Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Clan Macfarlane ( Midship Section Plan for Clan Macfarlane, 27th March 1920 1920, Profile & Deck Plans for Clan Macfarlane, 27th May 1920 1920, Plan of Three Main Boilers for Clan Macfarlane, September 1920 1920, Letter from William McMeek, Lloyd's Register, Glasgow to The Secretary, Glasgow, regarding thickness of plating, width of seam & length of decks for Clan MacFarlane, 4th December 1922 1922, Letter from Assistant to the Secretary, Lloyd's Register, to The Secretary, Glasgow, regarding report on thickness of plating & width of seam & length of decks for Clan MacFarlane, 29th November 1922 1922, Memo to the Chief Ship Surveyor regarding the first entry for Clan MacFarlane, 23rd November 1922 1922, Freeboard Verification Form for Steamers for Clan MacFarlane, 17th August 1922 1922, Steel Steamer Report for Clan Macfarlane, 16th November 1922 1922, Form for Vessels of 100 Tons & Upwards for Clan MacFarlane, 17th October 1922 1922, Certificate of Survey during the Constructions of Boilers & Machinery for Clan Macfarlane, 14th November 1922 1922, Report on Machinery for Clan Macfarlane, 18th November 1922 1922, Report on Boilers Clan Macfarlane, 18th November 1922 1922, Report on Electric Fittings for Clan Macfarlane, 20th November 1922 1922, Midship Section Plan for Clan Macfarlane, 6th November 1922 1922, Plan of Donkey Boiler for Clan Macfarlane, 22nd September 1922 1922, Plan of Extension of the Recess Tunnel for Clan Macfarlane, 11th September 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding dry dock survey & alterations to Clan MacFarlane, 25th June 1929 1929, Report of Survey for Repairs, &c for Clan Macfarlane, 7th June 1929 1929, Memo regarding turbine fitted & screwshaft drawing for Clan MacFarlane, 27th June 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 11th June 1929 1929, Certificate of Survey of Machinery for Clan Macfarlane, 5th June 1929 1929, Certificate of Survey for Clan Macfarlane, 20th May 1929 1929, Letter from Secretary to the Glasgow Committee to Cayzer Irvine & Co Ltd, Glasgow, regarding boiler survey & completion of machinery survey for Clan MacFarlane, 4th June 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 30th May 1940 1940, Report of Total Loss, Casualty, &c for Clan Macfarlane, Undated no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

24/08/1922 ( Midship Section Plan for Clan Macfarlane, 27th March 1920 1920, Profile & Deck Plans for Clan Macfarlane, 27th May 1920 1920, Letter from G Redman, Assistant to the Secretary, Lloyd's Register, London to The Secretary, Glasgow, regarding approval of plan of boilers for Clan Macfarlane, 29th September 1920 1920, Plan of Three Main Boilers for Clan Macfarlane, September 1920 1920, Letter from William McMeek, Lloyd's Register, Glasgow to The Secretary, Glasgow, regarding thickness of plating, width of seam & length of decks for Clan MacFarlane, 4th December 1922 1922, Letter from Assistant to the Secretary, Lloyd's Register, to The Secretary, Glasgow, regarding report on thickness of plating & width of seam & length of decks for Clan MacFarlane, 29th November 1922 1922, Memo to the Chief Ship Surveyor regarding the first entry for Clan MacFarlane, 23rd November 1922 1922, Freeboard Verification Form for Steamers for Clan MacFarlane, 17th August 1922 1922, Steel Steamer Report for Clan Macfarlane, 16th November 1922 1922, Form for Vessels of 100 Tons & Upwards for Clan MacFarlane, 17th October 1922 1922, Certificate of Survey during the Constructions of Boilers & Machinery for Clan Macfarlane, 14th November 1922 1922, Report on Machinery for Clan Macfarlane, 18th November 1922 1922, Report on Boilers Clan Macfarlane, 18th November 1922 1922, Report on Electric Fittings for Clan Macfarlane, 20th November 1922 1922, Midship Section Plan for Clan Macfarlane, 6th November 1922 1922, Plan of Donkey Boiler for Clan Macfarlane, 22nd September 1922 1922, Plan of Extension of the Recess Tunnel for Clan Macfarlane, 11th September 1928 1928, Plan in German language of Steam Turbine Arrangement for Clan Macfarlane, 28th November 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding dry dock survey & alterations to Clan MacFarlane, 25th June 1929 1929, Report of Survey for Repairs, &c for Clan Macfarlane, 7th June 1929 1929, Memo regarding turbine fitted & screwshaft drawing for Clan MacFarlane, 27th June 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 11th June 1929 1929, Certificate of Survey of Machinery for Clan Macfarlane, 5th June 1929 1929, Certificate of Survey for Clan Macfarlane, 20th May 1929 1929, Letter from Secretary to the Glasgow Committee to Cayzer Irvine & Co Ltd, Glasgow, regarding boiler survey & completion of machinery survey for Clan MacFarlane, 4th June 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 30th May 1940 1940, Report of Total Loss, Casualty, &c for Clan Macfarlane, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

490 ( Midship Section Plan for Clan Macfarlane, 27th March 1920 1920, Profile & Deck Plans for Clan Macfarlane, 27th May 1920 1920, Letter from G Redman, Assistant to the Secretary, Lloyd's Register, London to The Secretary, Glasgow, regarding approval of plan of boilers for Clan Macfarlane, 29th September 1920 1920, Plan of Three Main Boilers for Clan Macfarlane, September 1920 1920, Letter from William McMeek, Lloyd's Register, Glasgow to The Secretary, Glasgow, regarding thickness of plating, width of seam & length of decks for Clan MacFarlane, 4th December 1922 1922, Letter from Assistant to the Secretary, Lloyd's Register, to The Secretary, Glasgow, regarding report on thickness of plating & width of seam & length of decks for Clan MacFarlane, 29th November 1922 1922, Memo to the Chief Ship Surveyor regarding the first entry for Clan MacFarlane, 23rd November 1922 1922, Freeboard Verification Form for Steamers for Clan MacFarlane, 17th August 1922 1922, Steel Steamer Report for Clan Macfarlane, 16th November 1922 1922, Form for Vessels of 100 Tons & Upwards for Clan MacFarlane, 17th October 1922 1922, Certificate of Survey during the Constructions of Boilers & Machinery for Clan Macfarlane, 14th November 1922 1922, Report on Machinery for Clan Macfarlane, 18th November 1922 1922, Report on Boilers Clan Macfarlane, 18th November 1922 1922, Report on Electric Fittings for Clan Macfarlane, 20th November 1922 1922, Midship Section Plan for Clan Macfarlane, 6th November 1922 1922, Plan of Donkey Boiler for Clan Macfarlane, 22nd September 1922 1922, Plan of Extension of the Recess Tunnel for Clan Macfarlane, 11th September 1928 1928, Plan in German language of Steam Turbine Arrangement for Clan Macfarlane, 28th November 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding dry dock survey & alterations to Clan MacFarlane, 25th June 1929 1929, Report of Survey for Repairs, &c for Clan Macfarlane, 7th June 1929 1929, Memo regarding turbine fitted & screwshaft drawing for Clan MacFarlane, 27th June 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 11th June 1929 1929, Certificate of Survey of Machinery for Clan Macfarlane, 5th June 1929 1929, Certificate of Survey for Clan Macfarlane, 20th May 1929 1929, Letter from Secretary to the Glasgow Committee to Cayzer Irvine & Co Ltd, Glasgow, regarding boiler survey & completion of machinery survey for Clan MacFarlane, 4th June 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 30th May 1940 1940, Report of Total Loss, Casualty, &c for Clan Macfarlane, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Irvine ( Midship Section Plan for Clan Macfarlane, 27th March 1920 1920, Profile & Deck Plans for Clan Macfarlane, 27th May 1920 1920, Midship Section Plan for Clan Macfarlane, 6th November 1922 1922 )

