Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Elmshorn ( Plan in German Language of Boiler for Elmshorn, 17th December 1909 1909, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elmshorn, 1st December 1910 1910, Letter from George Dykes, Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 30th November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elmshorn, 28th November 1910 1910, Certificate of Survey for Elmshorn, 19th November 1910 1910, Steel Steamer Report for Elmshorn, 25th November 1910 1910, Press Copy of Certificate of Survey for Elmshorn, 19th November 1910 1910, Report on Machinery for Elmshorn, 18th November 1910 1910, Report on Electric Lighting Installation for Elmshorn, 19th November 1910 1910, Plan in German Language of Half Midship Section for Elmshorn, 7th March 1910 1910, Plan of Longitudinal Arrangement for Elmshorn, 7th March 1910 1910, Extract from a letter dated 19th October 1932 from A Chisholm Esq, regarding the examination of the tail shaft of Elmshorn 1932, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engine & Boilers for SS No of Elmshorn, 9th September 1932 1932, Certificate of Survey of Boilers & Machinery for Elmshorn, 2nd September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Elmshorn, 5th September 1932 1932, Report of Total Loss, Casualty, &c for Elmshorn, 5th October 1933 1933, Extract from Hamburg Rtn 10 dated 30th September 1933, regarding demolition of Elmshorn 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Principal Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 30th June 1933 1933, Form of Postponed Surveys for Elmshorn, 29th June 1933 1933, Letter from A Chisholm, Principal Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 23rd June 1933 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 21st June 1933 1933 )
The process of transferring a vessel to water, but not necessarily her completion.
09/08/1910 ( Plan in German Language of Boiler for Elmshorn, 17th December 1909 1909, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elmshorn, 1st December 1910 1910, Letter from George Dykes, Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 30th November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elmshorn, 28th November 1910 1910, Certificate of Survey for Elmshorn, 19th November 1910 1910, Steel Steamer Report for Elmshorn, 25th November 1910 1910, Press Copy of Certificate of Survey for Elmshorn, 19th November 1910 1910, Report on Machinery for Elmshorn, 18th November 1910 1910, Report on Electric Lighting Installation for Elmshorn, 19th November 1910 1910, Plan in German Language of Half Midship Section for Elmshorn, 7th March 1910 1910, Plan of Longitudinal Arrangement for Elmshorn, 7th March 1910 1910, Extract from a letter dated 19th October 1932 from A Chisholm Esq, regarding the examination of the tail shaft of Elmshorn 1932, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engine & Boilers for SS No of Elmshorn, 9th September 1932 1932, Certificate of Survey of Boilers & Machinery for Elmshorn, 2nd September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Elmshorn, 5th September 1932 1932, Report of Total Loss, Casualty, &c for Elmshorn, 5th October 1933 1933, Extract from Hamburg Rtn 10 dated 30th September 1933, regarding demolition of Elmshorn 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Principal Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 30th June 1933 1933, Form of Postponed Surveys for Elmshorn, 29th June 1933 1933, Letter from A Chisholm, Principal Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 23rd June 1933 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 21st June 1933 1933 )
Unique identifier for a given ship, it is assigned by a builder.
289 ( Plan in German Language of Boiler for Elmshorn, 17th December 1909 1909, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elmshorn, 1st December 1910 1910, Letter from George Dykes, Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 30th November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elmshorn, 28th November 1910 1910, Certificate of Survey for Elmshorn, 19th November 1910 1910, Steel Steamer Report for Elmshorn, 25th November 1910 1910, Press Copy of Certificate of Survey for Elmshorn, 19th November 1910 1910, Report on Machinery for Elmshorn, 18th November 1910 1910, Report on Electric Lighting Installation for Elmshorn, 19th November 1910 1910, Plan in German Language of Half Midship Section for Elmshorn, 7th March 1910 1910, Plan of Longitudinal Arrangement for Elmshorn, 7th March 1910 1910, Extract from a letter dated 19th October 1932 from A Chisholm Esq, regarding the examination of the tail shaft of Elmshorn 1932, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engine & Boilers for SS No of Elmshorn, 9th September 1932 1932, Certificate of Survey of Boilers & Machinery for Elmshorn, 2nd September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Elmshorn, 5th September 1932 1932, Report of Total Loss, Casualty, &c for Elmshorn, 5th October 1933 1933, Extract from Hamburg Rtn 10 dated 30th September 1933, regarding demolition of Elmshorn 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Principal Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 30th June 1933 1933, Form of Postponed Surveys for Elmshorn, 29th June 1933 1933, Letter from A Chisholm, Principal Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 23rd June 1933 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 21st June 1933 1933 )
Location where a vessel’s survey was undertaken.
