Name of ship as recorded on the record

Ship name

City of Hereford ( Memo about the Freeboard Report for City of Hereford, 9th December 1925 1925, Freeboard Application for Certificate of Approval for City of Hereford, 25th November 1925 1925, Report of Surveys for Freeboard-Steam Ships for City of Hereford, 8th December 1925 1925, Profile Plan for City of Hereford, 18th December 1925 1925, Request for Special Survey for City of Hereford, 10th February 1926 1926, Freeboard - Application for Certificate of Approval for City of Hereford, 21st December 1926 1926, Steel Steamer Report for City of Hereford, 12th May 1927 1927, Form for Vessels of 100 Tons & Upwards for City of Hereford, 21st April 1927 1927, Report on Steam Reciprocating Engine Machinery for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Electric Fittings for City of Hereford, 4th April 1927 1927, Freeboard Verification Form for Steamers for City of Hereford, 14th March 1927 1927, Copy of Letter from Secretary, to The Secretary, Glasgow, regarding City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 9th March 1927 1927, Copy of Letter from W W, to N Dobson Esq, Glasgow, regarding City of Hereford, 10th March 1927 1927, Letter from N Dobson, regarding City of Hereford, 8th March 1927 1927, Report of Surveys for Freeboard-Steam Ships for City of Hereford, March 1927 1927, Midship Section Plan for City of Hereford, 3rd May 1927 1927, Report of Surveys for Freeboard - Steamers for City of Hereford, 31st January 1931 1931, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, 9th October 1953 1953, Copy of Freeboard Report for City of Hereford, Undated no date, Freeboard & Draught Document for City of Hereford, Undated no date, Report of Surveys for Freeboard-Steam Ships for City of Hereford, Undated no date )

Golden Alpha ( Plan of Forged Ingot Steel Stern Frame & Forged Ingot Steel Rudder for Golden Alpha, December 1925 1925, Memo to the Chief Ship Surveyor regarding First Entry for Golden Alpha, 20th May 1927 1927, Report of Surveys for Freeboard for Golden Alpha, 11th May 1932 1932, Copy of Letter from Assistant Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Golden Alpha, 17th March 1959 1959, Report of Total Loss, Casualty, &c for Golden Alpha, 11th March 1959 1959, Question & Answer Memo between London & Kobe Offices, regarding Golden Alpha being Ship Breaking, 26th February 1959 1959, Remarks of the Chief Ship Surveyor, regarding class of Golden Alpha, 6th March 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 17th February 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 23rd February 1959 1959, Report of Ship Surveys & Repairs for Golden Alpha, 23rd February 1959 1959 )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

22/03/1927 ( Memo about the Freeboard Report for City of Hereford, 9th December 1925 1925, Freeboard Application for Certificate of Approval for City of Hereford, 25th November 1925 1925, Report of Surveys for Freeboard-Steam Ships for City of Hereford, 8th December 1925 1925, Plan of Forged Ingot Steel Stern Frame & Forged Ingot Steel Rudder for Golden Alpha, December 1925 1925, Profile Plan for City of Hereford, 18th December 1925 1925, Request for Special Survey for City of Hereford, 10th February 1926 1926, Freeboard - Application for Certificate of Approval for City of Hereford, 21st December 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry for Golden Alpha, 20th May 1927 1927, Steel Steamer Report for City of Hereford, 12th May 1927 1927, Form for Vessels of 100 Tons & Upwards for City of Hereford, 21st April 1927 1927, Report on Steam Reciprocating Engine Machinery for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Electric Fittings for City of Hereford, 4th April 1927 1927, Freeboard Verification Form for Steamers for City of Hereford, 14th March 1927 1927, Copy of Letter from Secretary, to The Secretary, Glasgow, regarding City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 9th March 1927 1927, Copy of Letter from W W, to N Dobson Esq, Glasgow, regarding City of Hereford, 10th March 1927 1927, Letter from N Dobson, regarding City of Hereford, 8th March 1927 1927, Report of Surveys for Freeboard-Steam Ships for City of Hereford, March 1927 1927, Midship Section Plan for City of Hereford, 3rd May 1927 1927, Report of Surveys for Freeboard - Steamers for City of Hereford, 31st January 1931 1931, Report of Surveys for Freeboard for Golden Alpha, 11th May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, 9th October 1953 1953, Copy of Letter from Assistant Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Golden Alpha, 17th March 1959 1959, Report of Total Loss, Casualty, &c for Golden Alpha, 11th March 1959 1959, Question & Answer Memo between London & Kobe Offices, regarding Golden Alpha being Ship Breaking, 26th February 1959 1959, Remarks of the Chief Ship Surveyor, regarding class of Golden Alpha, 6th March 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 17th February 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 23rd February 1959 1959, Report of Ship Surveys & Repairs for Golden Alpha, 23rd February 1959 1959, Copy of Freeboard Report for City of Hereford, Undated no date, Freeboard & Draught Document for City of Hereford, Undated no date, Report of Surveys for Freeboard-Steam Ships for City of Hereford, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

