Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

The year in which a vessel’s construction is completed.

Year of ship completion

1920 ( Request for Special Survey for Ethel Radcliffe, 3rd November 1919 1919, Plan of Steel Boiler for Ethel Radcliffe, 1919 1919, Plan of Boilers for Ethel Radcliffe, 28th November 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th November 1919 1919, Profile Plan for Ethel Radcliffe, 28th July 1919 1919, Midship Section Plan for Ethel Radcliffe, 28th July 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 31st December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 8th December 1919 1919, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 25th November 1920 1919, Letter from T G Baker, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding the thickness of the upper deck plating clear of the bridge for Ethel Radcliffe, 15th December 1920 1920, Letter from William Morrison, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors requesting further information confirming new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Memo for the Middlesbrough Surveyors requesting further information regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 3rd December 1920 1920, Steel Steamer Report for Ethel Radcliffe, 2nd December 1920 1920, Form for Vessels of 100 Tons & Upwards for Ethel Radcliffe, 19th November 1920 1920, Report on Machinery for Ethel Radcliffe, 23rd November 1920 1920, Report on Boilers for Ethel Radcliffe, 27th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th August 1920 1920, Consignment note from Leeds Forge Co to Blair & Co Ltd, regarding Steel for Ethel Radcliffe, 12th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th August 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 2nd July 1920 1920, Profile Plan for Ethel Radcliffe, 30th November 1920 1920, Midship Section Plan for Ethel Radcliffe, 30th November 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th January 1920 1920, Surveyor’s Copy of Receipt for Three Deighton Corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Ethel Radcliffe, 8th June 1920 1920, Receipt for Steel Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 26th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 5th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th June 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 3rd February 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 5th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th June 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th April 1926 1926, Letter from George Allan, Montreal Surveyor, to the Secretary for Lloyd's Register, Wokingham, regarding new lifeboats fitted on board Ethel Radcliffe, 30th April 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 8th May 1941 1941, Certificate of survey of Damage & Repairs for Ethel Radcliffe, 6th March 1941 1941, Report of Survey for Repairs, &c for Ethel Radcliffe, 6th March 1941 1941, Report of Total Loss, Casualty, &c for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Craig, Taylor & Co Ltd ( Request for Special Survey for Ethel Radcliffe, 3rd November 1919 1919, Plan of Steel Boiler for Ethel Radcliffe, 1919 1919, Plan of Boilers for Ethel Radcliffe, 28th November 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th November 1919 1919, Profile Plan for Ethel Radcliffe, 28th July 1919 1919, Midship Section Plan for Ethel Radcliffe, 28th July 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 31st December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 8th December 1919 1919, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 25th November 1920 1919, Letter from T G Baker, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding the thickness of the upper deck plating clear of the bridge for Ethel Radcliffe, 15th December 1920 1920, Letter from William Morrison, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors requesting further information confirming new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Memo for the Middlesbrough Surveyors requesting further information regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 3rd December 1920 1920, Steel Steamer Report for Ethel Radcliffe, 2nd December 1920 1920, Form for Vessels of 100 Tons & Upwards for Ethel Radcliffe, 19th November 1920 1920, Report on Machinery for Ethel Radcliffe, 23rd November 1920 1920, Report on Boilers for Ethel Radcliffe, 27th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th August 1920 1920, Consignment note from Leeds Forge Co to Blair & Co Ltd, regarding Steel for Ethel Radcliffe, 12th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th August 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 2nd July 1920 1920, Profile Plan for Ethel Radcliffe, 30th November 1920 1920, Midship Section Plan for Ethel Radcliffe, 30th November 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th January 1920 1920, Surveyor’s Copy of Receipt for Three Deighton Corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Ethel Radcliffe, 8th June 1920 1920, Receipt for Steel Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 26th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 5th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th June 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 3rd February 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 5th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th June 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th April 1926 1926, Letter from George Allan, Montreal Surveyor, to the Secretary for Lloyd's Register, Wokingham, regarding new lifeboats fitted on board Ethel Radcliffe, 30th April 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 8th May 1941 1941, Certificate of survey of Damage & Repairs for Ethel Radcliffe, 6th March 1941 1941, Report of Survey for Repairs, &c for Ethel Radcliffe, 6th March 1941 1941, Report of Total Loss, Casualty, &c for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Stockton on Tees ( Request for Special Survey for Ethel Radcliffe, 3rd November 1919 1919, Plan of Steel Boiler for Ethel Radcliffe, 1919 1919, Plan of Boilers for Ethel Radcliffe, 28th November 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th November 1919 1919, Profile Plan for Ethel Radcliffe, 28th July 1919 1919, Midship Section Plan for Ethel Radcliffe, 28th July 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 31st December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 8th December 1919 1919, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 25th November 1920 1919, Letter from T G Baker, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding the thickness of the upper deck plating clear of the bridge for Ethel Radcliffe, 15th December 1920 1920, Letter from William Morrison, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors requesting further information confirming new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Memo for the Middlesbrough Surveyors requesting further information regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 3rd December 1920 1920, Steel Steamer Report for Ethel Radcliffe, 2nd December 1920 1920, Form for Vessels of 100 Tons & Upwards for Ethel Radcliffe, 19th November 1920 1920, Report on Machinery for Ethel Radcliffe, 23rd November 1920 1920, Report on Boilers for Ethel Radcliffe, 27th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th August 1920 1920, Consignment note from Leeds Forge Co to Blair & Co Ltd, regarding Steel for Ethel Radcliffe, 12th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th August 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 2nd July 1920 1920, Profile Plan for Ethel Radcliffe, 30th November 1920 1920, Midship Section Plan for Ethel Radcliffe, 30th November 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th January 1920 1920, Surveyor’s Copy of Receipt for Three Deighton Corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Ethel Radcliffe, 8th June 1920 1920, Receipt for Steel Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 26th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 5th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th June 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 3rd February 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 5th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th June 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th April 1926 1926, Letter from George Allan, Montreal Surveyor, to the Secretary for Lloyd's Register, Wokingham, regarding new lifeboats fitted on board Ethel Radcliffe, 30th April 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 8th May 1941 1941, Certificate of survey of Damage & Repairs for Ethel Radcliffe, 6th March 1941 1941, Report of Survey for Repairs, &c for Ethel Radcliffe, 6th March 1941 1941, Report of Total Loss, Casualty, &c for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Stockton on Tees ( Request for Special Survey for Ethel Radcliffe, 3rd November 1919 1919, Plan of Steel Boiler for Ethel Radcliffe, 1919 1919, Plan of Boilers for Ethel Radcliffe, 28th November 1919 1919, Profile Plan for Ethel Radcliffe, 28th July 1919 1919, Midship Section Plan for Ethel Radcliffe, 28th July 1919 1919, Profile Plan for Ethel Radcliffe, 30th November 1920 1920, Midship Section Plan for Ethel Radcliffe, 30th November 1920 1920 )