Flensburg ( Plan in German Language of Boiler for Elmshorn, 17th December 1909 1909, Plan in German Language of Half Midship Section for Elmshorn, 7th March 1910 1910, Plan of Longitudinal Arrangement for Elmshorn, 7th March 1910 1910 )
Hamburg ( Letter from George Dykes, Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 30th November 1910 1910, Certificate of Survey for Elmshorn, 19th November 1910 1910, Press Copy of Certificate of Survey for Elmshorn, 19th November 1910 1910, Report on Electric Lighting Installation for Elmshorn, 19th November 1910 1910, Certificate of Survey of Boilers & Machinery for Elmshorn, 2nd September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Elmshorn, 5th September 1932 1932, Letter from A Chisholm, Principal Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 23rd June 1933 1933 )
Flensburg; Hamburg ( Steel Steamer Report for Elmshorn, 25th November 1910 1910, Report on Machinery for Elmshorn, 18th November 1910 1910 )
London ( Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Principal Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 30th June 1933 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 21st June 1933 1933 )
A vessel’s means of propulsion.
Steam ( Plan in German Language of Boiler for Elmshorn, 17th December 1909 1909, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elmshorn, 1st December 1910 1910, Letter from George Dykes, Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 30th November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elmshorn, 28th November 1910 1910, Certificate of Survey for Elmshorn, 19th November 1910 1910, Steel Steamer Report for Elmshorn, 25th November 1910 1910, Press Copy of Certificate of Survey for Elmshorn, 19th November 1910 1910, Report on Machinery for Elmshorn, 18th November 1910 1910, Report on Electric Lighting Installation for Elmshorn, 19th November 1910 1910, Plan in German Language of Half Midship Section for Elmshorn, 7th March 1910 1910, Extract from a letter dated 19th October 1932 from A Chisholm Esq, regarding the examination of the tail shaft of Elmshorn 1932, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engine & Boilers for SS No of Elmshorn, 9th September 1932 1932, Certificate of Survey of Boilers & Machinery for Elmshorn, 2nd September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Elmshorn, 5th September 1932 1932, Report of Total Loss, Casualty, &c for Elmshorn, 5th October 1933 1933, Extract from Hamburg Rtn 10 dated 30th September 1933, regarding demolition of Elmshorn 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Principal Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 30th June 1933 1933, Form of Postponed Surveys for Elmshorn, 29th June 1933 1933, Letter from A Chisholm, Principal Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 23rd June 1933 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 21st June 1933 1933 )
undefined ( Plan of Longitudinal Arrangement for Elmshorn, 7th March 1910 1910 )
Is the steamer assisted by sail?
No ( Plan in German Language of Boiler for Elmshorn, 17th December 1909 1909, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elmshorn, 1st December 1910 1910, Letter from George Dykes, Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 30th November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elmshorn, 28th November 1910 1910, Certificate of Survey for Elmshorn, 19th November 1910 1910, Steel Steamer Report for Elmshorn, 25th November 1910 1910, Press Copy of Certificate of Survey for Elmshorn, 19th November 1910 1910, Report on Machinery for Elmshorn, 18th November 1910 1910, Report on Electric Lighting Installation for Elmshorn, 19th November 1910 1910, Plan in German Language of Half Midship Section for Elmshorn, 7th March 1910 1910, Plan of Longitudinal Arrangement for Elmshorn, 7th March 1910 1910, Extract from a letter dated 19th October 1932 from A Chisholm Esq, regarding the examination of the tail shaft of Elmshorn 1932, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engine & Boilers for SS No of Elmshorn, 9th September 1932 1932, Certificate of Survey of Boilers & Machinery for Elmshorn, 2nd September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Elmshorn, 5th September 1932 1932, Report of Total Loss, Casualty, &c for Elmshorn, 5th October 1933 1933, Extract from Hamburg Rtn 10 dated 30th September 1933, regarding demolition of Elmshorn 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Principal Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 30th June 1933 1933, Form of Postponed Surveys for Elmshorn, 29th June 1933 1933, Letter from A Chisholm, Principal Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 23rd June 1933 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 21st June 1933 1933 )
Is machinery fitted at the aft of the vessel?
