Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Danwood ( Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors enclosing Classification Certificates on hull (half) & machinery in reference to Oslo First Entry Report for Danwood, 17th October 1930 1930, Memo to Chief Ship Surveyor regarding Oslo Report submitting that Surveyors should again be requested to forward a copy of midship section as built for Danwood, 2nd October 1930 1930, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing copy of approved midship section stating spacing of upper deck beams & height of tanks side brackets as approved for Danwood, 29th September 1930 1930, Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, informing of report from Oslo Surveyors in reference to Glasgow Report of satisfactorily fitted boiler & classing with notations for Danwood, 26th September 1930 1930, Request for Special Survey of Boilers & Engines of Danwood, 5th November 1930 1930, Memo regarding Stockholm Reports on Engines, submitting that the reports be sent to Oslo Surveyors for guidance & completion for Danwood, 1st May 1930 1930, Memo regarding Oslo Report on Electric Fittings, concluding conductors for main generators, air compressor & lubricating oil pump motors are in accordance with Rules & Surveyor should state insulating materials of cables for Danwood, 23rd September 1930 1930, Letter from George Webster, Gothenburg Surveyor, to Secretary of Lloyd's Register, London, confirming telegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Gothenburg Surveyors, confirming cablegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Gothenburg Surveyors regarding opening up & examination of machinery not being necessary at present for Danwood, 22nd April 1931 1931, Telegram from Lloyd's Register, London, to Gothenburg Surveyors regarding Danwood, 22nd April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, acknowledging receipt of letter & informing Owners accordingly, Owners stating drydocking & general examination in Gothenburg for Danwood, 20th April 1931 1931, Translation of Cablegram from Gothenburg Surveyors to Lloyd's Register, London, advising of vessel docking at Gothenburg port & if engines need to be opened out & examined on Danwood, 22nd April 1931 1931, Telegram from Gothenburg Surveyors to Committee of Lloyd's Register, London, regarding Danwood, 22nd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors regarding Owner requesting date of build being entered as April 1931, Committee unable to depart from clear terms of Rules & cablegram on decision sent for Danwood, 14th April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Oslo Surveyor advising of careful consideration of letter but regretting date of build recorded in Register Book cannot be altered for Danwood, 14th April 1931 1931, Telegram from Lloyd's Register, London, to Oslo Surveyor regarding Danwood, 14th April 1931 1931, Memo regarding build date following usual procedure recorded as last date of survey & letter from Owners requesting alteration in date of build in Register Book due to being laid up but under effective inspection of Danwood, 13th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, regarding letter from Owner requesting altered date of build in Register Book due to being laid up & examination in drydock at Gothenburg of Danwood, 10th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing plan of midship section & Owner's letter regarding omission of two watertight bulkheads of Danwood, 14th October 1930 1931 )

Maloja ( Letter from Clerk of Classification Committee of Lloyd's Register, London, to A Scott Esq, Vancouver Surveyor, regarding overdue Donkey Boiler Survey & informing of Owners having arranged inspection before departure from Vancouver of Maloja, 11th May 1939 1939, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, informing of letter from Owners stating that the Master had arranged to have Donkey Boiler Survey held in Vancouver before leaving for Japan for Maloja, 10th May 1939 1939, Letter from D A MacFarlane, Shanghai Surveyor, to Secretary of Lloyd's Register, London, responding to Classing Letter & Shanghai Report, enclosing photographs of broken Compressor Crank Shaft & explaining cause of damage on Maloja, 13th April 1939 1939, Letter from P Eide, Oslo Surveyor, to Secretary of Lloyd's Register, London, advising of Owners instructing Master to attend to donkey boiler survey, vessel in Japan & leaving for British Columbia & Owners again contacting Master of Maloja, 1st April 1939 1939, Letter from R Lockhart, Shimonoseki Surveyor, to Secretary of Lloyd's Register, London, responding to classing letter stating windlass bedplate not renewed in survey & new anchor shackle untested due to lack of facilities for Maloja, 16th February 1939 1939, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Secretary of Lloyd's Register, Glasgow, responding to letter stating fee to be charged for the portion of continuous Survey of oil engines for Maloja, 12th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, enclosing letter response received to letter addressed to The Norwegian Shipping & Trading Mission regarding Maloja, 9th October 1942 1942, Letter from E K Ripley of The Norwegian Shipping & Trade Mission, London, to Lloyd's Register, Glasgow, noting recommendation to withdraw starboard tailshaft at next drydocking for examination of stern gland stuffing box of Maloja, 7th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, regarding Glasgow Report requesting part of fee for the Continuous Survey of oil engines to be charged for Maloja, 6th October 1942 1942, Letter from Secretary of Glasgow Committee of Lloyd's Register to Norwegian Shipping & Trade Mission, London, recommending stern gland stuffing box in way be specially examined & renewal of repaired bottom cylinder flange for Maloja, 6th October 1942 1942 )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

04/01/1930 ( Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors enclosing Classification Certificates on hull (half) & machinery in reference to Oslo First Entry Report for Danwood, 17th October 1930 1930, Memo to Chief Ship Surveyor regarding Oslo Report submitting that Surveyors should again be requested to forward a copy of midship section as built for Danwood, 2nd October 1930 1930, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing copy of approved midship section stating spacing of upper deck beams & height of tanks side brackets as approved for Danwood, 29th September 1930 1930, Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, informing of report from Oslo Surveyors in reference to Glasgow Report of satisfactorily fitted boiler & classing with notations for Danwood, 26th September 1930 1930, Request for Special Survey of Boilers & Engines of Danwood, 5th November 1930 1930, Memo regarding Stockholm Reports on Engines, submitting that the reports be sent to Oslo Surveyors for guidance & completion for Danwood, 1st May 1930 1930, Memo regarding Oslo Report on Electric Fittings, concluding conductors for main generators, air compressor & lubricating oil pump motors are in accordance with Rules & Surveyor should state insulating materials of cables for Danwood, 23rd September 1930 1930, Letter from George Webster, Gothenburg Surveyor, to Secretary of Lloyd's Register, London, confirming telegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Gothenburg Surveyors, confirming cablegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Gothenburg Surveyors regarding opening up & examination of machinery not being necessary at present for Danwood, 22nd April 1931 1931, Telegram from Lloyd's Register, London, to Gothenburg Surveyors regarding Danwood, 22nd April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, acknowledging receipt of letter & informing Owners accordingly, Owners stating drydocking & general examination in Gothenburg for Danwood, 20th April 1931 1931, Translation of Cablegram from Gothenburg Surveyors to Lloyd's Register, London, advising of vessel docking at Gothenburg port & if engines need to be opened out & examined on Danwood, 22nd April 1931 1931, Telegram from Gothenburg Surveyors to Committee of Lloyd's Register, London, regarding Danwood, 22nd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors regarding Owner requesting date of build being entered as April 1931, Committee unable to depart from clear terms of Rules & cablegram on decision sent for Danwood, 14th April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Oslo Surveyor advising of careful consideration of letter but regretting date of build recorded in Register Book cannot be altered for Danwood, 14th April 1931 1931, Telegram from Lloyd's Register, London, to Oslo Surveyor regarding Danwood, 14th April 1931 1931, Memo regarding build date following usual procedure recorded as last date of survey & letter from Owners requesting alteration in date of build in Register Book due to being laid up but under effective inspection of Danwood, 13th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, regarding letter from Owner requesting altered date of build in Register Book due to being laid up & examination in drydock at Gothenburg of Danwood, 10th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing plan of midship section & Owner's letter regarding omission of two watertight bulkheads of Danwood, 14th October 1930 1931, Letter from Clerk of Classification Committee of Lloyd's Register, London, to A Scott Esq, Vancouver Surveyor, regarding overdue Donkey Boiler Survey & informing of Owners having arranged inspection before departure from Vancouver of Maloja, 11th May 1939 1939, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, informing of letter from Owners stating that the Master had arranged to have Donkey Boiler Survey held in Vancouver before leaving for Japan for Maloja, 10th May 1939 1939, Letter from D A MacFarlane, Shanghai Surveyor, to Secretary of Lloyd's Register, London, responding to Classing Letter & Shanghai Report, enclosing photographs of broken Compressor Crank Shaft & explaining cause of damage on Maloja, 13th April 1939 1939, Letter from P Eide, Oslo Surveyor, to Secretary of Lloyd's Register, London, advising of Owners instructing Master to attend to donkey boiler survey, vessel in Japan & leaving for British Columbia & Owners again contacting Master of Maloja, 1st April 1939 1939, Letter from R Lockhart, Shimonoseki Surveyor, to Secretary of Lloyd's Register, London, responding to classing letter stating windlass bedplate not renewed in survey & new anchor shackle untested due to lack of facilities for Maloja, 16th February 1939 1939, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Secretary of Lloyd's Register, Glasgow, responding to letter stating fee to be charged for the portion of continuous Survey of oil engines for Maloja, 12th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, enclosing letter response received to letter addressed to The Norwegian Shipping & Trading Mission regarding Maloja, 9th October 1942 1942, Letter from E K Ripley of The Norwegian Shipping & Trade Mission, London, to Lloyd's Register, Glasgow, noting recommendation to withdraw starboard tailshaft at next drydocking for examination of stern gland stuffing box of Maloja, 7th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, regarding Glasgow Report requesting part of fee for the Continuous Survey of oil engines to be charged for Maloja, 6th October 1942 1942, Letter from Secretary of Glasgow Committee of Lloyd's Register to Norwegian Shipping & Trade Mission, London, recommending stern gland stuffing box in way be specially examined & renewal of repaired bottom cylinder flange for Maloja, 6th October 1942 1942 )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

