, 4 September 1882 1882, Letter from J G Kinghorn, Lloyd's Register Liverpool, to J F Light, regretting his clerical error in recording boiler pressure for City of Rome, 4 September 1882 1882, Copy of telegram from Assistant Secretary, Lloyd's Register London, to Barrow Shipbuilding Co, Barrow in Furness, noting that further enquiry has found the auxiliary boilers passed for 90 lbs pressure, the same as the main boilers, stating that the Regist 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, requesting further clarity regarding boiler pressure for City of Rome, 6 September 1882 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, thanking him for his explanatory letter, 8 September 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 31 October 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 30 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, December 1882 1882, Plan of Arrangement of Boiler Room for City of Room, 2 February 1883 1883 )
Barrow-in-Furness ( Report on Machinery for City of Rome, 3 May 1883 1883, Report of Survey for Repairs for City of Rome, 3 May 1883 1883, Annual Survey report on City of Rome, 10 May 1883 1883, Report of Survey for Repairs for City of Rome, 28 February 1885 1885, Report of Survey for Repairs for City of Rome, 1886 1886 )
A vessel’s means of propulsion.
Steam ( Copy of Midship Section for City of Rome, December 1879 1879, Plan of Collision Bulkhead and Double Bottom for City of Rome, 23 June 1880 1880, Longitudinal Plan Showing Bulkhead Positions for Engine Room and Boiler Space, 31 July 1880 1880, Section Showing Plate Frames in Engine and Boiler Space for City of Rome, 31 July 1880 1880, Upper Deck Plan and Main Deck Plan for City of Rome, 31 July 1880 1880, Lower Deck Plan and Orlop Deck Plan for City of Rome, 31 July 1880 1880, First Entry Report, Iron Ship Survey, for City of Rome, 8 October 1881 1881, Report on Machinery for City of Rome, 13 October 1881 1881, Report of Survey for Repairs of Engines and Boilers for City of Rome, 3 February 1882 1882, Annual Survey for City of Rome, 4 April 1882 1882, Report on Machinery for City of Rome, 13 June 1882 1882, Telegram from Barrow Shipbuilding Co to Lloyd's Register Committee enquiring why boiler pressure for City of Rome is listed as 80 lbs, 2 September 1882. Note on back submits that enquiries be made of Liverpool surveyor, 4 September 1882 1882, Transcribed copy of telegram, noting enquiry from Barrow Shipbuilding Co, 4 September 1882 1882, Longitudinal plan of boiler room arrangement showing position of boilers, valves and pipes for City of Rome, 3 March 1882 1882, Telegram from Light, Lloyd's Register Liverpool, to Gillespie, Lloyd's Register Cornhill London, on subject of City of Rome boiler pressure, 4 September 1882 1882, Plan for Double Ended Boiler for City of Rome, 30 October 1882 1882, Detailed memorandum on boiler pressure issue regarding City of Rome, 4 September 1882 1882, Plan for Single Ended Boiler for City of Rome, 30 October 1882 1882, Copy of reply telegram wired from Lloyd's Register Cornhill to Barrow Shipbuilding Co on subject of boiler pressure for City of Rome, 4 September 1882 1882, Plan for Superheater for City of Rome, 6 November 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to R. Gillespie, London, further to his earlier wire, updating Gillespie regarding boiler pressure for City of Rome after speaking with surveyor Mr Kinghorn, 4 September 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to B Waymouth, London, enclosing a letter from Mr Kinghorn regarding boiler pressure for City of Rome. Detailed note on reverse regarding decisions re case, 4 September 1882 1882, Machinery plan for renewal of pipework to superheater for City of Rome, 3 March 1882 1882, Letter from J G Kinghorn, Lloyd's Register Liverpool, to J F Light, regretting his clerical error in recording boiler pressure for City of Rome, 4 September 1882 1882, Copy of telegram from Assistant Secretary, Lloyd's Register London, to Barrow Shipbuilding Co, Barrow in Furness, noting that further enquiry has found the auxiliary boilers passed for 90 lbs pressure, the same as the main boilers, stating that the Regist 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, requesting further clarity regarding boiler pressure for City of Rome, 6 September 1882 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, thanking him for his explanatory letter, 8 September 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 31 October 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 30 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, December 1882 1882, Plan of Arrangement of Boiler Room for City of Room, 2 February 1883 1883, Tests of Boiler Steel for Boiler no. 77 for City of Rome, 16 January 1883 1883, Letter from Duncan Ritchie, Lloyd's Register Barrow-in-Furness, to the Secretary, Lloyd's Register London, recommending alterations to City of Rome before she leaves port, 2 May 1883 1883, Report on Machinery for City of Rome, 3 May 1883 1883, Report of Survey for Repairs for City of Rome, 3 May 1883 1883, Annual Survey report on City of Rome, 10 May 1883 1883, Report of Survey for Repairs of Engines and Boilers for City of Rome, 10 May 1883 1883, Annual Surveys report for City of Rome, 7 March 1884 1884, Report of Survey for Repairs for City of Rome, 28 February 1885 1885, Report of Survey for Repairs for City of Rome, 1886 1886 )
Predominant material(s) utilised in a vessel’s construction.