No ( Plan in German Language of Boiler for Elmshorn, 17th December 1909 1909, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elmshorn, 1st December 1910 1910, Letter from George Dykes, Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 30th November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elmshorn, 28th November 1910 1910, Certificate of Survey for Elmshorn, 19th November 1910 1910, Steel Steamer Report for Elmshorn, 25th November 1910 1910, Press Copy of Certificate of Survey for Elmshorn, 19th November 1910 1910, Report on Machinery for Elmshorn, 18th November 1910 1910, Report on Electric Lighting Installation for Elmshorn, 19th November 1910 1910, Plan in German Language of Half Midship Section for Elmshorn, 7th March 1910 1910, Plan of Longitudinal Arrangement for Elmshorn, 7th March 1910 1910, Extract from a letter dated 19th October 1932 from A Chisholm Esq, regarding the examination of the tail shaft of Elmshorn 1932, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engine & Boilers for SS No of Elmshorn, 9th September 1932 1932, Certificate of Survey of Boilers & Machinery for Elmshorn, 2nd September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Elmshorn, 5th September 1932 1932, Report of Total Loss, Casualty, &c for Elmshorn, 5th October 1933 1933, Extract from Hamburg Rtn 10 dated 30th September 1933, regarding demolition of Elmshorn 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Principal Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 30th June 1933 1933, Form of Postponed Surveys for Elmshorn, 29th June 1933 1933, Letter from A Chisholm, Principal Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 23rd June 1933 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 21st June 1933 1933 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Plan in German Language of Boiler for Elmshorn, 17th December 1909 1909, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elmshorn, 1st December 1910 1910, Letter from George Dykes, Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 30th November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elmshorn, 28th November 1910 1910, Certificate of Survey for Elmshorn, 19th November 1910 1910, Steel Steamer Report for Elmshorn, 25th November 1910 1910, Press Copy of Certificate of Survey for Elmshorn, 19th November 1910 1910, Report on Machinery for Elmshorn, 18th November 1910 1910, Report on Electric Lighting Installation for Elmshorn, 19th November 1910 1910, Plan in German Language of Half Midship Section for Elmshorn, 7th March 1910 1910, Plan of Longitudinal Arrangement for Elmshorn, 7th March 1910 1910, Extract from a letter dated 19th October 1932 from A Chisholm Esq, regarding the examination of the tail shaft of Elmshorn 1932, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engine & Boilers for SS No of Elmshorn, 9th September 1932 1932, Certificate of Survey of Boilers & Machinery for Elmshorn, 2nd September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Elmshorn, 5th September 1932 1932, Report of Total Loss, Casualty, &c for Elmshorn, 5th October 1933 1933, Extract from Hamburg Rtn 10 dated 30th September 1933, regarding demolition of Elmshorn 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Principal Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 30th June 1933 1933, Form of Postponed Surveys for Elmshorn, 29th June 1933 1933, Letter from A Chisholm, Principal Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 23rd June 1933 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 21st June 1933 1933 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Plan in German Language of Boiler for Elmshorn, 17th December 1909 1909, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elmshorn, 1st December 1910 1910, Letter from George Dykes, Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 30th November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elmshorn, 28th November 1910 1910, Certificate of Survey for Elmshorn, 19th November 1910 1910, Steel Steamer Report for Elmshorn, 25th November 1910 1910, Press Copy of Certificate of Survey for Elmshorn, 19th November 1910 1910, Report on Machinery for Elmshorn, 18th November 1910 1910, Report on Electric Lighting Installation for Elmshorn, 19th November 1910 1910, Plan in German Language of Half Midship Section for Elmshorn, 7th March 1910 1910, Plan of Longitudinal Arrangement for Elmshorn, 7th March 1910 1910, Extract from a letter dated 19th October 1932 from A Chisholm Esq, regarding the examination of the tail shaft of Elmshorn 1932, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engine & Boilers for SS No of Elmshorn, 9th September 1932 1932, Certificate of Survey of Boilers & Machinery for Elmshorn, 2nd September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Elmshorn, 5th September 1932 1932, Report of Total Loss, Casualty, &c for Elmshorn, 5th October 1933 1933, Extract from Hamburg Rtn 10 dated 30th September 1933, regarding demolition of Elmshorn 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Principal Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 30th June 1933 1933, Form of Postponed Surveys for Elmshorn, 29th June 1933 1933, Letter from A Chisholm, Principal Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 23rd June 1933 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 21st June 1933 1933 )
Contextual information related to the reasons of the vessel’s loss or disposal.