Newcastle on Tyne; Stockton on Tees ( Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th November 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 31st December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th April 1920 1920, Receipt for Steel Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th June 1920 1920 )

Newcastle on Tyne; Stockton ( Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 8th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th August 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th August 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 2nd July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th January 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 26th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 5th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th June 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th April 1926 1926, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date )

Leeds; Stockton on Tees ( Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 25th November 1920 1919, Surveyor’s Copy of Receipt for Three Deighton Corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Ethel Radcliffe, 8th June 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 3rd February 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 5th February 1920 1920 )

Middlesbrough ( Letter from T G Baker, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding the thickness of the upper deck plating clear of the bridge for Ethel Radcliffe, 15th December 1920 1920, Letter from William Morrison, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920 )

London ( Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors requesting further information confirming new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Form for Vessels of 100 Tons & Upwards for Ethel Radcliffe, 19th November 1920 1920 )

Stockton on Tees; Middlesbrough ( Steel Steamer Report for Ethel Radcliffe, 2nd December 1920 1920, Report on Machinery for Ethel Radcliffe, 23rd November 1920 1920, Report on Boilers for Ethel Radcliffe, 27th July 1920 1920 )

Leeds; Stockton ( Consignment note from Leeds Forge Co to Blair & Co Ltd, regarding Steel for Ethel Radcliffe, 12th February 1920 1920 )

Montreal ( Letter from George Allan, Montreal Surveyor, to the Secretary for Lloyd's Register, Wokingham, regarding new lifeboats fitted on board Ethel Radcliffe, 30th April 1941 1941 )

St John N B ( Certificate of survey of Damage & Repairs for Ethel Radcliffe, 6th March 1941 1941 )

Saint John N B; St John, N B ( Report of Survey for Repairs, &c for Ethel Radcliffe, 6th March 1941 1941 )

A vessel’s means of propulsion.

Propulsion

undefined ( Request for Special Survey for Ethel Radcliffe, 3rd November 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th November 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 31st December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 8th December 1919 1919, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 25th November 1920 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th August 1920 1920, Consignment note from Leeds Forge Co to Blair & Co Ltd, regarding Steel for Ethel Radcliffe, 12th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th August 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 2nd July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th January 1920 1920, Surveyor’s Copy of Receipt for Three Deighton Corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Ethel Radcliffe, 8th June 1920 1920, Receipt for Steel Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 26th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 5th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th June 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 3rd February 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 5th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th June 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th April 1926 1926, Letter from George Allan, Montreal Surveyor, to the Secretary for Lloyd's Register, Wokingham, regarding new lifeboats fitted on board Ethel Radcliffe, 30th April 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 8th May 1941 1941, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date )