London ( Letter from G Redman, Assistant to the Secretary, Lloyd's Register, London to The Secretary, Glasgow, regarding approval of plan of boilers for Clan Macfarlane, 29th September 1920 1920, Letter from Assistant to the Secretary, Lloyd's Register, to The Secretary, Glasgow, regarding report on thickness of plating & width of seam & length of decks for Clan MacFarlane, 29th November 1922 1922 )

Glasgow ( Plan of Three Main Boilers for Clan Macfarlane, September 1920 1920, Letter from William McMeek, Lloyd's Register, Glasgow to The Secretary, Glasgow, regarding thickness of plating, width of seam & length of decks for Clan MacFarlane, 4th December 1922 1922, Freeboard Verification Form for Steamers for Clan MacFarlane, 17th August 1922 1922, Form for Vessels of 100 Tons & Upwards for Clan MacFarlane, 17th October 1922 1922, Certificate of Survey during the Constructions of Boilers & Machinery for Clan Macfarlane, 14th November 1922 1922, Report on Machinery for Clan Macfarlane, 18th November 1922 1922, Report on Boilers Clan Macfarlane, 18th November 1922 1922, Report on Electric Fittings for Clan Macfarlane, 20th November 1922 1922, Plan of Donkey Boiler for Clan Macfarlane, 22nd September 1922 1922, Letter from Secretary to the Glasgow Committee to Cayzer Irvine & Co Ltd, Glasgow, regarding boiler survey & completion of machinery survey for Clan MacFarlane, 4th June 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 30th May 1940 1940 )

Irvine; Glasgow ( Steel Steamer Report for Clan Macfarlane, 16th November 1922 1922 )

Hamburg ( Plan in German language of Steam Turbine Arrangement for Clan Macfarlane, 28th November 1928 1928, Report of Survey for Repairs, &c for Clan Macfarlane, 7th June 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 11th June 1929 1929, Certificate of Survey of Machinery for Clan Macfarlane, 5th June 1929 1929, Certificate of Survey for Clan Macfarlane, 20th May 1929 1929 )

A vessel’s means of propulsion.

Propulsion

Steam ( Midship Section Plan for Clan Macfarlane, 27th March 1920 1920, Plan of Three Main Boilers for Clan Macfarlane, September 1920 1920, Letter from William McMeek, Lloyd's Register, Glasgow to The Secretary, Glasgow, regarding thickness of plating, width of seam & length of decks for Clan MacFarlane, 4th December 1922 1922, Letter from Assistant to the Secretary, Lloyd's Register, to The Secretary, Glasgow, regarding report on thickness of plating & width of seam & length of decks for Clan MacFarlane, 29th November 1922 1922, Memo to the Chief Ship Surveyor regarding the first entry for Clan MacFarlane, 23rd November 1922 1922, Steel Steamer Report for Clan Macfarlane, 16th November 1922 1922, Form for Vessels of 100 Tons & Upwards for Clan MacFarlane, 17th October 1922 1922, Certificate of Survey during the Constructions of Boilers & Machinery for Clan Macfarlane, 14th November 1922 1922, Report on Machinery for Clan Macfarlane, 18th November 1922 1922, Report on Boilers Clan Macfarlane, 18th November 1922 1922, Report on Electric Fittings for Clan Macfarlane, 20th November 1922 1922, Midship Section Plan for Clan Macfarlane, 6th November 1922 1922, Plan of Donkey Boiler for Clan Macfarlane, 22nd September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding dry dock survey & alterations to Clan MacFarlane, 25th June 1929 1929, Report of Survey for Repairs, &c for Clan Macfarlane, 7th June 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 11th June 1929 1929, Certificate of Survey of Machinery for Clan Macfarlane, 5th June 1929 1929, Certificate of Survey for Clan Macfarlane, 20th May 1929 1929, Letter from Secretary to the Glasgow Committee to Cayzer Irvine & Co Ltd, Glasgow, regarding boiler survey & completion of machinery survey for Clan MacFarlane, 4th June 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 30th May 1940 1940, Report of Total Loss, Casualty, &c for Clan Macfarlane, Undated no date )