255 ( Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors enclosing Classification Certificates on hull (half) & machinery in reference to Oslo First Entry Report for Danwood, 17th October 1930 1930, Memo to Chief Ship Surveyor regarding Oslo Report submitting that Surveyors should again be requested to forward a copy of midship section as built for Danwood, 2nd October 1930 1930, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing copy of approved midship section stating spacing of upper deck beams & height of tanks side brackets as approved for Danwood, 29th September 1930 1930, Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, informing of report from Oslo Surveyors in reference to Glasgow Report of satisfactorily fitted boiler & classing with notations for Danwood, 26th September 1930 1930, Request for Special Survey of Boilers & Engines of Danwood, 5th November 1930 1930, Memo regarding Stockholm Reports on Engines, submitting that the reports be sent to Oslo Surveyors for guidance & completion for Danwood, 1st May 1930 1930, Memo regarding Oslo Report on Electric Fittings, concluding conductors for main generators, air compressor & lubricating oil pump motors are in accordance with Rules & Surveyor should state insulating materials of cables for Danwood, 23rd September 1930 1930, Letter from George Webster, Gothenburg Surveyor, to Secretary of Lloyd's Register, London, confirming telegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Gothenburg Surveyors, confirming cablegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Gothenburg Surveyors regarding opening up & examination of machinery not being necessary at present for Danwood, 22nd April 1931 1931, Telegram from Lloyd's Register, London, to Gothenburg Surveyors regarding Danwood, 22nd April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, acknowledging receipt of letter & informing Owners accordingly, Owners stating drydocking & general examination in Gothenburg for Danwood, 20th April 1931 1931, Translation of Cablegram from Gothenburg Surveyors to Lloyd's Register, London, advising of vessel docking at Gothenburg port & if engines need to be opened out & examined on Danwood, 22nd April 1931 1931, Telegram from Gothenburg Surveyors to Committee of Lloyd's Register, London, regarding Danwood, 22nd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors regarding Owner requesting date of build being entered as April 1931, Committee unable to depart from clear terms of Rules & cablegram on decision sent for Danwood, 14th April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Oslo Surveyor advising of careful consideration of letter but regretting date of build recorded in Register Book cannot be altered for Danwood, 14th April 1931 1931, Telegram from Lloyd's Register, London, to Oslo Surveyor regarding Danwood, 14th April 1931 1931, Memo regarding build date following usual procedure recorded as last date of survey & letter from Owners requesting alteration in date of build in Register Book due to being laid up but under effective inspection of Danwood, 13th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, regarding letter from Owner requesting altered date of build in Register Book due to being laid up & examination in drydock at Gothenburg of Danwood, 10th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing plan of midship section & Owner's letter regarding omission of two watertight bulkheads of Danwood, 14th October 1930 1931, Letter from Clerk of Classification Committee of Lloyd's Register, London, to A Scott Esq, Vancouver Surveyor, regarding overdue Donkey Boiler Survey & informing of Owners having arranged inspection before departure from Vancouver of Maloja, 11th May 1939 1939, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, informing of letter from Owners stating that the Master had arranged to have Donkey Boiler Survey held in Vancouver before leaving for Japan for Maloja, 10th May 1939 1939, Letter from D A MacFarlane, Shanghai Surveyor, to Secretary of Lloyd's Register, London, responding to Classing Letter & Shanghai Report, enclosing photographs of broken Compressor Crank Shaft & explaining cause of damage on Maloja, 13th April 1939 1939, Letter from P Eide, Oslo Surveyor, to Secretary of Lloyd's Register, London, advising of Owners instructing Master to attend to donkey boiler survey, vessel in Japan & leaving for British Columbia & Owners again contacting Master of Maloja, 1st April 1939 1939, Letter from R Lockhart, Shimonoseki Surveyor, to Secretary of Lloyd's Register, London, responding to classing letter stating windlass bedplate not renewed in survey & new anchor shackle untested due to lack of facilities for Maloja, 16th February 1939 1939, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Secretary of Lloyd's Register, Glasgow, responding to letter stating fee to be charged for the portion of continuous Survey of oil engines for Maloja, 12th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, enclosing letter response received to letter addressed to The Norwegian Shipping & Trading Mission regarding Maloja, 9th October 1942 1942, Letter from E K Ripley of The Norwegian Shipping & Trade Mission, London, to Lloyd's Register, Glasgow, noting recommendation to withdraw starboard tailshaft at next drydocking for examination of stern gland stuffing box of Maloja, 7th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, regarding Glasgow Report requesting part of fee for the Continuous Survey of oil engines to be charged for Maloja, 6th October 1942 1942, Letter from Secretary of Glasgow Committee of Lloyd's Register to Norwegian Shipping & Trade Mission, London, recommending stern gland stuffing box in way be specially examined & renewal of repaired bottom cylinder flange for Maloja, 6th October 1942 1942 )

Location where a vessel’s survey was undertaken.

Location of Survey

London ( Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors enclosing Classification Certificates on hull (half) & machinery in reference to Oslo First Entry Report for Danwood, 17th October 1930 1930, Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, informing of report from Oslo Surveyors in reference to Glasgow Report of satisfactorily fitted boiler & classing with notations for Danwood, 26th September 1930 1930, Letter from Secretary of Lloyd's Register, London, to Gothenburg Surveyors, confirming cablegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Gothenburg Surveyors regarding opening up & examination of machinery not being necessary at present for Danwood, 22nd April 1931 1931, Telegram from Lloyd's Register, London, to Gothenburg Surveyors regarding Danwood, 22nd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors regarding Owner requesting date of build being entered as April 1931, Committee unable to depart from clear terms of Rules & cablegram on decision sent for Danwood, 14th April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Oslo Surveyor advising of careful consideration of letter but regretting date of build recorded in Register Book cannot be altered for Danwood, 14th April 1931 1931, Telegram from Lloyd's Register, London, to Oslo Surveyor regarding Danwood, 14th April 1931 1931, Letter from Clerk of Classification Committee of Lloyd's Register, London, to A Scott Esq, Vancouver Surveyor, regarding overdue Donkey Boiler Survey & informing of Owners having arranged inspection before departure from Vancouver of Maloja, 11th May 1939 1939 )

Oslo ( Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing copy of approved midship section stating spacing of upper deck beams & height of tanks side brackets as approved for Danwood, 29th September 1930 1930, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, acknowledging receipt of letter & informing Owners accordingly, Owners stating drydocking & general examination in Gothenburg for Danwood, 20th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, regarding letter from Owner requesting altered date of build in Register Book due to being laid up & examination in drydock at Gothenburg of Danwood, 10th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing plan of midship section & Owner's letter regarding omission of two watertight bulkheads of Danwood, 14th October 1930 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, informing of letter from Owners stating that the Master had arranged to have Donkey Boiler Survey held in Vancouver before leaving for Japan for Maloja, 10th May 1939 1939, Letter from P Eide, Oslo Surveyor, to Secretary of Lloyd's Register, London, advising of Owners instructing Master to attend to donkey boiler survey, vessel in Japan & leaving for British Columbia & Owners again contacting Master of Maloja, 1st April 1939 1939 )

Fredrikstad ( Request for Special Survey of Boilers & Engines of Danwood, 5th November 1930 1930 )

Gothenburg ( Letter from George Webster, Gothenburg Surveyor, to Secretary of Lloyd's Register, London, confirming telegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Translation of Cablegram from Gothenburg Surveyors to Lloyd's Register, London, advising of vessel docking at Gothenburg port & if engines need to be opened out & examined on Danwood, 22nd April 1931 1931, Telegram from Gothenburg Surveyors to Committee of Lloyd's Register, London, regarding Danwood, 22nd April 1931 1931 )

Shanghai ( Letter from D A MacFarlane, Shanghai Surveyor, to Secretary of Lloyd's Register, London, responding to Classing Letter & Shanghai Report, enclosing photographs of broken Compressor Crank Shaft & explaining cause of damage on Maloja, 13th April 1939 1939 )

Shimonoseki ( Letter from R Lockhart, Shimonoseki Surveyor, to Secretary of Lloyd's Register, London, responding to classing letter stating windlass bedplate not renewed in survey & new anchor shackle untested due to lack of facilities for Maloja, 16th February 1939 1939 )

Wokingham ( Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Secretary of Lloyd's Register, Glasgow, responding to letter stating fee to be charged for the portion of continuous Survey of oil engines for Maloja, 12th October 1942 1942 )

