Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Empire Chivalry ( Plan of Rudder & Stern Frames for Empire Chivalry, 10th May 1936 1936, Profile & Decks Plan for Empire Chivalry, 8th May 1936 1936, Plan of General Arrangement for Empire Chivalry, 15th July 1941 1941, Report of Surveys for Freeboard - Conditions of Assignment for Empire Chivalry, November 1941 1941, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Empire Chivalry, 20th November 1943 1943 )
Inkosi ( Profile & Decks Plan for Inkosi, 8th May 1936 1936, Half Midship Section Plan for Inkosi, 8th May 1936 1936, Request for Special Survey for Inkosi, 10th June 1936 1936, Freeboard - Application for Certificate of Approval for Inkosi, 8th May 1936 1936, Report of Surveys for Freeboard for Inkosi, 14th May 1936 1936, Copy of a Certificate of Survey for Inkosi, 29th May 1937 1937, Steel Steamer Report for Inkosi, 10th June 1937 1937, Form for Vessels of 100 Tons & Upwards for Inkosi, 26th May 1937 1937, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Inkosi, 14th June 1937 1937, Report on Steam Reciprocating Engine Machinery for Inkosi, 3rd June 1937 1937, Report on Boilers for Inkosi, 3rd June 1937 1937, Report on Electrical Equipment for Inkosi, 3rd June 1937 1937, Report of Surveys for Freeboard for Inkosi, 13th May 1937 1937, Report of Surveys for Freeboard - Conditions of Assignment for Inkosi, 13th May 1937 1937, Memo for Inkosi, Undated no date )
Planter ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Planter, 14th June 1937 1937, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Planter, April 1947 1947, Copy of a Letter from pro Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 22nd November 1957 1957, Form of Postponed Surveys for Planter, 20th November 1957 1957, Letter from S O Howard, Assistant Superintendent Engineer, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 18th November 1957 1957, Copy of a Certificate of Survey of Main Boilers for Planter, 19th October 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Planter, 14th October 1957 1957, Report of Total Loss, Casualty, &c for Planter, 16th October 1958 1958, Letter from W Cowan, Director, The Charente Steam Ship Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 3rd October 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 21st March 1958 1958, Report of Ship Surveys & Repairs for Planter, 23rd January 1958 1958, Copy of a Certificate of Survey of Repairs for Planter, 22nd January 1958 1958, Copy of a Certificate of Partly Surveyed Boilers & Machinery for Planter, 10th February 1958 1958, Remarks of the Chief Engineer Surveyor, regarding Class of Planter, 10th March 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Planter, 7th February 1958 1958, Remarks of the Chief Ship Surveyor, regarding Class of Planter, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
25/02/1937 ( Plan of Rudder & Stern Frames for Empire Chivalry, 10th May 1936 1936, Profile & Decks Plan for Inkosi, 8th May 1936 1936, Profile & Decks Plan for Empire Chivalry, 8th May 1936 1936, Half Midship Section Plan for Inkosi, 8th May 1936 1936, Request for Special Survey for Inkosi, 10th June 1936 1936, Freeboard - Application for Certificate of Approval for Inkosi, 8th May 1936 1936, Report of Surveys for Freeboard for Inkosi, 14th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Planter, 14th June 1937 1937, Copy of a Certificate of Survey for Inkosi, 29th May 1937 1937, Steel Steamer Report for Inkosi, 10th June 1937 1937, Form for Vessels of 100 Tons & Upwards for Inkosi, 26th May 1937 1937, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Inkosi, 14th June 1937 1937, Report on Steam Reciprocating Engine Machinery for Inkosi, 3rd June 1937 1937, Report on Boilers for Inkosi, 3rd June 1937 1937, Report on Electrical Equipment for Inkosi, 3rd June 1937 1937, Report of Surveys for Freeboard for Inkosi, 13th May 1937 1937, Report of Surveys for Freeboard - Conditions of Assignment for Inkosi, 13th May 1937 1937, Plan of General Arrangement for Empire Chivalry, 15th July 1941 1941, Report of Surveys for Freeboard - Conditions of Assignment for Empire Chivalry, November 1941 1941, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Empire Chivalry, 20th November 1943 1943, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Planter, April 1947 1947, Copy of a Letter from pro Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 22nd November 1957 1957, Form of Postponed Surveys for Planter, 20th November 1957 1957, Letter from S O Howard, Assistant Superintendent Engineer, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 18th November 1957 1957, Copy of a Certificate of Survey of Main Boilers for Planter, 19th October 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Planter, 14th October 1957 1957, Report of Total Loss, Casualty, &c for Planter, 16th October 1958 1958, Letter from W Cowan, Director, The Charente Steam Ship Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 3rd October 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 21st March 1958 1958, Report of Ship Surveys & Repairs for Planter, 23rd January 1958 1958, Copy of a Certificate of Survey of Repairs for Planter, 22nd January 1958 1958, Copy of a Certificate of Partly Surveyed Boilers & Machinery for Planter, 10th February 1958 1958, Remarks of the Chief Engineer Surveyor, regarding Class of Planter, 10th March 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Planter, 7th February 1958 1958, Remarks of the Chief Ship Surveyor, regarding Class of Planter, Undated no date, Memo for Inkosi, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
1525 ( Plan of Rudder & Stern Frames for Empire Chivalry, 10th May 1936 1936, Profile & Decks Plan for Inkosi, 8th May 1936 1936, Profile & Decks Plan for Empire Chivalry, 8th May 1936 1936, Half Midship Section Plan for Inkosi, 8th May 1936 1936, Request for Special Survey for Inkosi, 10th June 1936 1936, Freeboard - Application for Certificate of Approval for Inkosi, 8th May 1936 1936, Report of Surveys for Freeboard for Inkosi, 14th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Planter, 14th June 1937 1937, Copy of a Certificate of Survey for Inkosi, 29th May 1937 1937, Steel Steamer Report for Inkosi, 10th June 1937 1937, Form for Vessels of 100 Tons & Upwards for Inkosi, 26th May 1937 1937, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Inkosi, 14th June 1937 1937, Report on Steam Reciprocating Engine Machinery for Inkosi, 3rd June 1937 1937, Report on Boilers for Inkosi, 3rd June 1937 1937, Report on Electrical Equipment for Inkosi, 3rd June 1937 1937, Report of Surveys for Freeboard for Inkosi, 13th May 1937 1937, Report of Surveys for Freeboard - Conditions of Assignment for Inkosi, 13th May 1937 1937, Plan of General Arrangement for Empire Chivalry, 15th July 1941 1941, Report of Surveys for Freeboard - Conditions of Assignment for Empire Chivalry, November 1941 1941, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Empire Chivalry, 20th November 1943 1943, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Planter, April 1947 1947, Copy of a Letter from pro Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 22nd November 1957 1957, Form of Postponed Surveys for Planter, 20th November 1957 1957, Letter from S O Howard, Assistant Superintendent Engineer, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 18th November 1957 1957, Copy of a Certificate of Survey of Main Boilers for Planter, 19th October 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Planter, 14th October 1957 1957, Report of Total Loss, Casualty, &c for Planter, 16th October 1958 1958, Letter from W Cowan, Director, The Charente Steam Ship Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 3rd October 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 21st March 1958 1958, Report of Ship Surveys & Repairs for Planter, 23rd January 1958 1958, Copy of a Certificate of Survey of Repairs for Planter, 22nd January 1958 1958, Copy of a Certificate of Partly Surveyed Boilers & Machinery for Planter, 10th February 1958 1958, Remarks of the Chief Engineer Surveyor, regarding Class of Planter, 10th March 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Planter, 7th February 1958 1958, Remarks of the Chief Ship Surveyor, regarding Class of Planter, Undated no date, Memo for Inkosi, Undated no date )
Location where a vessel’s survey was undertaken.
