Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Bramhill ( Midship Section Plan for Bramhill, 20th December 1922 1922, Profile & Deck Plan for Bramhill, 9th July 1923 1923, Copy of Freeboard Report for Bramhill, Undated no date )
Gwentland ( Freeboard - Application for Certificate of Approval for Gwentland, 21st December 1922 1922, Plan of Rudder for Gwentland, 28th February 1923 1923, Letter from T Shaw, to the Secretary, London, regarding Gwentland, 24th July 1923 1923, Copy of Letter from Secretary, to the Surveyors, Sunderland, regarding Gwentland, 23rd July 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Gwentland, 23rd July 1923 1923, Steel Steamer Report for Gwentland, 17th July 1923 1923, Request for Special Survey for Gwentland, 27th January 1923 1923, Form for Vessels of 100 Tons & Upwards for Gwentland, 10th July 1923 1923, Request for Special Survey for Gwentland, 30th January 1923 1923, Report on Machinery for Gwentland, 13th July 1923 1923, Report on Boilers for Gwentland, 5th April 1923 1923, Report on Electric Fittings for Gwentland, 1923 1923, Freeboard Verification Form for Steamers for Gwentland, 6th July 1923 1923, Memo about the Freeboard Report for Gwentland, 26th June 1923 1923, Report of Surveys for Freeboard - Steam Ships; Verification for Gwentland, 22nd June 1923 1923, Report of Surveys for Freeboard - Steam Ships for Gwentland, 19th September 1932 1932, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Gwentland, Undated no date, Freeboard & Draught Document for Gwentland, Undated no date )
Slemish ( Report of Surveys for Freeboard for Slemish, 19th September 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 31st July 1952 1952, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 3rd March 1954 1954, Report of Total Loss, Casualty, &c for Slemish, 10th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Letter from H C Murray, per the Surveyors, to the Secretary, London, regarding Slemish, 12th January 1956 1956, Report of Survey for Repairs, &c for Slemish, 22nd May 1956 1956, Memo for Slemish, 14th June 1956 1956, Copy of Certificate of Survey of Damage for Slemish, 25th May 1956 1956, Copy of Certificate of Survey of Boiler & Machinery for Slemish, 25th May 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Slemish, 22nd May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slemish, 11th June 1956 1956, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, London Outdoor Staff, regarding Slemish, 24th May 1956 1956 )
The process of transferring a vessel to water, but not necessarily her completion.
14/06/1923 ( Midship Section Plan for Bramhill, 20th December 1922 1922, Freeboard - Application for Certificate of Approval for Gwentland, 21st December 1922 1922, Plan of Rudder for Gwentland, 28th February 1923 1923, Profile & Deck Plan for Bramhill, 9th July 1923 1923, Letter from T Shaw, to the Secretary, London, regarding Gwentland, 24th July 1923 1923, Copy of Letter from Secretary, to the Surveyors, Sunderland, regarding Gwentland, 23rd July 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Gwentland, 23rd July 1923 1923, Steel Steamer Report for Gwentland, 17th July 1923 1923, Request for Special Survey for Gwentland, 27th January 1923 1923, Form for Vessels of 100 Tons & Upwards for Gwentland, 10th July 1923 1923, Request for Special Survey for Gwentland, 30th January 1923 1923, Report on Machinery for Gwentland, 13th July 1923 1923, Report on Boilers for Gwentland, 5th April 1923 1923, Report on Electric Fittings for Gwentland, 1923 1923, Freeboard Verification Form for Steamers for Gwentland, 6th July 1923 1923, Memo about the Freeboard Report for Gwentland, 26th June 1923 1923, Report of Surveys for Freeboard - Steam Ships; Verification for Gwentland, 22nd June 1923 1923, Report of Surveys for Freeboard - Steam Ships for Gwentland, 19th September 1932 1932, Report of Surveys for Freeboard for Slemish, 19th September 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 31st July 1952 1952, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 3rd March 1954 1954, Report of Total Loss, Casualty, &c for Slemish, 10th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Letter from H C Murray, per the Surveyors, to the Secretary, London, regarding Slemish, 12th January 1956 1956, Report of Survey for Repairs, &c for Slemish, 22nd May 1956 1956, Memo for Slemish, 14th June 1956 1956, Copy of Certificate of Survey of Damage for Slemish, 25th May 1956 1956, Copy of Certificate of Survey of Boiler & Machinery for Slemish, 25th May 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Slemish, 22nd May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slemish, 11th June 1956 1956, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, London Outdoor Staff, regarding Slemish, 24th May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Gwentland, Undated no date, Freeboard & Draught Document for Gwentland, Undated no date, Copy of Freeboard Report for Bramhill, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
319 ( Midship Section Plan for Bramhill, 20th December 1922 1922, Freeboard - Application for Certificate of Approval for Gwentland, 21st December 1922 1922, Plan of Rudder for Gwentland, 28th February 1923 1923, Profile & Deck Plan for Bramhill, 9th July 1923 1923, Letter from T Shaw, to the Secretary, London, regarding Gwentland, 24th July 1923 1923, Copy of Letter from Secretary, to the Surveyors, Sunderland, regarding Gwentland, 23rd July 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Gwentland, 23rd July 1923 1923, Steel Steamer Report for Gwentland, 17th July 1923 1923, Request for Special Survey for Gwentland, 27th January 1923 1923, Form for Vessels of 100 Tons & Upwards for Gwentland, 10th July 1923 1923, Request for Special Survey for Gwentland, 30th January 1923 1923, Report on Machinery for Gwentland, 13th July 1923 1923, Report on Boilers for Gwentland, 5th April 1923 1923, Report on Electric Fittings for Gwentland, 1923 1923, Freeboard Verification Form for Steamers for Gwentland, 6th July 1923 1923, Memo about the Freeboard Report for Gwentland, 26th June 1923 1923, Report of Surveys for Freeboard - Steam Ships; Verification for Gwentland, 22nd June 1923 1923, Report of Surveys for Freeboard - Steam Ships for Gwentland, 19th September 1932 1932, Report of Surveys for Freeboard for Slemish, 19th September 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 31st July 1952 1952, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 3rd March 1954 1954, Report of Total Loss, Casualty, &c for Slemish, 10th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Letter from H C Murray, per the Surveyors, to the Secretary, London, regarding Slemish, 12th January 1956 1956, Report of Survey for Repairs, &c for Slemish, 22nd May 1956 1956, Memo for Slemish, 14th June 1956 1956, Copy of Certificate of Survey of Damage for Slemish, 25th May 1956 1956, Copy of Certificate of Survey of Boiler & Machinery for Slemish, 25th May 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Slemish, 22nd May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slemish, 11th June 1956 1956, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, London Outdoor Staff, regarding Slemish, 24th May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Gwentland, Undated no date, Freeboard & Draught Document for Gwentland, Undated no date, Copy of Freeboard Report for