615 ( Memo about the Freeboard Report for City of Hereford, 9th December 1925 1925, Freeboard Application for Certificate of Approval for City of Hereford, 25th November 1925 1925, Report of Surveys for Freeboard-Steam Ships for City of Hereford, 8th December 1925 1925, Plan of Forged Ingot Steel Stern Frame & Forged Ingot Steel Rudder for Golden Alpha, December 1925 1925, Profile Plan for City of Hereford, 18th December 1925 1925, Request for Special Survey for City of Hereford, 10th February 1926 1926, Freeboard - Application for Certificate of Approval for City of Hereford, 21st December 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry for Golden Alpha, 20th May 1927 1927, Steel Steamer Report for City of Hereford, 12th May 1927 1927, Form for Vessels of 100 Tons & Upwards for City of Hereford, 21st April 1927 1927, Report on Steam Reciprocating Engine Machinery for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Electric Fittings for City of Hereford, 4th April 1927 1927, Freeboard Verification Form for Steamers for City of Hereford, 14th March 1927 1927, Copy of Letter from Secretary, to The Secretary, Glasgow, regarding City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 9th March 1927 1927, Copy of Letter from W W, to N Dobson Esq, Glasgow, regarding City of Hereford, 10th March 1927 1927, Letter from N Dobson, regarding City of Hereford, 8th March 1927 1927, Report of Surveys for Freeboard-Steam Ships for City of Hereford, March 1927 1927, Midship Section Plan for City of Hereford, 3rd May 1927 1927, Report of Surveys for Freeboard - Steamers for City of Hereford, 31st January 1931 1931, Report of Surveys for Freeboard for Golden Alpha, 11th May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, 9th October 1953 1953, Copy of Letter from Assistant Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Golden Alpha, 17th March 1959 1959, Report of Total Loss, Casualty, &c for Golden Alpha, 11th March 1959 1959, Question & Answer Memo between London & Kobe Offices, regarding Golden Alpha being Ship Breaking, 26th February 1959 1959, Remarks of the Chief Ship Surveyor, regarding class of Golden Alpha, 6th March 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 17th February 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 23rd February 1959 1959, Report of Ship Surveys & Repairs for Golden Alpha, 23rd February 1959 1959, Copy of Freeboard Report for City of Hereford, Undated no date, Freeboard & Draught Document for City of Hereford, Undated no date, Report of Surveys for Freeboard-Steam Ships for City of Hereford, Undated no date )

A vessel’s means of propulsion.

Propulsion

undefined ( Memo about the Freeboard Report for City of Hereford, 9th December 1925 1925, Profile Plan for City of Hereford, 18th December 1925 1925, Memo to the Chief Ship Surveyor regarding First Entry for Golden Alpha, 20th May 1927 1927, Memo about the Freeboard Report for City of Hereford, 12th April 1927 1927, Copy of Letter from W W, to N Dobson Esq, Glasgow, regarding City of Hereford, 10th March 1927 1927, Letter from N Dobson, regarding City of Hereford, 8th March 1927 1927, Report of Surveys for Freeboard for Golden Alpha, 11th May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, 9th October 1953 1953, Remarks of the Chief Ship Surveyor, regarding class of Golden Alpha, 6th March 1959 1959, Copy of Freeboard Report for City of Hereford, Undated no date, Freeboard & Draught Document for City of Hereford, Undated no date )