Wallsend on Tyne ( Plan of Rudder & Stern Frames for Empire Chivalry, 10th May 1936 1936, Profile & Decks Plan for Inkosi, 8th May 1936 1936, Profile & Decks Plan for Empire Chivalry, 8th May 1936 1936, Half Midship Section Plan for Inkosi, 8th May 1936 1936 )
Newcastle on Tyne ( Request for Special Survey for Inkosi, 10th June 1936 1936, Copy of a Certificate of Survey for Inkosi, 29th May 1937 1937 )
Wallsend on Tyne; Newcastle ( Steel Steamer Report for Inkosi, 10th June 1937 1937 )
Liverpool ( Form for Vessels of 100 Tons & Upwards for Inkosi, 26th May 1937 1937, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Planter, April 1947 1947, Letter from S O Howard, Assistant Superintendent Engineer, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 18th November 1957 1957, Letter from W Cowan, Director, The Charente Steam Ship Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 3rd October 1958 1958 )
Wallsend; Newcastle ( Report on Steam Reciprocating Engine Machinery for Inkosi, 3rd June 1937 1937, Report on Boilers for Inkosi, 3rd June 1937 1937 )
Newcastle ( Report on Electrical Equipment for Inkosi, 3rd June 1937 1937, Report of Surveys for Freeboard for Inkosi, 13th May 1937 1937, Report of Surveys for Freeboard - Conditions of Assignment for Inkosi, 13th May 1937 1937 )
London ( Plan of General Arrangement for Empire Chivalry, 15th July 1941 1941, Report of Surveys for Freeboard - Conditions of Assignment for Empire Chivalry, November 1941 1941, Copy of a Letter from pro Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 22nd November 1957 1957, Copy of a Certificate of Survey of Main Boilers for Planter, 19th October 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Planter, 14th October 1957 1957, Copy of a Letter from Assistant Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 21st March 1958 1958, Report of Ship Surveys & Repairs for Planter, 23rd January 1958 1958, Copy of a Certificate of Survey of Repairs for Planter, 22nd January 1958 1958, Copy of a Certificate of Partly Surveyed Boilers & Machinery for Planter, 10th February 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Planter, 7th February 1958 1958 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Plan of Rudder & Stern Frames for Empire Chivalry, 10th May 1936 1936, Profile & Decks Plan for Inkosi, 8th May 1936 1936, Profile & Decks Plan for Empire Chivalry, 8th May 1936 1936, Half Midship Section Plan for Inkosi, 8th May 1936 1936, Request for Special Survey for Inkosi, 10th June 1936 1936, Freeboard - Application for Certificate of Approval for Inkosi, 8th May 1936 1936, Report of Surveys for Freeboard for Inkosi, 14th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Planter, 14th June 1937 1937, Copy of a Certificate of Survey for Inkosi, 29th May 1937 1937, Steel Steamer Report for Inkosi, 10th June 1937 1937, Form for Vessels of 100 Tons & Upwards for Inkosi, 26th May 1937 1937, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Inkosi, 14th June 1937 1937, Report on Steam Reciprocating Engine Machinery for Inkosi, 3rd June 1937 1937, Report on Boilers for Inkosi, 3rd June 1937 1937, Report on Electrical Equipment for Inkosi, 3rd June 1937 1937, Report of Surveys for Freeboard for Inkosi, 13th May 1937 1937, Report of Surveys for Freeboard - Conditions of Assignment for Inkosi, 13th May 1937 1937, Plan of General Arrangement for Empire Chivalry, 15th July 1941 1941, Report of Surveys for Freeboard - Conditions of Assignment for Empire Chivalry, November 1941 1941, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Empire Chivalry, 20th November 1943 1943, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Planter, April 1947 1947, Copy of a Letter from pro Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 22nd November 1957 1957, Form of Postponed Surveys for Planter, 20th November 1957 1957, Letter from S O Howard, Assistant Superintendent Engineer, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 18th November 1957 1957, Copy of a Certificate of Survey of Main Boilers for Planter, 19th October 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Planter, 14th October 1957 1957, Report of Total Loss, Casualty, &c for Planter, 16th October 1958 1958, Letter from W Cowan, Director, The Charente Steam Ship Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 3rd October 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 21st March 1958 1958, Report of Ship Surveys & Repairs for Planter, 23rd January 1958 1958, Copy of a Certificate of Survey of Repairs for Planter, 22nd January 1958 1958, Copy of a Certificate of Partly Surveyed Boilers & Machinery for Planter, 10th February 1958 1958, Remarks of the Chief Engineer Surveyor, regarding Class of Planter, 10th March 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Planter, 7th February 1958 1958, Remarks of the Chief Ship Surveyor, regarding Class of Planter, Undated no date, Memo for Inkosi, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Plan of Rudder & Stern Frames for Empire Chivalry, 10th May 1936 1936, Profile & Decks Plan for Inkosi, 8th May 1936 1936, Profile & Decks Plan for Empire Chivalry, 8th May 1936 1936, Half Midship Section Plan for Inkosi, 8th May 1936 1936, Request for Special Survey for Inkosi, 10th June 1936 1936, Freeboard - Application for Certificate of Approval for Inkosi, 8th May 1936 1936, Report of Surveys for Freeboard for Inkosi, 14th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Planter, 14th June 1937 1937, Copy of a Certificate of Survey for Inkosi, 29th May 1937 1937, Steel Steamer Report for Inkosi, 10th June 1937 1937, Form for Vessels of 100 Tons & Upwards for Inkosi, 26th May 1937 1937, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Inkosi, 14th June 1937 1937, Report on Steam Reciprocating Engine Machinery for Inkosi, 3rd June 1937 1937, Report on Boilers for Inkosi, 3rd June 1937 1937, Report on Electrical Equipment for Inkosi, 3rd June 1937 1937, Report of Surveys for Freeboard for Inkosi, 13th May 1937 1937, Report of Surveys for Freeboard - Conditions of Assignment for Inkosi, 13th May 1937 1937, Plan of General Arrangement for Empire Chivalry, 15th July 1941 1941, Report of Surveys for Freeboard - Conditions of Assignment for Empire Chivalry, November 1941 1941, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Empire Chivalry, 20th November 1943 1943, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Planter, April 1947 1947, Copy of a Letter from pro Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 22nd November 1957 1957, Form of Postponed Surveys for Planter, 20th November 1957 1957, Letter from S O Howard, Assistant Superintendent Engineer, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 18th November 1957 1957, Copy of a Certificate of Survey of Main Boilers for Planter, 19th October 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Planter, 14th October 1957 1957, Report of Total Loss, Casualty, &c for Planter, 16th October 1958 1958, Letter from W Cowan, Director, The Charente Steam Ship Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 3rd October 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 21st March 1958 1958, Report of Ship Surveys & Repairs for Planter, 23rd January 1958 1958, Copy of a Certificate of Survey of Repairs for Planter, 22nd January 1958 1958, Copy of a Certificate of Partly Surveyed Boilers & Machinery for Planter, 10th February 1958 1958, Remarks of the Chief Engineer Surveyor, regarding Class of Planter, 10th March 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Planter, 7th February 1958 1958, Remarks of the Chief Ship Surveyor, regarding Class of Planter, Undated no date, Memo for Inkosi, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Plan of Rudder & Stern Frames for Empire Chivalry, 10th May 1936 1936, Profile & Decks Plan for Inkosi, 8th May 1936 1936, Profile & Decks Plan for Empire Chivalry, 8th May 1936 1936, Half Midship Section Plan for Inkosi, 8th May 1936 1936, Request for Special Survey for Inkosi, 10th June 1936 1936, Freeboard - Application for Certificate of Approval for Inkosi, 8th May 1936 1936, Report of Surveys for Freeboard for Inkosi, 14th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Planter, 14th June 1937 1937, Copy of a Certificate of Survey for Inkosi, 29th May 1937 1937, Steel Steamer Report for Inkosi, 10th June 1937 1937, Form for Vessels of 100 Tons & Upwards for Inkosi, 26th May 1937 1937, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Inkosi, 14th June 1937 1937, Report on Steam Reciprocating Engine Machinery for Inkosi, 3rd June 1937 1937, Report on Boilers for Inkosi, 3rd June 1937 1937, Report on Electrical Equipment for Inkosi, 3rd June 1937 1937, Report of Surveys for Freeboard for Inkosi, 13th May 1937 1937, Report of Surveys for Freeboard - Conditions of Assignment for Inkosi, 13th May 1937 1937, Plan of General Arrangement for Empire Chivalry, 15th July 1941 1941, Report of Surveys for Freeboard - Conditions of Assignment for Empire Chivalry, November 1941 1941, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Empire Chivalry, 20th November 1943 1943, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Planter, April 1947 1947, Copy of a Letter from pro Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 22nd November 1957 1957, Form of Postponed Surveys for Planter, 20th November 1957 1957, Letter from S O Howard, Assistant Superintendent Engineer, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 18th November 1957 1957, Copy of a Certificate of Survey of Main Boilers for Planter, 19th October 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Planter, 14th October 1957 1957, Report of Total Loss, Casualty, &c for Planter, 16th October 1958 1958, Letter from W Cowan, Director, The Charente Steam Ship Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 3rd October 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 21st March 1958 1958, Report of Ship Surveys & Repairs for Planter, 23rd January 1958 1958, Copy of a Certificate of Survey of Repairs for Planter, 22nd January 1958 1958, Copy of a Certificate of Partly Surveyed Boilers & Machinery for Planter, 10th February 1958 1958, Remarks of the Chief Engineer Surveyor, regarding Class of Planter, 10th March 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Planter, 7th February 1958 1958, Remarks of the Chief Ship Surveyor, regarding Class of Planter, Undated no date, Memo for Inkosi, Undated no date )
Is electric lighting fitted to the vessel?
No ( Plan of Rudder & Stern Frames for Empire Chivalry, 10th May 1936 1936, Profile & Decks Plan for Inkosi, 8th May 1936 1936, Profile & Decks Plan for Empire Chivalry, 8th May 1936 1936, Half Midship Section Plan for Inkosi, 8th May 1936 1936, Request for Special Survey for Inkosi, 10th June 1936 1936, Freeboard - Application for Certificate of Approval for Inkosi, 8th May 1936 1936, Report of Surveys for Freeboard for Inkosi, 14th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Planter, 14th June 1937 1937, Copy of a Certificate of Survey for Inkosi, 29th May 1937 1937, Steel Steamer Report for Inkosi, 10th June 1937 1937, Form for Vessels of 100 Tons & Upwards for Inkosi, 26th May 1937 1937, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Inkosi, 14th June 1937 1937, Report on Steam Reciprocating Engine Machinery for Inkosi, 3rd June 1937 1937, Report on Boilers for Inkosi, 3rd June 1937 1937, Report on Electrical Equipment for Inkosi, 3rd June 1937 1937, Report of Surveys for Freeboard for Inkosi, 13th May 1937 1937, Report of Surveys for Freeboard - Conditions of Assignment for Inkosi, 13th May 1937 1937, Plan of General Arrangement for Empire Chivalry, 15th July 1941 1941, Report of Surveys for Freeboard - Conditions of Assignment for Empire Chivalry, November 1941 1941, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Empire Chivalry, 20th November 1943 1943, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Planter, April 1947 1947, Copy of a Letter from pro Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 22nd November 1957 1957, Form of Postponed Surveys for Planter, 20th November 1957 1957, Letter from S O Howard, Assistant Superintendent Engineer, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 18th November 1957 1957, Copy of a Certificate of Survey of Main Boilers for Planter, 19th October 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Planter, 14th October 1957 1957, Report of Total Loss, Casualty, &c for Planter, 16th October 1958 1958, Letter from W Cowan, Director, The Charente Steam Ship Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 3rd October 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 21st March 1958 1958, Report of Ship Surveys & Repairs for Planter, 23rd January 1958 1958, Copy of a Certificate of Survey of Repairs for Planter, 22nd January 1958 1958, Copy of a Certificate of Partly Surveyed Boilers & Machinery for Planter, 10th February 1958 1958, Remarks of the Chief Engineer Surveyor, regarding Class of Planter, 10th March 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Planter, 7th February 1958 1958, Remarks of the Chief Ship Surveyor, regarding Class of Planter, Undated no date, Memo for Inkosi, Undated no date )
The official record pronounced by the Committee
To be broken up ( Plan of Rudder & Stern Frames for Empire Chivalry, 10th May 1936 1936, Profile & Decks Plan for Inkosi, 8th May 1936 1936, Profile & Decks Plan for Empire Chivalry, 8th May 1936 1936, Half Midship Section Plan for Inkosi, 8th May 1936 1936, Request for Special Survey for Inkosi, 10th June 1936 1936, Freeboard - Application for Certificate of Approval for Inkosi, 8th May 1936 1936, Report of Surveys for Freeboard for Inkosi, 14th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Planter, 14th June 1937 1937, Copy of a Certificate of Survey for Inkosi, 29th May 1937 1937, Steel Steamer Report for Inkosi, 10th June 1937 1937, Form for Vessels of 100 Tons & Upwards for Inkosi, 26th May 1937 1937, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Inkosi, 14th June 1937 1937, Report on Steam Reciprocating Engine Machinery for Inkosi, 3rd June 1937 1937, Report on Boilers for Inkosi, 3rd June 1937 1937, Report on Electrical Equipment for Inkosi, 3rd June 1937 1937, Report of Surveys for Freeboard for Inkosi, 13th May 1937 1937, Report of Surveys for Freeboard - Conditions of Assignment for Inkosi, 13th May 1937 1937, Plan of General Arrangement for Empire Chivalry, 15th July 1941 1941, Report of Surveys for Freeboard - Conditions of Assignment for Empire Chivalry, November 1941 1941, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Empire Chivalry, 20th November 1943 1943, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Planter, April 1947 1947, Copy of a Letter from pro Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 22nd November 1957 1957, Form of Postponed Surveys for Planter, 20th November 1957 1957, Letter from S O Howard, Assistant Superintendent Engineer, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 18th November 1957 1957, Copy of a Certificate of Survey of Main Boilers for Planter, 19th October 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Planter, 14th October 1957 1957, Report of Total Loss, Casualty, &c for Planter, 16th October 1958 1958, Letter from W Cowan, Director, The Charente Steam Ship Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 3rd October 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 21st March 1958 1958, Report of Ship Surveys & Repairs for Planter, 23rd January 1958 1958, Copy of a Certificate of Survey of Repairs for Planter, 22nd January 1958 1958, Copy of a Certificate of Partly Surveyed Boilers & Machinery for Planter, 10th February 1958 1958, Remarks of the Chief Engineer Surveyor, regarding Class of Planter, 10th March 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Planter, 7th February 1958 1958, Remarks of the Chief Ship Surveyor, regarding Class of Planter, Undated no date, Memo for Inkosi, Undated no date )
Vessel’s place of loss or disposal/last known recorded location.