To be broken up ( Plan in German Language of Boiler for Elmshorn, 17th December 1909 1909, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elmshorn, 1st December 1910 1910, Letter from George Dykes, Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 30th November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elmshorn, 28th November 1910 1910, Certificate of Survey for Elmshorn, 19th November 1910 1910, Steel Steamer Report for Elmshorn, 25th November 1910 1910, Press Copy of Certificate of Survey for Elmshorn, 19th November 1910 1910, Report on Machinery for Elmshorn, 18th November 1910 1910, Report on Electric Lighting Installation for Elmshorn, 19th November 1910 1910, Plan in German Language of Half Midship Section for Elmshorn, 7th March 1910 1910, Plan of Longitudinal Arrangement for Elmshorn, 7th March 1910 1910, Extract from a letter dated 19th October 1932 from A Chisholm Esq, regarding the examination of the tail shaft of Elmshorn 1932, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engine & Boilers for SS No of Elmshorn, 9th September 1932 1932, Certificate of Survey of Boilers & Machinery for Elmshorn, 2nd September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Elmshorn, 5th September 1932 1932, Report of Total Loss, Casualty, &c for Elmshorn, 5th October 1933 1933, Extract from Hamburg Rtn 10 dated 30th September 1933, regarding demolition of Elmshorn 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Principal Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 30th June 1933 1933, Form of Postponed Surveys for Elmshorn, 29th June 1933 1933, Letter from A Chisholm, Principal Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 23rd June 1933 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 21st June 1933 1933 )
Name of surveyor.
George Dykes ( Letter from George Dykes, Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 30th November 1910 1910, Certificate of Survey for Elmshorn, 19th November 1910 1910, Steel Steamer Report for Elmshorn, 25th November 1910 1910 )
M Berendt ( Press Copy of Certificate of Survey for Elmshorn, 19th November 1910 1910, Report on Machinery for Elmshorn, 18th November 1910 1910, Report on Electric Lighting Installation for Elmshorn, 19th November 1910 1910 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Ham ( Steel Steamer Report for Elmshorn, 25th November 1910 1910, Report on Machinery for Elmshorn, 18th November 1910 1910, Report on Electric Lighting Installation for Elmshorn, 19th November 1910 1910, Report of Survey for Repairs, &c, of Engines & Boilers for Elmshorn, 5th September 1932 1932 )
The individual and/or organisation listed
Deutsch Australische Dampfschiffsfatvets Gesellschaft ( Steel Steamer Report for Elmshorn, 25th November 1910 1910, Report on Machinery for Elmshorn, 18th November 1910 1910, Report on Electric Lighting Installation for Elmshorn, 19th November 1910 1910 )
Hamb Amer Packetf Akt Ges ( Report of Survey for Repairs, &c, of Engines & Boilers for Elmshorn, 5th September 1932 1932 )
Hamburg Amerik Packetf A G ( Report of Total Loss, Casualty, &c for Elmshorn, 5th October 1933 1933 )
Hamburg Amerika Line ( Form of Postponed Surveys for Elmshorn, 29th June 1933 1933 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Lloyds A & Cp; +LMC 11,10 ( Steel Steamer Report for Elmshorn, 25th November 1910 1910 )
+LMC 11,10; FD ( Report on Machinery for Elmshorn, 18th November 1910 1910 )
BS 9,32 ( Report of Survey for Repairs, &c, of Engines & Boilers for Elmshorn, 5th September 1932 1932 )
+100A1 3,32; SS N Yk No 3-11,22; SS Ham No 2-30; +LMC 8,30; BS 9,32 ( Report of Total Loss, Casualty, &c for Elmshorn, 5th October 1933 1933 )
The name of the port/place of destination given.
Australia ( Steel Steamer Report for Elmshorn, 25th November 1910 1910 )
Boston ( Report of Survey for Repairs, &c, of Engines & Boilers for Elmshorn, 5th September 1932 1932 )
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion ( Report on Machinery for Elmshorn, 18th November 1910 1910 )
Date in which construction of a vessel’s engines were completed.