Steam ( Plan of Steel Boiler for Ethel Radcliffe, 1919 1919, Plan of Boilers for Ethel Radcliffe, 28th November 1919 1919, Profile Plan for Ethel Radcliffe, 28th July 1919 1919, Midship Section Plan for Ethel Radcliffe, 28th July 1919 1919, Letter from T G Baker, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding the thickness of the upper deck plating clear of the bridge for Ethel Radcliffe, 15th December 1920 1920, Letter from William Morrison, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors requesting further information confirming new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Memo for the Middlesbrough Surveyors requesting further information regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 3rd December 1920 1920, Steel Steamer Report for Ethel Radcliffe, 2nd December 1920 1920, Form for Vessels of 100 Tons & Upwards for Ethel Radcliffe, 19th November 1920 1920, Report on Machinery for Ethel Radcliffe, 23rd November 1920 1920, Report on Boilers for Ethel Radcliffe, 27th July 1920 1920, Profile Plan for Ethel Radcliffe, 30th November 1920 1920, Midship Section Plan for Ethel Radcliffe, 30th November 1920 1920, Certificate of survey of Damage & Repairs for Ethel Radcliffe, 6th March 1941 1941, Report of Survey for Repairs, &c for Ethel Radcliffe, 6th March 1941 1941, Report of Total Loss, Casualty, &c for Ethel Radcliffe, Undated no date )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Request for Special Survey for Ethel Radcliffe, 3rd November 1919 1919, Plan of Steel Boiler for Ethel Radcliffe, 1919 1919, Plan of Boilers for Ethel Radcliffe, 28th November 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th November 1919 1919, Profile Plan for Ethel Radcliffe, 28th July 1919 1919, Midship Section Plan for Ethel Radcliffe, 28th July 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 31st December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 8th December 1919 1919, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 25th November 1920 1919, Letter from T G Baker, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding the thickness of the upper deck plating clear of the bridge for Ethel Radcliffe, 15th December 1920 1920, Letter from William Morrison, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors requesting further information confirming new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Memo for the Middlesbrough Surveyors requesting further information regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 3rd December 1920 1920, Steel Steamer Report for Ethel Radcliffe, 2nd December 1920 1920, Form for Vessels of 100 Tons & Upwards for Ethel Radcliffe, 19th November 1920 1920, Report on Machinery for Ethel Radcliffe, 23rd November 1920 1920, Report on Boilers for Ethel Radcliffe, 27th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th August 1920 1920, Consignment note from Leeds Forge Co to Blair & Co Ltd, regarding Steel for Ethel Radcliffe, 12th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th August 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 2nd July 1920 1920, Profile Plan for Ethel Radcliffe, 30th November 1920 1920, Midship Section Plan for Ethel Radcliffe, 30th November 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th January 1920 1920, Surveyor’s Copy of Receipt for Three Deighton Corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Ethel Radcliffe, 8th June 1920 1920, Receipt for Steel Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 26th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 5th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th June 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 3rd February 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 5th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th June 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th April 1926 1926, Letter from George Allan, Montreal Surveyor, to the Secretary for Lloyd's Register, Wokingham, regarding new lifeboats fitted on board Ethel Radcliffe, 30th April 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 8th May 1941 1941, Certificate of survey of Damage & Repairs for Ethel Radcliffe, 6th March 1941 1941, Report of Survey for Repairs, &c for Ethel Radcliffe, 6th March 1941 1941, Report of Total Loss, Casualty, &c for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Request for Special Survey for Ethel Radcliffe, 3rd November 1919 1919, Plan of Steel Boiler for Ethel Radcliffe, 1919 1919, Plan of Boilers for Ethel Radcliffe, 28th November 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th November 1919 1919, Profile Plan for Ethel Radcliffe, 28th July 1919 1919, Midship Section Plan for Ethel Radcliffe, 28th July 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 31st December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 8th December 1919 1919, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 25th November 1920 1919, Letter from T G Baker, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding the thickness of the upper deck plating clear of the bridge for Ethel Radcliffe, 15th December 1920 1920, Letter from William Morrison, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors requesting further information confirming new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Memo for the Middlesbrough Surveyors requesting further information regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 3rd December 1920 1920, Steel Steamer Report for Ethel Radcliffe, 2nd December 1920 1920, Form for Vessels of 100 Tons & Upwards for Ethel Radcliffe, 19th November 1920 1920, Report on Machinery for Ethel Radcliffe, 23rd November 1920 1920, Report on Boilers for Ethel Radcliffe, 27th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th August 1920 1920, Consignment note from Leeds Forge Co to Blair & Co Ltd, regarding Steel for Ethel Radcliffe, 12th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th August 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 2nd July 1920 1920, Profile Plan for Ethel Radcliffe, 30th November 1920 1920, Midship Section Plan for Ethel Radcliffe, 30th November 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th January 1920 1920, Surveyor’s Copy of Receipt for Three Deighton Corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Ethel Radcliffe, 8th June 1920 1920, Receipt for Steel Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 26th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 5th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th June 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 3rd February 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 5th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th June 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th April 1926 1926, Letter from George Allan, Montreal Surveyor, to the Secretary for Lloyd's Register, Wokingham, regarding new lifeboats fitted on board Ethel Radcliffe, 30th April 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 8th May 1941 1941, Certificate of survey of Damage & Repairs for Ethel Radcliffe, 6th March 1941 1941, Report of Survey for Repairs, &c for Ethel Radcliffe, 6th March 1941 1941, Report of Total Loss, Casualty, &c for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Request for Special Survey for Ethel Radcliffe, 3rd November 1919 1919, Plan of Steel Boiler for Ethel Radcliffe, 1919 1919, Plan of Boilers for Ethel Radcliffe, 28th November 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th November 1919 1919, Profile Plan for Ethel Radcliffe, 28th July 1919 1919, Midship Section Plan for Ethel Radcliffe, 28th July 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 31st December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 8th December 1919 1919, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 25th November 1920 1919, Letter from T G Baker, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding the thickness of the upper deck plating clear of the bridge for Ethel Radcliffe, 15th December 1920 1920, Letter from William Morrison, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors requesting further information confirming new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Memo for the Middlesbrough Surveyors requesting further information regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 3rd December 1920 1920, Steel Steamer Report for Ethel Radcliffe, 2nd December 1920 1920, Form for Vessels of 100 Tons & Upwards for Ethel Radcliffe, 19th November 1920 1920, Report on Machinery for Ethel Radcliffe, 23rd November 1920 1920, Report on Boilers for Ethel Radcliffe, 27th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th August 1920 1920, Consignment note from Leeds Forge Co to Blair & Co Ltd, regarding Steel for Ethel Radcliffe, 12th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th August 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 2nd July 1920 1920, Profile Plan for Ethel Radcliffe, 30th November 1920 1920, Midship Section Plan for Ethel Radcliffe, 30th November 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th January 1920 1920, Surveyor’s Copy of Receipt for Three Deighton Corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Ethel Radcliffe, 8th June 1920 1920, Receipt for Steel Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 26th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 5th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th June 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 3rd February 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 5th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th June 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th April 1926 1926, Letter from George Allan, Montreal Surveyor, to the Secretary for Lloyd's Register, Wokingham, regarding new lifeboats fitted on board Ethel Radcliffe, 30th April 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 8th May 1941 1941, Certificate of survey of Damage & Repairs for Ethel Radcliffe, 6th March 1941 1941, Report of Survey for Repairs, &c for Ethel Radcliffe, 6th March 1941 1941, Report of Total Loss, Casualty, &c for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Request for Special Survey for Ethel Radcliffe, 3rd November 1919 1919, Plan of Steel Boiler for Ethel Radcliffe, 1919 1919, Plan of Boilers for Ethel Radcliffe, 28th November 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th November 1919 1919, Profile Plan for Ethel Radcliffe, 28th July 1919 1919, Midship Section Plan for Ethel Radcliffe, 28th July 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 31st December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 8th December 1919 1919, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 25th November 1920 1919, Letter from T G Baker, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding the thickness of the upper deck plating clear of the bridge for Ethel Radcliffe, 15th December 1920 1920, Letter from William Morrison, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors requesting further information confirming new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Memo for the Middlesbrough Surveyors requesting further information regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 3rd December 1920 1920, Steel Steamer Report for Ethel Radcliffe, 2nd December 1920 1920, Form for Vessels of 100 Tons & Upwards for Ethel Radcliffe, 19th November 1920 1920, Report on Machinery for Ethel Radcliffe, 23rd November 1920 1920, Report on Boilers for Ethel Radcliffe, 27th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th August 1920 1920, Consignment note from Leeds Forge Co to Blair & Co Ltd, regarding Steel for Ethel Radcliffe, 12th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th August 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 2nd July 1920 1920, Profile Plan for Ethel Radcliffe, 30th November 1920 1920, Midship Section Plan for Ethel Radcliffe, 30th November 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th January 1920 1920, Surveyor’s Copy of Receipt for Three Deighton Corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Ethel Radcliffe, 8th June 1920 1920, Receipt for Steel Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 26th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 5th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th June 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 3rd February 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 5th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th June 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th April 1926 1926, Letter from George Allan, Montreal Surveyor, to the Secretary for Lloyd's Register, Wokingham, regarding new lifeboats fitted on board Ethel Radcliffe, 30th April 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 8th May 1941 1941, Certificate of survey of Damage & Repairs for Ethel Radcliffe, 6th March 1941 1941, Report of Survey for Repairs, &c for Ethel Radcliffe, 6th March 1941 1941, Report of Total Loss, Casualty, &c for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date )