Iron ( Copy of Midship Section for City of Rome, December 1879 1879, Plan of Collision Bulkhead and Double Bottom for City of Rome, 23 June 1880 1880, Longitudinal Plan Showing Bulkhead Positions for Engine Room and Boiler Space, 31 July 1880 1880, Section Showing Plate Frames in Engine and Boiler Space for City of Rome, 31 July 1880 1880, Upper Deck Plan and Main Deck Plan for City of Rome, 31 July 1880 1880, Lower Deck Plan and Orlop Deck Plan for City of Rome, 31 July 1880 1880, First Entry Report, Iron Ship Survey, for City of Rome, 8 October 1881 1881, Report on Machinery for City of Rome, 13 October 1881 1881, Report of Survey for Repairs of Engines and Boilers for City of Rome, 3 February 1882 1882, Annual Survey for City of Rome, 4 April 1882 1882, Report on Machinery for City of Rome, 13 June 1882 1882, Telegram from Barrow Shipbuilding Co to Lloyd's Register Committee enquiring why boiler pressure for City of Rome is listed as 80 lbs, 2 September 1882. Note on back submits that enquiries be made of Liverpool surveyor, 4 September 1882 1882, Transcribed copy of telegram, noting enquiry from Barrow Shipbuilding Co, 4 September 1882 1882, Longitudinal plan of boiler room arrangement showing position of boilers, valves and pipes for City of Rome, 3 March 1882 1882, Telegram from Light, Lloyd's Register Liverpool, to Gillespie, Lloyd's Register Cornhill London, on subject of City of Rome boiler pressure, 4 September 1882 1882, Plan for Double Ended Boiler for City of Rome, 30 October 1882 1882, Detailed memorandum on boiler pressure issue regarding City of Rome, 4 September 1882 1882, Plan for Single Ended Boiler for City of Rome, 30 October 1882 1882, Copy of reply telegram wired from Lloyd's Register Cornhill to Barrow Shipbuilding Co on subject of boiler pressure for City of Rome, 4 September 1882 1882, Plan for Superheater for City of Rome, 6 November 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to R. Gillespie, London, further to his earlier wire, updating Gillespie regarding boiler pressure for City of Rome after speaking with surveyor Mr Kinghorn, 4 September 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to B Waymouth, London, enclosing a letter from Mr Kinghorn regarding boiler pressure for City of Rome. Detailed note on reverse regarding decisions re case, 4 September 1882 1882, Machinery plan for renewal of pipework to superheater for City of Rome, 3 March 1882 1882, Letter from J G Kinghorn, Lloyd's Register Liverpool, to J F Light, regretting his clerical error in recording boiler pressure for City of Rome, 4 September 1882 1882, Copy of telegram from Assistant Secretary, Lloyd's Register London, to Barrow Shipbuilding Co, Barrow in Furness, noting that further enquiry has found the auxiliary boilers passed for 90 lbs pressure, the same as the main boilers, stating that the Regist 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, requesting further clarity regarding boiler pressure for City of Rome, 6 September 1882 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, thanking him for his explanatory letter, 8 September 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 31 October 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 30 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, December 1882 1882, Plan of Arrangement of Boiler Room for City of Room, 2 February 1883 1883, Tests of Boiler Steel for Boiler no. 77 for City of Rome, 16 January 1883 1883, Letter from Duncan Ritchie, Lloyd's Register Barrow-in-Furness, to the Secretary, Lloyd's Register London, recommending alterations to City of Rome before she leaves port, 2 May 1883 1883, Report on Machinery for City of Rome, 3 May 1883 1883, Report of Survey for Repairs for City of Rome, 3 May 1883 1883, Annual Survey report on City of Rome, 10 May 1883 1883, Report of Survey for Repairs of Engines and Boilers for City of Rome, 10 May 1883 1883, Annual Surveys report for City of Rome, 7 March 1884 1884, Report of Survey for Repairs for City of Rome, 28 February 1885 1885, Report of Survey for Repairs for City of Rome, 1886 1886 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