Ghent ( Plan of Rudder & Stern Frames for Empire Chivalry, 10th May 1936 1936, Profile & Decks Plan for Inkosi, 8th May 1936 1936, Profile & Decks Plan for Empire Chivalry, 8th May 1936 1936, Half Midship Section Plan for Inkosi, 8th May 1936 1936, Request for Special Survey for Inkosi, 10th June 1936 1936, Freeboard - Application for Certificate of Approval for Inkosi, 8th May 1936 1936, Report of Surveys for Freeboard for Inkosi, 14th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Planter, 14th June 1937 1937, Copy of a Certificate of Survey for Inkosi, 29th May 1937 1937, Steel Steamer Report for Inkosi, 10th June 1937 1937, Form for Vessels of 100 Tons & Upwards for Inkosi, 26th May 1937 1937, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Inkosi, 14th June 1937 1937, Report on Steam Reciprocating Engine Machinery for Inkosi, 3rd June 1937 1937, Report on Boilers for Inkosi, 3rd June 1937 1937, Report on Electrical Equipment for Inkosi, 3rd June 1937 1937, Report of Surveys for Freeboard for Inkosi, 13th May 1937 1937, Report of Surveys for Freeboard - Conditions of Assignment for Inkosi, 13th May 1937 1937, Plan of General Arrangement for Empire Chivalry, 15th July 1941 1941, Report of Surveys for Freeboard - Conditions of Assignment for Empire Chivalry, November 1941 1941, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Empire Chivalry, 20th November 1943 1943, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Planter, April 1947 1947, Copy of a Letter from pro Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 22nd November 1957 1957, Form of Postponed Surveys for Planter, 20th November 1957 1957, Letter from S O Howard, Assistant Superintendent Engineer, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 18th November 1957 1957, Copy of a Certificate of Survey of Main Boilers for Planter, 19th October 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Planter, 14th October 1957 1957, Report of Total Loss, Casualty, &c for Planter, 16th October 1958 1958, Letter from W Cowan, Director, The Charente Steam Ship Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 3rd October 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 21st March 1958 1958, Report of Ship Surveys & Repairs for Planter, 23rd January 1958 1958, Copy of a Certificate of Survey of Repairs for Planter, 22nd January 1958 1958, Copy of a Certificate of Partly Surveyed Boilers & Machinery for Planter, 10th February 1958 1958, Remarks of the Chief Engineer Surveyor, regarding Class of Planter, 10th March 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Planter, 7th February 1958 1958, Remarks of the Chief Ship Surveyor, regarding Class of Planter, Undated no date, Memo for Inkosi, Undated no date )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; (Contemplated) ( Report of Surveys for Freeboard for Inkosi, 14th May 1936 1936 )
+100A1; Lloyd\'s A & CP; +LMC 6,37; FD; CL; Fitted for Oil Fuel 6,37; Fp above 150 F ( Steel Steamer Report for Inkosi, 10th June 1937 1937 )
+LMC 6,37; FD; CL (Spt); Fitted for OF & C ( Report on Steam Reciprocating Engine Machinery for Inkosi, 3rd June 1937 1937 )
See Nwc FE 95730 ( Report on Boilers for Inkosi, 3rd June 1937 1937, Report on Electrical Equipment for Inkosi, 3rd June 1937 1937 )
+100A1; Contemplated ( Report of Surveys for Freeboard for Inkosi, 13th May 1937 1937 )
MBS 10,57 ( Report of Periodical Surveys & Repairs of Machinery for Planter, 14th October 1957 1957 )
+100A1 1,58; S S Bkn 1,54; +LMC 1,54; BS M 10,57; TS 1,58; CL ( Report of Total Loss, Casualty, &c for Planter, 16th October 1958 1958 )
DS 1,58 (with Endorsement); TS 1,58; (Postponement of S S until 1,59 Approved) ( Report of Ship Surveys & Repairs for Planter, 23rd January 1958 1958 )
TS 1,58 ( Report of Periodical Surveys & Repairs of Machinery for Planter, 7th February 1958 1958 )
The port in which a vessel is registered or permanently based.
Liverpool ( Steel Steamer Report for Inkosi, 10th June 1937 1937, Form for Vessels of 100 Tons & Upwards for Inkosi, 26th May 1937 1937, Report of Surveys for Freeboard for Inkosi, 13th May 1937 1937, Report of Surveys for Freeboard - Conditions of Assignment for Inkosi, 13th May 1937 1937, Report of Periodical Surveys & Repairs of Machinery for Planter, 14th October 1957 1957, Report of Ship Surveys & Repairs for Planter, 23rd January 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Planter, 7th February 1958 1958 )
London ( Report of Surveys for Freeboard - Conditions of Assignment for Empire Chivalry, November 1941 1941 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
6618 ( Steel Steamer Report for Inkosi, 10th June 1937 1937, Form for Vessels of 100 Tons & Upwards for Inkosi, 26th May 1937 1937, Report on Steam Reciprocating Engine Machinery for Inkosi, 3rd June 1937 1937, Report on Boilers for Inkosi, 3rd June 1937 1937, Report of Surveys for Freeboard for Inkosi, 13th May 1937 1937 )
6007 ( Copy of a Certificate of Survey of Main Boilers for Planter, 19th October 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Planter, 14th October 1957 1957, Report of Total Loss, Casualty, &c for Planter, 16th October 1958 1958, Report of Ship Surveys & Repairs for Planter, 23rd January 1958 1958, Copy of a Certificate of Survey of Repairs for Planter, 22nd January 1958 1958, Copy of a Certificate of Partly Surveyed Boilers & Machinery for Planter, 10th February 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Planter, 7th February 1958 1958 )
Type and configuration of the engine(s) supplied for a vessel.