Vessel’s area of loss or disposal/last known recorded location.

Area of ship loss

North Sea ( Request for Special Survey for Ethel Radcliffe, 3rd November 1919 1919, Plan of Steel Boiler for Ethel Radcliffe, 1919 1919, Plan of Boilers for Ethel Radcliffe, 28th November 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th November 1919 1919, Profile Plan for Ethel Radcliffe, 28th July 1919 1919, Midship Section Plan for Ethel Radcliffe, 28th July 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 31st December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 8th December 1919 1919, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 25th November 1920 1919, Letter from T G Baker, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding the thickness of the upper deck plating clear of the bridge for Ethel Radcliffe, 15th December 1920 1920, Letter from William Morrison, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors requesting further information confirming new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Memo for the Middlesbrough Surveyors requesting further information regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 3rd December 1920 1920, Steel Steamer Report for Ethel Radcliffe, 2nd December 1920 1920, Form for Vessels of 100 Tons & Upwards for Ethel Radcliffe, 19th November 1920 1920, Report on Machinery for Ethel Radcliffe, 23rd November 1920 1920, Report on Boilers for Ethel Radcliffe, 27th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th August 1920 1920, Consignment note from Leeds Forge Co to Blair & Co Ltd, regarding Steel for Ethel Radcliffe, 12th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th August 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 2nd July 1920 1920, Profile Plan for Ethel Radcliffe, 30th November 1920 1920, Midship Section Plan for Ethel Radcliffe, 30th November 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th January 1920 1920, Surveyor’s Copy of Receipt for Three Deighton Corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Ethel Radcliffe, 8th June 1920 1920, Receipt for Steel Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 26th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 5th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th June 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 3rd February 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 5th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th June 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th April 1926 1926, Letter from George Allan, Montreal Surveyor, to the Secretary for Lloyd's Register, Wokingham, regarding new lifeboats fitted on board Ethel Radcliffe, 30th April 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 8th May 1941 1941, Certificate of survey of Damage & Repairs for Ethel Radcliffe, 6th March 1941 1941, Report of Survey for Repairs, &c for Ethel Radcliffe, 6th March 1941 1941, Report of Total Loss, Casualty, &c for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date )