undefined ( Profile & Deck Plans for Clan Macfarlane, 27th May 1920 1920, Letter from G Redman, Assistant to the Secretary, Lloyd's Register, London to The Secretary, Glasgow, regarding approval of plan of boilers for Clan Macfarlane, 29th September 1920 1920, Freeboard Verification Form for Steamers for Clan MacFarlane, 17th August 1922 1922, Plan of Extension of the Recess Tunnel for Clan Macfarlane, 11th September 1928 1928, Plan in German language of Steam Turbine Arrangement for Clan Macfarlane, 28th November 1928 1928, Memo regarding turbine fitted & screwshaft drawing for Clan MacFarlane, 27th June 1929 1929 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Midship Section Plan for Clan Macfarlane, 27th March 1920 1920, Profile & Deck Plans for Clan Macfarlane, 27th May 1920 1920, Letter from G Redman, Assistant to the Secretary, Lloyd's Register, London to The Secretary, Glasgow, regarding approval of plan of boilers for Clan Macfarlane, 29th September 1920 1920, Plan of Three Main Boilers for Clan Macfarlane, September 1920 1920, Letter from William McMeek, Lloyd's Register, Glasgow to The Secretary, Glasgow, regarding thickness of plating, width of seam & length of decks for Clan MacFarlane, 4th December 1922 1922, Letter from Assistant to the Secretary, Lloyd's Register, to The Secretary, Glasgow, regarding report on thickness of plating & width of seam & length of decks for Clan MacFarlane, 29th November 1922 1922, Memo to the Chief Ship Surveyor regarding the first entry for Clan MacFarlane, 23rd November 1922 1922, Freeboard Verification Form for Steamers for Clan MacFarlane, 17th August 1922 1922, Steel Steamer Report for Clan Macfarlane, 16th November 1922 1922, Form for Vessels of 100 Tons & Upwards for Clan MacFarlane, 17th October 1922 1922, Certificate of Survey during the Constructions of Boilers & Machinery for Clan Macfarlane, 14th November 1922 1922, Report on Machinery for Clan Macfarlane, 18th November 1922 1922, Report on Boilers Clan Macfarlane, 18th November 1922 1922, Report on Electric Fittings for Clan Macfarlane, 20th November 1922 1922, Midship Section Plan for Clan Macfarlane, 6th November 1922 1922, Plan of Donkey Boiler for Clan Macfarlane, 22nd September 1922 1922, Plan of Extension of the Recess Tunnel for Clan Macfarlane, 11th September 1928 1928, Plan in German language of Steam Turbine Arrangement for Clan Macfarlane, 28th November 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding dry dock survey & alterations to Clan MacFarlane, 25th June 1929 1929, Report of Survey for Repairs, &c for Clan Macfarlane, 7th June 1929 1929, Memo regarding turbine fitted & screwshaft drawing for Clan MacFarlane, 27th June 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 11th June 1929 1929, Certificate of Survey of Machinery for Clan Macfarlane, 5th June 1929 1929, Certificate of Survey for Clan Macfarlane, 20th May 1929 1929, Letter from Secretary to the Glasgow Committee to Cayzer Irvine & Co Ltd, Glasgow, regarding boiler survey & completion of machinery survey for Clan MacFarlane, 4th June 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 30th May 1940 1940, Report of Total Loss, Casualty, &c for Clan Macfarlane, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Midship Section Plan for Clan Macfarlane, 27th March 1920 1920, Profile & Deck Plans for Clan Macfarlane, 27th May 1920 1920, Letter from G Redman, Assistant to the Secretary, Lloyd's Register, London to The Secretary, Glasgow, regarding approval of plan of boilers for Clan Macfarlane, 29th September 1920 1920, Plan of Three Main Boilers for Clan Macfarlane, September 1920 1920, Letter from William McMeek, Lloyd's Register, Glasgow to The Secretary, Glasgow, regarding thickness of plating, width of seam & length of decks for Clan MacFarlane, 4th December 1922 1922, Letter from Assistant to the Secretary, Lloyd's Register, to The Secretary, Glasgow, regarding report on thickness of plating & width of seam & length of decks for Clan MacFarlane, 29th November 1922 1922, Memo to the Chief Ship Surveyor regarding the first entry for Clan MacFarlane, 23rd November 1922 1922, Freeboard Verification Form for Steamers for Clan MacFarlane, 17th August 1922 1922, Steel Steamer Report for Clan Macfarlane, 16th November 1922 1922, Form for Vessels of 100 Tons & Upwards for Clan MacFarlane, 17th October 1922 1922, Certificate of Survey during the Constructions of Boilers & Machinery for Clan Macfarlane, 14th November 1922 1922, Report on Machinery for Clan Macfarlane, 18th November 1922 1922, Report on Boilers Clan Macfarlane, 18th November 1922 1922, Report on Electric Fittings for Clan Macfarlane, 20th November 1922 1922, Midship Section Plan for Clan Macfarlane, 6th November 1922 1922, Plan of Donkey Boiler for Clan Macfarlane, 22nd September 1922 1922, Plan of Extension of the Recess Tunnel for Clan Macfarlane, 11th September 1928 1928, Plan in German language of Steam Turbine Arrangement for Clan Macfarlane, 28th November 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding dry dock survey & alterations to Clan MacFarlane, 25th June 1929 1929, Report of Survey for Repairs, &c for Clan Macfarlane, 7th June 1929 1929, Memo regarding turbine fitted & screwshaft drawing for Clan MacFarlane, 27th June 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 11th June 1929 1929, Certificate of Survey of Machinery for Clan Macfarlane, 5th June 1929 1929, Certificate of Survey for Clan Macfarlane, 20th May 1929 1929, Letter from Secretary to the Glasgow Committee to Cayzer Irvine & Co Ltd, Glasgow, regarding boiler survey & completion of machinery survey for Clan MacFarlane, 4th June 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 30th May 1940 1940, Report of Total Loss, Casualty, &c for Clan Macfarlane, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Midship Section Plan for Clan Macfarlane, 27th March 1920 1920, Profile & Deck Plans for Clan Macfarlane, 27th May 1920 1920, Letter from G Redman, Assistant to the Secretary, Lloyd's Register, London to The Secretary, Glasgow, regarding approval of plan of boilers for Clan Macfarlane, 29th September 1920 1920, Plan of Three Main Boilers for Clan Macfarlane, September 1920 1920, Letter from William McMeek, Lloyd's Register, Glasgow to The Secretary, Glasgow, regarding thickness of plating, width of seam & length of decks for Clan MacFarlane, 4th December 1922 1922, Letter from Assistant to the Secretary, Lloyd's Register, to The Secretary, Glasgow, regarding report on thickness of plating & width of seam & length of decks for Clan MacFarlane, 29th November 1922 1922, Memo to the Chief Ship Surveyor regarding the first entry for Clan MacFarlane, 23rd November 1922 1922, Freeboard Verification Form for Steamers for Clan MacFarlane, 17th August 1922 1922, Steel Steamer Report for Clan Macfarlane, 16th November 1922 1922, Form for Vessels of 100 Tons & Upwards for Clan MacFarlane, 17th October 1922 1922, Certificate of Survey during the Constructions of Boilers & Machinery for Clan Macfarlane, 14th November 1922 1922, Report on Machinery for Clan Macfarlane, 18th November 1922 1922, Report on Boilers Clan Macfarlane, 18th November 1922 1922, Report on Electric Fittings for Clan Macfarlane, 20th November 1922 1922, Midship Section Plan for Clan Macfarlane, 6th November 1922 1922, Plan of Donkey Boiler for Clan Macfarlane, 22nd September 1922 1922, Plan of Extension of the Recess Tunnel for Clan Macfarlane, 11th September 1928 1928, Plan in German language of Steam Turbine Arrangement for Clan Macfarlane, 28th November 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding dry dock survey & alterations to Clan MacFarlane, 25th June 1929 1929, Report of Survey for Repairs, &c for Clan Macfarlane, 7th June 1929 1929, Memo regarding turbine fitted & screwshaft drawing for Clan MacFarlane, 27th June 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 11th June 1929 1929, Certificate of Survey of Machinery for Clan Macfarlane, 5th June 1929 1929, Certificate of Survey for Clan Macfarlane, 20th May 1929 1929, Letter from Secretary to the Glasgow Committee to Cayzer Irvine & Co Ltd, Glasgow, regarding boiler survey & completion of machinery survey for Clan MacFarlane, 4th June 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 30th May 1940 1940, Report of Total Loss, Casualty, &c for Clan Macfarlane, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Midship Section Plan for Clan Macfarlane, 27th March 1920 1920, Profile & Deck Plans for Clan Macfarlane, 27th May 1920 1920, Letter from G Redman, Assistant to the Secretary, Lloyd's Register, London to The Secretary, Glasgow, regarding approval of plan of boilers for Clan Macfarlane, 29th September 1920 1920, Plan of Three Main Boilers for Clan Macfarlane, September 1920 1920, Letter from William McMeek, Lloyd's Register, Glasgow to The Secretary, Glasgow, regarding thickness of plating, width of seam & length of decks for Clan MacFarlane, 4th December 1922 1922, Letter from Assistant to the Secretary, Lloyd's Register, to The Secretary, Glasgow, regarding report on thickness of plating & width of seam & length of decks for Clan MacFarlane, 29th November 1922 1922, Memo to the Chief Ship Surveyor regarding the first entry for Clan MacFarlane, 23rd November 1922 1922, Freeboard Verification Form for Steamers for Clan MacFarlane, 17th August 1922 1922, Steel Steamer Report for Clan Macfarlane, 16th November 1922 1922, Form for Vessels of 100 Tons & Upwards for Clan MacFarlane, 17th October 1922 1922, Certificate of Survey during the Constructions of Boilers & Machinery for Clan Macfarlane, 14th November 1922 1922, Report on Machinery for Clan Macfarlane, 18th November 1922 1922, Report on Boilers Clan Macfarlane, 18th November 1922 1922, Report on Electric Fittings for Clan Macfarlane, 20th November 1922 1922, Midship Section Plan for Clan Macfarlane, 6th November 1922 1922, Plan of Donkey Boiler for Clan Macfarlane, 22nd September 1922 1922, Plan of Extension of the Recess Tunnel for Clan Macfarlane, 11th September 1928 1928, Plan in German language of Steam Turbine Arrangement for Clan Macfarlane, 28th November 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding dry dock survey & alterations to Clan MacFarlane, 25th June 1929 1929, Report of Survey for Repairs, &c for Clan Macfarlane, 7th June 1929 1929, Memo regarding turbine fitted & screwshaft drawing for Clan MacFarlane, 27th June 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 11th June 1929 1929, Certificate of Survey of Machinery for Clan Macfarlane, 5th June 1929 1929, Certificate of Survey for Clan Macfarlane, 20th May 1929 1929, Letter from Secretary to the Glasgow Committee to Cayzer Irvine & Co Ltd, Glasgow, regarding boiler survey & completion of machinery survey for Clan MacFarlane, 4th June 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 30th May 1940 1940, Report of Total Loss, Casualty, &c for Clan Macfarlane, Undated no date )