8415 ( Copy of Midship Section for City of Rome, December 1879 1879, Plan of Collision Bulkhead and Double Bottom for City of Rome, 23 June 1880 1880, Longitudinal Plan Showing Bulkhead Positions for Engine Room and Boiler Space, 31 July 1880 1880, Section Showing Plate Frames in Engine and Boiler Space for City of Rome, 31 July 1880 1880, Upper Deck Plan and Main Deck Plan for City of Rome, 31 July 1880 1880, Lower Deck Plan and Orlop Deck Plan for City of Rome, 31 July 1880 1880, First Entry Report, Iron Ship Survey, for City of Rome, 8 October 1881 1881, Report on Machinery for City of Rome, 13 October 1881 1881, Report of Survey for Repairs of Engines and Boilers for City of Rome, 3 February 1882 1882, Annual Survey for City of Rome, 4 April 1882 1882, Report on Machinery for City of Rome, 13 June 1882 1882, Telegram from Barrow Shipbuilding Co to Lloyd's Register Committee enquiring why boiler pressure for City of Rome is listed as 80 lbs, 2 September 1882. Note on back submits that enquiries be made of Liverpool surveyor, 4 September 1882 1882, Transcribed copy of telegram, noting enquiry from Barrow Shipbuilding Co, 4 September 1882 1882, Longitudinal plan of boiler room arrangement showing position of boilers, valves and pipes for City of Rome, 3 March 1882 1882, Telegram from Light, Lloyd's Register Liverpool, to Gillespie, Lloyd's Register Cornhill London, on subject of City of Rome boiler pressure, 4 September 1882 1882, Plan for Double Ended Boiler for City of Rome, 30 October 1882 1882, Detailed memorandum on boiler pressure issue regarding City of Rome, 4 September 1882 1882, Plan for Single Ended Boiler for City of Rome, 30 October 1882 1882, Copy of reply telegram wired from Lloyd's Register Cornhill to Barrow Shipbuilding Co on subject of boiler pressure for City of Rome, 4 September 1882 1882, Plan for Superheater for City of Rome, 6 November 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to R. Gillespie, London, further to his earlier wire, updating Gillespie regarding boiler pressure for City of Rome after speaking with surveyor Mr Kinghorn, 4 September 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to B Waymouth, London, enclosing a letter from Mr Kinghorn regarding boiler pressure for City of Rome. Detailed note on reverse regarding decisions re case, 4 September 1882 1882, Letter from J G Kinghorn, Lloyd's Register Liverpool, to J F Light, regretting his clerical error in recording boiler pressure for City of Rome, 4 September 1882 1882, Copy of telegram from Assistant Secretary, Lloyd's Register London, to Barrow Shipbuilding Co, Barrow in Furness, noting that further enquiry has found the auxiliary boilers passed for 90 lbs pressure, the same as the main boilers, stating that the Regist 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, requesting further clarity regarding boiler pressure for City of Rome, 6 September 1882 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, thanking him for his explanatory letter, 8 September 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 31 October 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 30 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, December 1882 1882, Plan of Arrangement of Boiler Room for City of Room, 2 February 1883 1883, Tests of Boiler Steel for Boiler no. 77 for City of Rome, 16 January 1883 1883, Letter from Duncan Ritchie, Lloyd's Register Barrow-in-Furness, to the Secretary, Lloyd's Register London, recommending alterations to City of Rome before she leaves port, 2 May 1883 1883, Report on Machinery for City of Rome, 3 May 1883 1883, Report of Survey for Repairs for City of Rome, 3 May 1883 1883, Annual Survey report on City of Rome, 10 May 1883 1883, Report of Survey for Repairs of Engines and Boilers for City of Rome, 10 May 1883 1883 )
8144 ( Annual Surveys report for City of Rome, 7 March 1884 1884, Report of Survey for Repairs for City of Rome, 28 February 1885 1885, Report of Survey for Repairs for City of Rome, 1886 1886 )
Is machinery fitted at the aft of the vessel?
