Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Garthclyde ( Request for Special Survey of Boilers for Garthclyde, 22nd June 1916 1916, Request for Special Survey of Boiler for Garthclyde, 26th July 1916 1916, Report on Boilers for Garthclyde, 28th September 1916 1916, Profile & Deck Plan for Garthclyde, 14th June 1916 1916, Midship Section Plan for Garthclyde, 14th June 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding Garthclyde, 31st December 1917 1917, Steel Steamer Report for Garthclyde, 10th October 1917 1917, Form for Vessels of 100 Tons & Upwards for Garthclyde, 9th October 1917 1917, Report on Machinery for Garthclyde, 24th August 1917 1917, Report on Boilers for Garthclyde, 21st April 1917 1917, Report on Electric Lighting Installation for Garthclyde, 2nd October 1917 1917, Engine Forgings Form for Garthclyde, 22nd June 1917 1917 )
The process of transferring a vessel to water, but not necessarily her completion.
07/08/1917 ( Request for Special Survey of Boilers for Garthclyde, 22nd June 1916 1916, Request for Special Survey of Boiler for Garthclyde, 26th July 1916 1916, Report on Boilers for Garthclyde, 28th September 1916 1916, Profile & Deck Plan for Garthclyde, 14th June 1916 1916, Midship Section Plan for Garthclyde, 14th June 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding Garthclyde, 31st December 1917 1917, Steel Steamer Report for Garthclyde, 10th October 1917 1917, Form for Vessels of 100 Tons & Upwards for Garthclyde, 9th October 1917 1917, Report on Machinery for Garthclyde, 24th August 1917 1917, Report on Boilers for Garthclyde, 21st April 1917 1917, Report on Electric Lighting Installation for Garthclyde, 2nd October 1917 1917, Engine Forgings Form for Garthclyde, 22nd June 1917 1917 )
Unique identifier for a given ship, it is assigned by a builder.
2 ( Request for Special Survey of Boilers for Garthclyde, 22nd June 1916 1916, Request for Special Survey of Boiler for Garthclyde, 26th July 1916 1916, Report on Boilers for Garthclyde, 28th September 1916 1916, Profile & Deck Plan for Garthclyde, 14th June 1916 1916, Midship Section Plan for Garthclyde, 14th June 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding Garthclyde, 31st December 1917 1917, Steel Steamer Report for Garthclyde, 10th October 1917 1917, Form for Vessels of 100 Tons & Upwards for Garthclyde, 9th October 1917 1917, Report on Machinery for Garthclyde, 24th August 1917 1917, Report on Boilers for Garthclyde, 21st April 1917 1917, Report on Electric Lighting Installation for Garthclyde, 2nd October 1917 1917, Engine Forgings Form for Garthclyde, 22nd June 1917 1917 )
Location where a vessel’s survey was undertaken.
Glasgow ( Request for Special Survey of Boilers for Garthclyde, 22nd June 1916 1916, Request for Special Survey of Boiler for Garthclyde, 26th July 1916 1916, Profile & Deck Plan for Garthclyde, 14th June 1916 1916, Midship Section Plan for Garthclyde, 14th June 1916 1916, Steel Steamer Report for Garthclyde, 10th October 1917 1917, Form for Vessels of 100 Tons & Upwards for Garthclyde, 9th October 1917 1917, Report on Boilers for Garthclyde, 21st April 1917 1917, Report on Electric Lighting Installation for Garthclyde, 2nd October 1917 1917, Engine Forgings Form for Garthclyde, 22nd June 1917 1917 )
Annan; Glasgow ( Report on Boilers for Garthclyde, 28th September 1916 1916 )
Dundee ( Report on Machinery for Garthclyde, 24th August 1917 1917 )
A vessel’s means of propulsion.
undefined ( Request for Special Survey of Boilers for Garthclyde, 22nd June 1916 1916, Request for Special Survey of Boiler for Garthclyde, 26th July 1916 1916 )
Steam ( Report on Boilers for Garthclyde, 28th September 1916 1916, Profile & Deck Plan for Garthclyde, 14th June 1916 1916, Midship Section Plan for Garthclyde, 14th June 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding Garthclyde, 31st December 1917 1917, Steel Steamer Report for Garthclyde, 10th October 1917 1917, Form for Vessels of 100 Tons & Upwards for Garthclyde, 9th October 1917 1917, Report on Machinery for Garthclyde, 24th August 1917 1917, Report on Boilers for Garthclyde, 21st April 1917 1917, Report on Electric Lighting Installation for Garthclyde, 2nd October 1917 1917, Engine Forgings Form for Garthclyde, 22nd June 1917 1917 )
Is the steamer assisted by sail?