Vessel’s area of loss or disposal/last known recorded location.

Area of ship loss

East of Italian Somaliland ( Midship Section Plan for Clan Macfarlane, 27th March 1920 1920, Profile & Deck Plans for Clan Macfarlane, 27th May 1920 1920, Letter from G Redman, Assistant to the Secretary, Lloyd's Register, London to The Secretary, Glasgow, regarding approval of plan of boilers for Clan Macfarlane, 29th September 1920 1920, Plan of Three Main Boilers for Clan Macfarlane, September 1920 1920, Letter from William McMeek, Lloyd's Register, Glasgow to The Secretary, Glasgow, regarding thickness of plating, width of seam & length of decks for Clan MacFarlane, 4th December 1922 1922, Letter from Assistant to the Secretary, Lloyd's Register, to The Secretary, Glasgow, regarding report on thickness of plating & width of seam & length of decks for Clan MacFarlane, 29th November 1922 1922, Memo to the Chief Ship Surveyor regarding the first entry for Clan MacFarlane, 23rd November 1922 1922, Freeboard Verification Form for Steamers for Clan MacFarlane, 17th August 1922 1922, Steel Steamer Report for Clan Macfarlane, 16th November 1922 1922, Form for Vessels of 100 Tons & Upwards for Clan MacFarlane, 17th October 1922 1922, Certificate of Survey during the Constructions of Boilers & Machinery for Clan Macfarlane, 14th November 1922 1922, Report on Machinery for Clan Macfarlane, 18th November 1922 1922, Report on Boilers Clan Macfarlane, 18th November 1922 1922, Report on Electric Fittings for Clan Macfarlane, 20th November 1922 1922, Midship Section Plan for Clan Macfarlane, 6th November 1922 1922, Plan of Donkey Boiler for Clan Macfarlane, 22nd September 1922 1922, Plan of Extension of the Recess Tunnel for Clan Macfarlane, 11th September 1928 1928, Plan in German language of Steam Turbine Arrangement for Clan Macfarlane, 28th November 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding dry dock survey & alterations to Clan MacFarlane, 25th June 1929 1929, Report of Survey for Repairs, &c for Clan Macfarlane, 7th June 1929 1929, Memo regarding turbine fitted & screwshaft drawing for Clan MacFarlane, 27th June 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 11th June 1929 1929, Certificate of Survey of Machinery for Clan Macfarlane, 5th June 1929 1929, Certificate of Survey for Clan Macfarlane, 20th May 1929 1929, Letter from Secretary to the Glasgow Committee to Cayzer Irvine & Co Ltd, Glasgow, regarding boiler survey & completion of machinery survey for Clan MacFarlane, 4th June 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 30th May 1940 1940, Report of Total Loss, Casualty, &c for Clan Macfarlane, Undated no date )

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

17/07/1940 ( Midship Section Plan for Clan Macfarlane, 27th March 1920 1920, Profile & Deck Plans for Clan Macfarlane, 27th May 1920 1920, Letter from G Redman, Assistant to the Secretary, Lloyd's Register, London to The Secretary, Glasgow, regarding approval of plan of boilers for Clan Macfarlane, 29th September 1920 1920, Plan of Three Main Boilers for Clan Macfarlane, September 1920 1920, Letter from William McMeek, Lloyd's Register, Glasgow to The Secretary, Glasgow, regarding thickness of plating, width of seam & length of decks for Clan MacFarlane, 4th December 1922 1922, Letter from Assistant to the Secretary, Lloyd's Register, to The Secretary, Glasgow, regarding report on thickness of plating & width of seam & length of decks for Clan MacFarlane, 29th November 1922 1922, Memo to the Chief Ship Surveyor regarding the first entry for Clan MacFarlane, 23rd November 1922 1922, Freeboard Verification Form for Steamers for Clan MacFarlane, 17th August 1922 1922, Steel Steamer Report for Clan Macfarlane, 16th November 1922 1922, Form for Vessels of 100 Tons & Upwards for Clan MacFarlane, 17th October 1922 1922, Certificate of Survey during the Constructions of Boilers & Machinery for Clan Macfarlane, 14th November 1922 1922, Report on Machinery for Clan Macfarlane, 18th November 1922 1922, Report on Boilers Clan Macfarlane, 18th November 1922 1922, Report on Electric Fittings for Clan Macfarlane, 20th November 1922 1922, Midship Section Plan for Clan Macfarlane, 6th November 1922 1922, Plan of Donkey Boiler for Clan Macfarlane, 22nd September 1922 1922, Plan of Extension of the Recess Tunnel for Clan Macfarlane, 11th September 1928 1928, Plan in German language of Steam Turbine Arrangement for Clan Macfarlane, 28th November 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding dry dock survey & alterations to Clan MacFarlane, 25th June 1929 1929, Report of Survey for Repairs, &c for Clan Macfarlane, 7th June 1929 1929, Memo regarding turbine fitted & screwshaft drawing for Clan MacFarlane, 27th June 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 11th June 1929 1929, Certificate of Survey of Machinery for Clan Macfarlane, 5th June 1929 1929, Certificate of Survey for Clan Macfarlane, 20th May 1929 1929, Letter from Secretary to the Glasgow Committee to Cayzer Irvine & Co Ltd, Glasgow, regarding boiler survey & completion of machinery survey for Clan MacFarlane, 4th June 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 30th May 1940 1940, Report of Total Loss, Casualty, &c for Clan Macfarlane, Undated no date )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1; Awning Dk with Fbd 11,22; Lloyds A & CP; +LMC 11,22 Fd; fitted for oil fuel 11,22 F p above 150 F ( Steel Steamer Report for Clan Macfarlane, 16th November 1922 1922 )

