Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Highland Park ( Half Midship Section Plan for Highland Park, 15th February 1944 1944, Request for Special Survey for Highland Park, 1st February 1944 1944, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Steel Steamer Report for Highland Park, June 1945 1945, Form for Vessels of 100 Tons & Upwards for Highland Park, 23rd May 1945 1945, Copy of a Certificate of Survey of Repairs for Highland Park, 8th June 1945 1945, Copy of a Certificate of Survey of Boilers & Machinery for Highland Park, 8th June 1945 1945, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 14th June 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 15th March 1945 1945, Report on Boilers for Highland Park, 15th June 1945 1945, Report on Electrical Equipment for Highland Park, 14th June 1945 1945 )

Leefoon ( Report of Surveys for Freeboard - Conditions of Assignment for Leefoon, June 1945 1945, Report of Surveys for Freeboard for Leefoon, October 1950 1950, Copy of a Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 9th November 1962 1962, Memo regarding Classification for Leefoon, 26th October 1962 1962, Memo regarding Classification for Leefoon, 1st November 1962 1962, Letter from K T Wong, Shipping Managers (Hong Kong) Ltd, to Lloyd's Register of Shipping, London, regarding Leefoon, 28th August 1962 1962, Copy of Air Letter from Clerk to the Classification Committee, to Shipping Managers (Hong Kong) Ltd, Hong Kong, regarding Leefoon, 22nd August 1962 1962, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Copy of a Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon still being laid up, 18th March 1963 1963, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 16th January 1963 1963, Telex from Lloyd\'s Committee, London, to the Marine, Hong Kong, regarding Leefoon, 16th January 1963 1963, Form of Postponed Surveys for Leefoon, 16th January 1963 1963, Report of Total Loss, Casualty, Breaking Up, etc for Leefoon, Undated no date, Telegram from Marine, Hong Kong Office, to the Lloyd\'s Committee, London, regarding Leefoon, Undated no date )

Sunjewel ( Reciprocating Steam Engine Surveys for Sunjewel, Undated no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

01/03/1945 ( Half Midship Section Plan for Highland Park, 15th February 1944 1944, Request for Special Survey for Highland Park, 1st February 1944 1944, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Steel Steamer Report for Highland Park, June 1945 1945, Form for Vessels of 100 Tons & Upwards for Highland Park, 23rd May 1945 1945, Copy of a Certificate of Survey of Repairs for Highland Park, 8th June 1945 1945, Copy of a Certificate of Survey of Boilers & Machinery for Highland Park, 8th June 1945 1945, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 14th June 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 15th March 1945 1945, Report on Boilers for Highland Park, 15th June 1945 1945, Report on Electrical Equipment for Highland Park, 14th June 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Leefoon, June 1945 1945, Report of Surveys for Freeboard for Leefoon, October 1950 1950, Copy of a Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 9th November 1962 1962, Memo regarding Classification for Leefoon, 26th October 1962 1962, Memo regarding Classification for Leefoon, 1st November 1962 1962, Letter from K T Wong, Shipping Managers (Hong Kong) Ltd, to Lloyd's Register of Shipping, London, regarding Leefoon, 28th August 1962 1962, Copy of Air Letter from Clerk to the Classification Committee, to Shipping Managers (Hong Kong) Ltd, Hong Kong, regarding Leefoon, 22nd August 1962 1962, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Copy of a Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon still being laid up, 18th March 1963 1963, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 16th January 1963 1963, Telex from Lloyd\'s Committee, London, to the Marine, Hong Kong, regarding Leefoon, 16th January 1963 1963, Form of Postponed Surveys for Leefoon, 16th January 1963 1963, Report of Total Loss, Casualty, Breaking Up, etc for Leefoon, Undated no date, Telegram from Marine, Hong Kong Office, to the Lloyd\'s Committee, London, regarding Leefoon, Undated no date, Reciprocating Steam Engine Surveys for Sunjewel, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