Reciprocating Quadruple Expansion Direct Acting Vertical ( Form for Vessels of 100 Tons & Upwards for Inkosi, 26th May 1937 1937 )
Quadruple Expansion ( Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Inkosi, 14th June 1937 1937, Report on Steam Reciprocating Engine Machinery for Inkosi, 3rd June 1937 1937 )
Q 4 Cylinders ( Report of Periodical Surveys & Repairs of Machinery for Planter, 14th October 1957 1957 )
Quadruple Expansion Steam Engine ( Report of Periodical Surveys & Repairs of Machinery for Planter, 7th February 1958 1958 )
Date in which construction of a vessel’s engines were completed.
1937 ( Form for Vessels of 100 Tons & Upwards for Inkosi, 26th May 1937 1937, Report on Steam Reciprocating Engine Machinery for Inkosi, 3rd June 1937 1937, Report on Boilers for Inkosi, 3rd June 1937 1937, Report of Periodical Surveys & Repairs of Machinery for Planter, 14th October 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Planter, 7th February 1958 1958 )
The year in which a vessel’s construction is completed.
1937 ( Plan of Rudder & Stern Frames for Empire Chivalry, 10th May 1936 1936, Profile & Decks Plan for Inkosi, 8th May 1936 1936, Profile & Decks Plan for Empire Chivalry, 8th May 1936 1936, Half Midship Section Plan for Inkosi, 8th May 1936 1936, Request for Special Survey for Inkosi, 10th June 1936 1936, Freeboard - Application for Certificate of Approval for Inkosi, 8th May 1936 1936, Report of Surveys for Freeboard for Inkosi, 14th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Planter, 14th June 1937 1937, Copy of a Certificate of Survey for Inkosi, 29th May 1937 1937, Steel Steamer Report for Inkosi, 10th June 1937 1937, Form for Vessels of 100 Tons & Upwards for Inkosi, 26th May 1937 1937, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Inkosi, 14th June 1937 1937, Report on Steam Reciprocating Engine Machinery for Inkosi, 3rd June 1937 1937, Report on Boilers for Inkosi, 3rd June 1937 1937, Report on Electrical Equipment for Inkosi, 3rd June 1937 1937, Report of Surveys for Freeboard for Inkosi, 13th May 1937 1937, Report of Surveys for Freeboard - Conditions of Assignment for Inkosi, 13th May 1937 1937, Plan of General Arrangement for Empire Chivalry, 15th July 1941 1941, Report of Surveys for Freeboard - Conditions of Assignment for Empire Chivalry, November 1941 1941, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Empire Chivalry, 20th November 1943 1943, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Planter, April 1947 1947, Copy of a Letter from pro Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 22nd November 1957 1957, Form of Postponed Surveys for Planter, 20th November 1957 1957, Letter from S O Howard, Assistant Superintendent Engineer, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 18th November 1957 1957, Copy of a Certificate of Survey of Main Boilers for Planter, 19th October 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Planter, 14th October 1957 1957, Report of Total Loss, Casualty, &c for Planter, 16th October 1958 1958, Letter from W Cowan, Director, The Charente Steam Ship Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 3rd October 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 21st March 1958 1958, Report of Ship Surveys & Repairs for Planter, 23rd January 1958 1958, Copy of a Certificate of Survey of Repairs for Planter, 22nd January 1958 1958, Copy of a Certificate of Partly Surveyed Boilers & Machinery for Planter, 10th February 1958 1958, Remarks of the Chief Engineer Surveyor, regarding Class of Planter, 10th March 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Planter, 7th February 1958 1958, Remarks of the Chief Ship Surveyor, regarding Class of Planter, Undated no date, Memo for Inkosi, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Swan Hunter & Wigham Richardson Ltd ( Plan of Rudder & Stern Frames for Empire Chivalry, 10th May 1936 1936, Profile & Decks Plan for Inkosi, 8th May 1936 1936, Profile & Decks Plan for Empire Chivalry, 8th May 1936 1936, Half Midship Section Plan for Inkosi, 8th May 1936 1936, Request for Special Survey for Inkosi, 10th June 1936 1936, Freeboard - Application for Certificate of Approval for Inkosi, 8th May 1936 1936, Report of Surveys for Freeboard for Inkosi, 14th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Planter, 14th June 1937 1937, Copy of a Certificate of Survey for Inkosi, 29th May 1937 1937, Steel Steamer Report for Inkosi, 10th June 1937 1937, Form for Vessels of 100 Tons & Upwards for Inkosi, 26th May 1937 1937, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Inkosi, 14th June 1937 1937, Report on Steam Reciprocating Engine Machinery for Inkosi, 3rd June 1937 1937, Report on Boilers for Inkosi, 3rd June 1937 1937, Report on Electrical Equipment for Inkosi, 3rd June 1937 1937, Report of Surveys for Freeboard for Inkosi, 13th May 1937 1937, Report of Surveys for Freeboard - Conditions of Assignment for Inkosi, 13th May 1937 1937, Plan of General Arrangement for Empire Chivalry, 15th July 1941 1941, Report of Surveys for Freeboard - Conditions of Assignment for Empire Chivalry, November 1941 1941, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Empire Chivalry, 20th November 1943 1943, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Planter, April 1947 1947, Copy of a Letter from pro Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 22nd November 1957 1957, Form of Postponed Surveys for Planter, 20th November 1957 1957, Letter from S O Howard, Assistant Superintendent Engineer, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 18th November 1957 1957, Copy of a Certificate of Survey of Main Boilers for Planter, 19th October 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Planter, 14th October 1957 1957, Report of Total Loss, Casualty, &c for Planter, 16th October 1958 1958, Letter from W Cowan, Director, The Charente Steam Ship Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 3rd October 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 21st March 1958 1958, Report of Ship Surveys & Repairs for Planter, 23rd January 1958 1958, Copy of a Certificate of Survey of Repairs for Planter, 22nd January 1958 1958, Copy of a Certificate of Partly Surveyed Boilers & Machinery for Planter, 10th February 1958 1958, Remarks of the Chief Engineer Surveyor, regarding Class of Planter, 10th March 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Planter, 7th February 1958 1958, Remarks of the Chief Ship Surveyor, regarding Class of Planter, Undated no date, Memo for Inkosi, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Wallsend on Tyne ( Plan of Rudder & Stern Frames for Empire Chivalry, 10th May 1936 1936, Profile & Decks Plan for Inkosi, 8th May 1936 1936, Profile & Decks Plan for Empire Chivalry, 8th May 1936 1936, Half Midship Section Plan for Inkosi, 8th May 1936 1936, Request for Special Survey for Inkosi, 10th June 1936 1936, Freeboard - Application for Certificate of Approval for Inkosi, 8th May 1936 1936, Report of Surveys for Freeboard for Inkosi, 14th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Planter, 14th June 1937 1937, Copy of a Certificate of Survey for Inkosi, 29th May 1937 1937, Steel Steamer Report for Inkosi, 10th June 