+LM C 11,22 FD; Fitted for Oil Fuel 11,22 Fp above 150 cF ( Report on Machinery for Clan Macfarlane, 18th November 1922 1922 )

See Accompanying Machinery Report ( Report on Boilers Clan Macfarlane, 18th November 1922 1922 )

Elec Light ( Report on Electric Fittings for Clan Macfarlane, 20th November 1922 1922 )

+100A1 Subject awns dk with Fbd; fitted for oil fuel & c s b 29 ( Report of Survey for Repairs, &c for Clan Macfarlane, 7th June 1929 1929 )

S 6,29 ( Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 11th June 1929 1929 )

Deferred for Compn MS; B S 5,40 ( Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 30th May 1940 1940 )

+100A1; Awing Deck With Freeboard 8,39; Oil Engines; S S Grk No 3-35; fitted For Oil Fuel 11,22 FP; +LMC; B S 5,40; MS 8,35; TS 8,38 CL ( Report of Total Loss, Casualty, &c for Clan Macfarlane, Undated no date )

Type and configuration of the engine(s) supplied for a vessel.

The year in which a vessel’s construction is completed.

Year of ship completion

1922 ( Midship Section Plan for Clan Macfarlane, 27th March 1920 1920, Profile & Deck Plans for Clan Macfarlane, 27th May 1920 1920, Letter from G Redman, Assistant to the Secretary, Lloyd's Register, London to The Secretary, Glasgow, regarding approval of plan of boilers for Clan Macfarlane, 29th September 1920 1920, Plan of Three Main Boilers for Clan Macfarlane, September 1920 1920, Letter from William McMeek, Lloyd's Register, Glasgow to The Secretary, Glasgow, regarding thickness of plating, width of seam & length of decks for Clan MacFarlane, 4th December 1922 1922, Letter from Assistant to the Secretary, Lloyd's Register, to The Secretary, Glasgow, regarding report on thickness of plating & width of seam & length of decks for Clan MacFarlane, 29th November 1922 1922, Memo to the Chief Ship Surveyor regarding the first entry for Clan MacFarlane, 23rd November 1922 1922, Freeboard Verification Form for Steamers for Clan MacFarlane, 17th August 1922 1922, Steel Steamer Report for Clan Macfarlane, 16th November 1922 1922, Form for Vessels of 100 Tons & Upwards for Clan MacFarlane, 17th October 1922 1922, Certificate of Survey during the Constructions of Boilers & Machinery for Clan Macfarlane, 14th November 1922 1922, Report on Machinery for Clan Macfarlane, 18th November 1922 1922, Report on Boilers Clan Macfarlane, 18th November 1922 1922, Report on Electric Fittings for Clan Macfarlane, 20th November 1922 1922, Midship Section Plan for Clan Macfarlane, 6th November 1922 1922, Plan of Donkey Boiler for Clan Macfarlane, 22nd September 1922 1922, Plan of Extension of the Recess Tunnel for Clan Macfarlane, 11th September 1928 1928, Plan in German language of Steam Turbine Arrangement for Clan Macfarlane, 28th November 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding dry dock survey & alterations to Clan MacFarlane, 25th June 1929 1929, Report of Survey for Repairs, &c for Clan Macfarlane, 7th June 1929 1929, Memo regarding turbine fitted & screwshaft drawing for Clan MacFarlane, 27th June 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 11th June 1929 1929, Certificate of Survey of Machinery for Clan Macfarlane, 5th June 1929 1929, Certificate of Survey for Clan Macfarlane, 20th May 1929 1929, Letter from Secretary to the Glasgow Committee to Cayzer Irvine & Co Ltd, Glasgow, regarding boiler survey & completion of machinery survey for Clan MacFarlane, 4th June 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 30th May 1940 1940, Report of Total Loss, Casualty, &c for Clan Macfarlane, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Ayrshire Dockyard Co Ltd ( Midship Section Plan for Clan Macfarlane, 27th March 1920 1920, Profile & Deck Plans for Clan Macfarlane, 27th May 1920 1920, Letter from G Redman, Assistant to the Secretary, Lloyd's Register, London to The Secretary, Glasgow, regarding approval of plan of boilers for Clan Macfarlane, 29th September 1920 1920, Plan of Three Main Boilers for Clan Macfarlane, September 1920 1920, Letter from William McMeek, Lloyd's Register, Glasgow to The Secretary, Glasgow, regarding thickness of plating, width of seam & length of decks for Clan MacFarlane, 4th December 1922 1922, Letter from Assistant to the Secretary, Lloyd's Register, to The Secretary, Glasgow, regarding report on thickness of plating & width of seam & length of decks for Clan MacFarlane, 29th November 1922 1922, Memo to the Chief Ship Surveyor regarding the first entry for Clan MacFarlane, 23rd November 1922 1922, Freeboard Verification Form for Steamers for Clan MacFarlane, 17th August 1922 1922, Steel Steamer Report for Clan Macfarlane, 16th November 1922 1922, Form for Vessels of 100 Tons & Upwards for Clan MacFarlane, 17th October 1922 1922, Certificate of Survey during the Constructions of Boilers & Machinery for Clan Macfarlane, 14th November 1922 1922, Report on Machinery for Clan Macfarlane, 18th November 1922 1922, Report on Boilers Clan Macfarlane, 18th November 1922 1922, Report on Electric Fittings for Clan Macfarlane, 20th November 1922 1922, Midship Section Plan for Clan Macfarlane, 6th November 1922 1922, Plan of Donkey Boiler for Clan Macfarlane, 22nd September 1922 1922, Plan of Extension of the Recess Tunnel for Clan Macfarlane, 11th September 1928 1928, Plan in German language of Steam Turbine Arrangement for Clan Macfarlane, 28th November 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding dry dock survey & alterations to Clan MacFarlane, 25th June 1929 1929, Report of Survey for Repairs, &c for Clan Macfarlane, 7th June 1929 1929, Memo regarding turbine fitted & screwshaft drawing for Clan MacFarlane, 27th June 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 11th June 1929 1929, Certificate of Survey of Machinery for Clan Macfarlane, 5th June 1929 1929, Certificate of Survey for Clan Macfarlane, 20th May 1929 1929, Letter from Secretary to the Glasgow Committee to Cayzer Irvine & Co Ltd, Glasgow, regarding boiler survey & completion of machinery survey for Clan MacFarlane, 4th June 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 30th May 1940 1940, Report of Total Loss, Casualty, &c for Clan Macfarlane, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Irvine, Ayrshire ( Midship Section Plan for Clan Macfarlane, 27th March 1920 1920, Profile & Deck Plans for Clan Macfarlane, 27th May 1920 1920, Letter from G Redman, Assistant to the Secretary, Lloyd's Register, London to The Secretary, Glasgow, regarding approval of plan of boilers for Clan Macfarlane, 29th September 1920 1920, Plan of Three Main Boilers for Clan Macfarlane, September 1920 1920, Letter from William McMeek, Lloyd's Register, Glasgow to The Secretary, Glasgow, regarding thickness of plating, width of seam & length of decks for Clan MacFarlane, 4th December 1922 1922, Letter from Assistant to the Secretary, Lloyd's Register, to The Secretary, Glasgow, regarding report on thickness of plating & width of seam & length of decks for Clan MacFarlane, 29th November 1922 1922, Memo to the Chief Ship Surveyor regarding the first entry for Clan MacFarlane, 23rd November 1922 1922, Freeboard Verification Form for Steamers for Clan MacFarlane, 17th August 1922 1922, Steel Steamer Report for Clan Macfarlane, 16th November 1922 1922, Form for Vessels of 100 Tons & Upwards for Clan MacFarlane, 17th October 1922 1922, Certificate of Survey during the Constructions of Boilers & Machinery for Clan Macfarlane, 14th November 1922 1922, Report on Machinery for Clan Macfarlane, 18th November 1922 1922, Report on Boilers Clan Macfarlane, 18th November 1922 1922, Report on Electric Fittings for Clan Macfarlane, 20th November 1922 1922, Midship Section Plan for Clan Macfarlane, 6th November 1922 1922, Plan of Donkey Boiler for Clan Macfarlane, 22nd September 1922 1922, Plan of Extension of the Recess Tunnel for Clan Macfarlane, 11th September 1928 1928, Plan in German language of Steam Turbine Arrangement for Clan Macfarlane, 28th November 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding dry dock survey & alterations to Clan MacFarlane, 25th June 1929 1929, Report of Survey for Repairs, &c for Clan Macfarlane, 7th June 1929 1929, Memo regarding turbine fitted & screwshaft drawing for Clan MacFarlane, 27th June 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 11th June 1929 1929, Certificate of Survey of Machinery for Clan Macfarlane, 5th June 1929 1929, Certificate of Survey for Clan Macfarlane, 20th May 1929 1929, Letter from Secretary to the Glasgow Committee to Cayzer Irvine & Co Ltd, Glasgow, regarding boiler survey & completion of machinery survey for Clan MacFarlane, 4th June 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 30th May 1940 1940, Report of Total Loss, Casualty, &c for Clan Macfarlane, Undated no date )