Steam ( Freeboard Application for Certificate of Approval for City of Hereford, 25th November 1925 1925, Report of Surveys for Freeboard-Steam Ships for City of Hereford, 8th December 1925 1925, Plan of Forged Ingot Steel Stern Frame & Forged Ingot Steel Rudder for Golden Alpha, December 1925 1925, Request for Special Survey for City of Hereford, 10th February 1926 1926, Freeboard - Application for Certificate of Approval for City of Hereford, 21st December 1926 1926, Steel Steamer Report for City of Hereford, 12th May 1927 1927, Form for Vessels of 100 Tons & Upwards for City of Hereford, 21st April 1927 1927, Report on Steam Reciprocating Engine Machinery for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Electric Fittings for City of Hereford, 4th April 1927 1927, Freeboard Verification Form for Steamers for City of Hereford, 14th March 1927 1927, Copy of Letter from Secretary, to The Secretary, Glasgow, regarding City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 9th March 1927 1927, Report of Surveys for Freeboard-Steam Ships for City of Hereford, March 1927 1927, Midship Section Plan for City of Hereford, 3rd May 1927 1927, Report of Surveys for Freeboard - Steamers for City of Hereford, 31st January 1931 1931, Copy of Letter from Assistant Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Golden Alpha, 17th March 1959 1959, Report of Total Loss, Casualty, &c for Golden Alpha, 11th March 1959 1959, Question & Answer Memo between London & Kobe Offices, regarding Golden Alpha being Ship Breaking, 26th February 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 17th February 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 23rd February 1959 1959, Report of Ship Surveys & Repairs for Golden Alpha, 23rd February 1959 1959, Report of Surveys for Freeboard-Steam Ships for City of Hereford, Undated no date )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Memo about the Freeboard Report for City of Hereford, 9th December 1925 1925, Freeboard Application for Certificate of Approval for City of Hereford, 25th November 1925 1925, Report of Surveys for Freeboard-Steam Ships for City of Hereford, 8th December 1925 1925, Plan of Forged Ingot Steel Stern Frame & Forged Ingot Steel Rudder for Golden Alpha, December 1925 1925, Profile Plan for City of Hereford, 18th December 1925 1925, Request for Special Survey for City of Hereford, 10th February 1926 1926, Freeboard - Application for Certificate of Approval for City of Hereford, 21st December 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry for Golden Alpha, 20th May 1927 1927, Steel Steamer Report for City of Hereford, 12th May 1927 1927, Form for Vessels of 100 Tons & Upwards for City of Hereford, 21st April 1927 1927, Report on Steam Reciprocating Engine Machinery for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Electric Fittings for City of Hereford, 4th April 1927 1927, Freeboard Verification Form for Steamers for City of Hereford, 14th March 1927 1927, Copy of Letter from Secretary, to The Secretary, Glasgow, regarding City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 9th March 1927 1927, Copy of Letter from W W, to N Dobson Esq, Glasgow, regarding City of Hereford, 10th March 1927 1927, Letter from N Dobson, regarding City of Hereford, 8th March 1927 1927, Report of Surveys for Freeboard-Steam Ships for City of Hereford, March 1927 1927, Midship Section Plan for City of Hereford, 3rd May 1927 1927, Report of Surveys for Freeboard - Steamers for City of Hereford, 31st January 1931 1931, Report of Surveys for Freeboard for Golden Alpha, 11th May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, 9th October 1953 1953, Copy of Letter from Assistant Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Golden Alpha, 17th March 1959 1959, Report of Total Loss, Casualty, &c for Golden Alpha, 11th March 1959 1959, Question & Answer Memo between London & Kobe Offices, regarding Golden Alpha being Ship Breaking, 26th February 1959 1959, Remarks of the Chief Ship Surveyor, regarding class of Golden Alpha, 6th March 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 17th February 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 23rd February 1959 1959, Report of Ship Surveys & Repairs for Golden Alpha, 23rd February 1959 1959, Copy of Freeboard Report for City of Hereford, Undated no date, Freeboard & Draught Document for City of Hereford, Undated no date, Report of Surveys for Freeboard-Steam Ships for City of Hereford, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Memo about the Freeboard Report for City of Hereford, 9th December 1925 1925, Freeboard Application for Certificate of Approval for City of Hereford, 25th November 1925 1925, Report of Surveys for Freeboard-Steam Ships for City of Hereford, 8th December 1925 1925, Plan of Forged Ingot Steel Stern Frame & Forged Ingot Steel Rudder for Golden Alpha, December 1925 1925, Profile Plan for City of Hereford, 18th December 1925 1925, Request for Special Survey for City of Hereford, 10th February 1926 1926, Freeboard - Application for Certificate of Approval for City of Hereford, 21st December 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry for Golden Alpha, 20th May 1927 1927, Steel Steamer Report for City of Hereford, 12th May 1927 1927, Form for Vessels of 100 Tons & Upwards for City of Hereford, 21st April 1927 1927, Report on Steam Reciprocating Engine Machinery for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Electric Fittings for City of Hereford, 4th April 1927 1927, Freeboard Verification Form for Steamers for City of Hereford, 14th March 1927 1927, Copy of Letter from Secretary, to The Secretary, Glasgow, regarding City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 9th March 1927 1927, Copy of Letter from W W, to N Dobson Esq, Glasgow, regarding City of Hereford, 10th March 1927 1927, Letter from N Dobson, regarding City of Hereford, 8th March 1927 1927, Report of Surveys for Freeboard-Steam Ships for City of Hereford, March 1927 1927, Midship Section Plan for City of Hereford, 3rd May 1927 1927, Report of Surveys for Freeboard - Steamers for City of Hereford, 31st January 1931 1931, Report of Surveys for Freeboard for Golden Alpha, 11th May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, 9th October 1953 1953, Copy of Letter from Assistant Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Golden Alpha, 17th March 1959 1959, Report of Total Loss, Casualty, &c for Golden Alpha, 11th March 1959 1959, Question & Answer Memo between London & Kobe Offices, regarding Golden Alpha being Ship Breaking, 26th February 1959 1959, Remarks of the Chief Ship Surveyor, regarding class of Golden Alpha, 6th March 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 17th February 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 23rd February 1959 1959, Report of Ship Surveys & Repairs for Golden Alpha, 23rd February 1959 1959, Copy of Freeboard Report for City of Hereford, Undated no date, Freeboard & Draught Document for City of Hereford, Undated no date, Report of Surveys for Freeboard-Steam Ships for City of Hereford, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Memo about the Freeboard Report for City of Hereford, 9th December 1925 1925, Freeboard Application for Certificate of Approval for City of Hereford, 25th November 1925 1925, Report of Surveys for Freeboard-Steam Ships for City of Hereford, 8th December 1925 1925, Plan of Forged Ingot Steel Stern Frame & Forged Ingot Steel Rudder for Golden Alpha, December 1925 1925, Profile Plan for City of Hereford, 18th December 1925 1925, Request for Special Survey for City of Hereford, 10th February 1926 1926, Freeboard - Application for Certificate of Approval for City of Hereford, 21st December 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry for Golden Alpha, 20th May 1927 1927, Steel Steamer Report for City of Hereford, 12th May 1927 1927, Form for Vessels