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Hamburg Amerika Linie ( Report of Survey for Repairs, &c, of Engines & Boilers for Elmshorn, 5th September 1932 1932 )
The year in which a vessel’s construction is completed.
1910 ( Plan in German Language of Boiler for Elmshorn, 17th December 1909 1909, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elmshorn, 1st December 1910 1910, Letter from George Dykes, Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 30th November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elmshorn, 28th November 1910 1910, Certificate of Survey for Elmshorn, 19th November 1910 1910, Steel Steamer Report for Elmshorn, 25th November 1910 1910, Press Copy of Certificate of Survey for Elmshorn, 19th November 1910 1910, Report on Machinery for Elmshorn, 18th November 1910 1910, Report on Electric Lighting Installation for Elmshorn, 19th November 1910 1910, Plan in German Language of Half Midship Section for Elmshorn, 7th March 1910 1910, Plan of Longitudinal Arrangement for Elmshorn, 7th March 1910 1910, Extract from a letter dated 19th October 1932 from A Chisholm Esq, regarding the examination of the tail shaft of Elmshorn 1932, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engine & Boilers for SS No of Elmshorn, 9th September 1932 1932, Certificate of Survey of Boilers & Machinery for Elmshorn, 2nd September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Elmshorn, 5th September 1932 1932, Report of Total Loss, Casualty, &c for Elmshorn, 5th October 1933 1933, Extract from Hamburg Rtn 10 dated 30th September 1933, regarding demolition of Elmshorn 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Principal Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 30th June 1933 1933, Form of Postponed Surveys for Elmshorn, 29th June 1933 1933, Letter from A Chisholm, Principal Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 23rd June 1933 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 21st June 1933 1933 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Flensburger Schiffsbau Gesellschaft ( Plan in German Language of Boiler for Elmshorn, 17th December 1909 1909, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elmshorn, 1st December 1910 1910, Letter from George Dykes, Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 30th November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elmshorn, 28th November 1910 1910, Certificate of Survey for Elmshorn, 19th November 1910 1910, Steel Steamer Report for Elmshorn, 25th November 1910 1910, Press Copy of Certificate of Survey for Elmshorn, 19th November 1910 1910, Report on Machinery for Elmshorn, 18th November 1910 1910, Report on Electric Lighting Installation for Elmshorn, 19th November 1910 1910, Plan in German Language of Half Midship Section for Elmshorn, 7th March 1910 1910, Plan of Longitudinal Arrangement for Elmshorn, 7th March 1910 1910, Extract from a letter dated 19th October 1932 from A Chisholm Esq, regarding the examination of the tail shaft of Elmshorn 1932, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engine & Boilers for SS No of Elmshorn, 9th September 1932 1932, Certificate of Survey of Boilers & Machinery for Elmshorn, 2nd September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Elmshorn, 5th September 1932 1932, Report of Total Loss, Casualty, &c for Elmshorn, 5th October 1933 1933, Extract from Hamburg Rtn 10 dated 30th September 1933, regarding demolition of Elmshorn 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Principal Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 30th June 1933 1933, Form of Postponed Surveys for Elmshorn, 29th June 1933 1933, Letter from A Chisholm, Principal Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 23rd June 1933 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 21st June 1933 1933 )
The port or place in which the vessel’s construction took place, at the time of writing.