152 ( Half Midship Section Plan for Highland Park, 15th February 1944 1944, Request for Special Survey for Highland Park, 1st February 1944 1944, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Steel Steamer Report for Highland Park, June 1945 1945, Form for Vessels of 100 Tons & Upwards for Highland Park, 23rd May 1945 1945, Copy of a Certificate of Survey of Repairs for Highland Park, 8th June 1945 1945, Copy of a Certificate of Survey of Boilers & Machinery for Highland Park, 8th June 1945 1945, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 14th June 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 15th March 1945 1945, Report on Boilers for Highland Park, 15th June 1945 1945, Report on Electrical Equipment for Highland Park, 14th June 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Leefoon, June 1945 1945, Report of Surveys for Freeboard for Leefoon, October 1950 1950, Copy of a Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 9th November 1962 1962, Memo regarding Classification for Leefoon, 26th October 1962 1962, Memo regarding Classification for Leefoon, 1st November 1962 1962, Letter from K T Wong, Shipping Managers (Hong Kong) Ltd, to Lloyd's Register of Shipping, London, regarding Leefoon, 28th August 1962 1962, Copy of Air Letter from Clerk to the Classification Committee, to Shipping Managers (Hong Kong) Ltd, Hong Kong, regarding Leefoon, 22nd August 1962 1962, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Copy of a Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon still being laid up, 18th March 1963 1963, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 16th January 1963 1963, Telex from Lloyd\'s Committee, London, to the Marine, Hong Kong, regarding Leefoon, 16th January 1963 1963, Form of Postponed Surveys for Leefoon, 16th January 1963 1963, Report of Total Loss, Casualty, Breaking Up, etc for Leefoon, Undated no date, Telegram from Marine, Hong Kong Office, to the Lloyd\'s Committee, London, regarding Leefoon, Undated no date, Reciprocating Steam Engine Surveys for Sunjewel, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

North Vancouver BC ( Half Midship Section Plan for Highland Park, 15th February 1944 1944 )

Vancouver BC ( Request for Special Survey for Highland Park, 1st February 1944 1944, Copy of a Certificate of Survey of Repairs for Highland Park, 8th June 1945 1945, Copy of a Certificate of Survey of Boilers & Machinery for Highland Park, 8th June 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Leefoon, June 1945 1945 )

North Vancouver BC; Vancouver BC ( Steel Steamer Report for Highland Park, June 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 14th June 1945 1945, Report on Boilers for Highland Park, 15th June 1945 1945, Report on Electrical Equipment for Highland Park, 14th June 1945 1945 )

Montreal ( Form for Vessels of 100 Tons & Upwards for Highland Park, 23rd May 1945 1945 )

Montreal Quebec ( Report on Steam Reciprocating Engine Machinery for Highland Park, 15th March 1945 1945 )

Montreal P Q ( Report of Surveys for Freeboard for Leefoon, October 1950 1950 )

London ( Copy of a Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 9th November 1962 1962, Copy of Air Letter from Clerk to the Classification Committee, to Shipping Managers (Hong Kong) Ltd, Hong Kong, regarding Leefoon, 22nd August 1962 1962, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 16th January 1963 1963, Telex from Lloyd\'s Committee, London, to the Marine, Hong Kong, regarding Leefoon, 16th January 1963 1963 )

Hong Kong ( Letter from K T Wong, Shipping Managers (Hong Kong) Ltd, to Lloyd's Register of Shipping, London, regarding Leefoon, 28th August 1962 1962, Telegram from Marine, Hong Kong Office, to the Lloyd\'s Committee, London, regarding Leefoon, Undated no date )