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined ( Midship Section Plan for Clan Macfarlane, 27th March 1920 1920, Profile & Deck Plans for Clan Macfarlane, 27th May 1920 1920, Letter from G Redman, Assistant to the Secretary, Lloyd's Register, London to The Secretary, Glasgow, regarding approval of plan of boilers for Clan Macfarlane, 29th September 1920 1920, Plan of Three Main Boilers for Clan Macfarlane, September 1920 1920, Letter from William McMeek, Lloyd's Register, Glasgow to The Secretary, Glasgow, regarding thickness of plating, width of seam & length of decks for Clan MacFarlane, 4th December 1922 1922, Letter from Assistant to the Secretary, Lloyd's Register, to The Secretary, Glasgow, regarding report on thickness of plating & width of seam & length of decks for Clan MacFarlane, 29th November 1922 1922, Memo to the Chief Ship Surveyor regarding the first entry for Clan MacFarlane, 23rd November 1922 1922, Freeboard Verification Form for Steamers for Clan MacFarlane, 17th August 1922 1922, Steel Steamer Report for Clan Macfarlane, 16th November 1922 1922, Report on Machinery for Clan Macfarlane, 18th November 1922 1922, Report on Boilers Clan Macfarlane, 18th November 1922 1922, Report on Electric Fittings for Clan Macfarlane, 20th November 1922 1922, Midship Section Plan for Clan Macfarlane, 6th November 1922 1922, Plan of Donkey Boiler for Clan Macfarlane, 22nd September 1922 1922, Plan of Extension of the Recess Tunnel for Clan Macfarlane, 11th September 1928 1928, Plan in German language of Steam Turbine Arrangement for Clan Macfarlane, 28th November 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding dry dock survey & alterations to Clan MacFarlane, 25th June 1929 1929, Report of Survey for Repairs, &c for Clan Macfarlane, 7th June 1929 1929, Memo regarding turbine fitted & screwshaft drawing for Clan MacFarlane, 27th June 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 11th June 1929 1929, Certificate of Survey of Machinery for Clan Macfarlane, 5th June 1929 1929, Certificate of Survey for Clan Macfarlane, 20th May 1929 1929, Letter from Secretary to the Glasgow Committee to Cayzer Irvine & Co Ltd, Glasgow, regarding boiler survey & completion of machinery survey for Clan MacFarlane, 4th June 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 30th May 1940 1940, Report of Total Loss, Casualty, &c for Clan Macfarlane, Undated no date )

Cargo ( Form for Vessels of 100 Tons & Upwards for Clan MacFarlane, 17th October 1922 1922 )