Flensburg ( Plan in German Language of Boiler for Elmshorn, 17th December 1909 1909, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elmshorn, 1st December 1910 1910, Letter from George Dykes, Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 30th November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elmshorn, 28th November 1910 1910, Certificate of Survey for Elmshorn, 19th November 1910 1910, Steel Steamer Report for Elmshorn, 25th November 1910 1910, Press Copy of Certificate of Survey for Elmshorn, 19th November 1910 1910, Report on Machinery for Elmshorn, 18th November 1910 1910, Report on Electric Lighting Installation for Elmshorn, 19th November 1910 1910, Plan in German Language of Half Midship Section for Elmshorn, 7th March 1910 1910, Plan of Longitudinal Arrangement for Elmshorn, 7th March 1910 1910, Extract from a letter dated 19th October 1932 from A Chisholm Esq, regarding the examination of the tail shaft of Elmshorn 1932, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engine & Boilers for SS No of Elmshorn, 9th September 1932 1932, Certificate of Survey of Boilers & Machinery for Elmshorn, 2nd September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Elmshorn, 5th September 1932 1932, Report of Total Loss, Casualty, &c for Elmshorn, 5th October 1933 1933, Extract from Hamburg Rtn 10 dated 30th September 1933, regarding demolition of Elmshorn 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Principal Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 30th June 1933 1933, Form of Postponed Surveys for Elmshorn, 29th June 1933 1933, Letter from A Chisholm, Principal Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 23rd June 1933 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 21st June 1933 1933 )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Plan in German Language of Boiler for Elmshorn, 17th December 1909 1909, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elmshorn, 1st December 1910 1910, Letter from George Dykes, Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 30th November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elmshorn, 28th November 1910 1910, Report on Machinery for Elmshorn, 18th November 1910 1910, Report on Electric Lighting Installation for Elmshorn, 19th November 1910 1910, Plan of Longitudinal Arrangement for Elmshorn, 7th March 1910 1910, Extract from a letter dated 19th October 1932 from A Chisholm Esq, regarding the examination of the tail shaft of Elmshorn 1932, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engine & Boilers for SS No of Elmshorn, 9th September 1932 1932, Certificate of Survey of Boilers & Machinery for Elmshorn, 2nd September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Elmshorn, 5th September 1932 1932, Report of Total Loss, Casualty, &c for Elmshorn, 5th October 1933 1933, Extract from Hamburg Rtn 10 dated 30th September 1933, regarding demolition of Elmshorn 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Principal Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 30th June 1933 1933, Form of Postponed Surveys for Elmshorn, 29th June 1933 1933, Letter from A Chisholm, Principal Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 23rd June 1933 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 21st June 1933 1933 )
Screw Steamer ( Certificate of Survey for Elmshorn, 19th November 1910 1910, Steel Steamer Report for Elmshorn, 25th November 1910 1910, Press Copy of Certificate of Survey for Elmshorn, 19th November 1910 1910 )
Cargo ( Plan in German Language of Half Midship Section for Elmshorn, 7th March 1910 1910 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Plan in German Language of Boiler for Elmshorn, 17th December 1909 1909, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elmshorn, 1st December 1910 1910, Letter from George Dykes, Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 30th November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elmshorn, 28th November 1910 1910, Certificate of Survey for Elmshorn, 19th November 1910 1910, Steel Steamer Report for Elmshorn, 25th November 1910 1910, Press Copy of Certificate of Survey for Elmshorn, 19th November 1910 1910, Report on Machinery for Elmshorn, 18th November 1910 1910, Report on Electric Lighting Installation for Elmshorn, 19th November 1910 1910, Plan in German Language of Half Midship Section for Elmshorn, 7th March 1910 1910, Plan of Longitudinal Arrangement for Elmshorn, 7th March 1910 1910, Extract from a letter dated 19th October 1932 from A Chisholm Esq, regarding the examination of the tail shaft of Elmshorn 1932, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engine & Boilers for SS No of Elmshorn, 9th September 1932 1932, Certificate of Survey of Boilers & Machinery for Elmshorn, 2nd September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Elmshorn, 5th September 1932 1932, Report of Total Loss, Casualty, &c for Elmshorn, 5th October 1933 1933, Extract from Hamburg Rtn 10 dated 30th September 1933, regarding demolition of Elmshorn 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Principal Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 30th June 1933 1933, Form of Postponed Surveys for Elmshorn, 29th June 1933 1933, Letter from A Chisholm, Principal Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 23rd June 1933 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 21st June 1933 1933 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Plan in German Language of Boiler for Elmshorn, 17th December 1909 1909, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elmshorn, 1st December 1910 1910, Letter from George Dykes, Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 30th November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elmshorn, 28th November 1910 1910, Certificate of Survey for Elmshorn, 19th November 1910 1910, Steel Steamer Report for Elmshorn, 25th November 1910 1910, Press Copy of Certificate of Survey for Elmshorn, 19th November 1910 1910, Report on Machinery for Elmshorn, 18th November 1910 1910, Report on Electric Lighting Installation for Elmshorn, 19th November 1910 1910, Plan in German Language of Half Midship Section for Elmshorn, 7th March 1910 1910, Plan of Longitudinal Arrangement for Elmshorn, 7th March 1910 1910, Extract from a letter dated 19th October 1932 from A Chisholm Esq, regarding the examination of the tail shaft of Elmshorn 1932, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engine & Boilers for SS No of Elmshorn, 9th September 1932 1932, Certificate of Survey of Boilers & Machinery for Elmshorn, 2nd September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Elmshorn, 5th September 1932 1932, Report of Total Loss, Casualty, &c for Elmshorn, 5th October 1933 1933, Extract from Hamburg Rtn 10 dated 30th September 1933, regarding demolition of Elmshorn 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Principal Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 30th June 1933 1933, Form of Postponed Surveys for Elmshorn, 29th June 1933 1933, Letter from A Chisholm, Principal Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 23rd June 1933 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 21st June 1933 1933 )
Does the vessel possess an auxiliary power source?