London; Hong Kong ( Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Copy of a Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon still being laid up, 18th March 1963 1963 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Half Midship Section Plan for Highland Park, 15th February 1944 1944, Request for Special Survey for Highland Park, 1st February 1944 1944, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Steel Steamer Report for Highland Park, June 1945 1945, Form for Vessels of 100 Tons & Upwards for Highland Park, 23rd May 1945 1945, Copy of a Certificate of Survey of Repairs for Highland Park, 8th June 1945 1945, Copy of a Certificate of Survey of Boilers & Machinery for Highland Park, 8th June 1945 1945, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 14th June 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 15th March 1945 1945, Report on Boilers for Highland Park, 15th June 1945 1945, Report on Electrical Equipment for Highland Park, 14th June 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Leefoon, June 1945 1945, Report of Surveys for Freeboard for Leefoon, October 1950 1950, Copy of a Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 9th November 1962 1962, Memo regarding Classification for Leefoon, 26th October 1962 1962, Memo regarding Classification for Leefoon, 1st November 1962 1962, Letter from K T Wong, Shipping Managers (Hong Kong) Ltd, to Lloyd's Register of Shipping, London, regarding Leefoon, 28th August 1962 1962, Copy of Air Letter from Clerk to the Classification Committee, to Shipping Managers (Hong Kong) Ltd, Hong Kong, regarding Leefoon, 22nd August 1962 1962, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Copy of a Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon still being laid up, 18th March 1963 1963, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 16th January 1963 1963, Telex from Lloyd\'s Committee, London, to the Marine, Hong Kong, regarding Leefoon, 16th January 1963 1963, Form of Postponed Surveys for Leefoon, 16th January 1963 1963, Report of Total Loss, Casualty, Breaking Up, etc for Leefoon, Undated no date, Telegram from Marine, Hong Kong Office, to the Lloyd\'s Committee, London, regarding Leefoon, Undated no date, Reciprocating Steam Engine Surveys for Sunjewel, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Half Midship Section Plan for Highland Park, 15th February 1944 1944, Request for Special Survey for Highland Park, 1st February 1944 1944, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Steel Steamer Report for Highland Park, June 1945 1945, Form for Vessels of 100 Tons & Upwards for Highland Park, 23rd May 1945 1945, Copy of a Certificate of Survey of Repairs for Highland Park, 8th June 1945 1945, Copy of a Certificate of Survey of Boilers & Machinery for Highland Park, 8th June 1945 1945, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 14th June 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 15th March 1945 1945, Report on Boilers for Highland Park, 15th June 1945 1945, Report on Electrical Equipment for Highland Park, 14th June 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Leefoon, June 1945 1945, Report of Surveys for Freeboard for Leefoon, October 1950 1950, Copy of a Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 9th November 1962 1962, Memo regarding Classification for Leefoon, 26th October 1962 1962, Memo regarding Classification for Leefoon, 1st November 1962 1962, Letter from K T Wong, Shipping Managers (Hong Kong) Ltd, to Lloyd's Register of Shipping, London, regarding Leefoon, 28th August 1962 1962, Copy of Air Letter from Clerk to the Classification Committee, to Shipping Managers (Hong Kong) Ltd, Hong Kong, regarding Leefoon, 22nd August 1962 1962, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Copy of a Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon still being laid up, 18th March 1963 1963, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 16th January 1963 1963, Telex from Lloyd\'s Committee, London, to the Marine, Hong Kong, regarding Leefoon, 16th January 1963 1963, Form of Postponed Surveys for Leefoon, 16th January 1963 1963, Report of Total Loss, Casualty, Breaking Up, etc for Leefoon, Undated no date, Telegram from Marine, Hong Kong Office, to the Lloyd\'s Committee, London, regarding Leefoon, Undated no date, Reciprocating Steam Engine Surveys for Sunjewel, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Half Midship Section Plan for Highland Park, 15th February 1944 1944, Request for Special Survey for Highland Park, 1st February 1944 1944, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Steel Steamer Report for Highland Park, June 1945 1945, Form for Vessels of 100 Tons & Upwards for Highland Park, 23rd May 1945 1945, Copy of a Certificate of Survey of Repairs for Highland Park, 8th June 1945 1945, Copy of a Certificate of Survey of Boilers & Machinery for Highland Park, 8th June 1945 1945, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 14th June 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 15th March 1945 1945, Report on Boilers for Highland Park, 15th June 1945 1945, Report on Electrical Equipment for Highland Park, 14th June 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Leefoon, June 1945 1945, Report of Surveys for Freeboard for Leefoon, October 1950 1950, Copy of a Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 9th November 1962 1962, Memo regarding Classification for Leefoon, 26th October 1962 1962, Memo regarding Classification for Leefoon, 1st November 1962 1962, Letter from K T Wong, Shipping Managers (Hong Kong) Ltd, to Lloyd's Register of Shipping, London, regarding Leefoon, 28th August 1962 1962, Copy of Air Letter from Clerk to the Classification Committee, to Shipping Managers (Hong Kong) Ltd, Hong Kong, regarding Leefoon, 22nd August 1962 1962, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Copy of a Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon still being laid up, 18th March 1963 1963, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 16th January 1963 1963, Telex from Lloyd\'s Committee, London, to the Marine, Hong Kong, regarding Leefoon, 16th January 1963 1963, Form of Postponed Surveys for Leefoon, 16th January 1963 1963, Report of Total Loss, Casualty, Breaking Up, etc for Leefoon, Undated no date, Telegram from Marine, Hong Kong Office, to the Lloyd\'s Committee, London, regarding Leefoon, Undated no date, Reciprocating Steam Engine Surveys for Sunjewel, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Half Midship Section Plan for Highland Park, 15th February 1944 1944, Request for Special Survey for Highland Park, 1st February 1944 1944, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Steel Steamer Report for Highland Park, June 1945 1945, Form for Vessels of 100 Tons & Upwards for Highland Park, 23rd May 1945 1945, Copy of a Certificate of Survey of Repairs for Highland Park, 8th June 1945 1945, Copy of a Certificate of Survey of Boilers & Machinery for Highland Park, 8th June 1945 1945, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 14th June 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 15th March 1945 1945, Report on Boilers for Highland Park, 15th June 1945 1945, Report on Electrical Equipment for Highland Park, 14th June 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Leefoon, June 1945 1945, Report of Surveys for Freeboard for Leefoon, October 1950 1950, Copy of a Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 9th November 1962 1962, Memo regarding Classification for Leefoon, 26th October 1962 1962, Memo regarding Classification for Leefoon, 1st November 1962 1962, Letter from K T Wong, Shipping Managers (Hong Kong) Ltd, to Lloyd's Register of Shipping, London, regarding Leefoon, 28th August 1962 1962, Copy of Air Letter from Clerk to the Classification Committee, to Shipping Managers (Hong Kong) Ltd, Hong Kong, regarding Leefoon, 22nd August 1962 1962, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Copy of a Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon still being laid up, 18th March 1963 1963, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 16th January 1963 1963, Telex from Lloyd\'s Committee, London, to the Marine, Hong Kong, regarding Leefoon, 16th January 1963 1963, Form of Postponed Surveys for Leefoon, 16th January 1963 1963, Report of Total Loss, Casualty, Breaking Up, etc for Leefoon, Undated no date, Telegram from Marine, Hong Kong Office, to the Lloyd\'s Committee, London, regarding Leefoon, Undated no date, Reciprocating Steam Engine Surveys for Sunjewel, Undated no date )