1937 1937, Form for Vessels of 100 Tons & Upwards for Inkosi, 26th May 1937 1937, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Inkosi, 14th June 1937 1937, Report on Steam Reciprocating Engine Machinery for Inkosi, 3rd June 1937 1937, Report on Boilers for Inkosi, 3rd June 1937 1937, Report on Electrical Equipment for Inkosi, 3rd June 1937 1937, Report of Surveys for Freeboard for Inkosi, 13th May 1937 1937, Report of Surveys for Freeboard - Conditions of Assignment for Inkosi, 13th May 1937 1937, Plan of General Arrangement for Empire Chivalry, 15th July 1941 1941, Report of Surveys for Freeboard - Conditions of Assignment for Empire Chivalry, November 1941 1941, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Empire Chivalry, 20th November 1943 1943, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Planter, April 1947 1947, Copy of a Letter from pro Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 22nd November 1957 1957, Form of Postponed Surveys for Planter, 20th November 1957 1957, Letter from S O Howard, Assistant Superintendent Engineer, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 18th November 1957 1957, Copy of a Certificate of Survey of Main Boilers for Planter, 19th October 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Planter, 14th October 1957 1957, Report of Total Loss, Casualty, &c for Planter, 16th October 1958 1958, Letter from W Cowan, Director, The Charente Steam Ship Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 3rd October 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 21st March 1958 1958, Report of Ship Surveys & Repairs for Planter, 23rd January 1958 1958, Copy of a Certificate of Survey of Repairs for Planter, 22nd January 1958 1958, Copy of a Certificate of Partly Surveyed Boilers & Machinery for Planter, 10th February 1958 1958, Remarks of the Chief Engineer Surveyor, regarding Class of Planter, 10th March 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Planter, 7th February 1958 1958, Remarks of the Chief Ship Surveyor, regarding Class of Planter, Undated no date, Memo for Inkosi, Undated no date )
A vessel’s means of propulsion.
Steam ( Plan of Rudder & Stern Frames for Empire Chivalry, 10th May 1936 1936, Profile & Decks Plan for Inkosi, 8th May 1936 1936, Profile & Decks Plan for Empire Chivalry, 8th May 1936 1936, Half Midship Section Plan for Inkosi, 8th May 1936 1936, Request for Special Survey for Inkosi, 10th June 1936 1936, Freeboard - Application for Certificate of Approval for Inkosi, 8th May 1936 1936, Report of Surveys for Freeboard for Inkosi, 14th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Planter, 14th June 1937 1937, Copy of a Certificate of Survey for Inkosi, 29th May 1937 1937, Steel Steamer Report for Inkosi, 10th June 1937 1937, Form for Vessels of 100 Tons & Upwards for Inkosi, 26th May 1937 1937, Report on Steam Reciprocating Engine Machinery for Inkosi, 3rd June 1937 1937, Report on Boilers for Inkosi, 3rd June 1937 1937, Report on Electrical Equipment for Inkosi, 3rd June 1937 1937, Plan of General Arrangement for Empire Chivalry, 15th July 1941 1941, Copy of a Letter from pro Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 22nd November 1957 1957, Form of Postponed Surveys for Planter, 20th November 1957 1957, Letter from S O Howard, Assistant Superintendent Engineer, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 18th November 1957 1957, Copy of a Certificate of Survey of Main Boilers for Planter, 19th October 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Planter, 14th October 1957 1957, Report of Total Loss, Casualty, &c for Planter, 16th October 1958 1958, Letter from W Cowan, Director, The Charente Steam Ship Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 3rd October 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 21st March 1958 1958, Report of Ship Surveys & Repairs for Planter, 23rd January 1958 1958, Copy of a Certificate of Survey of Repairs for Planter, 22nd January 1958 1958, Copy of a Certificate of Partly Surveyed Boilers & Machinery for Planter, 10th February 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Planter, 7th February 1958 1958, Memo for Inkosi, Undated no date )
undefined ( Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Inkosi, 14th June 1937 1937, Report of Surveys for Freeboard for Inkosi, 13th May 1937 1937, Report of Surveys for Freeboard - Conditions of Assignment for Inkosi, 13th May 1937 1937, Report of Surveys for Freeboard - Conditions of Assignment for Empire Chivalry, November 1941 1941, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Empire Chivalry, 20th November 1943 1943, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Planter, April 1947 1947, Remarks of the Chief Engineer Surveyor, regarding Class of Planter, 10th March 1958 1958, Remarks of the Chief Ship Surveyor, regarding Class of Planter, Undated no date )
Is the steamer assisted by sail?
No ( Plan of Rudder & Stern Frames for Empire Chivalry, 10th May 1936 1936, Profile & Decks Plan for Inkosi, 8th May 1936 1936, Profile & Decks Plan for Empire Chivalry, 8th May 1936 1936, Half Midship Section Plan for Inkosi, 8th May 1936 1936, Request for Special Survey for Inkosi, 10th June 1936 1936, Freeboard - Application for Certificate of Approval for Inkosi, 8th May 1936 1936, Report of Surveys for Freeboard for Inkosi, 14th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Planter, 14th June 1937 1937, Copy of a Certificate of Survey for Inkosi, 29th May 1937 1937, Steel Steamer Report for Inkosi, 10th June 1937 1937, Form for Vessels of 100 Tons & Upwards for Inkosi, 26th May 1937 1937, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Inkosi, 14th June 1937 1937, Report on Steam Reciprocating Engine Machinery for Inkosi, 3rd June 1937 1937, Report on Boilers for Inkosi, 3rd June 1937 1937, Report on Electrical Equipment for Inkosi, 3rd June 1937 1937, Report of Surveys for Freeboard for Inkosi, 13th May 1937 1937, Report of Surveys for Freeboard - Conditions of Assignment for Inkosi, 13th May 1937 1937, Plan of General Arrangement for Empire Chivalry, 15th July 1941 1941, Report of Surveys for Freeboard - Conditions of Assignment for Empire Chivalry, November 1941 1941, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Empire Chivalry, 20th November 1943 1943, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Planter, April 1947 1947, Copy of a Letter from pro Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 22nd November 1957 1957, Form of Postponed Surveys for Planter, 20th November 1957 1957, Letter from S O Howard, Assistant Superintendent Engineer, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 18th November 1957 1957, Copy of a Certificate of Survey of Main Boilers for Planter, 19th October 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Planter, 14th October 1957 1957, Report of Total Loss, Casualty, &c for Planter, 16th October 1958 1958, Letter from W Cowan, Director, The Charente Steam Ship Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 3rd October 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 21st March 1958 1958, Report of Ship Surveys & Repairs for Planter, 23rd January 1958 1958, Copy of a Certificate of Survey of Repairs for