Name of ship as recorded on the record

Ship name

Ethel Radcliffe ( Plan of Steel Boiler for Ethel Radcliffe, 1919 1919, Plan of Boilers for Ethel Radcliffe, 28th November 1919 1919, Profile Plan for Ethel Radcliffe, 28th July 1919 1919, Midship Section Plan for Ethel Radcliffe, 28th July 1919 1919, Letter from T G Baker, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding the thickness of the upper deck plating clear of the bridge for Ethel Radcliffe, 15th December 1920 1920, Letter from William Morrison, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors requesting further information confirming new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Memo for the Middlesbrough Surveyors requesting further information regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 3rd December 1920 1920, Steel Steamer Report for Ethel Radcliffe, 2nd December 1920 1920, Form for Vessels of 100 Tons & Upwards for Ethel Radcliffe, 19th November 1920 1920, Report on Machinery for Ethel Radcliffe, 23rd November 1920 1920, Report on Boilers for Ethel Radcliffe, 27th July 1920 1920, Profile Plan for Ethel Radcliffe, 30th November 1920 1920, Midship Section Plan for Ethel Radcliffe, 30th November 1920 1920, Letter from George Allan, Montreal Surveyor, to the Secretary for Lloyd's Register, Wokingham, regarding new lifeboats fitted on board Ethel Radcliffe, 30th April 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 8th May 1941 1941, Certificate of survey of Damage & Repairs for Ethel Radcliffe, 6th March 1941 1941, Report of Survey for Repairs, &c for Ethel Radcliffe, 6th March 1941 1941, Report of Total Loss, Casualty, &c for Ethel Radcliffe, Undated no date )

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Recorded information related to a vessel’s movements.

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Recorded information relating the specific cargo being conveyed.

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

29/09/1920 ( Request for Special Survey for Ethel Radcliffe, 3rd November 1919 1919, Plan of Steel Boiler for Ethel Radcliffe, 1919 1919, Plan of Boilers for Ethel Radcliffe, 28th November 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th November 1919 1919, Profile Plan for Ethel Radcliffe, 28th July 1919 1919, Midship Section Plan for Ethel Radcliffe, 28th July 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 31st December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 8th December 1919 1919, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 25th November 1920 1919, Letter from T G Baker, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding the thickness of the upper deck plating clear of the bridge for Ethel Radcliffe, 15th December 1920 1920, Letter from William Morrison, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors requesting further information confirming new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Memo for the Middlesbrough Surveyors requesting further information regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 3rd December 1920 1920, Steel Steamer Report for Ethel Radcliffe, 2nd December 1920 1920, Form for Vessels of 100 Tons & Upwards for Ethel Radcliffe, 19th November 1920 1920, Report on Machinery for Ethel Radcliffe, 23rd November 1920 1920, Report on Boilers for Ethel Radcliffe, 27th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th August 1920 1920, Consignment note from Leeds Forge Co to Blair & Co Ltd, regarding Steel for Ethel Radcliffe, 12th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th August 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 2nd July 1920 1920, Profile Plan for Ethel Radcliffe, 30th November 1920 1920, Midship Section Plan for Ethel Radcliffe, 30th November 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th January 1920 1920, Surveyor’s Copy of Receipt for Three Deighton Corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Ethel Radcliffe, 8th June 1920 1920, Receipt for Steel Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 26th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 5th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th June 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 3rd February 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 5th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th June 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th April 1926 1926, Letter from George Allan, Montreal Surveyor, to the Secretary for Lloyd's Register, Wokingham, regarding new lifeboats fitted on board Ethel Radcliffe, 30th April 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 8th May 1941 1941, Certificate of survey of Damage & Repairs for Ethel Radcliffe, 6th March 1941 1941, Report of Survey for Repairs, &c for Ethel Radcliffe, 6th March 1941 1941, Report of Total Loss, Casualty, &c for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

196 ( Request for Special Survey for Ethel Radcliffe, 3rd November 1919 1919, Plan of Steel Boiler for Ethel Radcliffe, 1919 1919, Plan of Boilers for Ethel Radcliffe, 28th November 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th November 1919 1919, Profile Plan for Ethel Radcliffe, 28th July 1919 1919, Midship Section Plan for Ethel Radcliffe, 28th July 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 31st December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 8th December 1919 1919, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 25th November 1920 1919, Letter from T G Baker, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding the thickness of the upper deck plating clear of the bridge for Ethel Radcliffe, 15th December 1920 1920, Letter from William Morrison, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors requesting further information confirming new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Memo for the Middlesbrough Surveyors requesting further information regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 3rd December 1920 1920, Steel Steamer Report for Ethel Radcliffe, 2nd December 1920 1920, Form for Vessels of 100 Tons & Upwards for Ethel Radcliffe, 19th November 1920 1920, Report on Machinery for Ethel Radcliffe, 23rd November 1920 1920, Report on Boilers for Ethel Radcliffe, 27th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th August 1920 1920, Consignment note from Leeds Forge Co to Blair & Co Ltd, regarding Steel for Ethel Radcliffe, 12th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th August 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 2nd July 1920 1920, Profile Plan for Ethel Radcliffe, 30th November 1920 1920, Midship Section Plan for Ethel Radcliffe, 30th November 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th January 1920 1920, Surveyor’s Copy of Receipt for Three Deighton Corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Ethel Radcliffe, 8th June 1920 1920, Receipt for Steel Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 26th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 5th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th June 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 3rd February 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 5th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th June 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th April 1926 1926, Letter from George Allan, Montreal Surveyor, to the Secretary for Lloyd's Register, Wokingham, regarding new lifeboats fitted on board Ethel Radcliffe, 30th April 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 8th May 1941 1941, Certificate of survey of Damage & Repairs for Ethel Radcliffe, 6th March 1941 1941, Report of Survey for Repairs, &c for Ethel Radcliffe, 6th March 1941 1941, Report of Total Loss, Casualty, &c for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date )