Glasgow ( Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, enclosing letter response received to letter addressed to The Norwegian Shipping & Trading Mission regarding Maloja, 9th October 1942 1942, Letter from E K Ripley of The Norwegian Shipping & Trade Mission, London, to Lloyd's Register, Glasgow, noting recommendation to withdraw starboard tailshaft at next drydocking for examination of stern gland stuffing box of Maloja, 7th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, regarding Glasgow Report requesting part of fee for the Continuous Survey of oil engines to be charged for Maloja, 6th October 1942 1942, Letter from Secretary of Glasgow Committee of Lloyd's Register to Norwegian Shipping & Trade Mission, London, recommending stern gland stuffing box in way be specially examined & renewal of repaired bottom cylinder flange for Maloja, 6th October 1942 1942 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors enclosing Classification Certificates on hull (half) & machinery in reference to Oslo First Entry Report for Danwood, 17th October 1930 1930, Memo to Chief Ship Surveyor regarding Oslo Report submitting that Surveyors should again be requested to forward a copy of midship section as built for Danwood, 2nd October 1930 1930, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing copy of approved midship section stating spacing of upper deck beams & height of tanks side brackets as approved for Danwood, 29th September 1930 1930, Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, informing of report from Oslo Surveyors in reference to Glasgow Report of satisfactorily fitted boiler & classing with notations for Danwood, 26th September 1930 1930, Request for Special Survey of Boilers & Engines of Danwood, 5th November 1930 1930, Memo regarding Stockholm Reports on Engines, submitting that the reports be sent to Oslo Surveyors for guidance & completion for Danwood, 1st May 1930 1930, Memo regarding Oslo Report on Electric Fittings, concluding conductors for main generators, air compressor & lubricating oil pump motors are in accordance with Rules & Surveyor should state insulating materials of cables for Danwood, 23rd September 1930 1930, Letter from George Webster, Gothenburg Surveyor, to Secretary of Lloyd's Register, London, confirming telegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Gothenburg Surveyors, confirming cablegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Gothenburg Surveyors regarding opening up & examination of machinery not being necessary at present for Danwood, 22nd April 1931 1931, Telegram from Lloyd's Register, London, to Gothenburg Surveyors regarding Danwood, 22nd April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, acknowledging receipt of letter & informing Owners accordingly, Owners stating drydocking & general examination in Gothenburg for Danwood, 20th April 1931 1931, Translation of Cablegram from Gothenburg Surveyors to Lloyd's Register, London, advising of vessel docking at Gothenburg port & if engines need to be opened out & examined on Danwood, 22nd April 1931 1931, Telegram from Gothenburg Surveyors to Committee of Lloyd's Register, London, regarding Danwood, 22nd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors regarding Owner requesting date of build being entered as April 1931, Committee unable to depart from clear terms of Rules & cablegram on decision sent for Danwood, 14th April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Oslo Surveyor advising of careful consideration of letter but regretting date of build recorded in Register Book cannot be altered for Danwood, 14th April 1931 1931, Telegram from Lloyd's Register, London, to Oslo Surveyor regarding Danwood, 14th April 1931 1931, Memo regarding build date following usual procedure recorded as last date of survey & letter from Owners requesting alteration in date of build in Register Book due to being laid up but under effective inspection of Danwood, 13th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, regarding letter from Owner requesting altered date of build in Register Book due to being laid up & examination in drydock at Gothenburg of Danwood, 10th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing plan of midship section & Owner's letter regarding omission of two watertight bulkheads of Danwood, 14th October 1930 1931, Letter from Clerk of Classification Committee of Lloyd's Register, London, to A Scott Esq, Vancouver Surveyor, regarding overdue Donkey Boiler Survey & informing of Owners having arranged inspection before departure from Vancouver of Maloja, 11th May 1939 1939, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, informing of letter from Owners stating that the Master had arranged to have Donkey Boiler Survey held in Vancouver before leaving for Japan for Maloja, 10th May 1939 1939, Letter from D A MacFarlane, Shanghai Surveyor, to Secretary of Lloyd's Register, London, responding to Classing Letter & Shanghai Report, enclosing photographs of broken Compressor Crank Shaft & explaining cause of damage on Maloja, 13th April 1939 1939, Letter from P Eide, Oslo Surveyor, to Secretary of Lloyd's Register, London, advising of Owners instructing Master to attend to donkey boiler survey, vessel in Japan & leaving for British Columbia & Owners again contacting Master of Maloja, 1st April 1939 1939, Letter from R Lockhart, Shimonoseki Surveyor, to Secretary of Lloyd's Register, London, responding to classing letter stating windlass bedplate not renewed in survey & new anchor shackle untested due to lack of facilities for Maloja, 16th February 1939 1939, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Secretary of Lloyd's Register, Glasgow, responding to letter stating fee to be charged for the portion of continuous Survey of oil engines for Maloja, 12th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, enclosing letter response received to letter addressed to The Norwegian Shipping & Trading Mission regarding Maloja, 9th October 1942 1942, Letter from E K Ripley of The Norwegian Shipping & Trade Mission, London, to Lloyd's Register, Glasgow, noting recommendation to withdraw starboard tailshaft at next drydocking for examination of stern gland stuffing box of Maloja, 7th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, regarding Glasgow Report requesting part of fee for the Continuous Survey of oil engines to be charged for Maloja, 6th October 1942 1942, Letter from Secretary of Glasgow Committee of Lloyd's Register to Norwegian Shipping & Trade Mission, London, recommending stern gland stuffing box in way be specially examined & renewal of repaired bottom cylinder flange for Maloja, 6th October 1942 1942 )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors enclosing Classification Certificates on hull (half) & machinery in reference to Oslo First Entry Report for Danwood, 17th October 1930 1930, Memo to Chief Ship Surveyor regarding Oslo Report submitting that Surveyors should again be requested to forward a copy of midship section as built for Danwood, 2nd October 1930 1930, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing copy of approved midship section stating spacing of upper deck beams & height of tanks side brackets as approved for Danwood, 29th September 1930 1930, Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, informing of report from Oslo Surveyors in reference to Glasgow Report of satisfactorily fitted boiler & classing with notations for Danwood, 26th September 1930 1930, Request for Special Survey of Boilers & Engines of Danwood, 5th November 1930 1930, Memo regarding Stockholm Reports on Engines, submitting that the reports be sent to Oslo Surveyors for guidance & completion for Danwood, 1st May 1930 1930, Memo regarding Oslo Report on Electric Fittings, concluding conductors for main generators, air compressor & lubricating oil pump motors are in accordance with Rules & Surveyor should state insulating materials of cables for Danwood, 23rd September 1930 1930, Letter from George Webster, Gothenburg Surveyor, to Secretary of Lloyd's Register, London, confirming telegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Gothenburg Surveyors, confirming cablegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Gothenburg Surveyors regarding opening up & examination of machinery not being necessary at present for Danwood, 22nd April 1931 1931, Telegram from Lloyd's Register, London, to Gothenburg Surveyors regarding Danwood, 22nd April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, acknowledging receipt of letter & informing Owners accordingly, Owners stating drydocking & general examination in Gothenburg for Danwood, 20th April 1931 1931, Translation of Cablegram from Gothenburg Surveyors to Lloyd's Register, London, advising of vessel docking at Gothenburg port & if engines need to be opened out & examined on Danwood, 22nd April 1931 1931, Telegram from Gothenburg Surveyors to Committee of Lloyd's Register, London, regarding Danwood, 22nd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors regarding Owner requesting date of build being entered as April 1931, Committee unable to depart from clear terms of Rules & cablegram on decision sent for Danwood, 14th April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Oslo Surveyor advising of careful consideration of letter but regretting date of build recorded in Register Book cannot be altered for Danwood, 14th April 1931 1931, Telegram from Lloyd's Register, London, to Oslo Surveyor regarding Danwood, 14th April 1931 1931, Memo regarding build date following usual procedure recorded as last date of survey & letter from Owners requesting alteration in date of build in Register Book due to being laid up but under effective inspection of Danwood, 13th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, regarding letter from Owner requesting altered date of build in Register Book due to being laid up & examination in drydock at Gothenburg of Danwood, 10th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing plan of midship section & Owner's letter regarding omission of two watertight bulkheads of Danwood, 14th October 1930 1931, Letter from Clerk of Classification Committee of Lloyd's Register, London, to A Scott Esq, Vancouver Surveyor, regarding overdue Donkey Boiler Survey & informing of Owners having arranged inspection before departure from Vancouver of Maloja, 11th May 1939 1939, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, informing of letter from Owners stating that the Master had arranged to have Donkey Boiler Survey held in Vancouver before leaving for Japan for Maloja, 10th May 1939 1939, Letter from D A MacFarlane, Shanghai Surveyor, to Secretary of Lloyd's Register, London, responding to Classing Letter & Shanghai Report, enclosing photographs of broken Compressor Crank Shaft & explaining cause of damage on Maloja, 13th April 1939 1939, Letter from P Eide, Oslo Surveyor, to Secretary of Lloyd's Register, London, advising of Owners instructing Master to attend to donkey boiler survey, vessel in Japan & leaving for British Columbia & Owners again contacting Master of Maloja, 1st April 1939 1939, Letter from R Lockhart, Shimonoseki Surveyor, to Secretary of Lloyd's Register, London, responding to classing letter stating windlass bedplate not renewed in survey & new anchor shackle untested due to lack of facilities for Maloja, 16th February 1939 1939, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Secretary of Lloyd's Register, Glasgow, responding to letter stating fee to be charged for the portion of continuous Survey of oil engines for Maloja, 12th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, enclosing letter response received to letter addressed to The Norwegian Shipping & Trading Mission regarding Maloja, 9th October 1942 1942, Letter from E K Ripley of The Norwegian Shipping & Trade Mission, London, to Lloyd's Register, Glasgow, noting recommendation to withdraw starboard tailshaft at next drydocking for examination of stern gland stuffing box of Maloja, 7th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, regarding Glasgow Report requesting part of fee for the Continuous Survey of oil engines to be charged for Maloja, 6th October 1942 1942, Letter from Secretary of Glasgow Committee of Lloyd's Register to Norwegian Shipping & Trade Mission, London, recommending stern gland stuffing box in way be specially examined & renewal of repaired bottom cylinder flange for Maloja, 6th October 1942 1942 )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors enclosing Classification Certificates on hull (half) & machinery in reference to Oslo First Entry Report for Danwood, 17th October 1930 1930, Memo to Chief Ship Surveyor regarding Oslo Report submitting that Surveyors should again be requested to forward a copy of midship section as built for Danwood, 2nd October 1930 1930, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing copy of approved midship section stating spacing of upper deck beams & height of tanks side brackets as approved for Danwood, 29th September 1930 1930, Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, informing of report from Oslo Surveyors in reference to Glasgow Report of satisfactorily fitted boiler & classing with notations for Danwood, 26th September 1930 1930, Request for Special Survey of Boilers & Engines of Danwood, 5th November 1930 1930, Memo regarding Stockholm Reports on Engines, submitting that the reports be sent to Oslo Surveyors for guidance & completion for Danwood, 1st May 1930 1930, Memo regarding Oslo Report on Electric Fittings, concluding conductors for main generators, air compressor & lubricating oil pump motors are in accordance with Rules & Surveyor should state insulating materials of cables for Danwood, 23rd September 1930 1930, Letter from George Webster, Gothenburg Surveyor, to Secretary of Lloyd's Register, London, confirming telegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Gothenburg Surveyors, confirming cablegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Gothenburg Surveyors regarding opening up & examination of machinery not being necessary at present for Danwood, 22nd April 1931 1931, Telegram from Lloyd's Register, London, to Gothenburg Surveyors regarding Danwood, 22nd April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, acknowledging receipt of letter & informing Owners accordingly, Owners stating drydocking & general examination in Gothenburg for Danwood, 20th April 1931 1931, Translation of Cablegram from Gothenburg Surveyors to Lloyd's Register, London, advising of vessel docking at Gothenburg port & if engines need to be opened out & examined on Danwood, 22nd April 1931 1931, Telegram from Gothenburg Surveyors to Committee of Lloyd's Register, London, regarding Danwood, 22nd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors regarding Owner requesting date of build being entered as April 1931, Committee unable to depart from clear terms of Rules & cablegram on decision sent for Danwood, 14th April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Oslo Surveyor advising of careful consideration of letter but regretting date of build recorded in Register Book cannot be altered for Danwood, 14th April 1931 1931, Telegram from Lloyd's Register, London, to Oslo Surveyor regarding Danwood, 14th April 1931 1931, Memo regarding build date following usual procedure recorded as last date of survey & letter from Owners requesting alteration in date of build in Register Book due to being laid up but under effective inspection of Danwood, 13th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, regarding letter from Owner requesting altered date of build in Register Book due to being laid up & examination in drydock at Gothenburg of Danwood, 10th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing plan of midship section & Owner's letter regarding omission of two watertight bulkheads of Danwood, 14th October 1930 1931, Letter from Clerk of Classification Committee of Lloyd's Register, London, to A Scott Esq, Vancouver Surveyor, regarding overdue Donkey Boiler Survey & informing of Owners having arranged inspection before departure from Vancouver of Maloja, 11th May 1939 1939, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, informing of letter from Owners stating that the Master had arranged to have Donkey Boiler Survey held in Vancouver before leaving for Japan for Maloja, 10th May 1939 1939, Letter from D A MacFarlane, Shanghai Surveyor, to Secretary of Lloyd's Register, London, responding to Classing Letter & Shanghai Report, enclosing photographs of broken Compressor Crank Shaft & explaining cause of damage on Maloja, 13th April 1939 1939, Letter from P Eide, Oslo Surveyor, to Secretary of Lloyd's Register, London, advising of Owners instructing Master to attend to donkey boiler survey, vessel in Japan & leaving for British Columbia & Owners again contacting Master of Maloja, 1st April 1939 1939, Letter from R Lockhart, Shimonoseki Surveyor, to Secretary of Lloyd's Register, London, responding to classing letter stating windlass bedplate not renewed in survey & new anchor shackle untested due to lack of facilities for Maloja, 16th February 1939 1939, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Secretary of Lloyd's Register, Glasgow, responding to letter stating fee to be charged for the portion of continuous Survey of oil engines for Maloja, 12th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, enclosing letter response received to letter addressed to The Norwegian Shipping & Trading Mission regarding Maloja, 9th October 1942 1942, Letter from E K Ripley of The Norwegian Shipping & Trade Mission, London, to Lloyd's Register, Glasgow, noting recommendation to withdraw starboard tailshaft at next drydocking for examination of stern gland stuffing box of Maloja, 7th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, regarding Glasgow Report requesting part of fee for the Continuous Survey of oil engines to be charged for Maloja, 6th October 1942 1942, Letter from Secretary of Glasgow Committee of Lloyd's Register to Norwegian Shipping & Trade Mission, London, recommending stern gland stuffing box in way be specially examined & renewal of repaired bottom cylinder flange for Maloja, 6th October 1942 1942 )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors enclosing Classification Certificates on hull (half) & machinery in reference to Oslo First Entry Report for Danwood, 17th October 1930 1930, Memo to Chief Ship Surveyor regarding Oslo Report submitting that Surveyors should again be requested to forward a copy of midship section as built for Danwood, 2nd October 1930 1930, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing copy of approved midship section stating spacing of upper deck beams & height of tanks side brackets as approved for Danwood, 29th September 1930 1930, Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, informing of report from Oslo Surveyors in reference to Glasgow Report of satisfactorily fitted boiler & classing with notations for Danwood, 26th September 1930 1930, Request for Special Survey of Boilers & Engines of Danwood, 5th November 1930 1930, Memo regarding Stockholm Reports on Engines, submitting that the reports be sent to Oslo Surveyors for guidance & completion for Danwood, 1st May 1930 1930, Memo regarding Oslo Report on Electric Fittings, concluding conductors for main generators, air compressor & lubricating oil pump motors are in accordance with Rules & Surveyor should state insulating materials of cables for Danwood, 23rd September 1930 1930, Letter from George Webster, Gothenburg Surveyor, to Secretary of Lloyd's Register, London, confirming telegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Gothenburg Surveyors, confirming cablegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Gothenburg Surveyors regarding opening up & examination of machinery not being necessary at present for Danwood, 22nd April 1931 1931, Telegram from Lloyd's Register, London, to Gothenburg Surveyors regarding Danwood, 22nd April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, acknowledging receipt of letter & informing Owners accordingly, Owners stating drydocking & general examination in Gothenburg for Danwood, 20th April 1931 1931, Translation of Cablegram from Gothenburg Surveyors to Lloyd's Register, London, advising of vessel docking at Gothenburg port & if engines need to be opened out & examined on Danwood, 22nd April 1931 1931, Telegram from Gothenburg Surveyors to Committee of Lloyd's Register, London, regarding Danwood, 22nd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors regarding Owner requesting date of build being entered as April 1931, Committee unable to depart from clear terms of Rules & cablegram on decision sent for Danwood, 14th April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Oslo Surveyor advising of careful consideration of letter but regretting date of build recorded in Register Book cannot be altered for Danwood, 14th April 1931 1931, Telegram from Lloyd's Register, London, to Oslo Surveyor regarding Danwood, 14th April 1931 1931, Memo regarding build date following usual procedure recorded as last date of survey & letter from Owners requesting alteration in date of build in Register Book due to being laid up but under effective inspection of Danwood, 13th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, regarding letter from Owner requesting altered date of build in Register Book due to being laid up & examination in drydock at Gothenburg of Danwood, 10th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing plan of midship section & Owner's letter regarding omission of two watertight bulkheads of Danwood, 14th October 1930 1931, Letter from Clerk of Classification Committee of Lloyd's Register, London, to A Scott Esq, Vancouver Surveyor, regarding overdue Donkey Boiler Survey & informing of Owners having arranged inspection before departure from Vancouver of Maloja, 11th May 1939 1939, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, informing of letter from Owners stating that the Master had arranged to have Donkey Boiler Survey held in Vancouver before leaving for Japan for Maloja, 10th May 1939 1939, Letter from D A MacFarlane, Shanghai Surveyor, to Secretary of Lloyd's Register, London, responding to Classing Letter & Shanghai Report, enclosing photographs of broken Compressor Crank Shaft & explaining cause of damage on Maloja, 13th April 1939 1939, Letter from P Eide, Oslo Surveyor, to Secretary of Lloyd's Register, London, advising of Owners instructing Master to attend to donkey boiler survey, vessel in Japan & leaving for British Columbia & Owners again contacting Master of Maloja, 1st April 1939 1939, Letter from R Lockhart, Shimonoseki Surveyor, to Secretary of Lloyd's Register, London, responding to classing letter stating windlass bedplate not renewed in survey & new anchor shackle untested due to lack of facilities for Maloja, 16th February 1939 1939, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Secretary of Lloyd's Register, Glasgow, responding to letter stating fee to be charged for the portion of continuous Survey of oil engines for Maloja, 12th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, enclosing letter response received to letter addressed to The Norwegian Shipping & Trading Mission regarding Maloja, 9th October 1942 1942, Letter from E K Ripley of The Norwegian Shipping & Trade Mission, London, to Lloyd's Register, Glasgow, noting recommendation to withdraw starboard tailshaft at next drydocking for examination of stern gland stuffing box of Maloja, 7th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, regarding Glasgow Report requesting part of fee for the Continuous Survey of oil engines to be charged for Maloja, 6th October 1942 1942, Letter from Secretary of Glasgow Committee of Lloyd's Register to Norwegian Shipping & Trade Mission, London, recommending stern gland stuffing box in way be specially examined & renewal of repaired bottom cylinder flange for Maloja, 6th October 1942 1942 )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sunk by Submarine ( Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors enclosing Classification Certificates on hull (half) & machinery in reference to Oslo First Entry Report for Danwood, 17th October 1930 1930, Memo to Chief Ship Surveyor regarding Oslo Report submitting that Surveyors should again be requested to forward a copy of midship section as built for Danwood, 2nd October 1930 1930, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing copy of approved midship section stating spacing of upper deck beams & height of tanks side brackets as approved for Danwood, 29th September 1930 1930, Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, informing of report from Oslo Surveyors in reference to Glasgow Report of satisfactorily fitted boiler & classing with notations for Danwood, 26th September 1930 1930, Request for Special Survey of Boilers & Engines of Danwood, 5th November 1930 1930, Memo regarding Stockholm Reports on Engines, submitting that the reports be sent to Oslo Surveyors for guidance & completion for Danwood, 1st May 1930 1930, Memo regarding Oslo Report on Electric Fittings, concluding conductors for main generators, air compressor & lubricating oil pump motors are in accordance with Rules & Surveyor should state insulating materials of cables for Danwood, 23rd September 1930 1930, Letter from George Webster, Gothenburg Surveyor, to Secretary of Lloyd's Register, London, confirming telegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Gothenburg Surveyors, confirming cablegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Gothenburg Surveyors regarding opening up & examination of machinery not being necessary at present for Danwood, 22nd April 1931 1931, Telegram from Lloyd's Register, London, to Gothenburg Surveyors regarding Danwood, 22nd April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, acknowledging receipt of letter & informing Owners accordingly, Owners stating drydocking & general examination in Gothenburg for Danwood, 20th April 1931 1931, Translation of Cablegram from Gothenburg Surveyors to Lloyd's Register, London, advising of vessel docking at Gothenburg port & if engines need to be opened out & examined on Danwood, 22nd April 1931 1931, Telegram from Gothenburg Surveyors to Committee of Lloyd's Register, London, regarding Danwood, 22nd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors regarding Owner requesting date of build being entered as April 1931, Committee unable to depart from clear terms of Rules & cablegram on decision sent for Danwood, 14th April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Oslo Surveyor advising of careful consideration of letter but regretting date of build recorded in Register Book cannot be altered for Danwood, 14th April 1931 1931, Telegram from Lloyd's Register, London, to Oslo Surveyor regarding Danwood, 14th April 1931 1931, Memo regarding build date following usual procedure recorded as last date of survey & letter from Owners requesting alteration in date of build in Register Book due to being laid up but under effective inspection of Danwood, 13th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, regarding letter from Owner requesting altered date of build in Register Book due to being laid up & examination in drydock at Gothenburg of Danwood, 10th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing plan of midship section & Owner's letter regarding omission of two watertight bulkheads of Danwood, 14th October 1930 1931, Letter from Clerk of Classification Committee of Lloyd's Register, London, to A Scott Esq, Vancouver Surveyor, regarding overdue Donkey Boiler Survey & informing of Owners having arranged inspection before departure from Vancouver of Maloja, 11th May 1939 1939, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, informing of letter from Owners stating that the Master had arranged to have Donkey Boiler Survey held in Vancouver before leaving for Japan for Maloja, 10th May 1939 1939, Letter from D A MacFarlane, Shanghai Surveyor, to Secretary of Lloyd's Register, London, responding to Classing Letter & Shanghai Report, enclosing photographs of broken Compressor Crank Shaft & explaining cause of damage on Maloja, 13th April 1939 1939, Letter from P Eide, Oslo Surveyor, to Secretary of Lloyd's Register, London, advising of Owners instructing Master to attend to donkey boiler survey, vessel in Japan & leaving for British Columbia & Owners again contacting Master of Maloja, 1st April 1939 1939, Letter from R Lockhart, Shimonoseki Surveyor, to Secretary of Lloyd's Register, London, responding to classing letter stating windlass bedplate not renewed in survey & new anchor shackle untested due to lack of facilities for Maloja, 16th February 1939 1939, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Secretary of Lloyd's Register, Glasgow, responding to letter stating fee to be charged for the portion of continuous Survey of oil engines for Maloja, 12th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, enclosing letter response received to letter addressed to The Norwegian Shipping & Trading Mission regarding Maloja, 9th October 1942 1942, Letter from E K Ripley of The Norwegian Shipping & Trade Mission, London, to Lloyd's Register, Glasgow, noting recommendation to withdraw starboard tailshaft at next drydocking for examination of stern gland stuffing box of Maloja, 7th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, regarding Glasgow Report requesting part of fee for the Continuous Survey of oil engines to be charged for Maloja, 6th October 1942 1942, Letter from Secretary of Glasgow Committee of Lloyd's Register to Norwegian Shipping & Trade Mission, London, recommending stern gland stuffing box in way be specially examined & renewal of repaired bottom cylinder flange for Maloja, 6th October 1942 1942 )