Screw Steamer ( Certificate of Survey during the Constructions of Boilers & Machinery for Clan Macfarlane, 14th November 1922 1922 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Midship Section Plan for Clan Macfarlane, 27th March 1920 1920, Profile & Deck Plans for Clan Macfarlane, 27th May 1920 1920, Letter from G Redman, Assistant to the Secretary, Lloyd's Register, London to The Secretary, Glasgow, regarding approval of plan of boilers for Clan Macfarlane, 29th September 1920 1920, Plan of Three Main Boilers for Clan Macfarlane, September 1920 1920, Letter from William McMeek, Lloyd's Register, Glasgow to The Secretary, Glasgow, regarding thickness of plating, width of seam & length of decks for Clan MacFarlane, 4th December 1922 1922, Letter from Assistant to the Secretary, Lloyd's Register, to The Secretary, Glasgow, regarding report on thickness of plating & width of seam & length of decks for Clan MacFarlane, 29th November 1922 1922, Memo to the Chief Ship Surveyor regarding the first entry for Clan MacFarlane, 23rd November 1922 1922, Freeboard Verification Form for Steamers for Clan MacFarlane, 17th August 1922 1922, Steel Steamer Report for Clan Macfarlane, 16th November 1922 1922, Form for Vessels of 100 Tons & Upwards for Clan MacFarlane, 17th October 1922 1922, Certificate of Survey during the Constructions of Boilers & Machinery for Clan Macfarlane, 14th November 1922 1922, Report on Machinery for Clan Macfarlane, 18th November 1922 1922, Report on Boilers Clan Macfarlane, 18th November 1922 1922, Report on Electric Fittings for Clan Macfarlane, 20th November 1922 1922, Midship Section Plan for Clan Macfarlane, 6th November 1922 1922, Plan of Donkey Boiler for Clan Macfarlane, 22nd September 1922 1922, Plan of Extension of the Recess Tunnel for Clan Macfarlane, 11th September 1928 1928, Plan in German language of Steam Turbine Arrangement for Clan Macfarlane, 28th November 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding dry dock survey & alterations to Clan MacFarlane, 25th June 1929 1929, Report of Survey for Repairs, &c for Clan Macfarlane, 7th June 1929 1929, Memo regarding turbine fitted & screwshaft drawing for Clan MacFarlane, 27th June 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 11th June 1929 1929, Certificate of Survey of Machinery for Clan Macfarlane, 5th June 1929 1929, Certificate of Survey for Clan Macfarlane, 20th May 1929 1929, Letter from Secretary to the Glasgow Committee to Cayzer Irvine & Co Ltd, Glasgow, regarding boiler survey & completion of machinery survey for Clan MacFarlane, 4th June 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 30th May 1940 1940, Report of Total Loss, Casualty, &c for Clan Macfarlane, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Midship Section Plan for Clan Macfarlane, 27th March 1920 1920, Profile & Deck Plans for Clan Macfarlane, 27th May 1920 1920, Letter from G Redman, Assistant to the Secretary, Lloyd's Register, London to The Secretary, Glasgow, regarding approval of plan of boilers for Clan Macfarlane, 29th September 1920 1920, Plan of Three Main Boilers for Clan Macfarlane, September 1920 1920, Letter from William McMeek, Lloyd's Register, Glasgow to The Secretary, Glasgow, regarding thickness of plating, width of seam & length of decks for Clan MacFarlane, 4th December 1922 1922, Letter from Assistant to the Secretary, Lloyd's Register, to The Secretary, Glasgow, regarding report on thickness of plating & width of seam & length of decks for Clan MacFarlane, 29th November 1922 1922, Memo to the Chief Ship Surveyor regarding the first entry for Clan MacFarlane, 23rd November 1922 1922, Freeboard Verification Form for Steamers for Clan MacFarlane, 17th August 1922 1922, Steel Steamer Report for Clan Macfarlane, 16th November 1922 1922, Form for Vessels of 100 Tons & Upwards for Clan MacFarlane, 17th October 1922 1922, Certificate of Survey during the Constructions of Boilers & Machinery for Clan Macfarlane, 14th November 1922 1922, Report on Machinery for Clan Macfarlane, 18th November 1922 1922, Report on Boilers Clan Macfarlane, 18th November 1922 1922, Report on Electric Fittings for Clan Macfarlane, 20th November 1922 1922, Midship Section Plan for Clan Macfarlane, 6th November 1922 1922, Plan of Donkey Boiler for Clan Macfarlane, 22nd September 1922 1922, Plan of Extension of the Recess Tunnel for Clan Macfarlane, 11th September 1928 1928, Plan in German language of Steam Turbine Arrangement for Clan Macfarlane, 28th November 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding dry dock survey & alterations to Clan MacFarlane, 25th June 1929 1929, Report of Survey for Repairs, &c for Clan Macfarlane, 7th June 1929 1929, Memo regarding turbine fitted & screwshaft drawing for Clan MacFarlane, 27th June 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 11th June 1929 1929, Certificate of Survey of Machinery for Clan Macfarlane, 5th June 1929 1929, Certificate of Survey for Clan Macfarlane, 20th May 1929 1929, Letter from Secretary to the Glasgow Committee to Cayzer Irvine & Co Ltd, Glasgow, regarding boiler survey & completion of machinery survey for Clan MacFarlane, 4th June 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 30th May 1940 1940, Report of Total Loss, Casualty, &c for Clan Macfarlane, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Midship Section Plan for Clan Macfarlane, 27th March 1920 1920, Profile & Deck Plans for Clan Macfarlane, 27th May 1920 1920, Letter from G Redman, Assistant to the Secretary, Lloyd's Register, London to The Secretary, Glasgow, regarding approval of plan of boilers for Clan Macfarlane, 29th September 1920 1920, Plan of Three Main Boilers for Clan Macfarlane, September 1920 1920, Letter from William McMeek, Lloyd's Register, Glasgow to The Secretary, Glasgow, regarding thickness of plating, width of seam & length of decks for Clan MacFarlane, 4th December 1922 1922, Letter from Assistant to the Secretary, Lloyd's Register, to The Secretary, Glasgow, regarding report on thickness of plating & width of seam & length of decks for Clan MacFarlane, 29th November 1922 1922, Memo to the Chief Ship Surveyor regarding the first entry for Clan MacFarlane, 23rd November 1922 1922, Freeboard Verification Form for Steamers for Clan MacFarlane, 17th August 1922 1922, Steel Steamer Report for Clan Macfarlane, 16th November 1922 1922, Form for Vessels of 100 Tons & Upwards for Clan MacFarlane, 17th October 1922 1922, Certificate of Survey during the Constructions of Boilers & Machinery for Clan Macfarlane, 14th November 1922 1922, Report on Machinery for Clan Macfarlane, 18th November 1922 1922, Report on Boilers Clan Macfarlane, 18th November 1922 1922, Report on Electric Fittings for Clan Macfarlane, 20th November 1922 1922, Midship Section Plan for Clan Macfarlane, 6th November 1922 1922, Plan of Donkey Boiler for Clan Macfarlane, 22nd September 1922 1922, Plan of Extension of the Recess Tunnel for Clan Macfarlane, 11th September 1928 1928, Plan in German language of Steam Turbine Arrangement for Clan Macfarlane, 28th November 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding dry dock survey & alterations to Clan MacFarlane, 25th June 1929 1929, Report of Survey for Repairs, &c for Clan Macfarlane, 7th June 1929 1929, Memo regarding turbine fitted & screwshaft drawing for Clan MacFarlane, 27th June 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 11th June 1929 1929, Certificate of Survey of Machinery for Clan Macfarlane, 5th June 1929 1929, Certificate of Survey for Clan Macfarlane, 20th May 1929 1929, Letter from Secretary to the Glasgow Committee to Cayzer Irvine & Co Ltd, Glasgow, regarding boiler survey & completion of machinery survey for Clan MacFarlane, 4th June 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 30th May 1940 1940, Report of Total Loss, Casualty, &c for Clan Macfarlane, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Midship Section Plan for Clan Macfarlane, 27th March 1920 1920, Profile & Deck Plans for Clan Macfarlane, 27th May 1920 1920, Letter from G Redman, Assistant to the Secretary, Lloyd's Register, London to The Secretary, Glasgow, regarding approval of plan of boilers for Clan Macfarlane, 29th September 1920 1920, Plan of Three Main Boilers for Clan Macfarlane, September 1920 1920, Letter from William McMeek, Lloyd's Register, Glasgow to The Secretary, Glasgow, regarding thickness of plating, width of seam & length of decks for Clan MacFarlane, 4th December 1922 1922, Letter from Assistant to the Secretary, Lloyd's Register, to The Secretary, Glasgow, regarding report on thickness of plating & width of seam & length of decks for Clan MacFarlane, 29th November 1922 1922, Memo to the Chief Ship Surveyor regarding the first entry for Clan MacFarlane, 23rd November 1922 1922, Freeboard Verification Form for Steamers for Clan MacFarlane, 17th August 1922 1922, Steel Steamer Report for Clan Macfarlane, 16th November 1922 1922, Form for Vessels of 100 Tons & Upwards for Clan MacFarlane, 17th October 1922 1922, Certificate of Survey during the Constructions of Boilers & Machinery for Clan Macfarlane, 14th November 1922 1922, Report on Machinery for Clan Macfarlane, 18th November 1922 1922, Report on Boilers Clan Macfarlane, 18th November 1922 1922, Report on Electric Fittings for Clan Macfarlane, 20th November 1922 1922, Midship Section Plan for Clan Macfarlane, 6th November 1922 1922, Plan of Donkey Boiler for Clan Macfarlane, 22nd September 1922 1922, Plan of Extension of the Recess Tunnel for Clan Macfarlane, 11th September 1928 1928, Plan in German language of Steam Turbine Arrangement for Clan Macfarlane, 28th November 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding dry dock survey & alterations to Clan MacFarlane, 25th June 1929 1929, Report of Survey for Repairs, &c for Clan Macfarlane, 7th June 1929 1929, Memo regarding turbine fitted & screwshaft drawing for Clan MacFarlane, 27th June 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 11th June 1929 1929, Certificate of Survey of Machinery for Clan Macfarlane, 5th June 1929 1929, Certificate of Survey for Clan Macfarlane, 20th May 1929 1929, Letter from Secretary to the Glasgow Committee to Cayzer Irvine & Co Ltd, Glasgow, regarding boiler survey & completion of machinery survey for Clan MacFarlane, 4th June 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 30th May 1940 1940, Report of Total Loss, Casualty, &c for Clan Macfarlane, Undated no date )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sunk by Collision ( Midship Section Plan for Clan Macfarlane, 27th March 1920 1920, Profile & Deck Plans for Clan Macfarlane, 27th May 1920 1920, Letter from G Redman, Assistant to the Secretary, Lloyd's Register, London to The Secretary, Glasgow, regarding approval of plan of boilers for Clan Macfarlane, 29th September 1920 1920, Plan of Three Main Boilers for Clan Macfarlane, September 1920 1920, Letter from William McMeek, Lloyd's Register, Glasgow to The Secretary, Glasgow, regarding thickness of plating, width of seam & length of decks for Clan MacFarlane, 4th December 1922 1922, Letter from Assistant to the Secretary, Lloyd's Register, to The Secretary, Glasgow, regarding report on thickness of plating & width of seam & length of decks for Clan MacFarlane, 29th November 1922 1922, Memo to the Chief Ship Surveyor regarding the first entry for Clan MacFarlane, 23rd November 1922 1922, Freeboard Verification Form for Steamers for Clan MacFarlane, 17th August 1922 1922, Steel Steamer Report for Clan Macfarlane, 16th November 1922 1922, Form for Vessels of 100 Tons & Upwards for Clan MacFarlane, 17th October 1922 1922, Certificate of Survey during the Constructions of Boilers & Machinery for Clan Macfarlane, 14th November 1922 1922, Report on Machinery for Clan Macfarlane, 18th November 1922 1922, Report on Boilers Clan Macfarlane, 18th November 1922 1922, Report on Electric Fittings for Clan Macfarlane, 20th November 1922 1922, Midship Section Plan for Clan Macfarlane, 6th November 1922 1922, Plan of Donkey Boiler for Clan Macfarlane, 22nd September 1922 1922, Plan of Extension of the Recess Tunnel for Clan Macfarlane, 11th September 1928 1928, Plan in German language of Steam Turbine Arrangement for Clan Macfarlane, 28th November 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding dry dock survey & alterations to Clan MacFarlane, 25th June 1929 1929, Report of Survey for Repairs, &c for Clan Macfarlane, 7th June 1929 1929, Memo regarding turbine fitted & screwshaft drawing for Clan MacFarlane, 27th June 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 11th June 1929 1929, Certificate of Survey of Machinery for Clan Macfarlane, 5th June 1929 1929, Certificate of Survey for Clan Macfarlane, 20th May 1929 1929, Letter from Secretary to the Glasgow Committee to Cayzer Irvine & Co Ltd, Glasgow, regarding boiler survey & completion of machinery survey for Clan MacFarlane, 4th June 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 30th May 1940 1940, Report of Total Loss, Casualty, &c for Clan Macfarlane, Undated no date )