of 100 Tons & Upwards for City of Hereford, 21st April 1927 1927, Report on Steam Reciprocating Engine Machinery for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Electric Fittings for City of Hereford, 4th April 1927 1927, Freeboard Verification Form for Steamers for City of Hereford, 14th March 1927 1927, Copy of Letter from Secretary, to The Secretary, Glasgow, regarding City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 9th March 1927 1927, Copy of Letter from W W, to N Dobson Esq, Glasgow, regarding City of Hereford, 10th March 1927 1927, Letter from N Dobson, regarding City of Hereford, 8th March 1927 1927, Report of Surveys for Freeboard-Steam Ships for City of Hereford, March 1927 1927, Midship Section Plan for City of Hereford, 3rd May 1927 1927, Report of Surveys for Freeboard - Steamers for City of Hereford, 31st January 1931 1931, Report of Surveys for Freeboard for Golden Alpha, 11th May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, 9th October 1953 1953, Copy of Letter from Assistant Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Golden Alpha, 17th March 1959 1959, Report of Total Loss, Casualty, &c for Golden Alpha, 11th March 1959 1959, Question & Answer Memo between London & Kobe Offices, regarding Golden Alpha being Ship Breaking, 26th February 1959 1959, Remarks of the Chief Ship Surveyor, regarding class of Golden Alpha, 6th March 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 17th February 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 23rd February 1959 1959, Report of Ship Surveys & Repairs for Golden Alpha, 23rd February 1959 1959, Copy of Freeboard Report for City of Hereford, Undated no date, Freeboard & Draught Document for City of Hereford, Undated no date, Report of Surveys for Freeboard-Steam Ships for City of Hereford, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Memo about the Freeboard Report for City of Hereford, 9th December 1925 1925, Freeboard Application for Certificate of Approval for City of Hereford, 25th November 1925 1925, Report of Surveys for Freeboard-Steam Ships for City of Hereford, 8th December 1925 1925, Plan of Forged Ingot Steel Stern Frame & Forged Ingot Steel Rudder for Golden Alpha, December 1925 1925, Profile Plan for City of Hereford, 18th December 1925 1925, Request for Special Survey for City of Hereford, 10th February 1926 1926, Freeboard - Application for Certificate of Approval for City of Hereford, 21st December 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry for Golden Alpha, 20th May 1927 1927, Steel Steamer Report for City of Hereford, 12th May 1927 1927, Form for Vessels of 100 Tons & Upwards for City of Hereford, 21st April 1927 1927, Report on Steam Reciprocating Engine Machinery for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Electric Fittings for City of Hereford, 4th April 1927 1927, Freeboard Verification Form for Steamers for City of Hereford, 14th March 1927 1927, Copy of Letter from Secretary, to The Secretary, Glasgow, regarding City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 9th March 1927 1927, Copy of Letter from W W, to N Dobson Esq, Glasgow, regarding City of Hereford, 10th March 1927 1927, Letter from N Dobson, regarding City of Hereford, 8th March 1927 1927, Report of Surveys for Freeboard-Steam Ships for City of Hereford, March 1927 1927, Midship Section Plan for City of Hereford, 3rd May 1927 1927, Report of Surveys for Freeboard - Steamers for City of Hereford, 31st January 1931 1931, Report of Surveys for Freeboard for Golden Alpha, 11th May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, 9th October 1953 1953, Copy of Letter from Assistant Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Golden Alpha, 17th March 1959 1959, Report of Total Loss, Casualty, &c for Golden Alpha, 11th March 1959 1959, Question & Answer Memo between London & Kobe Offices, regarding Golden Alpha being Ship Breaking, 26th February 1959 1959, Remarks of the Chief Ship Surveyor, regarding class of Golden Alpha, 6th March 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 17th February 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 23rd February 1959 1959, Report of Ship Surveys & Repairs for Golden Alpha, 23rd February 1959 1959, Copy of Freeboard Report for City of Hereford, Undated no date, Freeboard & Draught Document for City of Hereford, Undated no date, Report of Surveys for Freeboard-Steam Ships for City of Hereford, Undated no date )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sold to Sakaguchi Kosan KK for Breaking up at Sakai City ( Memo about the Freeboard Report for City of Hereford, 9th December 1925 1925, Freeboard Application for Certificate of Approval for City of Hereford, 25th November 1925 1925, Report of Surveys for Freeboard-Steam Ships for City of Hereford, 8th December 1925 1925, Plan of Forged Ingot Steel Stern Frame & Forged Ingot Steel Rudder for Golden Alpha, December 1925 1925, Profile Plan for City of Hereford, 18th December 1925 1925, Request for Special Survey for City of Hereford, 10th February 1926 1926, Freeboard - Application for Certificate of Approval for City of Hereford, 21st December 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry for Golden Alpha, 20th May 1927 1927, Steel Steamer Report for City of Hereford, 12th May 1927 1927, Form for Vessels of 100 Tons & Upwards for City of Hereford, 21st April 1927 1927, Report on Steam Reciprocating Engine Machinery for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Electric Fittings for City of Hereford, 4th April 1927 1927, Freeboard Verification Form for Steamers for City of Hereford, 14th March 1927 1927, Copy of Letter from Secretary, to The Secretary, Glasgow, regarding City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 9th March 1927 1927, Copy of Letter from W W, to N Dobson Esq, Glasgow, regarding City of Hereford, 10th March 1927 1927, Letter from N Dobson, regarding City of Hereford, 8th March 1927 1927, Report of Surveys for Freeboard-Steam Ships for City of Hereford, March 1927 1927, Midship Section Plan for City of Hereford, 3rd May 1927 1927, Report of Surveys for Freeboard - Steamers for City of Hereford, 31st January 1931 1931, Report of Surveys for Freeboard for Golden Alpha, 11th May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, 9th October 1953 1953, Copy of Letter from Assistant Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Golden Alpha, 17th March 1959 1959, Report of Total Loss, Casualty, &c for Golden Alpha, 11th March 1959 1959, Question & Answer Memo between London & Kobe Offices, regarding Golden Alpha being Ship Breaking, 26th February 1959 1959, Remarks of the Chief Ship Surveyor, regarding class of Golden Alpha, 6th March 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 17th February 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 23rd February 1959 1959, Report of Ship Surveys & Repairs for Golden Alpha, 23rd February 1959 1959, Copy of Freeboard Report for City of Hereford, Undated no date, Freeboard & Draught Document for City of Hereford, Undated no date, Report of Surveys for Freeboard-Steam Ships for City of Hereford, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Glasgow ( Report of Surveys for Freeboard-Steam Ships for City of Hereford, 8th December 1925 1925, Request for Special Survey for City of Hereford, 10th February 1926 1926, Steel Steamer Report for City of Hereford, 12th May 1927 1927, Report on Steam Reciprocating Engine Machinery for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Electric Fittings for City of Hereford, 4th April 1927 1927, Freeboard Verification Form for Steamers for City of Hereford, 14th March 1927 1927, Letter from N Dobson, regarding City of Hereford, 8th March 1927 1927, Report of Surveys for Freeboard-Steam Ships for City of Hereford, March 1927 1927, Report of Surveys for Freeboard-Steam Ships for City of Hereford, Undated no date )