No ( Request for Special Survey of Boilers for Garthclyde, 22nd June 1916 1916, Request for Special Survey of Boiler for Garthclyde, 26th July 1916 1916, Report on Boilers for Garthclyde, 28th September 1916 1916, Profile & Deck Plan for Garthclyde, 14th June 1916 1916, Midship Section Plan for Garthclyde, 14th June 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding Garthclyde, 31st December 1917 1917, Steel Steamer Report for Garthclyde, 10th October 1917 1917, Form for Vessels of 100 Tons & Upwards for Garthclyde, 9th October 1917 1917, Report on Machinery for Garthclyde, 24th August 1917 1917, Report on Boilers for Garthclyde, 21st April 1917 1917, Report on Electric Lighting Installation for Garthclyde, 2nd October 1917 1917, Engine Forgings Form for Garthclyde, 22nd June 1917 1917 )
Is machinery fitted at the aft of the vessel?
No ( Request for Special Survey of Boilers for Garthclyde, 22nd June 1916 1916, Request for Special Survey of Boiler for Garthclyde, 26th July 1916 1916, Report on Boilers for Garthclyde, 28th September 1916 1916, Profile & Deck Plan for Garthclyde, 14th June 1916 1916, Midship Section Plan for Garthclyde, 14th June 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding Garthclyde, 31st December 1917 1917, Steel Steamer Report for Garthclyde, 10th October 1917 1917, Form for Vessels of 100 Tons & Upwards for Garthclyde, 9th October 1917 1917, Report on Machinery for Garthclyde, 24th August 1917 1917, Report on Boilers for Garthclyde, 21st April 1917 1917, Report on Electric Lighting Installation for Garthclyde, 2nd October 1917 1917, Engine Forgings Form for Garthclyde, 22nd June 1917 1917 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Request for Special Survey of Boilers for Garthclyde, 22nd June 1916 1916, Request for Special Survey of Boiler for Garthclyde, 26th July 1916 1916, Report on Boilers for Garthclyde, 28th September 1916 1916, Profile & Deck Plan for Garthclyde, 14th June 1916 1916, Midship Section Plan for Garthclyde, 14th June 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding Garthclyde, 31st December 1917 1917, Steel Steamer Report for Garthclyde, 10th October 1917 1917, Form for Vessels of 100 Tons & Upwards for Garthclyde, 9th October 1917 1917, Report on Machinery for Garthclyde, 24th August 1917 1917, Report on Boilers for Garthclyde, 21st April 1917 1917, Report on Electric Lighting Installation for Garthclyde, 2nd October 1917 1917, Engine Forgings Form for Garthclyde, 22nd June 1917 1917 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Request for Special Survey of Boilers for Garthclyde, 22nd June 1916 1916, Request for Special Survey of Boiler for Garthclyde, 26th July 1916 1916, Report on Boilers for Garthclyde, 28th September 1916 1916, Profile & Deck Plan for Garthclyde, 14th June 1916 1916, Midship Section Plan for Garthclyde, 14th June 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding Garthclyde, 31st December 1917 1917, Steel Steamer Report for Garthclyde, 10th October 1917 1917, Form for Vessels of 100 Tons & Upwards for Garthclyde, 9th October 1917 1917, Report on Machinery for Garthclyde, 24th August 1917 1917, Report on Boilers for Garthclyde, 21st April 1917 1917, Report on Electric Lighting Installation for Garthclyde, 2nd October 1917 1917, Engine Forgings Form for Garthclyde, 22nd June 1917 1917 )
The listed port to which a given vessel belongs.
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Stephen ( Steel Steamer Report for Garthclyde, 10th October 1917 1917 )
John Stephen ( Form for Vessels of 100 Tons & Upwards for Garthclyde, 9th October 1917 1917 )
Recorded information related to a vessel’s movements.
Glasgow; Bordeaux ( Steel Steamer Report for Garthclyde, 10th October 1917 1917 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
The port in which a vessel is registered or permanently based.
Glasgow ( Form for Vessels of 100 Tons & Upwards for Garthclyde, 9th October 1917 1917 )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Form for Vessels of 100 Tons & Upwards for Garthclyde, 9th October 1917 1917 )
Location of construction for a vessel’s engines.
Name of surveyor.
William Gordon Minchin ( Report on Boilers for Garthclyde, 21st April 1917 1917 )
Alexander Fletcher ( Engine Forgings Form for Garthclyde, 22nd June 1917 1917 )
The year in which a vessel’s construction is completed.