The official record pronounced by the Committee

Loss or disposal

Broken up ( Half Midship Section Plan for Highland Park, 15th February 1944 1944, Request for Special Survey for Highland Park, 1st February 1944 1944, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Steel Steamer Report for Highland Park, June 1945 1945, Form for Vessels of 100 Tons & Upwards for Highland Park, 23rd May 1945 1945, Copy of a Certificate of Survey of Repairs for Highland Park, 8th June 1945 1945, Copy of a Certificate of Survey of Boilers & Machinery for Highland Park, 8th June 1945 1945, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 14th June 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 15th March 1945 1945, Report on Boilers for Highland Park, 15th June 1945 1945, Report on Electrical Equipment for Highland Park, 14th June 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Leefoon, June 1945 1945, Report of Surveys for Freeboard for Leefoon, October 1950 1950, Copy of a Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 9th November 1962 1962, Memo regarding Classification for Leefoon, 26th October 1962 1962, Memo regarding Classification for Leefoon, 1st November 1962 1962, Letter from K T Wong, Shipping Managers (Hong Kong) Ltd, to Lloyd's Register of Shipping, London, regarding Leefoon, 28th August 1962 1962, Copy of Air Letter from Clerk to the Classification Committee, to Shipping Managers (Hong Kong) Ltd, Hong Kong, regarding Leefoon, 22nd August 1962 1962, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Copy of a Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon still being laid up, 18th March 1963 1963, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 16th January 1963 1963, Telex from Lloyd\'s Committee, London, to the Marine, Hong Kong, regarding Leefoon, 16th January 1963 1963, Form of Postponed Surveys for Leefoon, 16th January 1963 1963, Report of Total Loss, Casualty, Breaking Up, etc for Leefoon, Undated no date, Telegram from Marine, Hong Kong Office, to the Lloyd\'s Committee, London, regarding Leefoon, Undated no date, Reciprocating Steam Engine Surveys for Sunjewel, Undated no date )

The country or national waters where a vessel is lost/disposed of, or last recorded.

Country of loss or disposal

Hong Kong ( Half Midship Section Plan for Highland Park, 15th February 1944 1944, Request for Special Survey for Highland Park, 1st February 1944 1944, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Steel Steamer Report for Highland Park, June 1945 1945, Form for Vessels of 100 Tons & Upwards for Highland Park, 23rd May 1945 1945, Copy of a Certificate of Survey of Repairs for Highland Park, 8th June 1945 1945, Copy of a Certificate of Survey of Boilers & Machinery for Highland Park, 8th June 1945 1945, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 14th June 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 15th March 1945 1945, Report on Boilers for Highland Park, 15th June 1945 1945, Report on Electrical Equipment for Highland Park, 14th June 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Leefoon, June 1945 1945, Report of Surveys for Freeboard for Leefoon, October 1950 1950, Copy of a Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 9th November 1962 1962, Memo regarding Classification for Leefoon, 26th October 1962 1962, Memo regarding Classification for Leefoon, 1st November 1962 1962, Letter from K T Wong, Shipping Managers (Hong Kong) Ltd, to Lloyd's Register of Shipping, London, regarding Leefoon, 28th August 1962 1962, Copy of Air Letter from Clerk to the Classification Committee, to Shipping Managers (Hong Kong) Ltd, Hong Kong, regarding Leefoon, 22nd August 1962 1962, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Copy of a Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon still being laid up, 18th March 1963 1963, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 16th January 1963 1963, Telex from Lloyd\'s Committee, London, to the Marine, Hong Kong, regarding Leefoon, 16th January 1963 1963, Form of Postponed Surveys for Leefoon, 16th January 1963 1963, Report of Total Loss, Casualty, Breaking Up, etc for Leefoon, Undated no date, Telegram from Marine, Hong Kong Office, to the Lloyd\'s Committee, London, regarding Leefoon, Undated no date, Reciprocating Steam Engine Surveys for Sunjewel, Undated no date )