Whiteinch Glasgow ( Plan of Forged Ingot Steel Stern Frame & Forged Ingot Steel Rudder for Golden Alpha, December 1925 1925, Profile Plan for City of Hereford, 18th December 1925 1925, Midship Section Plan for City of Hereford, 3rd May 1927 1927 )

Liverpool ( Form for Vessels of 100 Tons & Upwards for City of Hereford, 21st April 1927 1927, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, 9th October 1953 1953 )

London ( Copy of Letter from Secretary, to The Secretary, Glasgow, regarding City of Hereford, 12th April 1927 1927, Copy of Letter from Assistant Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Golden Alpha, 17th March 1959 1959 )

Manchester ( Report of Surveys for Freeboard for Golden Alpha, 11th May 1932 1932 )

London; Kobe ( Question & Answer Memo between London & Kobe Offices, regarding Golden Alpha being Ship Breaking, 26th February 1959 1959 )

Kobe ( Copy of Certificate of Survey of Damage for Golden Alpha, 17th February 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 23rd February 1959 1959, Report of Ship Surveys & Repairs for Golden Alpha, 23rd February 1959 1959 )

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Type and configuration of the engine(s) supplied for a vessel.

The year in which a vessel’s construction is completed.

Year of ship completion

1927 ( Memo about the Freeboard Report for City of Hereford, 9th December 1925 1925, Freeboard Application for Certificate of Approval for City of Hereford, 25th November 1925 1925, Report of Surveys for Freeboard-Steam Ships for City of Hereford, 8th December 1925 1925, Plan of Forged Ingot Steel Stern Frame & Forged Ingot Steel Rudder for Golden Alpha, December 1925 1925, Profile Plan for City of Hereford, 18th December 1925 1925, Request for Special Survey for City of Hereford, 10th February 1926 1926, Freeboard - Application for Certificate of Approval for City of Hereford, 21st December 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry for Golden Alpha, 20th May 1927 1927, Steel Steamer Report for City of Hereford, 12th May 1927 1927, Form for Vessels of 100 Tons & Upwards for City of Hereford, 21st April 1927 1927, Report on Steam Reciprocating Engine Machinery for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Electric Fittings for City of Hereford, 4th April 1927 1927, Freeboard Verification Form for Steamers for City of Hereford, 14th March 1927 1927, Copy of Letter from Secretary, to The Secretary, Glasgow, regarding City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 9th March 1927 1927, Copy of Letter from W W, to N Dobson Esq, Glasgow, regarding City of Hereford, 10th March 1927 1927, Letter from N Dobson, regarding City of Hereford, 8th March 1927 1927, Report of Surveys for Freeboard-Steam Ships for City of Hereford, March 1927 1927, Midship Section Plan for City of Hereford, 3rd May 1927 1927, Report of Surveys for Freeboard - Steamers for City of Hereford, 31st January 1931 1931, Report of Surveys for Freeboard for Golden Alpha, 11th May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, 9th October 1953 1953, Copy of Letter from Assistant Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Golden Alpha, 17th March 1959 1959, Report of Total Loss, Casualty, &c for Golden Alpha, 11th March 1959 1959, Question & Answer Memo between London & Kobe Offices, regarding Golden Alpha being Ship Breaking, 26th February 1959 1959, Remarks of the Chief Ship Surveyor, regarding class of Golden Alpha, 6th March 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 17th February 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 23rd February 1959 1959, Report of Ship Surveys & Repairs for Golden Alpha, 23rd February 1959 1959, Copy of Freeboard Report for City of Hereford, Undated no date, Freeboard & Draught Document for City of Hereford, Undated no date, Report of Surveys for Freeboard-Steam Ships for City of Hereford, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Barclay, Curle & Co Ltd ( Memo about the Freeboard Report for City of Hereford, 9th December 1925 1925, Freeboard Application for Certificate of Approval for City of Hereford, 25th November 1925 1925, Report of Surveys for Freeboard-Steam Ships for City of Hereford, 8th December 1925 1925, Plan of Forged Ingot Steel Stern Frame & Forged Ingot Steel Rudder for Golden Alpha, December 1925 1925, Profile Plan for City of Hereford, 18th December 1925 1925, Request for Special Survey for City of Hereford, 10th February 1926 1926, Freeboard - Application for Certificate of Approval for City of Hereford, 21st December 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry for Golden Alpha, 20th May 1927 1927, Steel Steamer Report for City of Hereford, 12th May 1927 1927, Form for Vessels of 100 Tons & Upwards for City of Hereford, 21st April 1927 1927, Report on Steam Reciprocating Engine Machinery for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Electric Fittings for City of Hereford, 4th April 1927 1927, Freeboard Verification Form for Steamers for City of Hereford, 14th March 1927 1927, Copy of Letter from Secretary, to The Secretary, Glasgow, regarding City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 9th March 1927 1927, Copy of Letter from W W, to N Dobson Esq, Glasgow, regarding City of Hereford, 10th March 1927 1927, Letter from N Dobson, regarding City of Hereford, 8th March 1927 1927, Report of Surveys for Freeboard-Steam Ships for City of Hereford, March 1927 1927, Midship Section Plan for City of Hereford, 3rd May 1927 1927, Report of Surveys for Freeboard - Steamers for City of Hereford, 31st January 1931 1931, Report of Surveys for Freeboard for Golden Alpha, 11th May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, 9th October 1953 1953, Copy of Letter from Assistant Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Golden Alpha, 17th March 1959 1959, Report of Total Loss, Casualty, &c for Golden Alpha, 11th March 1959 1959, Question & Answer Memo between London & Kobe Offices, regarding Golden Alpha being Ship Breaking, 26th February 1959 1959, Remarks of the Chief Ship Surveyor, regarding class of Golden Alpha, 6th March 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 17th February 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 23rd February 1959 1959, Report of Ship Surveys & Repairs for Golden Alpha, 23rd February 1959 1959, Copy of Freeboard Report for City of Hereford, Undated no date, Freeboard & Draught Document for City of Hereford, Undated no date, Report of Surveys for Freeboard-Steam Ships for City of Hereford, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Scotstoun ( Memo about the Freeboard Report for City of Hereford, 9th December 1925 1925, Freeboard Application for Certificate of Approval for City of Hereford, 25th November 1925 1925, Report of Surveys for Freeboard-Steam Ships for City of Hereford, 8th December 1925 1925, Plan of Forged Ingot Steel Stern Frame & Forged Ingot Steel Rudder for Golden Alpha, December 1925 1925, Profile Plan for City of Hereford, 18th December 1925 1925, Request for Special Survey for City of Hereford, 10th February 1926 1926, Freeboard - Application for Certificate of Approval for City of Hereford, 21st December 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry for Golden Alpha, 20th May 1927 1927, Steel Steamer Report for City of Hereford, 12th May 1927 1927, Form for Vessels of 100 Tons & Upwards for City of Hereford, 21st April 1927 1927, Report on Steam Reciprocating Engine Machinery for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Electric Fittings for City of Hereford, 4th April 1927 1927, Freeboard Verification Form for Steamers for City of Hereford, 14th March 1927 1927, Copy of Letter from Secretary, to The Secretary, Glasgow, regarding City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 9th March 1927 1927, Copy of Letter from W W, to N Dobson Esq, Glasgow, regarding City of Hereford, 10th March 1927 1927, Letter from N Dobson, regarding City of Hereford, 8th March 1927 1927, Report of Surveys for Freeboard-Steam Ships for City of Hereford, March 1927 1927, Midship Section Plan for City of Hereford, 3rd May 1927 1927, Report of Surveys for Freeboard - Steamers for City of Hereford, 31st January 1931 1931, Report of Surveys for Freeboard for Golden Alpha, 11th May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, 9th October 1953 1953, Copy of Letter from Assistant Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Golden Alpha, 17th March 1959 1959, Report of Total Loss, Casualty, &c for Golden Alpha, 11th March 1959 1959, Question & Answer Memo between London & Kobe Offices, regarding Golden Alpha being Ship Breaking, 26th February 1959 1959, Remarks of the Chief Ship Surveyor, regarding class of Golden Alpha, 6th March 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 17th February 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 23rd February 1959 1959, Report of Ship Surveys & Repairs for Golden Alpha, 23rd February 1959 1959, Copy of Freeboard Report for City of Hereford, Undated no date, Freeboard & Draught Document for City of Hereford, Undated no date, Report of Surveys for Freeboard-Steam Ships for City of Hereford, Undated no date )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Memo about the Freeboard Report for City of Hereford, 9th December 1925 1925, Freeboard Application for Certificate of Approval for City of Hereford, 25th November 1925 1925, Report of Surveys for Freeboard-Steam Ships for City of Hereford, 8th December 1925 1925, Plan of Forged Ingot Steel Stern Frame & Forged Ingot Steel Rudder for Golden Alpha, December 1925 1925, Profile Plan for City of Hereford, 18th December 1925 1925, Request for Special Survey for City of Hereford, 10th February 1926 1926, Freeboard - Application for Certificate of Approval for City of Hereford, 21st December 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry for Golden Alpha, 20th May 1927 1927, Steel Steamer Report for City of Hereford, 12th May 1927 1927, Form for Vessels of 100 Tons & Upwards for City of Hereford, 21st April 1927 1927, Report on Steam Reciprocating Engine Machinery for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Electric Fittings for City of Hereford, 4th April 1927 1927, Freeboard Verification Form for Steamers for City of Hereford, 14th March 1927 1927, Copy of Letter from Secretary, to The Secretary, Glasgow, regarding City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 9th March 1927 1927, Copy of Letter from W W, to N Dobson Esq, Glasgow, regarding City of Hereford, 10th March 1927 1927, Letter from N Dobson, regarding City of Hereford, 8th March 1927 1927, Report of Surveys for Freeboard-Steam Ships for City of Hereford, March 1927 1927, Midship Section Plan for City of Hereford, 3rd May 1927 1927, Report of Surveys for Freeboard - Steamers for City of Hereford, 31st January 1931 1931, Report of Surveys for Freeboard for Golden Alpha, 11th May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, 9th October 1953 1953, Copy of Letter from Assistant Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Golden Alpha, 17th March 1959 1959, Report of Total Loss, Casualty, &c for Golden Alpha, 11th March 1959 1959, Question & Answer Memo between London & Kobe Offices, regarding Golden Alpha being Ship Breaking, 26th February 1959 1959, Remarks of the Chief Ship Surveyor, regarding class of Golden Alpha, 6th March 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 17th February 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 23rd February 1959 1959, Report of Ship Surveys & Repairs for Golden Alpha, 23rd February 1959 1959, Copy of Freeboard Report for City of Hereford, Undated no date, Freeboard & Draught Document for City of Hereford, Undated no date, Report of Surveys for Freeboard-Steam Ships for City of Hereford, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Memo about the Freeboard Report for City of Hereford, 9th December 1925 1925, Freeboard Application for Certificate of Approval for City of Hereford, 25th November 1925 1925, Report of Surveys for Freeboard-Steam Ships for City of Hereford, 8th December 1925 1925, Plan of Forged Ingot Steel Stern Frame & Forged Ingot Steel Rudder for Golden Alpha, December 1925 1925, Profile Plan for City of Hereford, 18th December 1925 1925, Request for Special Survey for City of Hereford, 10th February 1926 1926, Freeboard - Application for Certificate of Approval for City of Hereford, 21st December 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry for Golden Alpha, 20th May 1927 1927, Steel Steamer Report for City of Hereford, 12th May 1927 1927, Form for Vessels of 100 Tons & Upwards for City of Hereford, 21st April 1927 1927, Report on Steam Reciprocating Engine Machinery for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Electric Fittings for City of Hereford, 4th April 1927 1927, Freeboard Verification Form for Steamers for City of Hereford, 14th March 1927 1927, Copy of Letter from Secretary, to The Secretary, Glasgow, regarding City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 9th March 1927 1927, Copy of Letter from W W, to N Dobson