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

16/11/1942 ( Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors enclosing Classification Certificates on hull (half) & machinery in reference to Oslo First Entry Report for Danwood, 17th October 1930 1930, Memo to Chief Ship Surveyor regarding Oslo Report submitting that Surveyors should again be requested to forward a copy of midship section as built for Danwood, 2nd October 1930 1930, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing copy of approved midship section stating spacing of upper deck beams & height of tanks side brackets as approved for Danwood, 29th September 1930 1930, Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, informing of report from Oslo Surveyors in reference to Glasgow Report of satisfactorily fitted boiler & classing with notations for Danwood, 26th September 1930 1930, Request for Special Survey of Boilers & Engines of Danwood, 5th November 1930 1930, Memo regarding Stockholm Reports on Engines, submitting that the reports be sent to Oslo Surveyors for guidance & completion for Danwood, 1st May 1930 1930, Memo regarding Oslo Report on Electric Fittings, concluding conductors for main generators, air compressor & lubricating oil pump motors are in accordance with Rules & Surveyor should state insulating materials of cables for Danwood, 23rd September 1930 1930, Letter from George Webster, Gothenburg Surveyor, to Secretary of Lloyd's Register, London, confirming telegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Gothenburg Surveyors, confirming cablegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Gothenburg Surveyors regarding opening up & examination of machinery not being necessary at present for Danwood, 22nd April 1931 1931, Telegram from Lloyd's Register, London, to Gothenburg Surveyors regarding Danwood, 22nd April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, acknowledging receipt of letter & informing Owners accordingly, Owners stating drydocking & general examination in Gothenburg for Danwood, 20th April 1931 1931, Translation of Cablegram from Gothenburg Surveyors to Lloyd's Register, London, advising of vessel docking at Gothenburg port & if engines need to be opened out & examined on Danwood, 22nd April 1931 1931, Telegram from Gothenburg Surveyors to Committee of Lloyd's Register, London, regarding Danwood, 22nd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors regarding Owner requesting date of build being entered as April 1931, Committee unable to depart from clear terms of Rules & cablegram on decision sent for Danwood, 14th April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Oslo Surveyor advising of careful consideration of letter but regretting date of build recorded in Register Book cannot be altered for Danwood, 14th April 1931 1931, Telegram from Lloyd's Register, London, to Oslo Surveyor regarding Danwood, 14th April 1931 1931, Memo regarding build date following usual procedure recorded as last date of survey & letter from Owners requesting alteration in date of build in Register Book due to being laid up but under effective inspection of Danwood, 13th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, regarding letter from Owner requesting altered date of build in Register Book due to being laid up & examination in drydock at Gothenburg of Danwood, 10th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing plan of midship section & Owner's letter regarding omission of two watertight bulkheads of Danwood, 14th October 1930 1931, Letter from Clerk of Classification Committee of Lloyd's Register, London, to A Scott Esq, Vancouver Surveyor, regarding overdue Donkey Boiler Survey & informing of Owners having arranged inspection before departure from Vancouver of Maloja, 11th May 1939 1939, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, informing of letter from Owners stating that the Master had arranged to have Donkey Boiler Survey held in Vancouver before leaving for Japan for Maloja, 10th May 1939 1939, Letter from D A MacFarlane, Shanghai Surveyor, to Secretary of Lloyd's Register, London, responding to Classing Letter & Shanghai Report, enclosing photographs of broken Compressor Crank Shaft & explaining cause of damage on Maloja, 13th April 1939 1939, Letter from P Eide, Oslo Surveyor, to Secretary of Lloyd's Register, London, advising of Owners instructing Master to attend to donkey boiler survey, vessel in Japan & leaving for British Columbia & Owners again contacting Master of Maloja, 1st April 1939 1939, Letter from R Lockhart, Shimonoseki Surveyor, to Secretary of Lloyd's Register, London, responding to classing letter stating windlass bedplate not renewed in survey & new anchor shackle untested due to lack of facilities for Maloja, 16th February 1939 1939, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Secretary of Lloyd's Register, Glasgow, responding to letter stating fee to be charged for the portion of continuous Survey of oil engines for Maloja, 12th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, enclosing letter response received to letter addressed to The Norwegian Shipping & Trading Mission regarding Maloja, 9th October 1942 1942, Letter from E K Ripley of The Norwegian Shipping & Trade Mission, London, to Lloyd's Register, Glasgow, noting recommendation to withdraw starboard tailshaft at next drydocking for examination of stern gland stuffing box of Maloja, 7th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, regarding Glasgow Report requesting part of fee for the Continuous Survey of oil engines to be charged for Maloja, 6th October 1942 1942, Letter from Secretary of Glasgow Committee of Lloyd's Register to Norwegian Shipping & Trade Mission, London, recommending stern gland stuffing box in way be specially examined & renewal of repaired bottom cylinder flange for Maloja, 6th October 1942 1942 )