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

The year in which a vessel’s construction is completed.

Year of ship completion

1945 ( Half Midship Section Plan for Highland Park, 15th February 1944 1944, Request for Special Survey for Highland Park, 1st February 1944 1944, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Steel Steamer Report for Highland Park, June 1945 1945, Form for Vessels of 100 Tons & Upwards for Highland Park, 23rd May 1945 1945, Copy of a Certificate of Survey of Repairs for Highland Park, 8th June 1945 1945, Copy of a Certificate of Survey of Boilers & Machinery for Highland Park, 8th June 1945 1945, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 14th June 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 15th March 1945 1945, Report on Boilers for Highland Park, 15th June 1945 1945, Report on Electrical Equipment for Highland Park, 14th June 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Leefoon, June 1945 1945, Report of Surveys for Freeboard for Leefoon, October 1950 1950, Copy of a Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 9th November 1962 1962, Memo regarding Classification for Leefoon, 26th October 1962 1962, Memo regarding Classification for Leefoon, 1st November 1962 1962, Letter from K T Wong, Shipping Managers (Hong Kong) Ltd, to Lloyd's Register of Shipping, London, regarding Leefoon, 28th August 1962 1962, Copy of Air Letter from Clerk to the Classification Committee, to Shipping Managers (Hong Kong) Ltd, Hong Kong, regarding Leefoon, 22nd August 1962 1962, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Copy of a Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon still being laid up, 18th March 1963 1963, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 16th January 1963 1963, Telex from Lloyd\'s Committee, London, to the Marine, Hong Kong, regarding Leefoon, 16th January 1963 1963, Form of Postponed Surveys for Leefoon, 16th January 1963 1963, Report of Total Loss, Casualty, Breaking Up, etc for Leefoon, Undated no date, Telegram from Marine, Hong Kong Office, to the Lloyd\'s Committee, London, regarding Leefoon, Undated no date, Reciprocating Steam Engine Surveys for Sunjewel, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

North Vancouver Ship Repairs Ltd ( Half Midship Section Plan for Highland Park, 15th February 1944 1944, Request for Special Survey for Highland Park, 1st February 1944 1944, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Steel Steamer Report for Highland Park, June 1945 1945, Form for Vessels of 100 Tons & Upwards for Highland Park, 23rd May 1945 1945, Copy of a Certificate of Survey of Repairs for Highland Park, 8th June 1945 1945, Copy of a Certificate of Survey of Boilers & Machinery for Highland Park, 8th June 1945 1945, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 14th June 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 15th March 1945 1945, Report on Boilers for Highland Park, 15th June 1945 1945, Report on Electrical Equipment for Highland Park, 14th June 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Leefoon, June 1945 1945, Report of Surveys for Freeboard for Leefoon, October 1950 1950, Copy of a Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 9th November 1962 1962, Memo regarding Classification for Leefoon, 26th October 1962 1962, Memo regarding Classification for Leefoon, 1st November 1962 1962, Letter from K T Wong, Shipping Managers (Hong Kong) Ltd, to Lloyd's Register of Shipping, London, regarding Leefoon, 28th August 1962 1962, Copy of Air Letter from Clerk to the Classification Committee, to Shipping Managers (Hong Kong) Ltd, Hong Kong, regarding Leefoon, 22nd August 1962 1962, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Copy of a Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon still being laid up, 18th March 1963 1963, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 16th January 1963 1963, Telex from Lloyd\'s Committee, London, to the Marine, Hong Kong, regarding Leefoon, 16th January 1963 1963, Form of Postponed Surveys for Leefoon, 16th January 1963 1963, Report of Total Loss, Casualty, Breaking Up, etc for Leefoon, Undated no date, Telegram from Marine, Hong Kong Office, to the Lloyd\'s Committee, London, regarding Leefoon, Undated no date, Reciprocating Steam Engine Surveys for Sunjewel, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