The country or national waters where a vessel is lost/disposed of, or last recorded.

Country of loss or disposal

Italian Somaliland ( Midship Section Plan for Clan Macfarlane, 27th March 1920 1920, Profile & Deck Plans for Clan Macfarlane, 27th May 1920 1920, Letter from G Redman, Assistant to the Secretary, Lloyd's Register, London to The Secretary, Glasgow, regarding approval of plan of boilers for Clan Macfarlane, 29th September 1920 1920, Plan of Three Main Boilers for Clan Macfarlane, September 1920 1920, Letter from William McMeek, Lloyd's Register, Glasgow to The Secretary, Glasgow, regarding thickness of plating, width of seam & length of decks for Clan MacFarlane, 4th December 1922 1922, Letter from Assistant to the Secretary, Lloyd's Register, to The Secretary, Glasgow, regarding report on thickness of plating & width of seam & length of decks for Clan MacFarlane, 29th November 1922 1922, Memo to the Chief Ship Surveyor regarding the first entry for Clan MacFarlane, 23rd November 1922 1922, Freeboard Verification Form for Steamers for Clan MacFarlane, 17th August 1922 1922, Steel Steamer Report for Clan Macfarlane, 16th November 1922 1922, Form for Vessels of 100 Tons & Upwards for Clan MacFarlane, 17th October 1922 1922, Certificate of Survey during the Constructions of Boilers & Machinery for Clan Macfarlane, 14th November 1922 1922, Report on Machinery for Clan Macfarlane, 18th November 1922 1922, Report on Boilers Clan Macfarlane, 18th November 1922 1922, Report on Electric Fittings for Clan Macfarlane, 20th November 1922 1922, Midship Section Plan for Clan Macfarlane, 6th November 1922 1922, Plan of Donkey Boiler for Clan Macfarlane, 22nd September 1922 1922, Plan of Extension of the Recess Tunnel for Clan Macfarlane, 11th September 1928 1928, Plan in German language of Steam Turbine Arrangement for Clan Macfarlane, 28th November 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding dry dock survey & alterations to Clan MacFarlane, 25th June 1929 1929, Report of Survey for Repairs, &c for Clan Macfarlane, 7th June 1929 1929, Memo regarding turbine fitted & screwshaft drawing for Clan MacFarlane, 27th June 1929 1929, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 11th June 1929 1929, Certificate of Survey of Machinery for Clan Macfarlane, 5th June 1929 1929, Certificate of Survey for Clan Macfarlane, 20th May 1929 1929, Letter from Secretary to the Glasgow Committee to Cayzer Irvine & Co Ltd, Glasgow, regarding boiler survey & completion of machinery survey for Clan MacFarlane, 4th June 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macfarlane, 30th May 1940 1940, Report of Total Loss, Casualty, &c for Clan Macfarlane, Undated no date )

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.