Bramhill, Undated no date )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Midship Section Plan for Bramhill, 20th December 1922 1922, Freeboard - Application for Certificate of Approval for Gwentland, 21st December 1922 1922, Plan of Rudder for Gwentland, 28th February 1923 1923, Profile & Deck Plan for Bramhill, 9th July 1923 1923, Letter from T Shaw, to the Secretary, London, regarding Gwentland, 24th July 1923 1923, Copy of Letter from Secretary, to the Surveyors, Sunderland, regarding Gwentland, 23rd July 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Gwentland, 23rd July 1923 1923, Request for Special Survey for Gwentland, 30th January 1923 1923, Report on Machinery for Gwentland, 13th July 1923 1923, Report on Boilers for Gwentland, 5th April 1923 1923, Report on Electric Fittings for Gwentland, 1923 1923, Freeboard Verification Form for Steamers for Gwentland, 6th July 1923 1923, Memo about the Freeboard Report for Gwentland, 26th June 1923 1923, Report of Surveys for Freeboard - Steam Ships; Verification for Gwentland, 22nd June 1923 1923, Report of Surveys for Freeboard - Steam Ships for Gwentland, 19th September 1932 1932, Report of Surveys for Freeboard for Slemish, 19th September 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 31st July 1952 1952, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 3rd March 1954 1954, Report of Total Loss, Casualty, &c for Slemish, 10th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Letter from H C Murray, per the Surveyors, to the Secretary, London, regarding Slemish, 12th January 1956 1956, Report of Survey for Repairs, &c for Slemish, 22nd May 1956 1956, Memo for Slemish, 14th June 1956 1956, Copy of Certificate of Survey of Damage for Slemish, 25th May 1956 1956, Copy of Certificate of Survey of Boiler & Machinery for Slemish, 25th May 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Slemish, 22nd May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slemish, 11th June 1956 1956, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, London Outdoor Staff, regarding Slemish, 24th May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Gwentland, Undated no date, Freeboard & Draught Document for Gwentland, Undated no date, Copy of Freeboard Report for Bramhill, Undated no date )
Screw Steamer ( Steel Steamer Report for Gwentland, 17th July 1923 1923, Request for Special Survey for Gwentland, 27th January 1923 1923 )
Cargo ( Form for Vessels of 100 Tons & Upwards for Gwentland, 10th July 1923 1923 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Midship Section Plan for Bramhill, 20th December 1922 1922, Freeboard - Application for Certificate of Approval for Gwentland, 21st December 1922 1922, Plan of Rudder for Gwentland, 28th February 1923 1923, Profile & Deck Plan for Bramhill, 9th July 1923 1923, Letter from T Shaw, to the Secretary, London, regarding Gwentland, 24th July 1923 1923, Copy of Letter from Secretary, to the Surveyors, Sunderland, regarding Gwentland, 23rd July 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Gwentland, 23rd July 1923 1923, Steel Steamer Report for Gwentland, 17th July 1923 1923, Request for Special Survey for Gwentland, 27th January 1923 1923, Form for Vessels of 100 Tons & Upwards for Gwentland, 10th July 1923 1923, Request for Special Survey for Gwentland, 30th January 1923 1923, Report on Machinery for Gwentland, 13th July 1923 1923, Report on Boilers for Gwentland, 5th April 1923 1923, Report on Electric Fittings for Gwentland, 1923 1923, Freeboard Verification Form for Steamers for Gwentland, 6th July 1923 1923, Memo about the Freeboard Report for Gwentland, 26th June 1923 1923, Report of Surveys for Freeboard - Steam Ships; Verification for Gwentland, 22nd June 1923 1923, Report of Surveys for Freeboard - Steam Ships for Gwentland, 19th September 1932 1932, Report of Surveys for Freeboard for Slemish, 19th September 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 31st July 1952 1952, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 3rd March 1954 1954, Report of Total Loss, Casualty, &c for Slemish, 10th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Letter from H C Murray, per the Surveyors, to the Secretary, London, regarding Slemish, 12th January 1956 1956, Report of Survey for Repairs, &c for Slemish, 22nd May 1956 1956, Memo for Slemish, 14th June 1956 1956, Copy of Certificate of Survey of Damage for Slemish, 25th May 1956 1956, Copy of Certificate of Survey of Boiler & Machinery for Slemish, 25th May 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Slemish, 22nd May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slemish, 11th June 1956 1956, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, London Outdoor Staff, regarding Slemish, 24th May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Gwentland, Undated no date, Freeboard & Draught Document for Gwentland, Undated no date, Copy of Freeboard Report for Bramhill, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Midship Section Plan for Bramhill, 20th December 1922 1922, Freeboard - Application for Certificate of Approval for Gwentland, 21st December 1922 1922, Plan of Rudder for Gwentland, 28th February 1923 1923, Profile & Deck Plan for Bramhill, 9th July 1923 1923, Letter from T Shaw, to the Secretary, London, regarding Gwentland, 24th July 1923 1923, Copy of Letter from Secretary, to the Surveyors, Sunderland, regarding Gwentland, 23rd July 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Gwentland, 23rd July 1923 1923, Steel Steamer Report for Gwentland, 17th July 1923 1923, Request for Special Survey for Gwentland, 27th January 1923 1923, Form for Vessels of 100 Tons & Upwards for Gwentland, 10th July 1923 1923, Request for Special Survey for Gwentland, 30th January 1923 1923, Report on Machinery for Gwentland, 13th July 1923 1923, Report on Boilers for Gwentland, 5th April 1923 1923, Report on Electric Fittings for Gwentland, 1923 1923, Freeboard Verification Form for Steamers for Gwentland, 6th July 1923 1923, Memo about the Freeboard Report for Gwentland, 26th June 1923 1923, Report of Surveys for Freeboard - Steam Ships; Verification for Gwentland, 22nd June 1923 1923, Report of Surveys for Freeboard - Steam Ships for Gwentland, 19th September 1932 1932, Report of Surveys for Freeboard for Slemish, 19th September 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 31st July 1952 1952, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 3rd March 1954 1954, Report of Total Loss, Casualty, &c for Slemish, 10th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Letter from H C Murray, per the Surveyors, to the Secretary, London, regarding Slemish, 12th January 1956 1956, Report of Survey for Repairs, &c for Slemish, 22nd May 1956 1956, Memo for Slemish, 14th June 1956 1956, Copy of Certificate of Survey of Damage for Slemish, 25th May 1956 1956, Copy of Certificate of Survey of Boiler & Machinery for Slemish, 25th May 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Slemish, 22nd May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slemish, 11th June 1956 1956, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, London Outdoor Staff, regarding Slemish, 24th May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Gwentland, Undated no date, Freeboard & Draught Document for Gwentland, Undated no date, Copy of Freeboard Report for Bramhill, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Midship