North Vancouver, B C ( Half Midship Section Plan for Highland Park, 15th February 1944 1944, Request for Special Survey for Highland Park, 1st February 1944 1944, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Steel Steamer Report for Highland Park, June 1945 1945, Form for Vessels of 100 Tons & Upwards for Highland Park, 23rd May 1945 1945, Copy of a Certificate of Survey of Repairs for Highland Park, 8th June 1945 1945, Copy of a Certificate of Survey of Boilers & Machinery for Highland Park, 8th June 1945 1945, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 14th June 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 15th March 1945 1945, Report on Boilers for Highland Park, 15th June 1945 1945, Report on Electrical Equipment for Highland Park, 14th June 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Leefoon, June 1945 1945, Report of Surveys for Freeboard for Leefoon, October 1950 1950, Copy of a Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 9th November 1962 1962, Memo regarding Classification for Leefoon, 26th October 1962 1962, Memo regarding Classification for Leefoon, 1st November 1962 1962, Letter from K T Wong, Shipping Managers (Hong Kong) Ltd, to Lloyd's Register of Shipping, London, regarding Leefoon, 28th August 1962 1962, Copy of Air Letter from Clerk to the Classification Committee, to Shipping Managers (Hong Kong) Ltd, Hong Kong, regarding Leefoon, 22nd August 1962 1962, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Copy of a Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon still being laid up, 18th March 1963 1963, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 16th January 1963 1963, Telex from Lloyd\'s Committee, London, to the Marine, Hong Kong, regarding Leefoon, 16th January 1963 1963, Form of Postponed Surveys for Leefoon, 16th January 1963 1963, Report of Total Loss, Casualty, Breaking Up, etc for Leefoon, Undated no date, Telegram from Marine, Hong Kong Office, to the Lloyd\'s Committee, London, regarding Leefoon, Undated no date, Reciprocating Steam Engine Surveys for Sunjewel, Undated no date )

A vessel’s means of propulsion.

Propulsion

Steam ( Half Midship Section Plan for Highland Park, 15th February 1944 1944, Request for Special Survey for Highland Park, 1st February 1944 1944, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Steel Steamer Report for Highland Park, June 1945 1945, Form for Vessels of 100 Tons & Upwards for Highland Park, 23rd May 1945 1945, Copy of a Certificate of Survey of Repairs for Highland Park, 8th June 1945 1945, Copy of a Certificate of Survey of Boilers & Machinery for Highland Park, 8th June 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 14th June 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 15th March 1945 1945, Report on Boilers for Highland Park, 15th June 1945 1945, Report on Electrical Equipment for Highland Park, 14th June 1945 1945, Copy of a Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 9th November 1962 1962, Letter from K T Wong, Shipping Managers (Hong Kong) Ltd, to Lloyd's Register of Shipping, London, regarding Leefoon, 28th August 1962 1962, Copy of Air Letter from Clerk to the Classification Committee, to Shipping Managers (Hong Kong) Ltd, Hong Kong, regarding Leefoon, 22nd August 1962 1962, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Copy of a Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon still being laid up, 18th March 1963 1963, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 16th January 1963 1963, Telex from Lloyd\'s Committee, London, to the Marine, Hong Kong, regarding Leefoon, 16th January 1963 1963, Form of Postponed Surveys for Leefoon, 16th January 1963 1963, Report of Total Loss, Casualty, Breaking Up, etc for Leefoon, Undated no date, Telegram from Marine, Hong Kong Office, to the Lloyd\'s Committee, London, regarding Leefoon, Undated no date )