The year in which a vessel’s construction is completed.

Year of ship completion

1930 ( Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors enclosing Classification Certificates on hull (half) & machinery in reference to Oslo First Entry Report for Danwood, 17th October 1930 1930, Memo to Chief Ship Surveyor regarding Oslo Report submitting that Surveyors should again be requested to forward a copy of midship section as built for Danwood, 2nd October 1930 1930, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing copy of approved midship section stating spacing of upper deck beams & height of tanks side brackets as approved for Danwood, 29th September 1930 1930, Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, informing of report from Oslo Surveyors in reference to Glasgow Report of satisfactorily fitted boiler & classing with notations for Danwood, 26th September 1930 1930, Request for Special Survey of Boilers & Engines of Danwood, 5th November 1930 1930, Memo regarding Stockholm Reports on Engines, submitting that the reports be sent to Oslo Surveyors for guidance & completion for Danwood, 1st May 1930 1930, Memo regarding Oslo Report on Electric Fittings, concluding conductors for main generators, air compressor & lubricating oil pump motors are in accordance with Rules & Surveyor should state insulating materials of cables for Danwood, 23rd September 1930 1930, Letter from George Webster, Gothenburg Surveyor, to Secretary of Lloyd's Register, London, confirming telegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Gothenburg Surveyors, confirming cablegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Gothenburg Surveyors regarding opening up & examination of machinery not being necessary at present for Danwood, 22nd April 1931 1931, Telegram from Lloyd's Register, London, to Gothenburg Surveyors regarding Danwood, 22nd April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, acknowledging receipt of letter & informing Owners accordingly, Owners stating drydocking & general examination in Gothenburg for Danwood, 20th April 1931 1931, Translation of Cablegram from Gothenburg Surveyors to Lloyd's Register, London, advising of vessel docking at Gothenburg port & if engines need to be opened out & examined on Danwood, 22nd April 1931 1931, Telegram from Gothenburg Surveyors to Committee of Lloyd's Register, London, regarding Danwood, 22nd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors regarding Owner requesting date of build being entered as April 1931, Committee unable to depart from clear terms of Rules & cablegram on decision sent for Danwood, 14th April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Oslo Surveyor advising of careful consideration of letter but regretting date of build recorded in Register Book cannot be altered for Danwood, 14th April 1931 1931, Telegram from Lloyd's Register, London, to Oslo Surveyor regarding Danwood, 14th April 1931 1931, Memo regarding build date following usual procedure recorded as last date of survey & letter from Owners requesting alteration in date of build in Register Book due to being laid up but under effective inspection of Danwood, 13th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, regarding letter from Owner requesting altered date of build in Register Book due to being laid up & examination in drydock at Gothenburg of Danwood, 10th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing plan of midship section & Owner's letter regarding omission of two watertight bulkheads of Danwood, 14th October 1930 1931, Letter from Clerk of Classification Committee of Lloyd's Register, London, to A Scott Esq, Vancouver Surveyor, regarding overdue Donkey Boiler Survey & informing of Owners having arranged inspection before departure from Vancouver of Maloja, 11th May 1939 1939, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, informing of letter from Owners stating that the Master had arranged to have Donkey Boiler Survey held in Vancouver before leaving for Japan for Maloja, 10th May 1939 1939, Letter from D A MacFarlane, Shanghai Surveyor, to Secretary of Lloyd's Register, London, responding to Classing Letter & Shanghai Report, enclosing photographs of broken Compressor Crank Shaft & explaining cause of damage on Maloja, 13th April 1939 1939, Letter from P Eide, Oslo Surveyor, to Secretary of Lloyd's Register, London, advising of Owners instructing Master to attend to donkey boiler survey, vessel in Japan & leaving for British Columbia & Owners again contacting Master of Maloja, 1st April 1939 1939, Letter from R Lockhart, Shimonoseki Surveyor, to Secretary of Lloyd's Register, London, responding to classing letter stating windlass bedplate not renewed in survey & new anchor shackle untested due to lack of facilities for Maloja, 16th February 1939 1939, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Secretary of Lloyd's Register, Glasgow, responding to letter stating fee to be charged for the portion of continuous Survey of oil engines for Maloja, 12th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, enclosing letter response received to letter addressed to The Norwegian Shipping & Trading Mission regarding Maloja, 9th October 1942 1942, Letter from E K Ripley of The Norwegian Shipping & Trade Mission, London, to Lloyd's Register, Glasgow, noting recommendation to withdraw starboard tailshaft at next drydocking for examination of stern gland stuffing box of Maloja, 7th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, regarding Glasgow Report requesting part of fee for the Continuous Survey of oil engines to be charged for Maloja, 6th October 1942 1942, Letter from Secretary of Glasgow Committee of Lloyd's Register to Norwegian Shipping & Trade Mission, London, recommending stern gland stuffing box in way be specially examined & renewal of repaired bottom cylinder flange for Maloja, 6th October 1942 1942 )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Fredriksted Me Vaerkst ( Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors enclosing Classification Certificates on hull (half) & machinery in reference to Oslo First Entry Report for Danwood, 17th October 1930 1930, Memo to Chief Ship Surveyor regarding Oslo Report submitting that Surveyors should again be requested to forward a copy of midship section as built for Danwood, 2nd October 1930 1930, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing copy of approved midship section stating spacing of upper deck beams & height of tanks side brackets as approved for Danwood, 29th September 1930 1930, Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, informing of report from Oslo Surveyors in reference to Glasgow Report of satisfactorily fitted boiler & classing with notations for Danwood, 26th September 1930 1930, Request for Special Survey of Boilers & Engines of Danwood, 5th November 1930 1930, Memo regarding Stockholm Reports on Engines, submitting that the reports be sent to Oslo Surveyors for guidance & completion for Danwood, 1st May 1930 1930, Memo regarding Oslo Report on Electric Fittings, concluding conductors for main generators, air compressor & lubricating oil pump motors are in accordance with Rules & Surveyor should state insulating materials of cables for Danwood, 23rd September 1930 1930, Letter from George Webster, Gothenburg Surveyor, to Secretary of Lloyd's Register, London, confirming telegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Gothenburg Surveyors, confirming cablegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Gothenburg Surveyors regarding opening up & examination of machinery not being necessary at present for Danwood, 22nd April 1931 1931, Telegram from Lloyd's Register, London, to Gothenburg Surveyors regarding Danwood, 22nd April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, acknowledging receipt of letter & informing Owners accordingly, Owners stating drydocking & general examination in Gothenburg for Danwood, 20th April 1931 1931, Translation of Cablegram from Gothenburg Surveyors to Lloyd's Register, London, advising of vessel docking at Gothenburg port & if engines need to be opened out & examined on Danwood, 22nd April 1931 1931, Telegram from Gothenburg Surveyors to Committee of Lloyd's Register, London, regarding Danwood, 22nd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors regarding Owner requesting date of build being entered as April 1931, Committee unable to depart from clear terms of Rules & cablegram on decision sent for Danwood, 14th April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Oslo Surveyor advising of careful consideration of letter but regretting date of build recorded in Register Book cannot be altered for Danwood, 14th April 1931 1931, Telegram from Lloyd's Register, London, to Oslo Surveyor regarding Danwood, 14th April 1931 1931, Memo regarding build date following usual procedure recorded as last date of survey & letter from Owners requesting alteration in date of build in Register Book due to being laid up but under effective inspection of Danwood, 13th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, regarding letter from Owner requesting altered date of build in Register Book due to being laid up & examination in drydock at Gothenburg of Danwood, 10th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing plan of midship section & Owner's letter regarding omission of two watertight bulkheads of Danwood, 14th October 1930 1931, Letter from Clerk of Classification Committee of Lloyd's Register, London, to A Scott Esq, Vancouver Surveyor, regarding overdue Donkey Boiler Survey & informing of Owners having arranged inspection before departure from Vancouver of Maloja, 11th May 1939 1939, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, informing of letter from Owners stating that the Master had arranged to have Donkey Boiler Survey held in Vancouver before leaving for Japan for Maloja, 10th May 1939 1939, Letter from D A MacFarlane, Shanghai Surveyor, to Secretary of Lloyd's Register, London, responding to Classing Letter & Shanghai Report, enclosing photographs of broken Compressor Crank Shaft & explaining cause of damage on Maloja, 13th April 1939 1939, Letter from P Eide, Oslo Surveyor, to Secretary of Lloyd's Register, London, advising of Owners instructing Master to attend to donkey boiler survey, vessel in Japan & leaving for British Columbia & Owners again contacting Master of Maloja, 1st April 1939 1939, Letter from R Lockhart, Shimonoseki Surveyor, to Secretary of Lloyd's Register, London, responding to classing letter stating windlass bedplate not renewed in survey & new anchor shackle untested due to lack of facilities for Maloja, 16th February 1939 1939, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Secretary of Lloyd's Register, Glasgow, responding to letter stating fee to be charged for the portion of continuous Survey of oil engines for Maloja, 12th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, enclosing letter response received to letter addressed to The Norwegian Shipping & Trading Mission regarding Maloja, 9th October 1942 1942, Letter from E K Ripley of The Norwegian Shipping & Trade Mission, London, to Lloyd's Register, Glasgow, noting recommendation to withdraw starboard tailshaft at next drydocking for examination of stern gland stuffing box of Maloja, 7th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, regarding Glasgow Report requesting part of fee for the Continuous Survey of oil engines to be charged for Maloja, 6th October 1942 1942, Letter from Secretary of Glasgow Committee of Lloyd's Register to Norwegian Shipping & Trade Mission, London, recommending stern gland stuffing box in way be specially examined & renewal of repaired bottom cylinder flange for Maloja, 6th October 1942 1942 )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Fredriksted ( Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors enclosing Classification Certificates on hull (half) & machinery in reference to Oslo First Entry Report for Danwood, 17th October 1930 1930, Memo to Chief Ship Surveyor regarding Oslo Report submitting that Surveyors should again be requested to forward a copy of midship section as built for Danwood, 2nd October 1930 1930, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing copy of approved midship section stating spacing of upper deck beams & height of tanks side brackets as approved for Danwood, 29th September 1930 1930, Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, informing of report from Oslo Surveyors in reference to Glasgow Report of satisfactorily fitted boiler & classing with notations for Danwood, 26th September 1930 1930, Request for Special Survey of Boilers & Engines of Danwood, 5th November 1930 1930, Memo regarding Stockholm Reports on Engines, submitting that the reports be sent to Oslo Surveyors for guidance & completion for Danwood, 1st May 1930 1930, Memo regarding Oslo Report on Electric Fittings, concluding conductors for main generators, air compressor & lubricating oil pump motors are in accordance with Rules & Surveyor should state insulating materials of cables for Danwood, 23rd September 1930 1930, Letter from George Webster, Gothenburg Surveyor, to Secretary of Lloyd's Register, London, confirming telegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Gothenburg Surveyors, confirming cablegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Gothenburg Surveyors regarding opening up & examination of machinery not being necessary at present for Danwood, 22nd April 1931 1931, Telegram from Lloyd's Register, London, to Gothenburg Surveyors regarding Danwood, 22nd April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, acknowledging receipt of letter & informing Owners accordingly, Owners stating drydocking & general examination in Gothenburg for Danwood, 20th April 1931 1931, Translation of Cablegram from Gothenburg Surveyors to Lloyd's Register, London, advising of vessel docking at Gothenburg port & if engines need to be opened out & examined on Danwood, 22nd April 1931 1931, Telegram from Gothenburg Surveyors to Committee of Lloyd's Register, London, regarding Danwood, 22nd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors regarding Owner requesting date of build being entered as April 1931, Committee unable to depart from clear terms of Rules & cablegram on decision sent for Danwood, 14th April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Oslo Surveyor advising of careful consideration of letter but regretting date of build recorded in Register Book cannot be altered for Danwood, 14th April 1931 1931, Telegram from Lloyd's Register, London, to Oslo Surveyor regarding Danwood, 14th April 1931 1931, Memo regarding build date following usual procedure recorded as last date of survey & letter from Owners requesting alteration in date of build in Register Book due to being laid up but under effective inspection of Danwood, 13th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, regarding letter from Owner requesting altered date of build in Register Book due to being laid up & examination in drydock at Gothenburg of Danwood, 10th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing plan of midship section & Owner's letter regarding omission of two watertight bulkheads of Danwood, 14th October 1930 1931, Letter from Clerk of Classification Committee of Lloyd's Register, London, to A Scott Esq, Vancouver Surveyor, regarding overdue Donkey Boiler Survey & informing of Owners having arranged inspection before departure from Vancouver of Maloja, 11th May 1939 1939, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, informing of letter from Owners stating that the Master had arranged to have Donkey Boiler Survey held in Vancouver before leaving for Japan for Maloja, 10th May 1939 1939, Letter from D A MacFarlane, Shanghai Surveyor, to Secretary of Lloyd's Register, London, responding to Classing Letter & Shanghai Report, enclosing photographs of broken Compressor Crank Shaft & explaining cause of damage on Maloja, 13th April 1939 1939, Letter from P Eide, Oslo Surveyor, to Secretary of Lloyd's Register, London, advising of Owners instructing Master to attend to donkey boiler survey, vessel in Japan & leaving for British Columbia & Owners again contacting Master of Maloja, 1st April 1939 1939, Letter from R Lockhart, Shimonoseki Surveyor, to Secretary of Lloyd's Register, London, responding to classing letter stating windlass bedplate not renewed in survey & new anchor shackle untested due to lack of facilities for Maloja, 16th February 1939 1939, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Secretary of Lloyd's Register, Glasgow, responding to letter stating fee to be charged for the portion of continuous Survey of oil engines for Maloja, 12th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, enclosing letter response received to letter addressed to The Norwegian Shipping & Trading Mission regarding Maloja, 9th October 1942 1942, Letter from E K Ripley of The Norwegian Shipping & Trade Mission, London, to Lloyd's Register, Glasgow, noting recommendation to withdraw starboard tailshaft at next drydocking for examination of stern gland stuffing box of Maloja, 7th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, regarding Glasgow Report requesting part of fee for the Continuous Survey of oil engines to be charged for Maloja, 6th October 1942 1942, Letter from Secretary of Glasgow Committee of Lloyd's Register to Norwegian Shipping & Trade Mission, London, recommending stern gland stuffing box in way be specially examined & renewal of repaired bottom cylinder flange for Maloja, 6th October 1942 1942 )