Esq, Glasgow, regarding City of Hereford, 10th March 1927 1927, Letter from N Dobson, regarding City of Hereford, 8th March 1927 1927, Report of Surveys for Freeboard-Steam Ships for City of Hereford, March 1927 1927, Midship Section Plan for City of Hereford, 3rd May 1927 1927, Report of Surveys for Freeboard - Steamers for City of Hereford, 31st January 1931 1931, Report of Surveys for Freeboard for Golden Alpha, 11th May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, 9th October 1953 1953, Copy of Letter from Assistant Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Golden Alpha, 17th March 1959 1959, Report of Total Loss, Casualty, &c for Golden Alpha, 11th March 1959 1959, Question & Answer Memo between London & Kobe Offices, regarding Golden Alpha being Ship Breaking, 26th February 1959 1959, Remarks of the Chief Ship Surveyor, regarding class of Golden Alpha, 6th March 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 17th February 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 23rd February 1959 1959, Report of Ship Surveys & Repairs for Golden Alpha, 23rd February 1959 1959, Copy of Freeboard Report for City of Hereford, Undated no date, Freeboard & Draught Document for City of Hereford, Undated no date, Report of Surveys for Freeboard-Steam Ships for City of Hereford, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Memo about the Freeboard Report for City of Hereford, 9th December 1925 1925, Freeboard Application for Certificate of Approval for City of Hereford, 25th November 1925 1925, Report of Surveys for Freeboard-Steam Ships for City of Hereford, 8th December 1925 1925, Plan of Forged Ingot Steel Stern Frame & Forged Ingot Steel Rudder for Golden Alpha, December 1925 1925, Profile Plan for City of Hereford, 18th December 1925 1925, Request for Special Survey for City of Hereford, 10th February 1926 1926, Freeboard - Application for Certificate of Approval for City of Hereford, 21st December 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry for Golden Alpha, 20th May 1927 1927, Steel Steamer Report for City of Hereford, 12th May 1927 1927, Form for Vessels of 100 Tons & Upwards for City of Hereford, 21st April 1927 1927, Report on Steam Reciprocating Engine Machinery for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Electric Fittings for City of Hereford, 4th April 1927 1927, Freeboard Verification Form for Steamers for City of Hereford, 14th March 1927 1927, Copy of Letter from Secretary, to The Secretary, Glasgow, regarding City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 9th March 1927 1927, Copy of Letter from W W, to N Dobson Esq, Glasgow, regarding City of Hereford, 10th March 1927 1927, Letter from N Dobson, regarding City of Hereford, 8th March 1927 1927, Report of Surveys for Freeboard-Steam Ships for City of Hereford, March 1927 1927, Midship Section Plan for City of Hereford, 3rd May 1927 1927, Report of Surveys for Freeboard - Steamers for City of Hereford, 31st January 1931 1931, Report of Surveys for Freeboard for Golden Alpha, 11th May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, 9th October 1953 1953, Copy of Letter from Assistant Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Golden Alpha, 17th March 1959 1959, Report of Total Loss, Casualty, &c for Golden Alpha, 11th March 1959 1959, Question & Answer Memo between London & Kobe Offices, regarding Golden Alpha being Ship Breaking, 26th February 1959 1959, Remarks of the Chief Ship Surveyor, regarding class of Golden Alpha, 6th March 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 17th February 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 23rd February 1959 1959, Report of Ship Surveys & Repairs for Golden Alpha, 23rd February 1959 1959, Copy of Freeboard Report for City of Hereford, Undated no date, Freeboard & Draught Document for City of Hereford, Undated no date, Report of Surveys for Freeboard-Steam Ships for City of Hereford, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Memo about the Freeboard Report for City of Hereford, 9th December 1925 1925, Freeboard Application for Certificate of Approval for City of Hereford, 25th November 1925 1925, Report of Surveys for Freeboard-Steam Ships for City of Hereford, 8th December 1925 1925, Plan of Forged Ingot Steel Stern Frame & Forged Ingot Steel Rudder for Golden Alpha, December 1925 1925, Profile Plan for City of Hereford, 18th December 1925 1925, Request for Special Survey for City of Hereford, 10th February 1926 1926, Freeboard - Application for Certificate of Approval for City of Hereford, 21st December 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry for Golden Alpha, 20th May 1927 1927, Steel Steamer Report for City of Hereford, 12th May 1927 1927, Form for Vessels of 100 Tons & Upwards for City of Hereford, 21st April 1927 1927, Report on Steam Reciprocating Engine Machinery for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Electric Fittings for City of Hereford, 4th April 1927 1927, Freeboard Verification Form for Steamers for City of Hereford, 14th March 1927 1927, Copy of Letter from Secretary, to The Secretary, Glasgow, regarding City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 9th March 1927 1927, Copy of Letter from W W, to N Dobson Esq, Glasgow, regarding City of Hereford, 10th March 1927 1927, Letter from N Dobson, regarding City of Hereford, 8th March 1927 1927, Report of Surveys for Freeboard-Steam Ships for City of Hereford, March 1927 1927, Midship Section Plan for City of Hereford, 3rd May 1927 1927, Report of Surveys for Freeboard - Steamers for City of Hereford, 31st January 1931 1931, Report of Surveys for Freeboard for Golden Alpha, 11th May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, 9th October 1953 1953, Copy of Letter from Assistant Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Golden Alpha, 17th March 1959 1959, Report of Total Loss, Casualty, &c for Golden Alpha, 11th March 1959 1959, Question & Answer Memo between London & Kobe Offices, regarding Golden Alpha being Ship Breaking, 26th February 1959 1959, Remarks of the Chief Ship Surveyor, regarding class of Golden Alpha, 6th March 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 17th February 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 23rd February 1959 1959, Report of Ship Surveys & Repairs for Golden Alpha, 23rd February 1959 1959, Copy of Freeboard Report for City of Hereford, Undated no date, Freeboard & Draught Document for City of Hereford, Undated no date, Report of Surveys for Freeboard-Steam Ships for City of Hereford, Undated no date )