No ( Copy of Midship Section for City of Rome, December 1879 1879, Plan of Collision Bulkhead and Double Bottom for City of Rome, 23 June 1880 1880, Longitudinal Plan Showing Bulkhead Positions for Engine Room and Boiler Space, 31 July 1880 1880, Section Showing Plate Frames in Engine and Boiler Space for City of Rome, 31 July 1880 1880, Upper Deck Plan and Main Deck Plan for City of Rome, 31 July 1880 1880, Lower Deck Plan and Orlop Deck Plan for City of Rome, 31 July 1880 1880, First Entry Report, Iron Ship Survey, for City of Rome, 8 October 1881 1881, Report on Machinery for City of Rome, 13 October 1881 1881, Report of Survey for Repairs of Engines and Boilers for City of Rome, 3 February 1882 1882, Annual Survey for City of Rome, 4 April 1882 1882, Report on Machinery for City of Rome, 13 June 1882 1882, Telegram from Barrow Shipbuilding Co to Lloyd's Register Committee enquiring why boiler pressure for City of Rome is listed as 80 lbs, 2 September 1882. Note on back submits that enquiries be made of Liverpool surveyor, 4 September 1882 1882, Transcribed copy of telegram, noting enquiry from Barrow Shipbuilding Co, 4 September 1882 1882, Longitudinal plan of boiler room arrangement showing position of boilers, valves and pipes for City of Rome, 3 March 1882 1882, Telegram from Light, Lloyd's Register Liverpool, to Gillespie, Lloyd's Register Cornhill London, on subject of City of Rome boiler pressure, 4 September 1882 1882, Plan for Double Ended Boiler for City of Rome, 30 October 1882 1882, Detailed memorandum on boiler pressure issue regarding City of Rome, 4 September 1882 1882, Plan for Single Ended Boiler for City of Rome, 30 October 1882 1882, Copy of reply telegram wired from Lloyd's Register Cornhill to Barrow Shipbuilding Co on subject of boiler pressure for City of Rome, 4 September 1882 1882, Plan for Superheater for City of Rome, 6 November 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to R. Gillespie, London, further to his earlier wire, updating Gillespie regarding boiler pressure for City of Rome after speaking with surveyor Mr Kinghorn, 4 September 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to B Waymouth, London, enclosing a letter from Mr Kinghorn regarding boiler pressure for City of Rome. Detailed note on reverse regarding decisions re case, 4 September 1882 1882, Machinery plan for renewal of pipework to superheater for City of Rome, 3 March 1882 1882, Letter from J G Kinghorn, Lloyd's Register Liverpool, to J F Light, regretting his clerical error in recording boiler pressure for City of Rome, 4 September 1882 1882, Copy of telegram from Assistant Secretary, Lloyd's Register London, to Barrow Shipbuilding Co, Barrow in Furness, noting that further enquiry has found the auxiliary boilers passed for 90 lbs pressure, the same as the main boilers, stating that the Regist 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, requesting further clarity regarding boiler pressure for City of Rome, 6 September 1882 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, thanking him for his explanatory letter, 8 September 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 31 October 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 30 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, December 1882 1882, Plan of Arrangement of Boiler Room for City of Room, 2 February 1883 1883, Tests of Boiler Steel for Boiler no. 77 for City of Rome, 16 January 1883 1883, Letter from Duncan Ritchie, Lloyd's Register Barrow-in-Furness, to the Secretary, Lloyd's Register London, recommending alterations to City of Rome before she leaves port, 2 May 1883 1883, Report on Machinery for City of Rome, 3 May 1883 1883, Report of Survey for Repairs for City of Rome, 3 May 1883 1883, Annual Survey report on City of Rome, 10 May 1883 1883, Report of Survey for Repairs of Engines and Boilers for City of Rome, 10 May 1883 1883, Annual Surveys report for City of Rome, 7 March 1884 1884, Report of Survey for Repairs for City of Rome, 28 February 1885 1885, Report of Survey for Repairs for City of Rome, 1886 1886 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Copy of Midship Section for City of Rome, December 1879 1879, Plan of Collision Bulkhead and Double Bottom for City of Rome, 23 June 1880 1880, Longitudinal Plan Showing Bulkhead Positions for Engine Room and Boiler Space, 31 July 1880 1880, Section Showing Plate Frames in Engine and Boiler Space for City of