The individual and/or organisation listed

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined ( Request for Special Survey for Ethel Radcliffe, 3rd November 1919 1919, Plan of Steel Boiler for Ethel Radcliffe, 1919 1919, Plan of Boilers for Ethel Radcliffe, 28th November 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th November 1919 1919, Profile Plan for Ethel Radcliffe, 28th July 1919 1919, Midship Section Plan for Ethel Radcliffe, 28th July 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 31st December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 8th December 1919 1919, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 25th November 1920 1919, Letter from T G Baker, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding the thickness of the upper deck plating clear of the bridge for Ethel Radcliffe, 15th December 1920 1920, Letter from William Morrison, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors requesting further information confirming new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Memo for the Middlesbrough Surveyors requesting further information regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 3rd December 1920 1920, Steel Steamer Report for Ethel Radcliffe, 2nd December 1920 1920, Report on Boilers for Ethel Radcliffe, 27th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th August 1920 1920, Consignment note from Leeds Forge Co to Blair & Co Ltd, regarding Steel for Ethel Radcliffe, 12th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th August 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 2nd July 1920 1920, Profile Plan for Ethel Radcliffe, 30th November 1920 1920, Midship Section Plan for Ethel Radcliffe, 30th November 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th January 1920 1920, Surveyor’s Copy of Receipt for Three Deighton Corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Ethel Radcliffe, 8th June 1920 1920, Receipt for Steel Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 26th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 5th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th June 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 3rd February 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 5th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th June 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th April 1926 1926, Letter from George Allan, Montreal Surveyor, to the Secretary for Lloyd's Register, Wokingham, regarding new lifeboats fitted on board Ethel Radcliffe, 30th April 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 8th May 1941 1941, Report of Total Loss, Casualty, &c for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date )

Cargo ( Form for Vessels of 100 Tons & Upwards for Ethel Radcliffe, 19th November 1920 1920 )