A vessel’s means of propulsion.

Propulsion

Motor (internal combustion) ( Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors enclosing Classification Certificates on hull (half) & machinery in reference to Oslo First Entry Report for Danwood, 17th October 1930 1930, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing copy of approved midship section stating spacing of upper deck beams & height of tanks side brackets as approved for Danwood, 29th September 1930 1930, Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, informing of report from Oslo Surveyors in reference to Glasgow Report of satisfactorily fitted boiler & classing with notations for Danwood, 26th September 1930 1930, Request for Special Survey of Boilers & Engines of Danwood, 5th November 1930 1930, Letter from Secretary of Lloyd's Register, London, to Gothenburg Surveyors, confirming cablegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, acknowledging receipt of letter & informing Owners accordingly, Owners stating drydocking & general examination in Gothenburg for Danwood, 20th April 1931 1931, Memo regarding build date following usual procedure recorded as last date of survey & letter from Owners requesting alteration in date of build in Register Book due to being laid up but under effective inspection of Danwood, 13th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing plan of midship section & Owner's letter regarding omission of two watertight bulkheads of Danwood, 14th October 1930 1931, Letter from Clerk of Classification Committee of Lloyd's Register, London, to A Scott Esq, Vancouver Surveyor, regarding overdue Donkey Boiler Survey & informing of Owners having arranged inspection before departure from Vancouver of Maloja, 11th May 1939 1939, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, informing of letter from Owners stating that the Master had arranged to have Donkey Boiler Survey held in Vancouver before leaving for Japan for Maloja, 10th May 1939 1939, Letter from D A MacFarlane, Shanghai Surveyor, to Secretary of Lloyd's Register, London, responding to Classing Letter & Shanghai Report, enclosing photographs of broken Compressor Crank Shaft & explaining cause of damage on Maloja, 13th April 1939 1939, Letter from P Eide, Oslo Surveyor, to Secretary of Lloyd's Register, London, advising of Owners instructing Master to attend to donkey boiler survey, vessel in Japan & leaving for British Columbia & Owners again contacting Master of Maloja, 1st April 1939 1939, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Secretary of Lloyd's Register, Glasgow, responding to letter stating fee to be charged for the portion of continuous Survey of oil engines for Maloja, 12th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, enclosing letter response received to letter addressed to The Norwegian Shipping & Trading Mission regarding Maloja, 9th October 1942 1942, Letter from E K Ripley of The Norwegian Shipping & Trade Mission, London, to Lloyd's Register, Glasgow, noting recommendation to withdraw starboard tailshaft at next drydocking for examination of stern gland stuffing box of Maloja, 7th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, regarding Glasgow Report requesting part of fee for the Continuous Survey of oil engines to be charged for Maloja, 6th October 1942 1942, Letter from Secretary of Glasgow Committee of Lloyd's Register to Norwegian Shipping & Trade Mission, London, recommending stern gland stuffing box in way be specially examined & renewal of repaired bottom cylinder flange for Maloja, 6th October 1942 1942 )

undefined ( Memo to Chief Ship Surveyor regarding Oslo Report submitting that Surveyors should again be requested to forward a copy of midship section as built for Danwood, 2nd October 1930 1930, Memo regarding Stockholm Reports on Engines, submitting that the reports be sent to Oslo Surveyors for guidance & completion for Danwood, 1st May 1930 1930, Memo regarding Oslo Report on Electric Fittings, concluding conductors for main generators, air compressor & lubricating oil pump motors are in accordance with Rules & Surveyor should state insulating materials of cables for Danwood, 23rd September 1930 1930, Letter from George Webster, Gothenburg Surveyor, to Secretary of Lloyd's Register, London, confirming telegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Gothenburg Surveyors regarding opening up & examination of machinery not being necessary at present for Danwood, 22nd April 1931 1931, Telegram from Lloyd's Register, London, to Gothenburg Surveyors regarding Danwood, 22nd April 1931 1931, Translation of Cablegram from Gothenburg Surveyors to Lloyd's Register, London, advising of vessel docking at Gothenburg port & if engines need to be opened out & examined on Danwood, 22nd April 1931 1931, Telegram from Gothenburg Surveyors to Committee of Lloyd's Register, London, regarding Danwood, 22nd April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Oslo Surveyor advising of careful consideration of letter but regretting date of build recorded in Register Book cannot be altered for Danwood, 14th April 1931 1931, Telegram from Lloyd's Register, London, to Oslo Surveyor regarding Danwood, 14th April 1931 1931, Letter from R Lockhart, Shimonoseki Surveyor, to Secretary of Lloyd's Register, London, responding to classing letter stating windlass bedplate not renewed in survey & new anchor shackle untested due to lack of facilities for Maloja, 16th February 1939 1939 )