undefined ( Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Leefoon, June 1945 1945, Report of Surveys for Freeboard for Leefoon, October 1950 1950, Memo regarding Classification for Leefoon, 26th October 1962 1962, Memo regarding Classification for Leefoon, 1st November 1962 1962, Reciprocating Steam Engine Surveys for Sunjewel, Undated no date )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Half Midship Section Plan for Highland Park, 15th February 1944 1944, Request for Special Survey for Highland Park, 1st February 1944 1944, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Steel Steamer Report for Highland Park, June 1945 1945, Form for Vessels of 100 Tons & Upwards for Highland Park, 23rd May 1945 1945, Copy of a Certificate of Survey of Repairs for Highland Park, 8th June 1945 1945, Copy of a Certificate of Survey of Boilers & Machinery for Highland Park, 8th June 1945 1945, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 14th June 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 15th March 1945 1945, Report on Boilers for Highland Park, 15th June 1945 1945, Report on Electrical Equipment for Highland Park, 14th June 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Leefoon, June 1945 1945, Report of Surveys for Freeboard for Leefoon, October 1950 1950, Copy of a Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 9th November 1962 1962, Memo regarding Classification for Leefoon, 26th October 1962 1962, Memo regarding Classification for Leefoon, 1st November 1962 1962, Letter from K T Wong, Shipping Managers (Hong Kong) Ltd, to Lloyd's Register of Shipping, London, regarding Leefoon, 28th August 1962 1962, Copy of Air Letter from Clerk to the Classification Committee, to Shipping Managers (Hong Kong) Ltd, Hong Kong, regarding Leefoon, 22nd August 1962 1962, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Copy of a Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon still being laid up, 18th March 1963 1963, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 16th January 1963 1963, Telex from Lloyd\'s Committee, London, to the Marine, Hong Kong, regarding Leefoon, 16th January 1963 1963, Form of Postponed Surveys for Leefoon, 16th January 1963 1963, Report of Total Loss, Casualty, Breaking Up, etc for Leefoon, Undated no date, Telegram from Marine, Hong Kong Office, to the Lloyd\'s Committee, London, regarding Leefoon, Undated no date, Reciprocating Steam Engine Surveys for Sunjewel, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Half Midship Section Plan for Highland Park, 15th February 1944 1944, Request for Special Survey for Highland Park, 1st February 1944 1944, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Steel Steamer Report for Highland Park, June 1945 1945, Form for Vessels of 100 Tons & Upwards for Highland Park, 23rd May 1945 1945, Copy of a Certificate of Survey of Repairs for Highland Park, 8th June 1945 1945, Copy of a Certificate of Survey of Boilers & Machinery for Highland Park, 8th June 1945 1945, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 14th June 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 15th March 1945 1945, Report on Boilers for Highland Park, 15th June 1945 1945, Report on Electrical Equipment for Highland Park, 14th June 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Leefoon, June 1945 1945, Report of Surveys for Freeboard for Leefoon, October 1950 1950, Copy of a Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 9th November 1962 1962, Memo regarding Classification for Leefoon, 26th October 1962 1962, Memo regarding Classification for Leefoon, 1st November 1962 1962, Letter from K T Wong, Shipping Managers (Hong Kong) Ltd, to Lloyd's Register of Shipping, London, regarding Leefoon, 28th August 1962 1962, Copy of Air Letter from Clerk to the Classification Committee, to Shipping Managers (Hong Kong) Ltd, Hong Kong, regarding Leefoon, 22nd August 1962 1962, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Copy of a Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon still being laid up, 18th March 1963 1963, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 16th January 1963 1963, Telex from Lloyd\'s Committee, London, to the Marine, Hong Kong, regarding Leefoon, 16th January 1963 1963, Form of Postponed Surveys for Leefoon, 16th January 1963 1963, Report of Total Loss, Casualty, Breaking Up, etc for Leefoon, Undated no date, Telegram from Marine, Hong Kong Office, to the Lloyd\'s Committee, London, regarding Leefoon, Undated no date, Reciprocating Steam Engine Surveys for Sunjewel, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Half Midship Section Plan for Highland Park, 15th February 1944 1944, Request for Special Survey for Highland Park, 1st February 1944 1944, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Steel Steamer Report for Highland Park, June 1945 1945, Form for Vessels of 100 Tons & Upwards for Highland Park, 23rd May 1945 1945, Copy of a Certificate of Survey of Repairs for Highland Park, 8th June 1945 1945, Copy of a Certificate of Survey of Boilers & Machinery for Highland Park, 8th June 1945 1945, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 14th June 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 15th March 1945 1945, Report on Boilers for Highland Park, 15th June 1945 1945, Report on Electrical Equipment for Highland Park, 14th June 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Leefoon, June 1945 1945, Report of Surveys for Freeboard for Leefoon, October 1950 1950, Copy of a Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 9th November 1962 1962, Memo regarding Classification