No ( Plan in German Language of Boiler for Elmshorn, 17th December 1909 1909, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elmshorn, 1st December 1910 1910, Letter from George Dykes, Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 30th November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elmshorn, 28th November 1910 1910, Certificate of Survey for Elmshorn, 19th November 1910 1910, Steel Steamer Report for Elmshorn, 25th November 1910 1910, Press Copy of Certificate of Survey for Elmshorn, 19th November 1910 1910, Report on Machinery for Elmshorn, 18th November 1910 1910, Report on Electric Lighting Installation for Elmshorn, 19th November 1910 1910, Plan in German Language of Half Midship Section for Elmshorn, 7th March 1910 1910, Plan of Longitudinal Arrangement for Elmshorn, 7th March 1910 1910, Extract from a letter dated 19th October 1932 from A Chisholm Esq, regarding the examination of the tail shaft of Elmshorn 1932, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engine & Boilers for SS No of Elmshorn, 9th September 1932 1932, Certificate of Survey of Boilers & Machinery for Elmshorn, 2nd September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Elmshorn, 5th September 1932 1932, Report of Total Loss, Casualty, &c for Elmshorn, 5th October 1933 1933, Extract from Hamburg Rtn 10 dated 30th September 1933, regarding demolition of Elmshorn 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Principal Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 30th June 1933 1933, Form of Postponed Surveys for Elmshorn, 29th June 1933 1933, Letter from A Chisholm, Principal Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 23rd June 1933 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 21st June 1933 1933 )
Is electric lighting fitted to the vessel?
No ( Plan in German Language of Boiler for Elmshorn, 17th December 1909 1909, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elmshorn, 1st December 1910 1910, Letter from George Dykes, Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 30th November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elmshorn, 28th November 1910 1910, Certificate of Survey for Elmshorn, 19th November 1910 1910, Steel Steamer Report for Elmshorn, 25th November 1910 1910, Press Copy of Certificate of Survey for Elmshorn, 19th November 1910 1910, Report on Machinery for Elmshorn, 18th November 1910 1910, Report on Electric Lighting Installation for Elmshorn, 19th November 1910 1910, Plan in German Language of Half Midship Section for Elmshorn, 7th March 1910 1910, Plan of Longitudinal Arrangement for Elmshorn, 7th March 1910 1910, Extract from a letter dated 19th October 1932 from A Chisholm Esq, regarding the examination of the tail shaft of Elmshorn 1932, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engine & Boilers for SS No of Elmshorn, 9th September 1932 1932, Certificate of Survey of Boilers & Machinery for Elmshorn, 2nd September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Elmshorn, 5th September 1932 1932, Report of Total Loss, Casualty, &c for Elmshorn, 5th October 1933 1933, Extract from Hamburg Rtn 10 dated 30th September 1933, regarding demolition of Elmshorn 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Principal Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 30th June 1933 1933, Form of Postponed Surveys for Elmshorn, 29th June 1933 1933, Letter from A Chisholm, Principal Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 23rd June 1933 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 21st June 1933 1933 )
The official record pronounced by the Committee
Broken up ( Plan in German Language of Boiler for Elmshorn, 17th December 1909 1909, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elmshorn, 1st December 1910 1910, Letter from George Dykes, Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 30th November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elmshorn, 28th November 1910 1910, Certificate of Survey for Elmshorn, 19th November 1910 1910, Steel Steamer Report for Elmshorn, 25th November 1910 1910, Press Copy of Certificate of Survey for Elmshorn, 19th November 1910 1910, Report on Machinery for Elmshorn, 18th November 1910 1910, Report on Electric Lighting Installation for Elmshorn, 19th November 1910 1910, Plan in German Language of Half Midship Section for Elmshorn, 7th March 1910 1910, Plan of Longitudinal Arrangement for Elmshorn, 7th March 1910 1910, Extract from a letter dated 19th October 1932 from A Chisholm Esq, regarding the examination of the tail shaft of Elmshorn 1932, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engine & Boilers for SS No of Elmshorn, 9th September 1932 1932, Certificate of Survey of Boilers & Machinery for Elmshorn, 2nd September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Elmshorn, 5th September 1932 1932, Report of Total Loss, Casualty, &c for Elmshorn, 5th October 1933 1933, Extract from Hamburg Rtn 10 dated 30th September 1933, regarding demolition of Elmshorn 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Principal Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 30th June 1933 1933, Form of Postponed Surveys for Elmshorn, 29th June 1933 1933, Letter from A Chisholm, Principal Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 23rd June 1933 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 21st June 1933 1933 )
Recorded date for the vessel’s loss or disposal.