Steam ( Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors regarding Owner requesting date of build being entered as April 1931, Committee unable to depart from clear terms of Rules & cablegram on decision sent for Danwood, 14th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, regarding letter from Owner requesting altered date of build in Register Book due to being laid up & examination in drydock at Gothenburg of Danwood, 10th April 1931 1931 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors enclosing Classification Certificates on hull (half) & machinery in reference to Oslo First Entry Report for Danwood, 17th October 1930 1930, Memo to Chief Ship Surveyor regarding Oslo Report submitting that Surveyors should again be requested to forward a copy of midship section as built for Danwood, 2nd October 1930 1930, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing copy of approved midship section stating spacing of upper deck beams & height of tanks side brackets as approved for Danwood, 29th September 1930 1930, Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, informing of report from Oslo Surveyors in reference to Glasgow Report of satisfactorily fitted boiler & classing with notations for Danwood, 26th September 1930 1930, Request for Special Survey of Boilers & Engines of Danwood, 5th November 1930 1930, Memo regarding Stockholm Reports on Engines, submitting that the reports be sent to Oslo Surveyors for guidance & completion for Danwood, 1st May 1930 1930, Memo regarding Oslo Report on Electric Fittings, concluding conductors for main generators, air compressor & lubricating oil pump motors are in accordance with Rules & Surveyor should state insulating materials of cables for Danwood, 23rd September 1930 1930, Letter from George Webster, Gothenburg Surveyor, to Secretary of Lloyd's Register, London, confirming telegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Gothenburg Surveyors, confirming cablegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Gothenburg Surveyors regarding opening up & examination of machinery not being necessary at present for Danwood, 22nd April 1931 1931, Telegram from Lloyd's Register, London, to Gothenburg Surveyors regarding Danwood, 22nd April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, acknowledging receipt of letter & informing Owners accordingly, Owners stating drydocking & general examination in Gothenburg for Danwood, 20th April 1931 1931, Translation of Cablegram from Gothenburg Surveyors to Lloyd's Register, London, advising of vessel docking at Gothenburg port & if engines need to be opened out & examined on Danwood, 22nd April 1931 1931, Telegram from Gothenburg Surveyors to Committee of Lloyd's Register, London, regarding Danwood, 22nd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors regarding Owner requesting date of build being entered as April 1931, Committee unable to depart from clear terms of Rules & cablegram on decision sent for Danwood, 14th April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Oslo Surveyor advising of careful consideration of letter but regretting date of build recorded in Register Book cannot be altered for Danwood, 14th April 1931 1931, Telegram from Lloyd's Register, London, to Oslo Surveyor regarding Danwood, 14th April 1931 1931, Memo regarding build date following usual procedure recorded as last date of survey & letter from Owners requesting alteration in date of build in Register Book due to being laid up but under effective inspection of Danwood, 13th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, regarding letter from Owner requesting altered date of build in Register Book due to being laid up & examination in drydock at Gothenburg of Danwood, 10th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing plan of midship section & Owner's letter regarding omission of two watertight bulkheads of Danwood, 14th October 1930 1931, Letter from Clerk of Classification Committee of Lloyd's Register, London, to A Scott Esq, Vancouver Surveyor, regarding overdue Donkey Boiler Survey & informing of Owners having arranged inspection before departure from Vancouver of Maloja, 11th May 1939 1939, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, informing of letter from Owners stating that the Master had arranged to have Donkey Boiler Survey held in Vancouver before leaving for Japan for Maloja, 10th May 1939 1939, Letter from D A MacFarlane, Shanghai Surveyor, to Secretary of Lloyd's Register, London, responding to Classing Letter & Shanghai Report, enclosing photographs of broken Compressor Crank Shaft & explaining cause of damage on Maloja, 13th April 1939 1939, Letter from P Eide, Oslo Surveyor, to Secretary of Lloyd's Register, London, advising of Owners instructing Master to attend to donkey boiler survey, vessel in Japan & leaving for British Columbia & Owners again contacting Master of Maloja, 1st April 1939 1939, Letter from R Lockhart, Shimonoseki Surveyor, to Secretary of Lloyd's Register, London, responding to classing letter stating windlass bedplate not renewed in survey & new anchor shackle untested due to lack of facilities for Maloja, 16th February 1939 1939, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Secretary of Lloyd's Register, Glasgow, responding to letter stating fee to be charged for the portion of continuous Survey of oil engines for Maloja, 12th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, enclosing letter response received to letter addressed to The Norwegian Shipping & Trading Mission regarding Maloja, 9th October 1942 1942, Letter from E K Ripley of The Norwegian Shipping & Trade Mission, London, to Lloyd's Register, Glasgow, noting recommendation to withdraw starboard tailshaft at next drydocking for examination of stern gland stuffing box of Maloja, 7th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, regarding Glasgow Report requesting part of fee for the Continuous Survey of oil engines to be charged for Maloja, 6th October 1942 1942, Letter from Secretary of Glasgow Committee of Lloyd's Register to Norwegian Shipping & Trade Mission, London, recommending stern gland stuffing box in way be specially examined & renewal of repaired bottom cylinder flange for Maloja, 6th October 1942 1942 )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors enclosing Classification Certificates on hull (half) & machinery in reference to Oslo First Entry Report for Danwood, 17th October 1930 1930, Memo to Chief Ship Surveyor regarding Oslo Report submitting that Surveyors should again be requested to forward a copy of midship section as built for Danwood, 2nd October 1930 1930, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing copy of approved midship section stating spacing of upper deck beams & height of tanks side brackets as approved for Danwood, 29th September 1930 1930, Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, informing of report from Oslo Surveyors in reference to Glasgow Report of satisfactorily fitted boiler & classing with notations for Danwood, 26th September 1930 1930, Request for Special Survey of Boilers & Engines of Danwood, 5th November 1930 1930, Memo regarding Stockholm Reports on Engines, submitting that the reports be sent to Oslo Surveyors for guidance & completion for Danwood, 1st May 1930 1930, Memo regarding Oslo Report on Electric Fittings, concluding conductors for main generators, air compressor & lubricating oil pump motors are in accordance with Rules & Surveyor should state insulating materials of cables for Danwood, 23rd September 1930 1930, Letter from George Webster, Gothenburg Surveyor, to Secretary of Lloyd's Register, London, confirming telegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Gothenburg Surveyors, confirming cablegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Gothenburg Surveyors regarding opening up & examination of machinery not being necessary at present for Danwood, 22nd April 1931 1931, Telegram from Lloyd's Register, London, to Gothenburg Surveyors regarding Danwood, 22nd April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, acknowledging receipt of letter & informing Owners accordingly, Owners stating drydocking & general examination in Gothenburg for Danwood, 20th April 1931 1931, Translation of Cablegram from Gothenburg Surveyors to Lloyd's Register, London, advising of vessel docking at Gothenburg port & if engines need to be opened out & examined on Danwood, 22nd April 1931 1931, Telegram from Gothenburg Surveyors to Committee of Lloyd's Register, London, regarding Danwood, 22nd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors regarding Owner requesting date of build being entered as April 1931, Committee unable to depart from clear terms of Rules & cablegram on decision sent for Danwood, 14th April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Oslo Surveyor advising of careful consideration of letter but regretting date of build recorded in Register Book cannot be altered for Danwood, 14th April 1931 1931, Telegram from Lloyd's Register, London, to Oslo Surveyor regarding Danwood, 14th April 1931 1931, Memo regarding build date following usual procedure recorded as last date of survey & letter from Owners requesting alteration in date of build in Register Book due to being laid up but under effective inspection of Danwood, 13th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, regarding letter from Owner requesting altered date of build in Register Book due to being laid up & examination in drydock at Gothenburg of Danwood, 10th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing plan of midship section & Owner's letter regarding omission of two watertight bulkheads of Danwood, 14th October 1930 1931, Letter from Clerk of Classification Committee of Lloyd's Register, London, to A Scott Esq, Vancouver Surveyor, regarding overdue Donkey Boiler Survey & informing of Owners having arranged inspection before departure from Vancouver of Maloja, 11th May 1939 1939, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, informing of letter from Owners stating that the Master had arranged to have Donkey Boiler Survey held in Vancouver before leaving for Japan for Maloja, 10th May 1939 1939, Letter from D A MacFarlane, Shanghai Surveyor, to Secretary of Lloyd's Register, London, responding to Classing Letter & Shanghai Report, enclosing photographs of broken Compressor Crank Shaft & explaining cause of damage on Maloja, 13th April 1939 1939, Letter from P Eide, Oslo Surveyor, to Secretary of Lloyd's Register, London, advising of Owners instructing Master to attend to donkey boiler survey, vessel in Japan & leaving for British Columbia & Owners again contacting Master of Maloja, 1st April 1939 1939, Letter from R Lockhart, Shimonoseki Surveyor, to Secretary of Lloyd's Register, London, responding to classing letter stating windlass bedplate not renewed in survey & new anchor shackle untested due to lack of facilities for Maloja, 16th February 1939 1939, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Secretary of Lloyd's Register, Glasgow, responding to letter stating fee to be charged for the portion of continuous Survey of oil engines for Maloja, 12th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, enclosing letter response received to letter addressed to The Norwegian Shipping & Trading Mission regarding Maloja, 9th October 1942 1942, Letter from E K Ripley of The Norwegian Shipping & Trade Mission, London, to Lloyd's Register, Glasgow, noting recommendation to withdraw starboard tailshaft at next drydocking for examination of stern gland stuffing box of Maloja, 7th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, regarding Glasgow Report requesting part of fee for the Continuous Survey of oil engines to be charged for Maloja, 6th October 1942 1942, Letter from Secretary of Glasgow Committee of Lloyd's Register to Norwegian Shipping & Trade Mission, London, recommending stern gland stuffing box in way be specially examined & renewal of repaired bottom cylinder flange for Maloja, 6th October 1942 1942 )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors enclosing Classification Certificates on hull (half) & machinery in reference to Oslo First Entry Report for Danwood, 17th October 1930 1930, Memo to Chief Ship Surveyor regarding Oslo Report submitting that Surveyors should again be requested to forward a copy of midship section as built for Danwood, 2nd October 1930 1930, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing copy of approved midship section stating spacing of upper deck beams & height of tanks side brackets as approved for Danwood, 29th September 1930 1930, Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, informing of report from Oslo Surveyors in reference to Glasgow Report of satisfactorily fitted boiler & classing with notations for Danwood, 26th September 1930 1930, Request for Special Survey of Boilers & Engines of Danwood, 5th November 1930 1930, Memo regarding Stockholm Reports on Engines, submitting that the reports be sent to Oslo Surveyors for guidance & completion for Danwood, 1st May 1930 1930, Memo regarding Oslo Report on Electric Fittings, concluding conductors for main generators, air compressor & lubricating oil pump motors are in accordance with Rules & Surveyor should state insulating materials of cables for Danwood, 23rd September 1930 1930, Letter from George Webster, Gothenburg Surveyor, to Secretary of Lloyd's Register, London, confirming telegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Gothenburg Surveyors, confirming cablegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Gothenburg Surveyors regarding opening up & examination of machinery not being necessary at present for Danwood, 22nd April 1931 1931, Telegram from Lloyd's Register, London, to Gothenburg Surveyors regarding Danwood, 22nd April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, acknowledging receipt of letter & informing Owners accordingly, Owners stating drydocking & general examination in Gothenburg for Danwood, 20th April 1931 1931, Translation of Cablegram from Gothenburg Surveyors to Lloyd's Register, London, advising of vessel docking at Gothenburg port & if engines need to be opened out & examined on Danwood, 22nd April 1931 1931, Telegram from Gothenburg Surveyors to Committee of Lloyd's Register, London, regarding Danwood, 22nd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors regarding Owner requesting date of build being entered as April 1931, Committee unable to depart from clear terms of Rules & cablegram on decision sent for Danwood, 14th April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Oslo Surveyor advising of careful consideration of letter but regretting date of build recorded in Register Book cannot be altered for Danwood, 14th April 1931 1931, Telegram from Lloyd's Register, London, to Oslo Surveyor regarding Danwood, 14th April 1931 1931, Memo regarding build date following usual procedure recorded as last date of survey & letter from Owners requesting alteration in date of build in Register Book due to being laid up but under effective inspection of Danwood, 13th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, regarding letter from Owner requesting altered date of build in Register Book due to being laid up & examination in drydock at Gothenburg of Danwood, 10th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing plan of midship section & Owner's letter regarding omission of two watertight bulkheads of Danwood, 14th October 1930 1931, Letter from Clerk of Classification Committee of Lloyd's Register, London, to A Scott Esq, Vancouver Surveyor, regarding overdue Donkey Boiler Survey & informing of Owners having arranged inspection before departure from Vancouver of Maloja, 11th May 1939 1939, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, informing of letter from Owners stating that the Master had arranged to have Donkey Boiler Survey held in Vancouver before leaving for Japan for Maloja, 10th May 1939 1939, Letter from D A MacFarlane, Shanghai Surveyor, to Secretary of Lloyd's Register, London, responding to Classing Letter & Shanghai Report, enclosing photographs of broken Compressor Crank Shaft & explaining cause of damage on Maloja, 13th April 1939 1939, Letter from P Eide, Oslo Surveyor, to Secretary of Lloyd's Register, London, advising of Owners instructing Master to attend to donkey boiler survey, vessel in Japan & leaving for British Columbia & Owners again contacting Master of Maloja, 1st April 1939 1939, Letter from R Lockhart, Shimonoseki Surveyor, to Secretary of Lloyd's Register, London, responding to classing letter stating windlass bedplate not renewed in survey & new anchor shackle untested due to lack of facilities for Maloja, 16th February 1939 1939, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Secretary of Lloyd's Register, Glasgow, responding to letter stating fee to be charged for the portion of continuous Survey of oil engines for Maloja, 12th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, enclosing letter response received to letter addressed to The Norwegian Shipping & Trading Mission regarding Maloja, 9th October 1942 1942, Letter from E K Ripley of The Norwegian Shipping & Trade Mission, London, to Lloyd's Register, Glasgow, noting recommendation to withdraw starboard tailshaft at next drydocking for examination of stern gland stuffing box of Maloja, 7th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, regarding Glasgow Report requesting part of fee for the Continuous Survey of oil engines to be charged for Maloja, 6th October 1942 1942, Letter from Secretary of Glasgow Committee of Lloyd's Register to Norwegian Shipping & Trade Mission, London, recommending stern gland stuffing box in way be specially examined & renewal of repaired bottom cylinder flange for Maloja, 6th October 1942 1942 )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors enclosing Classification Certificates on hull (half) & machinery in reference to Oslo First Entry Report for Danwood, 17th October 1930 1930, Memo to Chief Ship Surveyor regarding Oslo Report submitting that Surveyors should again be requested to forward a copy of midship section as built for Danwood, 2nd October 1930 1930, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing copy of approved midship section stating spacing of upper deck beams & height of tanks side brackets as approved for Danwood, 29th September 1930 1930, Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, informing of report from Oslo Surveyors in reference to Glasgow Report of satisfactorily fitted boiler & classing with notations for Danwood, 26th September 1930 1930, Request for Special Survey of Boilers & Engines of Danwood, 5th November 1930 1930, Memo regarding Stockholm Reports on Engines, submitting that the reports be sent to Oslo Surveyors for guidance & completion for Danwood, 1st May 1930 1930, Memo regarding Oslo Report on Electric Fittings, concluding conductors for main generators, air compressor & lubricating oil pump motors are in accordance with Rules & Surveyor should state insulating materials of cables for Danwood, 23rd September 1930 1930, Letter from George Webster, Gothenburg Surveyor, to Secretary of Lloyd's Register, London, confirming telegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Gothenburg Surveyors, confirming cablegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Gothenburg Surveyors regarding opening up & examination of machinery not being necessary at present for Danwood, 22nd April 1931 1931, Telegram from Lloyd's Register, London, to Gothenburg Surveyors regarding Danwood, 22nd April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, acknowledging receipt of letter & informing Owners accordingly, Owners stating drydocking & general examination in Gothenburg for Danwood, 20th April 1931 1931, Translation of Cablegram from Gothenburg Surveyors to Lloyd's Register, London, advising of vessel docking at Gothenburg port & if engines need to be opened out & examined on Danwood, 22nd April 1931 1931, Telegram from Gothenburg Surveyors to Committee of Lloyd's Register, London, regarding Danwood, 22nd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors regarding Owner requesting date of build being entered as April 1931, Committee unable to depart from clear terms of Rules & cablegram on decision sent for Danwood, 14th April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Oslo Surveyor advising of careful consideration of letter but regretting date of build recorded in Register Book cannot be altered for Danwood, 14th April 1931 1931, Telegram from Lloyd's Register, London, to Oslo Surveyor regarding Danwood, 14th April 1931 1931, Memo regarding build date following usual procedure recorded as last date of survey & letter from Owners requesting alteration in date of build in Register Book due to being laid up but under effective inspection of Danwood, 13th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, regarding letter from Owner requesting altered date of build in Register Book due to being laid up & examination in drydock at Gothenburg of Danwood, 10th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing plan of midship section & Owner's letter regarding omission of two watertight bulkheads of Danwood, 14th October 1930 1931, Letter from Clerk of Classification Committee of Lloyd's Register, London, to A Scott Esq, Vancouver Surveyor, regarding overdue Donkey Boiler Survey & informing of Owners having arranged inspection before departure from Vancouver of Maloja, 11th May 1939 1939, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, informing of letter from Owners stating that the Master had arranged to have Donkey Boiler Survey held in Vancouver before leaving for Japan for Maloja, 10th May 1939 1939, Letter from D A MacFarlane, Shanghai Surveyor, to Secretary of Lloyd's Register, London, responding to Classing Letter & Shanghai Report, enclosing photographs of broken Compressor Crank Shaft & explaining cause of damage on Maloja, 13th April 1939 1939, Letter from P Eide, Oslo Surveyor, to Secretary of Lloyd's Register, London, advising of Owners instructing Master to attend to donkey boiler survey, vessel in Japan & leaving for British Columbia & Owners again contacting Master of Maloja, 1st April 1939 1939, Letter from R Lockhart, Shimonoseki Surveyor, to Secretary of Lloyd's Register, London, responding to classing letter stating windlass bedplate not renewed in survey & new anchor shackle untested due to lack of facilities for Maloja, 16th February 1939 1939, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Secretary of Lloyd's Register, Glasgow, responding to letter stating fee to be charged for the portion of continuous Survey of oil engines for Maloja, 12th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, enclosing letter response received to letter addressed to The Norwegian Shipping & Trading Mission regarding Maloja, 9th October 1942 1942, Letter from E K Ripley of The Norwegian Shipping & Trade Mission, London, to Lloyd's Register, Glasgow, noting recommendation to withdraw starboard tailshaft at next drydocking for examination of stern gland stuffing box of Maloja, 7th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, regarding Glasgow Report requesting part of fee for the Continuous Survey of oil engines to be charged for Maloja, 6th October 1942 1942, Letter from Secretary of Glasgow Committee of Lloyd's Register to Norwegian Shipping & Trade Mission, London, recommending stern gland stuffing box in way be specially examined & renewal of repaired bottom cylinder flange for Maloja, 6th October 1942 1942 )