The official record pronounced by the Committee

Loss or disposal

To be broken up ( Memo about the Freeboard Report for City of Hereford, 9th December 1925 1925, Freeboard Application for Certificate of Approval for City of Hereford, 25th November 1925 1925, Report of Surveys for Freeboard-Steam Ships for City of Hereford, 8th December 1925 1925, Plan of Forged Ingot Steel Stern Frame & Forged Ingot Steel Rudder for Golden Alpha, December 1925 1925, Profile Plan for City of Hereford, 18th December 1925 1925, Request for Special Survey for City of Hereford, 10th February 1926 1926, Freeboard - Application for Certificate of Approval for City of Hereford, 21st December 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry for Golden Alpha, 20th May 1927 1927, Steel Steamer Report for City of Hereford, 12th May 1927 1927, Form for Vessels of 100 Tons & Upwards for City of Hereford, 21st April 1927 1927, Report on Steam Reciprocating Engine Machinery for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Electric Fittings for City of Hereford, 4th April 1927 1927, Freeboard Verification Form for Steamers for City of Hereford, 14th March 1927 1927, Copy of Letter from Secretary, to The Secretary, Glasgow, regarding City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 9th March 1927 1927, Copy of Letter from W W, to N Dobson Esq, Glasgow, regarding City of Hereford, 10th March 1927 1927, Letter from N Dobson, regarding City of Hereford, 8th March 1927 1927, Report of Surveys for Freeboard-Steam Ships for City of Hereford, March 1927 1927, Midship Section Plan for City of Hereford, 3rd May 1927 1927, Report of Surveys for Freeboard - Steamers for City of Hereford, 31st January 1931 1931, Report of Surveys for Freeboard for Golden Alpha, 11th May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, 9th October 1953 1953, Copy of Letter from Assistant Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Golden Alpha, 17th March 1959 1959, Report of Total Loss, Casualty, &c for Golden Alpha, 11th March 1959 1959, Question & Answer Memo between London & Kobe Offices, regarding Golden Alpha being Ship Breaking, 26th February 1959 1959, Remarks of the Chief Ship Surveyor, regarding class of Golden Alpha, 6th March 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 17th February 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 23rd February 1959 1959, Report of Ship Surveys & Repairs for Golden Alpha, 23rd February 1959 1959, Copy of Freeboard Report for City of Hereford, Undated no date, Freeboard & Draught Document for City of Hereford, Undated no date, Report of Surveys for Freeboard-Steam Ships for City of Hereford, Undated no date )

Vessel’s place of loss or disposal/last known recorded location.

Place of ship loss

Sakai City ( Memo about the Freeboard Report for City of Hereford, 9th December 1925 1925, Freeboard Application for Certificate of Approval for City of Hereford, 25th November 1925 1925, Report of Surveys for Freeboard-Steam Ships for City of Hereford, 8th December 1925 1925, Plan of Forged Ingot Steel Stern Frame & Forged Ingot Steel Rudder for Golden Alpha, December 1925 1925, Profile Plan for City of Hereford, 18th December 1925 1925, Request for Special Survey for City of Hereford, 10th February 1926 1926, Freeboard - Application for Certificate of Approval for City of Hereford, 21st December 1926 1926, Memo to the Chief Ship Surveyor regarding First Entry for Golden Alpha, 20th May 1927 1927, Steel Steamer Report for City of Hereford, 12th May 1927 1927, Form for Vessels of 100 Tons & Upwards for City of Hereford, 21st April 1927 1927, Report on Steam Reciprocating Engine Machinery for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Boilers for City of Hereford, 4th May 1927 1927, Report on Electric Fittings for City of Hereford, 4th April 1927 1927, Freeboard Verification Form for Steamers for City of Hereford, 14th March 1927 1927, Copy of Letter from Secretary, to The Secretary, Glasgow, regarding City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 12th April 1927 1927, Memo about the Freeboard Report for City of Hereford, 9th March 1927 1927, Copy of Letter from W W, to N Dobson Esq, Glasgow, regarding City of Hereford, 10th March 1927 1927, Letter from N Dobson, regarding City of Hereford, 8th March 1927 1927, Report of Surveys for Freeboard-Steam Ships for City of Hereford, March 1927 1927, Midship Section Plan for City of Hereford, 3rd May 1927 1927, Report of Surveys for Freeboard - Steamers for City of Hereford, 31st January 1931 1931, Report of Surveys for Freeboard for Golden Alpha, 11th May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, May 1932 1932, Report C. 11 continued, memorandum of alterations since ship surveyed for assignment of load lines for City of Hereford, 9th October 1953 1953, Copy of Letter from Assistant Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Golden Alpha, 17th March 1959 1959, Report of Total Loss, Casualty, &c for Golden Alpha, 11th March 1959 1959, Question & Answer Memo between London & Kobe Offices, regarding Golden Alpha being Ship Breaking, 26th February 1959 1959, Remarks of the Chief Ship Surveyor, regarding class of Golden Alpha, 6th March 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 17th February 1959 1959, Copy of Certificate of Survey of Damage for Golden Alpha, 23rd February 1959 1959, Report of Ship Surveys & Repairs for Golden Alpha, 23rd February 1959 1959, Copy of Freeboard Report for City of Hereford, Undated no date, Freeboard & Draught Document for City of Hereford, Undated no date, Report of Surveys for Freeboard-Steam Ships for City of Hereford, Undated no date )

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

Physical arrangement of a ship’s masts, sails and rigging.

The listed port to which a given vessel belongs.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.