Screw Steamer ( Report on Machinery for Ethel Radcliffe, 23rd November 1920 1920, Certificate of survey of Damage & Repairs for Ethel Radcliffe, 6th March 1941 1941, Report of Survey for Repairs, &c for Ethel Radcliffe, 6th March 1941 1941 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Request for Special Survey for Ethel Radcliffe, 3rd November 1919 1919, Plan of Steel Boiler for Ethel Radcliffe, 1919 1919, Plan of Boilers for Ethel Radcliffe, 28th November 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th November 1919 1919, Profile Plan for Ethel Radcliffe, 28th July 1919 1919, Midship Section Plan for Ethel Radcliffe, 28th July 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 31st December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 8th December 1919 1919, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 25th November 1920 1919, Letter from T G Baker, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding the thickness of the upper deck plating clear of the bridge for Ethel Radcliffe, 15th December 1920 1920, Letter from William Morrison, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors requesting further information confirming new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Memo for the Middlesbrough Surveyors requesting further information regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 3rd December 1920 1920, Steel Steamer Report for Ethel Radcliffe, 2nd December 1920 1920, Form for Vessels of 100 Tons & Upwards for Ethel Radcliffe, 19th November 1920 1920, Report on Machinery for Ethel Radcliffe, 23rd November 1920 1920, Report on Boilers for Ethel Radcliffe, 27th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th August 1920 1920, Consignment note from Leeds Forge Co to Blair & Co Ltd, regarding Steel for Ethel Radcliffe, 12th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th August 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 2nd July 1920 1920, Profile Plan for Ethel Radcliffe, 30th November 1920 1920, Midship Section Plan for Ethel Radcliffe, 30th November 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th January 1920 1920, Surveyor’s Copy of Receipt for Three Deighton Corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Ethel Radcliffe, 8th June 1920 1920, Receipt for Steel Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 26th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 5th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th June 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 3rd February 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 5th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th June 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th April 1926 1926, Letter from George Allan, Montreal Surveyor, to the Secretary for Lloyd's Register, Wokingham, regarding new lifeboats fitted on board Ethel Radcliffe, 30th April 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 8th May 1941 1941, Certificate of survey of Damage & Repairs for Ethel Radcliffe, 6th March 1941 1941, Report of Survey for Repairs, &c for Ethel Radcliffe, 6th March 1941 1941, Report of Total Loss, Casualty, &c for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Request for Special Survey for Ethel Radcliffe, 3rd November 1919 1919, Plan of Steel Boiler for Ethel Radcliffe, 1919 1919, Plan of Boilers for Ethel Radcliffe, 28th November 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th November 1919 1919, Profile Plan for Ethel Radcliffe, 28th July 1919 1919, Midship Section Plan for Ethel Radcliffe, 28th July 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 31st December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 8th December 1919 1919, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 25th November 1920 1919, Letter from T G Baker, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding the thickness of the upper deck plating clear of the bridge for Ethel Radcliffe, 15th December 1920 1920, Letter from William Morrison, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors requesting further information confirming new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Memo for the Middlesbrough Surveyors requesting further information regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 3rd December 1920 1920, Steel Steamer Report for Ethel Radcliffe, 2nd December 1920 1920, Form for Vessels of 100 Tons & Upwards for Ethel Radcliffe, 19th November 1920 1920, Report on Machinery for Ethel Radcliffe, 23rd November 1920 1920, Report on Boilers for Ethel Radcliffe, 27th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th August 1920 1920, Consignment note from Leeds Forge Co to Blair & Co Ltd, regarding Steel for Ethel Radcliffe, 12th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th August 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 2nd July 1920 1920, Profile Plan for Ethel Radcliffe, 30th November 1920 1920, Midship Section Plan for Ethel Radcliffe, 30th November 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th January 1920 1920, Surveyor’s Copy of Receipt for Three Deighton Corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Ethel Radcliffe, 8th June 1920 1920, Receipt for Steel Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 26th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 5th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th June 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 3rd February 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 5th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th June 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th April 1926 1926, Letter from George Allan, Montreal Surveyor, to the Secretary for Lloyd's Register, Wokingham, regarding new lifeboats fitted on board Ethel Radcliffe, 30th April 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 8th May 1941 1941, Certificate of survey of Damage & Repairs for Ethel Radcliffe, 6th March 1941 1941, Report of Survey for Repairs, &c for Ethel Radcliffe, 6th March 1941 1941, Report of Total Loss, Casualty, &c for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Request for Special Survey for Ethel Radcliffe, 3rd November 1919 1919, Plan of Steel Boiler for Ethel Radcliffe, 1919 1919, Plan of Boilers for Ethel Radcliffe, 28th November 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th November 1919 1919, Profile Plan for Ethel Radcliffe, 28th July 1919 1919, Midship Section Plan for Ethel Radcliffe, 28th July 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 31st December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 8th December 1919 1919, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 25th November 1920 1919, Letter from T G Baker, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding the thickness of the upper deck plating clear of the bridge for Ethel Radcliffe, 15th December 1920 1920, Letter from William Morrison, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors requesting further information confirming new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Memo for the Middlesbrough Surveyors requesting further information regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 3rd December 1920 1920, Steel Steamer Report for Ethel Radcliffe, 2nd December 1920 1920, Form for Vessels of 100 Tons & Upwards for Ethel Radcliffe, 19th November 1920 1920, Report on Machinery for Ethel Radcliffe, 23rd November 1920 1920, Report on Boilers for Ethel Radcliffe, 27th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th August 1920 1920, Consignment note from Leeds Forge Co to Blair & Co Ltd, regarding Steel for Ethel Radcliffe, 12th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th August 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 2nd July 1920 1920, Profile Plan for Ethel Radcliffe, 30th November 1920 1920, Midship Section Plan for Ethel Radcliffe, 30th November 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th January 1920 1920, Surveyor’s Copy of Receipt for Three Deighton Corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Ethel Radcliffe, 8th June 1920 1920, Receipt for Steel Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 26th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 5th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th June 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 3rd February 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 5th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th June 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th April 1926 1926, Letter from George Allan, Montreal Surveyor, to the Secretary for Lloyd's Register, Wokingham, regarding new lifeboats fitted on board Ethel Radcliffe, 30th April 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 8th May 1941 1941, Certificate of survey of Damage & Repairs for Ethel Radcliffe, 6th March 1941 1941, Report of Survey for Repairs, &c for Ethel Radcliffe, 6th March 1941 1941, Report of Total Loss, Casualty, &c for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Request for Special Survey for Ethel Radcliffe, 3rd November 1919 1919, Plan of Steel Boiler for Ethel Radcliffe, 1919 1919, Plan of Boilers for Ethel Radcliffe, 28th November 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th November 1919 1919, Profile Plan for Ethel Radcliffe, 28th July 1919 1919, Midship Section Plan for Ethel Radcliffe, 28th July 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 31st December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 8th December 1919 1919, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 25th November 1920 1919, Letter from T G Baker, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding the thickness of the upper deck plating clear of the bridge for Ethel Radcliffe, 15th December 1920 1920, Letter from William Morrison, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors requesting further information confirming new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Memo for the Middlesbrough Surveyors requesting further information regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 3rd December 1920 1920, Steel Steamer Report for Ethel Radcliffe, 2nd December 1920 1920, Form for Vessels of 100 Tons & Upwards for Ethel Radcliffe, 19th November 1920 1920, Report on Machinery for Ethel Radcliffe, 23rd November 1920 1920, Report on Boilers for Ethel Radcliffe, 27th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th August 1920 1920, Consignment note from Leeds Forge Co to Blair & Co Ltd, regarding Steel for Ethel Radcliffe, 12th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th August 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 2nd July 1920 1920, Profile Plan for Ethel Radcliffe, 30th November 1920 1920, Midship Section Plan for Ethel Radcliffe, 30th November 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th January 1920 1920, Surveyor’s Copy of Receipt for Three Deighton Corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Ethel Radcliffe, 8th June 1920 1920, Receipt for Steel Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 26th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 5th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th June 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 3rd February 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 5th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th June 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th April 1926 1926, Letter from George Allan, Montreal Surveyor, to the Secretary for Lloyd's Register, Wokingham, regarding new lifeboats fitted on board Ethel Radcliffe, 30th April 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 8th May 1941 1941, Certificate of survey of Damage & Repairs for Ethel Radcliffe, 6th March 1941 1941, Report of Survey for Repairs, &c for Ethel Radcliffe, 6th March 1941 1941, Report of Total Loss, Casualty, &c for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Torpedoed & beached ( Request for Special Survey for Ethel Radcliffe, 3rd November 1919 1919, Plan of Steel Boiler for Ethel Radcliffe, 1919 1919, Plan of Boilers for Ethel Radcliffe, 28th November 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th November 1919 1919, Profile Plan for Ethel Radcliffe, 28th July 1919 1919, Midship Section Plan for Ethel Radcliffe, 28th July 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 31st December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 8th December 1919 1919, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 25th November 1920 1919, Letter from T G Baker, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding the thickness of the upper deck plating clear of the bridge for Ethel Radcliffe, 15th December 1920 1920, Letter from William Morrison, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors requesting further information confirming new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Memo for the Middlesbrough Surveyors requesting further information regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 3rd December 1920 1920, Steel Steamer Report for Ethel Radcliffe, 2nd December 1920 1920, Form for Vessels of 100 Tons & Upwards for Ethel Radcliffe, 19th November 1920 1920, Report on Machinery for Ethel Radcliffe, 23rd November 1920 1920, Report on Boilers for Ethel Radcliffe, 27th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th August 1920 1920, Consignment note from Leeds Forge Co to Blair & Co Ltd, regarding Steel for Ethel Radcliffe, 12th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th August 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 2nd July 1920 1920, Profile Plan for Ethel Radcliffe, 30th November 1920 1920, Midship Section Plan for Ethel Radcliffe, 30th November 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th January 1920 1920, Surveyor’s Copy of Receipt for Three Deighton Corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Ethel Radcliffe, 8th June 1920 1920, Receipt for Steel Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 26th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 5th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th June 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 3rd February 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 5th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th June 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th April 1926 1926, Letter from George Allan, Montreal Surveyor, to the Secretary for Lloyd's Register, Wokingham, regarding new lifeboats fitted on board Ethel Radcliffe, 30th April 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 8th May 1941 1941, Certificate of survey of Damage & Repairs for Ethel Radcliffe, 6th March 1941 1941, Report of Survey for Repairs, &c for Ethel Radcliffe, 6th March 1941 1941, Report of Total Loss, Casualty, &c for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date )