Section Plan for Bramhill, 20th December 1922 1922, Freeboard - Application for Certificate of Approval for Gwentland, 21st December 1922 1922, Plan of Rudder for Gwentland, 28th February 1923 1923, Profile & Deck Plan for Bramhill, 9th July 1923 1923, Letter from T Shaw, to the Secretary, London, regarding Gwentland, 24th July 1923 1923, Copy of Letter from Secretary, to the Surveyors, Sunderland, regarding Gwentland, 23rd July 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Gwentland, 23rd July 1923 1923, Steel Steamer Report for Gwentland, 17th July 1923 1923, Request for Special Survey for Gwentland, 27th January 1923 1923, Form for Vessels of 100 Tons & Upwards for Gwentland, 10th July 1923 1923, Request for Special Survey for Gwentland, 30th January 1923 1923, Report on Machinery for Gwentland, 13th July 1923 1923, Report on Boilers for Gwentland, 5th April 1923 1923, Report on Electric Fittings for Gwentland, 1923 1923, Freeboard Verification Form for Steamers for Gwentland, 6th July 1923 1923, Memo about the Freeboard Report for Gwentland, 26th June 1923 1923, Report of Surveys for Freeboard - Steam Ships; Verification for Gwentland, 22nd June 1923 1923, Report of Surveys for Freeboard - Steam Ships for Gwentland, 19th September 1932 1932, Report of Surveys for Freeboard for Slemish, 19th September 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 31st July 1952 1952, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 3rd March 1954 1954, Report of Total Loss, Casualty, &c for Slemish, 10th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Letter from H C Murray, per the Surveyors, to the Secretary, London, regarding Slemish, 12th January 1956 1956, Report of Survey for Repairs, &c for Slemish, 22nd May 1956 1956, Memo for Slemish, 14th June 1956 1956, Copy of Certificate of Survey of Damage for Slemish, 25th May 1956 1956, Copy of Certificate of Survey of Boiler & Machinery for Slemish, 25th May 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Slemish, 22nd May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slemish, 11th June 1956 1956, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, London Outdoor Staff, regarding Slemish, 24th May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Gwentland, Undated no date, Freeboard & Draught Document for Gwentland, Undated no date, Copy of Freeboard Report for Bramhill, Undated no date )
Is electric lighting fitted to the vessel?
No ( Midship Section Plan for Bramhill, 20th December 1922 1922, Freeboard - Application for Certificate of Approval for Gwentland, 21st December 1922 1922, Plan of Rudder for Gwentland, 28th February 1923 1923, Profile & Deck Plan for Bramhill, 9th July 1923 1923, Letter from T Shaw, to the Secretary, London, regarding Gwentland, 24th July 1923 1923, Copy of Letter from Secretary, to the Surveyors, Sunderland, regarding Gwentland, 23rd July 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Gwentland, 23rd July 1923 1923, Steel Steamer Report for Gwentland, 17th July 1923 1923, Request for Special Survey for Gwentland, 27th January 1923 1923, Form for Vessels of 100 Tons & Upwards for Gwentland, 10th July 1923 1923, Request for Special Survey for Gwentland, 30th January 1923 1923, Report on Machinery for Gwentland, 13th July 1923 1923, Report on Boilers for Gwentland, 5th April 1923 1923, Report on Electric Fittings for Gwentland, 1923 1923, Freeboard Verification Form for Steamers for Gwentland, 6th July 1923 1923, Memo about the Freeboard Report for Gwentland, 26th June 1923 1923, Report of Surveys for Freeboard - Steam Ships; Verification for Gwentland, 22nd June 1923 1923, Report of Surveys for Freeboard - Steam Ships for Gwentland, 19th September 1932 1932, Report of Surveys for Freeboard for Slemish, 19th September 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 31st July 1952 1952, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 3rd March 1954 1954, Report of Total Loss, Casualty, &c for Slemish, 10th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Letter from H C Murray, per the Surveyors, to the Secretary, London, regarding Slemish, 12th January 1956 1956, Report of Survey for Repairs, &c for Slemish, 22nd May 1956 1956, Memo for Slemish, 14th June 1956 1956, Copy of Certificate of Survey of Damage for Slemish, 25th May 1956 1956, Copy of Certificate of Survey of Boiler & Machinery for Slemish, 25th May 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Slemish, 22nd May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slemish, 11th June 1956 1956, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, London Outdoor Staff, regarding Slemish, 24th May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Gwentland, Undated no date, Freeboard & Draught Document for Gwentland, Undated no date, Copy of Freeboard Report for Bramhill, Undated no date )
The official record pronounced by the Committee
Damaged by collision - To be broken up ( Midship Section Plan for Bramhill, 20th December 1922 1922, Freeboard - Application for Certificate of Approval for Gwentland, 21st December 1922 1922, Plan of Rudder for Gwentland, 28th February 1923 1923, Profile & Deck Plan for Bramhill, 9th July 1923 1923, Letter from T Shaw, to the Secretary, London, regarding Gwentland, 24th July 1923 1923, Copy of Letter from Secretary, to the Surveyors, Sunderland, regarding Gwentland, 23rd July 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Gwentland, 23rd July 1923 1923, Steel Steamer Report for Gwentland, 17th July 1923 1923, Request for Special Survey for Gwentland, 27th January 1923 1923, Form for Vessels of 100 Tons & Upwards for Gwentland, 10th July 1923 1923, Request for Special Survey for Gwentland, 30th January 1923 1923, Report on Machinery for Gwentland, 13th July 1923 1923, Report on Boilers for Gwentland, 5th April 1923 1923, Report on Electric Fittings for Gwentland, 1923 1923, Freeboard Verification Form for Steamers for Gwentland, 6th July 1923 1923, Memo about the Freeboard Report for Gwentland, 26th June 1923 1923, Report of Surveys for Freeboard - Steam Ships; Verification for Gwentland, 22nd June 1923 1923, Report of Surveys for Freeboard - Steam Ships for Gwentland, 19th September 1932 1932, Report of Surveys for Freeboard for Slemish, 19th September 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 31st July 1952 1952, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 3rd March 1954 1954, Report of Total Loss, Casualty, &c for Slemish, 10th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Letter from H C Murray, per the Surveyors, to the Secretary, London, regarding Slemish, 12th January 1956 1956, Report of Survey for Repairs, &c for Slemish, 22nd May 1956 1956, Memo for Slemish, 14th June 1956 1956, Copy of Certificate of Survey of Damage for Slemish, 25th May 1956 1956, Copy of Certificate of Survey of Boiler & Machinery for Slemish, 25th May 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Slemish, 22nd May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slemish, 11th June 1956 1956, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, London Outdoor Staff, regarding Slemish, 24th May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Gwentland, Undated no date, Freeboard & Draught Document for Gwentland, Undated no date, Copy of Freeboard Report for Bramhill, Undated no date )
Recorded date for the vessel’s loss or disposal.