Rome, 31 July 1880 1880, Upper Deck Plan and Main Deck Plan for City of Rome, 31 July 1880 1880, Lower Deck Plan and Orlop Deck Plan for City of Rome, 31 July 1880 1880, First Entry Report, Iron Ship Survey, for City of Rome, 8 October 1881 1881, Report on Machinery for City of Rome, 13 October 1881 1881, Report of Survey for Repairs of Engines and Boilers for City of Rome, 3 February 1882 1882, Annual Survey for City of Rome, 4 April 1882 1882, Report on Machinery for City of Rome, 13 June 1882 1882, Telegram from Barrow Shipbuilding Co to Lloyd's Register Committee enquiring why boiler pressure for City of Rome is listed as 80 lbs, 2 September 1882. Note on back submits that enquiries be made of Liverpool surveyor, 4 September 1882 1882, Transcribed copy of telegram, noting enquiry from Barrow Shipbuilding Co, 4 September 1882 1882, Longitudinal plan of boiler room arrangement showing position of boilers, valves and pipes for City of Rome, 3 March 1882 1882, Telegram from Light, Lloyd's Register Liverpool, to Gillespie, Lloyd's Register Cornhill London, on subject of City of Rome boiler pressure, 4 September 1882 1882, Plan for Double Ended Boiler for City of Rome, 30 October 1882 1882, Detailed memorandum on boiler pressure issue regarding City of Rome, 4 September 1882 1882, Plan for Single Ended Boiler for City of Rome, 30 October 1882 1882, Copy of reply telegram wired from Lloyd's Register Cornhill to Barrow Shipbuilding Co on subject of boiler pressure for City of Rome, 4 September 1882 1882, Plan for Superheater for City of Rome, 6 November 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to R. Gillespie, London, further to his earlier wire, updating Gillespie regarding boiler pressure for City of Rome after speaking with surveyor Mr Kinghorn, 4 September 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to B Waymouth, London, enclosing a letter from Mr Kinghorn regarding boiler pressure for City of Rome. Detailed note on reverse regarding decisions re case, 4 September 1882 1882, Machinery plan for renewal of pipework to superheater for City of Rome, 3 March 1882 1882, Letter from J G Kinghorn, Lloyd's Register Liverpool, to J F Light, regretting his clerical error in recording boiler pressure for City of Rome, 4 September 1882 1882, Copy of telegram from Assistant Secretary, Lloyd's Register London, to Barrow Shipbuilding Co, Barrow in Furness, noting that further enquiry has found the auxiliary boilers passed for 90 lbs pressure, the same as the main boilers, stating that the Regist 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, requesting further clarity regarding boiler pressure for City of Rome, 6 September 1882 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, thanking him for his explanatory letter, 8 September 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 31 October 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 30 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, December 1882 1882, Plan of Arrangement of Boiler Room for City of Room, 2 February 1883 1883, Tests of Boiler Steel for Boiler no. 77 for City of Rome, 16 January 1883 1883, Letter from Duncan Ritchie, Lloyd's Register Barrow-in-Furness, to the Secretary, Lloyd's Register London, recommending alterations to City of Rome before she leaves port, 2 May 1883 1883, Report on Machinery for City of Rome, 3 May 1883 1883, Report of Survey for Repairs for City of Rome, 3 May 1883 1883, Annual Survey report on City of Rome, 10 May 1883 1883, Report of Survey for Repairs of Engines and Boilers for City of Rome, 10 May 1883 1883, Annual Surveys report for City of Rome, 7 March 1884 1884, Report of Survey for Repairs for City of Rome, 28 February 1885 1885, Report of Survey for Repairs for City of Rome, 1886 1886 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Copy of Midship Section for City of Rome, December 1879 1879, Plan of Collision Bulkhead and Double Bottom for City of Rome, 23 June 1880 1880, Longitudinal Plan Showing Bulkhead Positions for Engine Room and Boiler Space, 31 July 1880 1880, Section Showing Plate Frames in Engine and Boiler Space for City of Rome, 31 July 1880 1880, Upper Deck Plan and Main Deck Plan for City of Rome, 31 July 1880 1880, Lower Deck Plan and Orlop Deck Plan for City of Rome, 31 July 1880 1880, First Entry Report, Iron Ship Survey, for City of Rome, 8 October 1881 1881, Report on Machinery for City of Rome, 13 October 1881 1881, Report of