1917 ( Request for Special Survey of Boilers for Garthclyde, 22nd June 1916 1916, Request for Special Survey of Boiler for Garthclyde, 26th July 1916 1916, Report on Boilers for Garthclyde, 28th September 1916 1916, Profile & Deck Plan for Garthclyde, 14th June 1916 1916, Midship Section Plan for Garthclyde, 14th June 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding Garthclyde, 31st December 1917 1917, Steel Steamer Report for Garthclyde, 10th October 1917 1917, Form for Vessels of 100 Tons & Upwards for Garthclyde, 9th October 1917 1917, Report on Machinery for Garthclyde, 24th August 1917 1917, Report on Boilers for Garthclyde, 21st April 1917 1917, Report on Electric Lighting Installation for Garthclyde, 2nd October 1917 1917, Engine Forgings Form for Garthclyde, 22nd June 1917 1917 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Brys & Gylsen Ltd ( Request for Special Survey of Boilers for Garthclyde, 22nd June 1916 1916, Request for Special Survey of Boiler for Garthclyde, 26th July 1916 1916, Report on Boilers for Garthclyde, 28th September 1916 1916, Profile & Deck Plan for Garthclyde, 14th June 1916 1916, Midship Section Plan for Garthclyde, 14th June 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding Garthclyde, 31st December 1917 1917, Steel Steamer Report for Garthclyde, 10th October 1917 1917, Form for Vessels of 100 Tons & Upwards for Garthclyde, 9th October 1917 1917, Report on Machinery for Garthclyde, 24th August 1917 1917, Report on Boilers for Garthclyde, 21st April 1917 1917, Report on Electric Lighting Installation for Garthclyde, 2nd October 1917 1917, Engine Forgings Form for Garthclyde, 22nd June 1917 1917 )
The port or place in which the vessel’s construction took place, at the time of writing.
Glasgow ( Request for Special Survey of Boilers for Garthclyde, 22nd June 1916 1916, Request for Special Survey of Boiler for Garthclyde, 26th July 1916 1916, Report on Boilers for Garthclyde, 28th September 1916 1916, Profile & Deck Plan for Garthclyde, 14th June 1916 1916, Midship Section Plan for Garthclyde, 14th June 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding Garthclyde, 31st December 1917 1917, Steel Steamer Report for Garthclyde, 10th October 1917 1917, Form for Vessels of 100 Tons & Upwards for Garthclyde, 9th October 1917 1917, Report on Machinery for Garthclyde, 24th August 1917 1917, Report on Boilers for Garthclyde, 21st April 1917 1917, Report on Electric Lighting Installation for Garthclyde, 2nd October 1917 1917, Engine Forgings Form for Garthclyde, 22nd June 1917 1917 )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Request for Special Survey of Boilers for Garthclyde, 22nd June 1916 1916, Request for Special Survey of Boiler for Garthclyde, 26th July 1916 1916, Report on Boilers for Garthclyde, 28th September 1916 1916, Profile & Deck Plan for Garthclyde, 14th June 1916 1916, Midship Section Plan for Garthclyde, 14th June 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding Garthclyde, 31st December 1917 1917, Steel Steamer Report for Garthclyde, 10th October 1917 1917, Report on Machinery for Garthclyde, 24th August 1917 1917, Report on Boilers for Garthclyde, 21st April 1917 1917, Report on Electric Lighting Installation for Garthclyde, 2nd October 1917 1917, Engine Forgings Form for Garthclyde, 22nd June 1917 1917 )
Cargo ( Form for Vessels of 100 Tons & Upwards for Garthclyde, 9th October 1917 1917 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Request for Special Survey of Boilers for Garthclyde, 22nd June 1916 1916, Request for Special Survey of Boiler for Garthclyde, 26th July 1916 1916, Report on Boilers for Garthclyde, 28th September 1916 1916, Profile & Deck Plan for Garthclyde, 14th June 1916 1916, Midship Section Plan for Garthclyde, 14th June 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding Garthclyde, 31st December 1917 1917, Steel Steamer Report for Garthclyde, 10th October 1917 1917, Form for Vessels of 100 Tons & Upwards for Garthclyde, 9th October 1917 1917, Report on Machinery for Garthclyde, 24th August 1917 1917, Report on Boilers for Garthclyde, 21st April 1917 1917, Report on Electric Lighting Installation for Garthclyde, 2nd October 1917 1917, Engine Forgings Form for Garthclyde, 22nd June 1917 1917 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Request for Special Survey of Boilers for Garthclyde, 22nd June 1916 1916, Request for Special Survey of Boiler for Garthclyde, 26th July 1916 1916, Report on Boilers for Garthclyde, 28th September 1916 1916, Profile & Deck Plan for Garthclyde, 14th June 1916 1916, Midship Section Plan for Garthclyde, 14th June 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding Garthclyde, 31st December 1917 1917, Steel Steamer Report for Garthclyde, 10th October 1917 1917, Form for Vessels of 100 Tons & Upwards for Garthclyde, 9th October 1917 1917, Report on Machinery for Garthclyde, 24th August 1917 1917, Report on Boilers for Garthclyde, 21st April 1917 1917, Report on Electric Lighting Installation for Garthclyde, 2nd October 1917 1917, Engine Forgings Form for Garthclyde, 22nd June 1917 1917 )
Does the vessel possess an auxiliary power source?