29/03/1956 ( Midship Section Plan for Bramhill, 20th December 1922 1922, Freeboard - Application for Certificate of Approval for Gwentland, 21st December 1922 1922, Plan of Rudder for Gwentland, 28th February 1923 1923, Profile & Deck Plan for Bramhill, 9th July 1923 1923, Letter from T Shaw, to the Secretary, London, regarding Gwentland, 24th July 1923 1923, Copy of Letter from Secretary, to the Surveyors, Sunderland, regarding Gwentland, 23rd July 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Gwentland, 23rd July 1923 1923, Steel Steamer Report for Gwentland, 17th July 1923 1923, Request for Special Survey for Gwentland, 27th January 1923 1923, Form for Vessels of 100 Tons & Upwards for Gwentland, 10th July 1923 1923, Request for Special Survey for Gwentland, 30th January 1923 1923, Report on Machinery for Gwentland, 13th July 1923 1923, Report on Boilers for Gwentland, 5th April 1923 1923, Report on Electric Fittings for Gwentland, 1923 1923, Freeboard Verification Form for Steamers for Gwentland, 6th July 1923 1923, Memo about the Freeboard Report for Gwentland, 26th June 1923 1923, Report of Surveys for Freeboard - Steam Ships; Verification for Gwentland, 22nd June 1923 1923, Report of Surveys for Freeboard - Steam Ships for Gwentland, 19th September 1932 1932, Report of Surveys for Freeboard for Slemish, 19th September 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 31st July 1952 1952, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 3rd March 1954 1954, Report of Total Loss, Casualty, &c for Slemish, 10th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Letter from H C Murray, per the Surveyors, to the Secretary, London, regarding Slemish, 12th January 1956 1956, Report of Survey for Repairs, &c for Slemish, 22nd May 1956 1956, Memo for Slemish, 14th June 1956 1956, Copy of Certificate of Survey of Damage for Slemish, 25th May 1956 1956, Copy of Certificate of Survey of Boiler & Machinery for Slemish, 25th May 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Slemish, 22nd May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slemish, 11th June 1956 1956, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, London Outdoor Staff, regarding Slemish, 24th May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Gwentland, Undated no date, Freeboard & Draught Document for Gwentland, Undated no date, Copy of Freeboard Report for Bramhill, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Sld ( Steel Steamer Report for Gwentland, 17th July 1923 1923, Report on Machinery for Gwentland, 13th July 1923 1923, Report on Electric Fittings for Gwentland, 1923 1923, Report of Surveys for Freeboard - Steam Ships; Verification for Gwentland, 22nd June 1923 1923 )
Gls ( Report on Boilers for Gwentland, 5th April 1923 1923 )
Npt ( Report of Surveys for Freeboard for Slemish, 19th September 1932 1932 )
Lon ( Report of Survey for Repairs, &c for Slemish, 22nd May 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Slemish, 22nd May 1956 1956 )
The individual and/or organisation listed
Mordey Jones & Co Ltd ( Steel Steamer Report for Gwentland, 17th July 1923 1923, Form for Vessels of 100 Tons & Upwards for Gwentland, 10th July 1923 1923, Report on Machinery for Gwentland, 13th July 1923 1923, Report on Boilers for Gwentland, 5th April 1923 1923, Report on Electric Fittings for Gwentland, 1923 1923, Report of Surveys for Freeboard - Steam Ships; Verification for Gwentland, 22nd June 1923 1923, Report of Surveys for Freeboard for Slemish, 19th September 1932 1932 )
Mordey & Jones ( Freeboard Verification Form for Steamers for Gwentland, 6th July 1923 1923 )
Thomas Leitch (Shipping) Ltd ( Report of Total Loss, Casualty, &c for Slemish, 10th May 1956 1956, Report of Survey for Repairs, &c for Slemish, 22nd May 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Slemish, 22nd May 1956 1956 )
Physical arrangement of a ship’s masts, sails and rigging.
Location of construction for a vessel’s engines.
Sunderland ( Request for Special Survey for Gwentland, 27th January 1923 1923, Form for Vessels of 100 Tons & Upwards for Gwentland, 10th July 1923 1923, Report on Machinery for Gwentland, 13th July 1923 1923, Report of Periodical Surveys & Repairs of Machinery for Slemish, 22nd May 1956 1956 )
The port in which a vessel is registered or permanently based.
Newport, Mon. ( Form for Vessels of 100 Tons & Upwards for Gwentland, 10th July 1923 1923, Freeboard Verification Form for Steamers for Gwentland, 6th July 1923 1923, Report of Surveys for Freeboard - Steam Ships; Verification for Gwentland, 22nd June 1923 1923, Report of Surveys for Freeboard - Steam Ships for Gwentland, 19th September 1932 1932 )
Belfast ( Report of Surveys for Freeboard for Slemish, 19th September 1932 1932 )
Type and configuration of the engine(s) supplied for a vessel.
Reciprocating Triple Compound Surface Condensing ( Form for Vessels of 100 Tons & Upwards for Gwentland, 10th July 1923 1923 )
Triple Expansion ( Report on Machinery for Gwentland, 13th July 1923 1923 )
Steam Reciprocating Triple Expansion ( Report of Periodical Surveys & Repairs of Machinery for Slemish, 22nd May 1956 1956 )
Name of surveyor.