for Leefoon, 26th October 1962 1962, Memo regarding Classification for Leefoon, 1st November 1962 1962, Letter from K T Wong, Shipping Managers (Hong Kong) Ltd, to Lloyd's Register of Shipping, London, regarding Leefoon, 28th August 1962 1962, Copy of Air Letter from Clerk to the Classification Committee, to Shipping Managers (Hong Kong) Ltd, Hong Kong, regarding Leefoon, 22nd August 1962 1962, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Copy of a Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon still being laid up, 18th March 1963 1963, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 16th January 1963 1963, Telex from Lloyd\'s Committee, London, to the Marine, Hong Kong, regarding Leefoon, 16th January 1963 1963, Form of Postponed Surveys for Leefoon, 16th January 1963 1963, Report of Total Loss, Casualty, Breaking Up, etc for Leefoon, Undated no date, Telegram from Marine, Hong Kong Office, to the Lloyd\'s Committee, London, regarding Leefoon, Undated no date, Reciprocating Steam Engine Surveys for Sunjewel, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Half Midship Section Plan for Highland Park, 15th February 1944 1944, Request for Special Survey for Highland Park, 1st February 1944 1944, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Steel Steamer Report for Highland Park, June 1945 1945, Form for Vessels of 100 Tons & Upwards for Highland Park, 23rd May 1945 1945, Copy of a Certificate of Survey of Repairs for Highland Park, 8th June 1945 1945, Copy of a Certificate of Survey of Boilers & Machinery for Highland Park, 8th June 1945 1945, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 14th June 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 15th March 1945 1945, Report on Boilers for Highland Park, 15th June 1945 1945, Report on Electrical Equipment for Highland Park, 14th June 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Leefoon, June 1945 1945, Report of Surveys for Freeboard for Leefoon, October 1950 1950, Copy of a Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 9th November 1962 1962, Memo regarding Classification for Leefoon, 26th October 1962 1962, Memo regarding Classification for Leefoon, 1st November 1962 1962, Letter from K T Wong, Shipping Managers (Hong Kong) Ltd, to Lloyd's Register of Shipping, London, regarding Leefoon, 28th August 1962 1962, Copy of Air Letter from Clerk to the Classification Committee, to Shipping Managers (Hong Kong) Ltd, Hong Kong, regarding Leefoon, 22nd August 1962 1962, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Copy of a Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon still being laid up, 18th March 1963 1963, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 16th January 1963 1963, Telex from Lloyd\'s Committee, London, to the Marine, Hong Kong, regarding Leefoon, 16th January 1963 1963, Form of Postponed Surveys for Leefoon, 16th January 1963 1963, Report of Total Loss, Casualty, Breaking Up, etc for Leefoon, Undated no date, Telegram from Marine, Hong Kong Office, to the Lloyd\'s Committee, London, regarding Leefoon, Undated no date, Reciprocating Steam Engine Surveys for Sunjewel, Undated no date )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sold for Breaking up, Demolition Commenced ( Half Midship Section Plan for Highland Park, 15th February 1944 1944, Request for Special Survey for Highland Park, 1st February 1944 1944, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Steel Steamer Report for Highland Park, June 1945 1945, Form for Vessels of 100 Tons & Upwards for Highland Park, 23rd May 1945 1945, Copy of a Certificate of Survey of Repairs for Highland Park, 8th June 1945 1945, Copy of a Certificate of Survey of Boilers & Machinery for Highland Park, 8th June 1945 1945, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Highland Park, 7th August 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 14th June 1945 1945, Report on Steam Reciprocating Engine Machinery for Highland Park, 15th March 1945 1945, Report on Boilers for Highland Park, 15th June 1945 1945, Report on Electrical Equipment for Highland Park, 14th June 1945 1945, Report of Surveys for Freeboard - Conditions of Assignment for Leefoon, June 1945 1945, Report of Surveys for Freeboard for Leefoon, October 1950 1950, Copy of a Letter from Deputy Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 9th November 1962 1962, Memo regarding Classification for Leefoon, 26th October 1962 1962, Memo regarding Classification for Leefoon, 1st November 1962 1962, Letter from K T Wong, Shipping Managers (Hong Kong) Ltd, to Lloyd's Register of Shipping, London, regarding Leefoon, 28th August 1962 1962, Copy of Air Letter from Clerk to the Classification Committee, to Shipping Managers (Hong Kong) Ltd, Hong Kong, regarding Leefoon, 22nd August 1962 1962, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Copy of a Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon being Broken up, 3rd July 1963 1963, Question & Answer Memo between London & Hong Kong Offices, regarding Leefoon still being laid up, 18th March 1963 1963, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Hong Kong, regarding Leefoon, 16th January 1963 1963, Telex from Lloyd\'s Committee, London, to the Marine, Hong Kong, regarding Leefoon, 16th January 1963 1963, Form of Postponed Surveys for Leefoon, 16th January 1963 1963, Report of Total Loss, Casualty, Breaking Up, etc for Leefoon, Undated no date, Telegram from Marine, Hong Kong Office, to the Lloyd\'s Committee, London, regarding Leefoon, Undated no date, Reciprocating Steam Engine Surveys for Sunjewel, Undated no date )