No ( Request for Special Survey of Boilers for Garthclyde, 22nd June 1916 1916, Request for Special Survey of Boiler for Garthclyde, 26th July 1916 1916, Report on Boilers for Garthclyde, 28th September 1916 1916, Profile & Deck Plan for Garthclyde, 14th June 1916 1916, Midship Section Plan for Garthclyde, 14th June 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding Garthclyde, 31st December 1917 1917, Steel Steamer Report for Garthclyde, 10th October 1917 1917, Form for Vessels of 100 Tons & Upwards for Garthclyde, 9th October 1917 1917, Report on Machinery for Garthclyde, 24th August 1917 1917, Report on Boilers for Garthclyde, 21st April 1917 1917, Report on Electric Lighting Installation for Garthclyde, 2nd October 1917 1917, Engine Forgings Form for Garthclyde, 22nd June 1917 1917 )
Is electric lighting fitted to the vessel?
No ( Request for Special Survey of Boilers for Garthclyde, 22nd June 1916 1916, Request for Special Survey of Boiler for Garthclyde, 26th July 1916 1916, Report on Boilers for Garthclyde, 28th September 1916 1916, Profile & Deck Plan for Garthclyde, 14th June 1916 1916, Midship Section Plan for Garthclyde, 14th June 1916 1916, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding Garthclyde, 31st December 1917 1917, Steel Steamer Report for Garthclyde, 10th October 1917 1917, Form for Vessels of 100 Tons & Upwards for Garthclyde, 9th October 1917 1917, Report on Machinery for Garthclyde, 24th August 1917 1917, Report on Boilers for Garthclyde, 21st April 1917 1917, Report on Electric Lighting Installation for Garthclyde, 2nd October 1917 1917, Engine Forgings Form for Garthclyde, 22nd June 1917 1917 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls ( Report on Boilers for Garthclyde, 28th September 1916 1916, Steel Steamer Report for Garthclyde, 10th October 1917 1917, Report on Boilers for Garthclyde, 21st April 1917 1917, Report on Electric Lighting Installation for Garthclyde, 2nd October 1917 1917 )
Dun ( Report on Machinery for Garthclyde, 24th August 1917 1917 )
The individual and/or organisation listed
Brys & Gylsen Ltd ( Report on Boilers for Garthclyde, 28th September 1916 1916, Report on Machinery for Garthclyde, 24th August 1917 1917, Report on Boilers for Garthclyde, 21st April 1917 1917, Report on Electric Lighting Installation for Garthclyde, 2nd October 1917 1917 )
William Garthwaite ( Steel Steamer Report for Garthclyde, 10th October 1917 1917, Form for Vessels of 100 Tons & Upwards for Garthclyde, 9th October 1917 1917 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 10,17; Lloyds A & CP; +LMC 10,17; Longitudinal Framing in DB & at Deck ( Steel Steamer Report for Garthclyde, 10th October 1917 1917 )
+LMC 10,17 ( Report on Machinery for Garthclyde, 24th August 1917 1917 )
Deferred ( Report on Boilers for Garthclyde, 21st April 1917 1917 )
Elec Light ( Report on Electric Lighting Installation for Garthclyde, 2nd October 1917 1917 )
The name of the port/place of destination given.
Bordeaux ( Steel Steamer Report for Garthclyde, 10th October 1917 1917 )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
JRKQ ( Form for Vessels of 100 Tons & Upwards for Garthclyde, 9th October 1917 1917 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
H J Garthwaite ( Form for Vessels of 100 Tons & Upwards for Garthclyde, 9th October 1917 1917 )
Type and configuration of the engine(s) supplied for a vessel.
Triple Compound Surface Condensing Inverted Cylinder Direct Acting ( Form for Vessels of 100 Tons & Upwards for Garthclyde, 9th October 1917 1917 )
Triple Expansion Surface Condensing ( Report on Machinery for Garthclyde, 24th August 1917 1917 )
Date in which construction of a vessel’s engines were completed.
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.