Planter, 22nd January 1958 1958, Copy of a Certificate of Partly Surveyed Boilers & Machinery for Planter, 10th February 1958 1958, Remarks of the Chief Engineer Surveyor, regarding Class of Planter, 10th March 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Planter, 7th February 1958 1958, Remarks of the Chief Ship Surveyor, regarding Class of Planter, Undated no date, Memo for Inkosi, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Plan of Rudder & Stern Frames for Empire Chivalry, 10th May 1936 1936, Profile & Decks Plan for Inkosi, 8th May 1936 1936, Profile & Decks Plan for Empire Chivalry, 8th May 1936 1936, Half Midship Section Plan for Inkosi, 8th May 1936 1936, Request for Special Survey for Inkosi, 10th June 1936 1936, Freeboard - Application for Certificate of Approval for Inkosi, 8th May 1936 1936, Report of Surveys for Freeboard for Inkosi, 14th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Planter, 14th June 1937 1937, Copy of a Certificate of Survey for Inkosi, 29th May 1937 1937, Steel Steamer Report for Inkosi, 10th June 1937 1937, Form for Vessels of 100 Tons & Upwards for Inkosi, 26th May 1937 1937, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Inkosi, 14th June 1937 1937, Report on Steam Reciprocating Engine Machinery for Inkosi, 3rd June 1937 1937, Report on Boilers for Inkosi, 3rd June 1937 1937, Report on Electrical Equipment for Inkosi, 3rd June 1937 1937, Report of Surveys for Freeboard for Inkosi, 13th May 1937 1937, Report of Surveys for Freeboard - Conditions of Assignment for Inkosi, 13th May 1937 1937, Plan of General Arrangement for Empire Chivalry, 15th July 1941 1941, Report of Surveys for Freeboard - Conditions of Assignment for Empire Chivalry, November 1941 1941, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Empire Chivalry, 20th November 1943 1943, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Planter, April 1947 1947, Copy of a Letter from pro Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 22nd November 1957 1957, Form of Postponed Surveys for Planter, 20th November 1957 1957, Letter from S O Howard, Assistant Superintendent Engineer, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 18th November 1957 1957, Copy of a Certificate of Survey of Main Boilers for Planter, 19th October 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Planter, 14th October 1957 1957, Report of Total Loss, Casualty, &c for Planter, 16th October 1958 1958, Letter from W Cowan, Director, The Charente Steam Ship Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 3rd October 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 21st March 1958 1958, Report of Ship Surveys & Repairs for Planter, 23rd January 1958 1958, Copy of a Certificate of Survey of Repairs for Planter, 22nd January 1958 1958, Copy of a Certificate of Partly Surveyed Boilers & Machinery for Planter, 10th February 1958 1958, Remarks of the Chief Engineer Surveyor, regarding Class of Planter, 10th March 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Planter, 7th February 1958 1958, Remarks of the Chief Ship Surveyor, regarding Class of Planter, Undated no date, Memo for Inkosi, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Plan of Rudder & Stern Frames for Empire Chivalry, 10th May 1936 1936, Profile & Decks Plan for Inkosi, 8th May 1936 1936, Profile & Decks Plan for Empire Chivalry, 8th May 1936 1936, Half Midship Section Plan for Inkosi, 8th May 1936 1936, Request for Special Survey for Inkosi, 10th June 1936 1936, Freeboard - Application for Certificate of Approval for Inkosi, 8th May 1936 1936, Report of Surveys for Freeboard for Inkosi, 14th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Planter, 14th June 1937 1937, Copy of a Certificate of Survey for Inkosi, 29th May 1937 1937, Steel Steamer Report for Inkosi, 10th June 1937 1937, Form for Vessels of 100 Tons & Upwards for Inkosi, 26th May 1937 1937, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Inkosi, 14th June 1937 1937, Report on Steam Reciprocating Engine Machinery for Inkosi, 3rd June 1937 1937, Report on Boilers for Inkosi, 3rd June 1937 1937, Report on Electrical Equipment for Inkosi, 3rd June 1937 1937, Report of Surveys for Freeboard for Inkosi, 13th May 1937 1937, Report of Surveys for Freeboard - Conditions of Assignment for Inkosi, 13th May 1937 1937, Plan of General Arrangement for Empire Chivalry, 15th July 1941 1941, Report of Surveys for Freeboard - Conditions of Assignment for Empire Chivalry, November 1941 1941, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Empire Chivalry, 20th November 1943 1943, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Planter, April 1947 1947, Copy of a Letter from pro Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 22nd November 1957 1957, Form of Postponed Surveys for Planter, 20th November 1957 1957, Letter from S O Howard, Assistant Superintendent Engineer, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 18th November 1957 1957, Copy of a Certificate of Survey of Main Boilers for Planter, 19th October 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Planter, 14th October 1957 1957, Report of Total Loss, Casualty, &c for Planter, 16th October 1958 1958, Letter from W Cowan, Director, The Charente Steam Ship Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 3rd October 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 21st March 1958 1958, Report of Ship Surveys & Repairs for Planter, 23rd January 1958 1958, Copy of a Certificate of Survey of Repairs for Planter, 22nd January 1958 1958, Copy of a Certificate of Partly Surveyed Boilers & Machinery for Planter, 10th February 1958 1958, Remarks of the Chief Engineer Surveyor, regarding Class of Planter, 10th March 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Planter, 7th February 1958 1958, Remarks of the Chief Ship Surveyor, regarding Class of Planter, Undated no date, Memo for Inkosi, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Plan of Rudder & Stern Frames for Empire Chivalry, 10th May 1936 1936, Profile & Decks Plan for Inkosi, 8th May 1936 1936, Profile & Decks Plan for Empire Chivalry, 8th May 1936 1936, Half Midship Section Plan for Inkosi, 8th May 1936 1936, Request for Special Survey for Inkosi, 10th June 1936 1936, Freeboard - Application for Certificate of Approval for Inkosi, 8th May 1936 1936, Report of Surveys for Freeboard for Inkosi, 14th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Planter, 14th June 1937 1937, Copy of a Certificate of Survey for Inkosi, 29th May 1937 1937, Steel Steamer Report for Inkosi, 10th June 1937 1937, Form for Vessels of 100 Tons & Upwards for Inkosi, 26th May 1937 1937, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Inkosi, 14th June 1937 1937, Report on Steam Reciprocating Engine Machinery for Inkosi, 3rd June 1937 1937, Report on Boilers for Inkosi, 3rd June 1937 1937, Report on Electrical Equipment for Inkosi, 3rd June 1937 1937, Report of Surveys for Freeboard for Inkosi, 13th May 1937 1937, Report of Surveys for Freeboard - Conditions of Assignment for Inkosi, 13th May 1937 1937, Plan of General Arrangement for Empire Chivalry, 15th July 1941 1941, Report of Surveys for Freeboard - Conditions of Assignment for Empire