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

17/04/1941 ( Request for Special Survey for Ethel Radcliffe, 3rd November 1919 1919, Plan of Steel Boiler for Ethel Radcliffe, 1919 1919, Plan of Boilers for Ethel Radcliffe, 28th November 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th November 1919 1919, Profile Plan for Ethel Radcliffe, 28th July 1919 1919, Midship Section Plan for Ethel Radcliffe, 28th July 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 31st December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th December 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 18th October 1919 1919, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 8th December 1919 1919, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 25th November 1920 1919, Letter from T G Baker, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding the thickness of the upper deck plating clear of the bridge for Ethel Radcliffe, 15th December 1920 1920, Letter from William Morrison, Middlesbrough Surveyor, to the Secretary for Lloyd's Register, London, regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Letter from the Secretary for Lloyd's Register, London, to the Middlesbrough Surveyors requesting further information confirming new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Memo for the Middlesbrough Surveyors requesting further information regarding new boiler fitted in Ethel Radcliffe, 16th December 1920 1920, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 3rd December 1920 1920, Steel Steamer Report for Ethel Radcliffe, 2nd December 1920 1920, Form for Vessels of 100 Tons & Upwards for Ethel Radcliffe, 19th November 1920 1920, Report on Machinery for Ethel Radcliffe, 23rd November 1920 1920, Report on Boilers for Ethel Radcliffe, 27th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th August 1920 1920, Consignment note from Leeds Forge Co to Blair & Co Ltd, regarding Steel for Ethel Radcliffe, 12th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 6th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th August 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 21st May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 2nd July 1920 1920, Profile Plan for Ethel Radcliffe, 30th November 1920 1920, Midship Section Plan for Ethel Radcliffe, 30th November 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th January 1920 1920, Surveyor’s Copy of Receipt for Three Deighton Corrugated furnaces manufactured by Deighton’s Patent Flue & Tube Co Ltd for Ethel Radcliffe, 8th June 1920 1920, Receipt for Steel Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 7th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 15th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 12th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 26th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 23rd March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 13th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 20th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 19th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 10th April 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 4th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 5th March 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 27th May 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 11th June 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 3rd February 1920 1920, Consignment Note from The Leeds Forge Co Ltd to Blair & Co Ltd regarding materials for Ethel Radcliffe, 5th February 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 9th July 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 30th June 1920 1920, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, 29th April 1926 1926, Letter from George Allan, Montreal Surveyor, to the Secretary for Lloyd's Register, Wokingham, regarding new lifeboats fitted on board Ethel Radcliffe, 30th April 1941 1941, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Ethel Radcliffe, 8th May 1941 1941, Certificate of survey of Damage & Repairs for Ethel Radcliffe, 6th March 1941 1941, Report of Survey for Repairs, &c for Ethel Radcliffe, 6th March 1941 1941, Report of Total Loss, Casualty, &c for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date, Receipt for Boiler manufactured by John Spencer & Sons Ltd for Ethel Radcliffe, Undated no date )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1; Lloyd's A & CP; +LMC 11,20; Write Fdb ( Steel Steamer Report for Ethel Radcliffe, 2nd December 1920 1920 )

+LMC 11,20 ( Report on Machinery for Ethel Radcliffe, 23rd November 1920 1920 )

+100A1; 10,40; SS Cff No3 6,33; SS Shl No 1,36; +LMC; MS 10,36; BS 1,41; B(CS) 9,40 ( Report of Survey for Repairs, &c for Ethel Radcliffe, 6th March 1941 1941 )

+100A1 10,40; SS Cff No 3-6,33; SS No Shl No 1-36; +LMC; BS 1,41; MS 10,36; TS 9,40 CL ( Report of Total Loss, Casualty, &c for Ethel Radcliffe, Undated no date )

The port in which a vessel is registered or permanently based.

Type and configuration of the engine(s) supplied for a vessel.

Location of construction for a vessel’s engines.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.