__/__/0000 ( Plan in German Language of Boiler for Elmshorn, 17th December 1909 1909, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Elmshorn, 1st December 1910 1910, Letter from George Dykes, Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 30th November 1910 1910, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Elmshorn, 28th November 1910 1910, Certificate of Survey for Elmshorn, 19th November 1910 1910, Steel Steamer Report for Elmshorn, 25th November 1910 1910, Press Copy of Certificate of Survey for Elmshorn, 19th November 1910 1910, Report on Machinery for Elmshorn, 18th November 1910 1910, Report on Electric Lighting Installation for Elmshorn, 19th November 1910 1910, Plan in German Language of Half Midship Section for Elmshorn, 7th March 1910 1910, Plan of Longitudinal Arrangement for Elmshorn, 7th March 1910 1910, Extract from a letter dated 19th October 1932 from A Chisholm Esq, regarding the examination of the tail shaft of Elmshorn 1932, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Completion of Special Survey of Engine & Boilers for SS No of Elmshorn, 9th September 1932 1932, Certificate of Survey of Boilers & Machinery for Elmshorn, 2nd September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Elmshorn, 5th September 1932 1932, Report of Total Loss, Casualty, &c for Elmshorn, 5th October 1933 1933, Extract from Hamburg Rtn 10 dated 30th September 1933, regarding demolition of Elmshorn 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Principal Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 30th June 1933 1933, Form of Postponed Surveys for Elmshorn, 29th June 1933 1933, Letter from A Chisholm, Principal Surveyor, Lloyd\'s Register, Hamburg to The Secretary of Lloyd\'s Register regarding Elmshorn, 23rd June 1933 1933, Copy of a Letter from Clerk to the Classification Committee, Lloyd\'s Register, London to A Chisholm Esq, Surveyor, Lloyd\'s Register, Hamburg, regarding Elmshorn, 21st June 1933 1933 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
4594 ( Certificate of Survey for Elmshorn, 19th November 1910 1910, Steel Steamer Report for Elmshorn, 25th November 1910 1910, Report on Machinery for Elmshorn, 18th November 1910 1910 )
4644 ( Certificate of Survey of Boilers & Machinery for Elmshorn, 2nd September 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Elmshorn, 5th September 1932 1932, Report of Total Loss, Casualty, &c for Elmshorn, 5th October 1933 1933 )
The listed port to which a given vessel belongs.
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Recorded information related to a vessel’s movements.
Flensburg; Australia ( Steel Steamer Report for Elmshorn, 25th November 1910 1910 )
Hamburg; Boston ( Report of Survey for Repairs, &c, of Engines & Boilers for Elmshorn, 5th September 1932 1932 )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Steel Steamer Report for Elmshorn, 25th November 1910 1910, Report on Machinery for Elmshorn, 18th November 1910 1910, Report on Electric Lighting Installation for Elmshorn, 19th November 1910 1910, Report of Survey for Repairs, &c, of Engines & Boilers for Elmshorn, 5th September 1932 1932 )
Location of construction for a vessel’s engines.
Flensburg ( Report on Machinery for Elmshorn, 18th November 1910 1910, Report of Survey for Repairs, &c, of Engines & Boilers for Elmshorn, 5th September 1932 1932 )
The port in which a vessel is registered or permanently based.
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.