Survey for Repairs of Engines and Boilers for City of Rome, 3 February 1882 1882, Annual Survey for City of Rome, 4 April 1882 1882, Report on Machinery for City of Rome, 13 June 1882 1882, Telegram from Barrow Shipbuilding Co to Lloyd's Register Committee enquiring why boiler pressure for City of Rome is listed as 80 lbs, 2 September 1882. Note on back submits that enquiries be made of Liverpool surveyor, 4 September 1882 1882, Transcribed copy of telegram, noting enquiry from Barrow Shipbuilding Co, 4 September 1882 1882, Longitudinal plan of boiler room arrangement showing position of boilers, valves and pipes for City of Rome, 3 March 1882 1882, Telegram from Light, Lloyd's Register Liverpool, to Gillespie, Lloyd's Register Cornhill London, on subject of City of Rome boiler pressure, 4 September 1882 1882, Plan for Double Ended Boiler for City of Rome, 30 October 1882 1882, Detailed memorandum on boiler pressure issue regarding City of Rome, 4 September 1882 1882, Plan for Single Ended Boiler for City of Rome, 30 October 1882 1882, Copy of reply telegram wired from Lloyd's Register Cornhill to Barrow Shipbuilding Co on subject of boiler pressure for City of Rome, 4 September 1882 1882, Plan for Superheater for City of Rome, 6 November 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to R. Gillespie, London, further to his earlier wire, updating Gillespie regarding boiler pressure for City of Rome after speaking with surveyor Mr Kinghorn, 4 September 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to B Waymouth, London, enclosing a letter from Mr Kinghorn regarding boiler pressure for City of Rome. Detailed note on reverse regarding decisions re case, 4 September 1882 1882, Machinery plan for renewal of pipework to superheater for City of Rome, 3 March 1882 1882, Letter from J G Kinghorn, Lloyd's Register Liverpool, to J F Light, regretting his clerical error in recording boiler pressure for City of Rome, 4 September 1882 1882, Copy of telegram from Assistant Secretary, Lloyd's Register London, to Barrow Shipbuilding Co, Barrow in Furness, noting that further enquiry has found the auxiliary boilers passed for 90 lbs pressure, the same as the main boilers, stating that the Regist 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, requesting further clarity regarding boiler pressure for City of Rome, 6 September 1882 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, thanking him for his explanatory letter, 8 September 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 31 October 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Copy of receipt for items bought by Barrow Engineering Co from David Colville, 8 November 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 20 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 26 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, 30 December 1882 1882, Receipt of plates bought by Barrow Engineering Co from David Colville, December 1882 1882, Plan of Arrangement of Boiler Room for City of Room, 2 February 1883 1883, Tests of Boiler Steel for Boiler no. 77 for City of Rome, 16 January 1883 1883, Letter from Duncan Ritchie, Lloyd's Register Barrow-in-Furness, to the Secretary, Lloyd's Register London, recommending alterations to City of Rome before she leaves port, 2 May 1883 1883, Report on Machinery for City of Rome, 3 May 1883 1883, Report of Survey for Repairs for City of Rome, 3 May 1883 1883, Annual Survey report on City of Rome, 10 May 1883 1883, Report of Survey for Repairs of Engines and Boilers for City of Rome, 10 May 1883 1883, Annual Surveys report for City of Rome, 7 March 1884 1884, Report of Survey for Repairs for City of Rome, 28 February 1885 1885, Report of Survey for Repairs for City of Rome, 1886 1886 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
James Kennedy ( First Entry Report, Iron Ship Survey, for City of Rome, 8 October 1881 1881 )
J Kennedy ( Report on Machinery for City of Rome, 13 October 1881 1881, Annual Survey for City of Rome, 4 April 1882 1882 )
Kennedy ( Report on Machinery for City of Rome, 13 June 1882 1882 )
R D Munro ( Report on Machinery for City of Rome, 3 May 1883 1883, Report of Survey for Repairs for City of Rome, 3 May 1883 1883, Annual Survey report on City of Rome, 10 May 1883 1883, Annual Surveys report for City of Rome, 7 March 1884 1884, Report of Survey for Repairs for City of Rome, 28 February 1885 1885 )
Location where a vessel’s survey was undertaken.