H C Forster ( Report on Boilers for Gwentland, 5th April 1923 1923 )
H C Murray ( Letter from H C Murray, per the Surveyors, to the Secretary, London, regarding Slemish, 12th January 1956 1956 )
The year in which a vessel’s construction is completed.
1923 ( Midship Section Plan for Bramhill, 20th December 1922 1922, Freeboard - Application for Certificate of Approval for Gwentland, 21st December 1922 1922, Plan of Rudder for Gwentland, 28th February 1923 1923, Profile & Deck Plan for Bramhill, 9th July 1923 1923, Letter from T Shaw, to the Secretary, London, regarding Gwentland, 24th July 1923 1923, Copy of Letter from Secretary, to the Surveyors, Sunderland, regarding Gwentland, 23rd July 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Gwentland, 23rd July 1923 1923, Steel Steamer Report for Gwentland, 17th July 1923 1923, Request for Special Survey for Gwentland, 27th January 1923 1923, Form for Vessels of 100 Tons & Upwards for Gwentland, 10th July 1923 1923, Request for Special Survey for Gwentland, 30th January 1923 1923, Report on Machinery for Gwentland, 13th July 1923 1923, Report on Boilers for Gwentland, 5th April 1923 1923, Report on Electric Fittings for Gwentland, 1923 1923, Freeboard Verification Form for Steamers for Gwentland, 6th July 1923 1923, Memo about the Freeboard Report for Gwentland, 26th June 1923 1923, Report of Surveys for Freeboard - Steam Ships; Verification for Gwentland, 22nd June 1923 1923, Report of Surveys for Freeboard - Steam Ships for Gwentland, 19th September 1932 1932, Report of Surveys for Freeboard for Slemish, 19th September 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 31st July 1952 1952, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 3rd March 1954 1954, Report of Total Loss, Casualty, &c for Slemish, 10th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Letter from H C Murray, per the Surveyors, to the Secretary, London, regarding Slemish, 12th January 1956 1956, Report of Survey for Repairs, &c for Slemish, 22nd May 1956 1956, Memo for Slemish, 14th June 1956 1956, Copy of Certificate of Survey of Damage for Slemish, 25th May 1956 1956, Copy of Certificate of Survey of Boiler & Machinery for Slemish, 25th May 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Slemish, 22nd May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slemish, 11th June 1956 1956, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, London Outdoor Staff, regarding Slemish, 24th May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Gwentland, Undated no date, Freeboard & Draught Document for Gwentland, Undated no date, Copy of Freeboard Report for Bramhill, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Robert Thompson & Sons Ltd ( Midship Section Plan for Bramhill, 20th December 1922 1922, Freeboard - Application for Certificate of Approval for Gwentland, 21st December 1922 1922, Plan of Rudder for Gwentland, 28th February 1923 1923, Profile & Deck Plan for Bramhill, 9th July 1923 1923, Letter from T Shaw, to the Secretary, London, regarding Gwentland, 24th July 1923 1923, Copy of Letter from Secretary, to the Surveyors, Sunderland, regarding Gwentland, 23rd July 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Gwentland, 23rd July 1923 1923, Steel Steamer Report for Gwentland, 17th July 1923 1923, Request for Special Survey for Gwentland, 27th January 1923 1923, Form for Vessels of 100 Tons & Upwards for Gwentland, 10th July 1923 1923, Request for Special Survey for Gwentland, 30th January 1923 1923, Report on Machinery for Gwentland, 13th July 1923 1923, Report on Boilers for Gwentland, 5th April 1923 1923, Report on Electric Fittings for Gwentland, 1923 1923, Freeboard Verification Form for Steamers for Gwentland, 6th July 1923 1923, Memo about the Freeboard Report for Gwentland, 26th June 1923 1923, Report of Surveys for Freeboard - Steam Ships; Verification for Gwentland, 22nd June 1923 1923, Report of Surveys for Freeboard - Steam Ships for Gwentland, 19th September 1932 1932, Report of Surveys for Freeboard for Slemish, 19th September 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 31st July 1952 1952, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 3rd March 1954 1954, Report of Total Loss, Casualty, &c for Slemish, 10th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Letter from H C Murray, per the Surveyors, to the Secretary, London, regarding Slemish, 12th January 1956 1956, Report of Survey for Repairs, &c for Slemish, 22nd May 1956 1956, Memo for Slemish, 14th June 1956 1956, Copy of Certificate of Survey of Damage for Slemish, 25th May 1956 1956, Copy of Certificate of Survey of Boiler & Machinery for Slemish, 25th May 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Slemish, 22nd May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slemish, 11th June 1956 1956, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, London Outdoor Staff, regarding Slemish, 24th May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Gwentland, Undated no date, Freeboard & Draught Document for Gwentland, Undated no date, Copy of Freeboard Report for Bramhill, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Sunderland ( Midship Section Plan for Bramhill, 20th December 1922 1922, Freeboard - Application for Certificate of Approval for Gwentland, 21st December 1922 1922, Plan of Rudder for Gwentland, 28th February 1923 1923, Profile & Deck Plan for Bramhill, 9th July 1923 1923, Letter from T Shaw, to the Secretary, London, regarding Gwentland, 24th July 1923 1923, Copy of Letter from Secretary, to the Surveyors, Sunderland, regarding Gwentland, 23rd July 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Gwentland, 23rd July 1923 1923, Steel Steamer Report for Gwentland, 17th July 1923 1923, Request for Special Survey for Gwentland, 27th January 1923 1923, Form for Vessels of 100 Tons & Upwards for Gwentland, 10th July 1923 1923, Request for Special Survey for Gwentland, 30th January 1923 1923, Report on Machinery for Gwentland, 13th July 1923 1923, Report on Boilers for Gwentland, 5th April 1923 1923, Report on Electric Fittings for Gwentland, 1923 1923, Freeboard Verification Form for Steamers for Gwentland, 6th July 1923 1923, Memo about the Freeboard Report for Gwentland, 26th June 1923 1923, Report of Surveys for Freeboard - Steam Ships; Verification for Gwentland, 22nd June 1923 1923, Report of Surveys for Freeboard - Steam Ships for Gwentland, 19th September 1932 1932, Report of Surveys for Freeboard for Slemish, 19th September 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 31st July 1952 1952, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 3rd March 1954 1954, Report of Total Loss, Casualty, &c for Slemish, 10th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Letter from H C Murray, per the Surveyors, to the Secretary, London, regarding Slemish, 12th January 1956 1956, Report of Survey for Repairs, &c for Slemish, 22nd May 1956 1956, Memo for Slemish, 14th June 1956 1956, Copy of Certificate of Survey of Damage for Slemish, 25th May 1956 1956, Copy of Certificate of Survey of Boiler & Machinery for Slemish, 25th May 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Slemish, 22nd May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slemish, 11th June 1956 1956, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, London Outdoor Staff, regarding Slemish, 24th May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Gwentland, Undated no date, Freeboard & Draught Document for Gwentland, Undated no date, Copy of Freeboard Report for Bramhill, Undated no date )
A vessel’s means of propulsion.