Chivalry, November 1941 1941, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Empire Chivalry, 20th November 1943 1943, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Planter, April 1947 1947, Copy of a Letter from pro Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 22nd November 1957 1957, Form of Postponed Surveys for Planter, 20th November 1957 1957, Letter from S O Howard, Assistant Superintendent Engineer, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 18th November 1957 1957, Copy of a Certificate of Survey of Main Boilers for Planter, 19th October 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Planter, 14th October 1957 1957, Report of Total Loss, Casualty, &c for Planter, 16th October 1958 1958, Letter from W Cowan, Director, The Charente Steam Ship Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 3rd October 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 21st March 1958 1958, Report of Ship Surveys & Repairs for Planter, 23rd January 1958 1958, Copy of a Certificate of Survey of Repairs for Planter, 22nd January 1958 1958, Copy of a Certificate of Partly Surveyed Boilers & Machinery for Planter, 10th February 1958 1958, Remarks of the Chief Engineer Surveyor, regarding Class of Planter, 10th March 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Planter, 7th February 1958 1958, Remarks of the Chief Ship Surveyor, regarding Class of Planter, Undated no date, Memo for Inkosi, Undated no date )
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to Ets van Heyghen Freres for Breaking up at Ghent ( Plan of Rudder & Stern Frames for Empire Chivalry, 10th May 1936 1936, Profile & Decks Plan for Inkosi, 8th May 1936 1936, Profile & Decks Plan for Empire Chivalry, 8th May 1936 1936, Half Midship Section Plan for Inkosi, 8th May 1936 1936, Request for Special Survey for Inkosi, 10th June 1936 1936, Freeboard - Application for Certificate of Approval for Inkosi, 8th May 1936 1936, Report of Surveys for Freeboard for Inkosi, 14th May 1936 1936, Remarks of the Chief Ship Surveyor to the Classing Committee regarding Class of Planter, 14th June 1937 1937, Copy of a Certificate of Survey for Inkosi, 29th May 1937 1937, Steel Steamer Report for Inkosi, 10th June 1937 1937, Form for Vessels of 100 Tons & Upwards for Inkosi, 26th May 1937 1937, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding Class of Inkosi, 14th June 1937 1937, Report on Steam Reciprocating Engine Machinery for Inkosi, 3rd June 1937 1937, Report on Boilers for Inkosi, 3rd June 1937 1937, Report on Electrical Equipment for Inkosi, 3rd June 1937 1937, Report of Surveys for Freeboard for Inkosi, 13th May 1937 1937, Report of Surveys for Freeboard - Conditions of Assignment for Inkosi, 13th May 1937 1937, Plan of General Arrangement for Empire Chivalry, 15th July 1941 1941, Report of Surveys for Freeboard - Conditions of Assignment for Empire Chivalry, November 1941 1941, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Empire Chivalry, 20th November 1943 1943, Report C.11 Continued, Memorandum of Alterations Since Ship was Surveyed for Assingment of Load Lines for Planter, April 1947 1947, Copy of a Letter from pro Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 22nd November 1957 1957, Form of Postponed Surveys for Planter, 20th November 1957 1957, Letter from S O Howard, Assistant Superintendent Engineer, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 18th November 1957 1957, Copy of a Certificate of Survey of Main Boilers for Planter, 19th October 1957 1957, Report of Periodical Surveys & Repairs of Machinery for Planter, 14th October 1957 1957, Report of Total Loss, Casualty, &c for Planter, 16th October 1958 1958, Letter from W Cowan, Director, The Charente Steam Ship Co Ltd, to The Secretary, Lloyd's Register of Shipping, London, regarding Planter, 3rd October 1958 1958, Copy of a Letter from Assistant Clerk to the Classification Committee, to T & J Harrison Ltd, Liverpool, regarding Planter, 21st March 1958 1958, Report of Ship Surveys & Repairs for Planter, 23rd January 1958 1958, Copy of a Certificate of Survey of Repairs for Planter, 22nd January 1958 1958, Copy of a Certificate of Partly Surveyed Boilers & Machinery for Planter, 10th February 1958 1958, Remarks of the Chief Engineer Surveyor, regarding Class of Planter, 10th March 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Planter, 7th February 1958 1958, Remarks of the Chief Ship Surveyor, regarding Class of Planter, Undated no date, Memo for Inkosi, Undated no date )
The individual and/or organisation listed
Thomas & James Harrison ( Request for Special Survey for Inkosi, 10th June 1936 1936 )
T & J Harrison Ltd ( Report of Surveys for Freeboard for Inkosi, 14th May 1936 1936, Report of Surveys for Freeboard for Inkosi, 13th May 1937 1937 )
Charente Steam Ship Co Ltd ( Steel Steamer Report for Inkosi, 10th June 1937 1937, Form for Vessels of 100 Tons & Upwards for Inkosi, 26th May 1937 1937, Report on Steam Reciprocating Engine Machinery for Inkosi, 3rd June 1937 1937, Report on Boilers for Inkosi, 3rd June 1937 1937, Report on Electrical Equipment for Inkosi, 3rd June 1937 1937, Report of Periodical Surveys & Repairs of Machinery for Planter, 14th October 1957 1957, Report of Ship Surveys & Repairs for Planter, 23rd January 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Planter, 7th February 1958 1958 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Nwc ( Steel Steamer Report for Inkosi, 10th June 1937 1937, Report on Steam Reciprocating Engine Machinery for Inkosi, 3rd June 1937 1937, Report on Boilers for Inkosi, 3rd June 1937 1937, Report on Electrical Equipment for Inkosi, 3rd June 1937 1937, Report of Surveys for Freeboard for Inkosi, 13th May 1937 1937, Report of Surveys for Freeboard - Conditions of Assignment for Inkosi, 13th May 1937 1937 )
Lon ( Report of Surveys for Freeboard - Conditions of Assignment for Empire Chivalry, November 1941 1941, Report of Periodical Surveys & Repairs of Machinery for Planter, 14th October 1957 1957, Report of Ship Surveys & Repairs for Planter, 23rd January 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Planter, 7th February 1958 1958 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
T & J Harrison Ltd ( Steel Steamer Report for Inkosi, 10th June 1937 1937, Report of Periodical Surveys & Repairs of Machinery for Planter, 14th October 1957 1957, Report of Ship Surveys & Repairs for Planter, 23rd January 1958 1958, Report of Periodical Surveys & Repairs of Machinery for Planter, 7th February 1958 1958 )
Charles Blackburn ( Form for Vessels of 100 Tons & Upwards for Inkosi, 26th May 1937 1937 )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
GZSS ( Form for Vessels of 100 Tons & Upwards for Inkosi, 26th May 1937 1937 )
Location of construction for a vessel’s engines.
Wallsend on Tyne ( Form for Vessels of 100 Tons & Upwards for Inkosi, 26th May 1937 1937 )
Wallsend ( Report on Steam Reciprocating Engine Machinery for Inkosi, 3rd June 1937 1937, Report on Boilers for Inkosi, 3rd June 1937 1937, Report of Periodical Surveys & Repairs of Machinery for Planter, 14th October 1957 1957 )
The listed port to which a given vessel belongs.
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.