Barrow-in-Furness; Barrow ( First Entry Report, Iron Ship Survey, for City of Rome, 8 October 1881 1881, Report on Machinery for City of Rome, 13 October 1881 1881, Report on Machinery for City of Rome, 3 May 1883 1883, Report of Survey for Repairs for City of Rome, 3 May 1883 1883 )
Liverpool ( Report of Survey for Repairs of Engines and Boilers for City of Rome, 3 February 1882 1882, Annual Survey for City of Rome, 4 April 1882 1882, Report on Machinery for City of Rome, 13 June 1882 1882, Telegram from Light, Lloyd's Register Liverpool, to Gillespie, Lloyd's Register Cornhill London, on subject of City of Rome boiler pressure, 4 September 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to R. Gillespie, London, further to his earlier wire, updating Gillespie regarding boiler pressure for City of Rome after speaking with surveyor Mr Kinghorn, 4 September 1882 1882, Letter from J F Light, Lloyd's Register Liverpool, to B Waymouth, London, enclosing a letter from Mr Kinghorn regarding boiler pressure for City of Rome. Detailed note on reverse regarding decisions re case, 4 September 1882 1882, Letter from J G Kinghorn, Lloyd's Register Liverpool, to J F Light, regretting his clerical error in recording boiler pressure for City of Rome, 4 September 1882 1882 )
Barrow-in-Furness ( Telegram from Barrow Shipbuilding Co to Lloyd's Register Committee enquiring why boiler pressure for City of Rome is listed as 80 lbs, 2 September 1882. Note on back submits that enquiries be made of Liverpool surveyor, 4 September 1882 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, requesting further clarity regarding boiler pressure for City of Rome, 6 September 1882 1882, Letter from William John, Barrow Shipbuilding Co, to the Secretary, Lloyd's Register London, thanking him for his explanatory letter, 8 September 1882 1882, Letter from Duncan Ritchie, Lloyd's Register Barrow-in-Furness, to the Secretary, Lloyd's Register London, recommending alterations to City of Rome before she leaves port, 2 May 1883 1883 )
London ( Copy of reply telegram wired from Lloyd's Register Cornhill to Barrow Shipbuilding Co on subject of boiler pressure for City of Rome, 4 September 1882 1882, Copy of telegram from Assistant Secretary, Lloyd's Register London, to Barrow Shipbuilding Co, Barrow in Furness, noting that further enquiry has found the auxiliary boilers passed for 90 lbs pressure, the same as the main boilers, stating that the Regist 1882 )
St George's Engine Works, Liverpool ( Machinery plan for renewal of pipework to superheater for City of Rome, 3 March 1882 1882 )
Glasgow ( Tests of Boiler Steel for Boiler no. 77 for City of Rome, 16 January 1883 1883, Annual Survey report on City of Rome, 10 May 1883 1883, Report of Survey for Repairs of Engines and Boilers for City of Rome, 10 May 1883 1883 )
Birkenhead; Liverpool ( Annual Surveys report for City of Rome, 7 March 1884 1884, Report of Survey for Repairs for City of Rome, 28 February 1885 1885 )
Recorded information related to a vessel’s movements.
Barrow-in-Furness ( First Entry Report, Iron Ship Survey, for City of Rome, 8 October 1881 1881, Report on Machinery for City of Rome, 13 October 1881 1881, Report on Machinery for City of Rome, 3 May 1883 1883, Report of Survey for Repairs for City of Rome, 3 May 1883 1883 )
Liverpool ( Report of Survey for Repairs of Engines and Boilers for City of Rome, 3 February 1882 1882, Annual Survey for City of Rome, 4 April 1882 1882, Report on Machinery for City of Rome, 13 June 1882 1882 )
Glasgow ( Annual Survey report on City of Rome, 10 May 1883 1883, Report of Survey for Repairs of Engines and Boilers for City of Rome, 10 May 1883 1883 )
Birkenhead ( Annual Surveys report for City of Rome, 7 March 1884 1884, Report of Survey for Repairs for City of Rome, 28 February 1885 1885 )
The laying of the keel is the formal recognition of the start of a vessel’s construction.
// ( Annual Surveys report for City of Rome, 7 March 1884 1884 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.