Steam ( Midship Section Plan for Bramhill, 20th December 1922 1922, Freeboard - Application for Certificate of Approval for Gwentland, 21st December 1922 1922, Plan of Rudder for Gwentland, 28th February 1923 1923, Profile & Deck Plan for Bramhill, 9th July 1923 1923, Letter from T Shaw, to the Secretary, London, regarding Gwentland, 24th July 1923 1923, Copy of Letter from Secretary, to the Surveyors, Sunderland, regarding Gwentland, 23rd July 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Gwentland, 23rd July 1923 1923, Steel Steamer Report for Gwentland, 17th July 1923 1923, Request for Special Survey for Gwentland, 27th January 1923 1923, Form for Vessels of 100 Tons & Upwards for Gwentland, 10th July 1923 1923, Request for Special Survey for Gwentland, 30th January 1923 1923, Report on Machinery for Gwentland, 13th July 1923 1923, Report on Boilers for Gwentland, 5th April 1923 1923, Report on Electric Fittings for Gwentland, 1923 1923, Freeboard Verification Form for Steamers for Gwentland, 6th July 1923 1923, Memo about the Freeboard Report for Gwentland, 26th June 1923 1923, Report of Surveys for Freeboard - Steam Ships; Verification for Gwentland, 22nd June 1923 1923, Report of Surveys for Freeboard - Steam Ships for Gwentland, 19th September 1932 1932, Report of Surveys for Freeboard for Slemish, 19th September 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 31st July 1952 1952, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 3rd March 1954 1954, Report of Total Loss, Casualty, &c for Slemish, 10th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Letter from H C Murray, per the Surveyors, to the Secretary, London, regarding Slemish, 12th January 1956 1956, Report of Survey for Repairs, &c for Slemish, 22nd May 1956 1956, Copy of Certificate of Survey of Damage for Slemish, 25th May 1956 1956, Copy of Certificate of Survey of Boiler & Machinery for Slemish, 25th May 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Slemish, 22nd May 1956 1956, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, London Outdoor Staff, regarding Slemish, 24th May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Gwentland, Undated no date, Freeboard & Draught Document for Gwentland, Undated no date )
undefined ( Memo for Slemish, 14th June 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slemish, 11th June 1956 1956, Copy of Freeboard Report for Bramhill, Undated no date )
Is the steamer assisted by sail?
No ( Midship Section Plan for Bramhill, 20th December 1922 1922, Freeboard - Application for Certificate of Approval for Gwentland, 21st December 1922 1922, Plan of Rudder for Gwentland, 28th February 1923 1923, Profile & Deck Plan for Bramhill, 9th July 1923 1923, Letter from T Shaw, to the Secretary, London, regarding Gwentland, 24th July 1923 1923, Copy of Letter from Secretary, to the Surveyors, Sunderland, regarding Gwentland, 23rd July 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Gwentland, 23rd July 1923 1923, Steel Steamer Report for Gwentland, 17th July 1923 1923, Request for Special Survey for Gwentland, 27th January 1923 1923, Form for Vessels of 100 Tons & Upwards for Gwentland, 10th July 1923 1923, Request for Special Survey for Gwentland, 30th January 1923 1923, Report on Machinery for Gwentland, 13th July 1923 1923, Report on Boilers for Gwentland, 5th April 1923 1923, Report on Electric Fittings for Gwentland, 1923 1923, Freeboard Verification Form for Steamers for Gwentland, 6th July 1923 1923, Memo about the Freeboard Report for Gwentland, 26th June 1923 1923, Report of Surveys for Freeboard - Steam Ships; Verification for Gwentland, 22nd June 1923 1923, Report of Surveys for Freeboard - Steam Ships for Gwentland, 19th September 1932 1932, Report of Surveys for Freeboard for Slemish, 19th September 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 31st July 1952 1952, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 3rd March 1954 1954, Report of Total Loss, Casualty, &c for Slemish, 10th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Letter from H C Murray, per the Surveyors, to the Secretary, London, regarding Slemish, 12th January 1956 1956, Report of Survey for Repairs, &c for Slemish, 22nd May 1956 1956, Memo for Slemish, 14th June 1956 1956, Copy of Certificate of Survey of Damage for Slemish, 25th May 1956 1956, Copy of Certificate of Survey of Boiler & Machinery for Slemish, 25th May 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Slemish, 22nd May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slemish, 11th June 1956 1956, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, London Outdoor Staff, regarding Slemish, 24th May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Gwentland, Undated no date, Freeboard & Draught Document for Gwentland, Undated no date, Copy of Freeboard Report for Bramhill, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Midship Section Plan for Bramhill, 20th December 1922 1922, Freeboard - Application for Certificate of Approval for Gwentland, 21st December 1922 1922, Plan of Rudder for Gwentland, 28th February 1923 1923, Profile & Deck Plan for Bramhill, 9th July 1923 1923, Letter from T Shaw, to the Secretary, London, regarding Gwentland, 24th July 1923 1923, Copy of Letter from Secretary, to the Surveyors, Sunderland, regarding Gwentland, 23rd July 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Gwentland, 23rd July 1923 1923, Steel Steamer Report for Gwentland, 17th July 1923 1923, Request for Special Survey for Gwentland, 27th January 1923 1923, Form for Vessels of 100 Tons & Upwards for Gwentland, 10th July 1923 1923, Request for Special Survey for Gwentland, 30th January 1923 1923, Report on Machinery for Gwentland, 13th July 1923 1923, Report on Boilers for Gwentland, 5th April 1923 1923, Report on Electric Fittings for Gwentland, 1923 1923, Freeboard Verification Form for Steamers for Gwentland, 6th July 1923 1923, Memo about the Freeboard Report for Gwentland, 26th June 1923 1923, Report of Surveys for Freeboard - Steam Ships; Verification for Gwentland, 22nd June 1923 1923, Report of Surveys for Freeboard - Steam Ships for Gwentland, 19th September 1932 1932, Report of Surveys for Freeboard for Slemish, 19th September 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 31st July 1952 1952, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 3rd March 1954 1954, Report of Total Loss, Casualty, &c for Slemish, 10th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Letter from H C Murray, per the Surveyors, to the Secretary, London, regarding Slemish, 12th January 1956 1956, Report of Survey for Repairs, &c for Slemish, 22nd May 1956 1956, Memo for Slemish, 14th June 1956 1956, Copy of Certificate of Survey of Damage for Slemish, 25th May 1956 1956, Copy of Certificate of Survey of Boiler & Machinery for Slemish, 25th May 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Slemish, 22nd May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slemish, 11th June 1956 1956, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, London Outdoor Staff, regarding Slemish, 24th May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Gwentland, Undated no date, Freeboard & Draught Document for Gwentland, Undated no date, Copy of Freeboard Report for Bramhill, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Midship Section Plan for Bramhill, 20th December 1922 1922, Freeboard - Application for Certificate of Approval for Gwentland, 21st December 1922 1922, Plan of Rudder for Gwentland, 28th February 1923 1923, Profile & Deck Plan for Bramhill, 9th July 1923 1923, Letter from T Shaw, to the Secretary, London, regarding Gwentland, 24th July 1923 1923, Copy of Letter from Secretary, to the Surveyors, Sunderland, regarding Gwentland, 23rd July 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Gwentland, 23rd July 1923 1923, Steel Steamer Report for Gwentland, 17th July 1923 1923, Request for Special Survey for Gwentland, 27th January 1923 1923, Form for Vessels of 100 Tons & Upwards for Gwentland, 10th July 1923 1923, Request for Special Survey for Gwentland, 30th January 1923 1923, Report on Machinery for Gwentland, 13th July 1923 1923, Report on Boilers for Gwentland, 5th April 1923 1923, Report on Electric Fittings for Gwentland, 1923 1923, Freeboard Verification Form for Steamers for Gwentland, 6th July 1923 1923, Memo about the Freeboard Report for Gwentland, 26th June 1923 1923, Report of Surveys for Freeboard - Steam Ships; Verification for Gwentland, 22nd June 1923 1923, Report of Surveys for Freeboard - Steam Ships for Gwentland, 19th September 1932 1932, Report of Surveys for Freeboard for Slemish, 19th September 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 31st July 1952 1952, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 3rd March 1954 1954, Report of Total Loss, Casualty, &c for Slemish, 10th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Letter from H C Murray, per the Surveyors, to the Secretary, London, regarding Slemish, 12th January 1956 1956, Report of Survey for Repairs, &c for Slemish, 22nd May 1956 1956, Memo for Slemish, 14th June 1956 1956, Copy of Certificate of Survey of Damage for Slemish, 25th May 1956 1956, Copy of Certificate of Survey of Boiler & Machinery for Slemish, 25th May 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Slemish, 22nd May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slemish, 11th June 1956 1956, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, London Outdoor Staff, regarding Slemish, 24th May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Gwentland, Undated no date, Freeboard & Draught Document for Gwentland, Undated no date, Copy of Freeboard Report for Bramhill, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Midship Section Plan for Bramhill, 20th December 1922 1922, Freeboard - Application for Certificate of Approval for Gwentland, 21st December 1922 1922, Plan of Rudder for Gwentland, 28th February 1923 1923, Profile & Deck Plan for Bramhill, 9th July 1923 1923, Letter from T Shaw, to the Secretary, London, regarding Gwentland, 24th July 1923 1923, Copy of Letter from Secretary, to the Surveyors, Sunderland, regarding Gwentland, 23rd July 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Gwentland, 23rd July 1923 1923, Steel Steamer Report for Gwentland, 17th July 1923 1923, Request for Special Survey for Gwentland, 27th January 1923 1923, Form for Vessels of 100 Tons & Upwards for Gwentland, 10th July 1923 1923, Request for Special Survey for Gwentland, 30th January 1923 1923, Report on Machinery for Gwentland, 13th July 1923 1923, Report on Boilers for Gwentland, 5th April 1923 1923, Report on Electric Fittings for Gwentland, 1923 1923, Freeboard Verification Form for Steamers for Gwentland, 6th July 1923 1923, Memo about the Freeboard Report for Gwentland, 26th June 1923 1923, Report of Surveys for Freeboard - Steam Ships; Verification for Gwentland, 22nd June 1923 1923, Report of Surveys for Freeboard - Steam Ships for Gwentland, 19th September 1932 1932, Report of Surveys for Freeboard for Slemish, 19th September 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 31st July 1952 1952, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 3rd March 1954 1954, Report of Total Loss, Casualty, &c for Slemish, 10th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Letter from H C Murray, per the Surveyors, to the Secretary, London, regarding Slemish, 12th January 1956 1956, Report of Survey for Repairs, &c for Slemish, 22nd May 1956 1956, Memo for Slemish, 14th June 1956 1956, Copy of Certificate of Survey of Damage for Slemish, 25th May 1956 1956, Copy of Certificate of Survey of Boiler & Machinery for Slemish, 25th May 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Slemish, 22nd May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slemish, 11th June 1956 1956, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, London Outdoor Staff, regarding Slemish, 24th May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Gwentland, Undated no date, Freeboard & Draught Document for Gwentland, Undated no date, Copy of Freeboard Report for Bramhill, Undated no date )
Contextual information related to the reasons of the vessel’s loss or disposal.
Beached after Collision, Holed & Tidal, Constructive Total Loss & Sold for Breaking up ( Midship Section Plan for Bramhill, 20th December 1922 1922, Freeboard - Application for Certificate of Approval for Gwentland, 21st December 1922 1922, Plan of Rudder for Gwentland, 28th February 1923 1923, Profile & Deck Plan for Bramhill, 9th July 1923 1923, Letter from T Shaw, to the Secretary, London, regarding Gwentland, 24th July 1923 1923, Copy of Letter from Secretary, to the Surveyors, Sunderland, regarding Gwentland, 23rd July 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding First Entry of Gwentland, 23rd July 1923 1923, Steel Steamer Report for Gwentland, 17th July 1923 1923, Request for Special Survey for Gwentland, 27th January 1923 1923, Form for Vessels of 100 Tons & Upwards for Gwentland, 10th July 1923 1923, Request for Special Survey for Gwentland, 30th January 1923 1923, Report on Machinery for Gwentland, 13th July 1923 1923, Report on Boilers for Gwentland, 5th April 1923 1923, Report on Electric Fittings for Gwentland, 1923 1923, Freeboard Verification Form for Steamers for Gwentland, 6th July 1923 1923, Memo about the Freeboard Report for Gwentland, 26th June 1923 1923, Report of Surveys for Freeboard - Steam Ships; Verification for Gwentland, 22nd June 1923 1923, Report of Surveys for Freeboard - Steam Ships for Gwentland, 19th September 1932 1932, Report of Surveys for Freeboard for Slemish, 19th September 1932 1932, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 31st July 1952 1952, Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 3rd March 1954 1954, Report of Total Loss, Casualty, &c for Slemish, 10th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Copy of Letter from Thomas Leitch (Shipping) Ltd, regarding Slemish, 4th May 1956 1956, Letter from H C Murray, per the Surveyors, to the Secretary, London, regarding Slemish, 12th January 1956 1956, Report of Survey for Repairs, &c for Slemish, 22nd May 1956 1956, Memo for Slemish, 14th June 1956 1956, Copy of Certificate of Survey of Damage for Slemish, 25th May 1956 1956, Copy of Certificate of Survey of Boiler & Machinery for Slemish, 25th May 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Slemish, 22nd May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Slemish, 11th June 1956 1956, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, London Outdoor Staff, regarding Slemish, 24th May 1956 1956, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Gwentland, Undated no date, Freeboard & Draught Document for Gwentland, Undated no date, Copy of Freeboard Report for Bramhill, Undated no date )
Location where a vessel’s survey was undertaken.
Sunderland ( Plan of Rudder for Gwentland, 28th February 1923 1923, Profile & Deck Plan for Bramhill, 9th July 1923 1923, Letter from T Shaw, to the Secretary, London, regarding Gwentland, 24th July 1923 1923, Steel Steamer Report for Gwentland, 17th July 1923 1923, Request for Special Survey for Gwentland, 27th January 1923 1923, Request for Special Survey for Gwentland, 30th January 1923 1923, Report on Machinery for Gwentland, 13th July 1923 1923, Report on Electric Fittings for Gwentland, 1923 1923, Freeboard Verification Form for Steamers for Gwentland, 6th July 1923 1923, Report of Surveys for Freeboard - Steam Ships; Verification for Gwentland, 22nd June 1923 1923 )
London ( Copy of Letter from Secretary, to the Surveyors, Sunderland, regarding Gwentland, 23rd July 1923 1923, Copy of Certificate of Survey of Damage for Slemish, 25th May 1956 1956, Copy of Certificate of Survey of Boiler & Machinery for Slemish, 25th May 1956 1956, Copy of Letter from Deputy Clerk to the Classification Committee, to The Surveyors, London Outdoor Staff, regarding Slemish, 24th May 1956 1956 )
Newport Mon ( Form for Vessels of 100 Tons & Upwards for Gwentland, 10th July 1923 1923, Report of Surveys for Freeboard - Steam Ships for Gwentland, 19th September 1932 1932, Report of Surveys for Freeboard for Slemish, 19th September 1932 1932 )
Annan; Glasgow ( Report on Boilers for Gwentland, 5th April 1923 1923 )
Newcastle upon Tyne ( Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 31st July 1952 1952 )
Newcastle on Tyne ( Report C.11 continued, memorandum of alterations since ship surveyed for assignment of load lines for Slemish, 3rd March 1954 1954 )
Tilbury; London ( Report of Survey for Repairs, &c for Slemish, 22nd May 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Slemish, 22nd May 1956 1956 )
The listed port to which a given vessel belongs.
Newport, Mon. ( Steel Steamer Report for Gwentland, 17th July 1923 1923, Report on Machinery for Gwentland, 13th July 1923 1923, Report on Boilers for Gwentland, 5th April 1923 1923, Report on Electric Fittings for Gwentland, 1923 1923 )
London ( Report of Survey for Repairs, &c for Slemish, 22nd May 1956 1956 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Lloyd's A & CP; +LMC 7,23; CL ( Steel Steamer Report for Gwentland, 17th July 1923 1923 )
+LMC 7,23; CL ( Report on Machinery for Gwentland, 13th July 1923 1923 )
See Sld FE 28617 ( Report on Boilers for Gwentland, 5th April 1923 1923 )
+100A1 (Contemplated) ( Report of Surveys for Freeboard - Steam Ships; Verification for Gwentland, 22nd June 1923 1923 )
+100A1 ( Report of Surveys for Freeboard - Steam Ships for Gwentland, 19th September 1932 1932 )
+100A1; SS Npt No 2-31 ( Report of Surveys for Freeboard for Slemish, 19th September 1932 1932 )
+100A1 7,55; ss(Dr) 12,48; Nwc 8,52; +LMC 7,52; BS8,55; sp7,52; ts 6,53; CL ( Report of Total Loss, Casualty, &c for Slemish, 10th May 1956 1956 )
+100A1 7-55; SS (Dr) 12-48; SS Nwc 8-52; +LMC 7-52; BS 8-55; TS CL 6-53; SPS 7-52 ( Report of Survey for Repairs, &c for Slemish, 22nd May 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Slemish, 22nd May 1956 1956 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1821 ( Steel Steamer Report for Gwentland, 17th July 1923 1923, Form for Vessels of 100 Tons & Upwards for Gwentland, 10th July 1923 1923, Report on Machinery for Gwentland, 13th July 1923 1923, Report on Boilers for Gwentland, 5th April 1923 1923, Report on Electric Fittings for Gwentland, 1923 1923, Report of Surveys for Freeboard - Steam Ships for Gwentland, 19th September 1932 1932 )
1740 ( Request for Special Survey for Gwentland, 27th January 1923 1923 )
1863 ( Report of Total Loss, Casualty, &c for Slemish, 10th May 1956 1956, Report of Survey for Repairs, &c for Slemish, 22nd May 1956 1956, Copy of Certificate of Survey of Damage for Slemish, 25th May 1956 1956, Copy of Certificate of Survey of Boiler & Machinery for Slemish, 25th May 1956 1956, Report of Periodical Surveys & Repairs of Machinery for Slemish, 22nd May 1956 1956 )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
KPHD ( Form for Vessels of 100 Tons & Upwards for Gwentland, 10th July 1923 1923 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Date in which construction of a vessel’s engines were completed.
A vessel’s calculated maximum speed.
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.