Vessel’s area of loss or disposal/last known recorded location.

Area of ship loss

Atlantic ( Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors enclosing Classification Certificates on hull (half) & machinery in reference to Oslo First Entry Report for Danwood, 17th October 1930 1930, Memo to Chief Ship Surveyor regarding Oslo Report submitting that Surveyors should again be requested to forward a copy of midship section as built for Danwood, 2nd October 1930 1930, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing copy of approved midship section stating spacing of upper deck beams & height of tanks side brackets as approved for Danwood, 29th September 1930 1930, Letter from Secretary of Lloyd's Register, London, to Secretary of Lloyd's Register, Glasgow, informing of report from Oslo Surveyors in reference to Glasgow Report of satisfactorily fitted boiler & classing with notations for Danwood, 26th September 1930 1930, Request for Special Survey of Boilers & Engines of Danwood, 5th November 1930 1930, Memo regarding Stockholm Reports on Engines, submitting that the reports be sent to Oslo Surveyors for guidance & completion for Danwood, 1st May 1930 1930, Memo regarding Oslo Report on Electric Fittings, concluding conductors for main generators, air compressor & lubricating oil pump motors are in accordance with Rules & Surveyor should state insulating materials of cables for Danwood, 23rd September 1930 1930, Letter from George Webster, Gothenburg Surveyor, to Secretary of Lloyd's Register, London, confirming telegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Gothenburg Surveyors, confirming cablegrams regarding docking at port & opening up & examination of engines of Danwood, 23rd April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Gothenburg Surveyors regarding opening up & examination of machinery not being necessary at present for Danwood, 22nd April 1931 1931, Telegram from Lloyd's Register, London, to Gothenburg Surveyors regarding Danwood, 22nd April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, acknowledging receipt of letter & informing Owners accordingly, Owners stating drydocking & general examination in Gothenburg for Danwood, 20th April 1931 1931, Translation of Cablegram from Gothenburg Surveyors to Lloyd's Register, London, advising of vessel docking at Gothenburg port & if engines need to be opened out & examined on Danwood, 22nd April 1931 1931, Telegram from Gothenburg Surveyors to Committee of Lloyd's Register, London, regarding Danwood, 22nd April 1931 1931, Letter from Secretary of Lloyd's Register, London, to Oslo Surveyors regarding Owner requesting date of build being entered as April 1931, Committee unable to depart from clear terms of Rules & cablegram on decision sent for Danwood, 14th April 1931 1931, Translation of Cablegram from Lloyd's Register, London, to Oslo Surveyor advising of careful consideration of letter but regretting date of build recorded in Register Book cannot be altered for Danwood, 14th April 1931 1931, Telegram from Lloyd's Register, London, to Oslo Surveyor regarding Danwood, 14th April 1931 1931, Memo regarding build date following usual procedure recorded as last date of survey & letter from Owners requesting alteration in date of build in Register Book due to being laid up but under effective inspection of Danwood, 13th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, regarding letter from Owner requesting altered date of build in Register Book due to being laid up & examination in drydock at Gothenburg of Danwood, 10th April 1931 1931, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, enclosing plan of midship section & Owner's letter regarding omission of two watertight bulkheads of Danwood, 14th October 1930 1931, Letter from Clerk of Classification Committee of Lloyd's Register, London, to A Scott Esq, Vancouver Surveyor, regarding overdue Donkey Boiler Survey & informing of Owners having arranged inspection before departure from Vancouver of Maloja, 11th May 1939 1939, Letter from Per Bjorn Roli, Oslo Surveyor, to Secretary of Lloyd's Register, London, informing of letter from Owners stating that the Master had arranged to have Donkey Boiler Survey held in Vancouver before leaving for Japan for Maloja, 10th May 1939 1939, Letter from D A MacFarlane, Shanghai Surveyor, to Secretary of Lloyd's Register, London, responding to Classing Letter & Shanghai Report, enclosing photographs of broken Compressor Crank Shaft & explaining cause of damage on Maloja, 13th April 1939 1939, Letter from P Eide, Oslo Surveyor, to Secretary of Lloyd's Register, London, advising of Owners instructing Master to attend to donkey boiler survey, vessel in Japan & leaving for British Columbia & Owners again contacting Master of Maloja, 1st April 1939 1939, Letter from R Lockhart, Shimonoseki Surveyor, to Secretary of Lloyd's Register, London, responding to classing letter stating windlass bedplate not renewed in survey & new anchor shackle untested due to lack of facilities for Maloja, 16th February 1939 1939, Letter from Clerk of Classification Committee of Lloyd's Register, Wokingham, to Secretary of Lloyd's Register, Glasgow, responding to letter stating fee to be charged for the portion of continuous Survey of oil engines for Maloja, 12th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, enclosing letter response received to letter addressed to The Norwegian Shipping & Trading Mission regarding Maloja, 9th October 1942 1942, Letter from E K Ripley of The Norwegian Shipping & Trade Mission, London, to Lloyd's Register, Glasgow, noting recommendation to withdraw starboard tailshaft at next drydocking for examination of stern gland stuffing box of Maloja, 7th October 1942 1942, Letter from C R Willis, Secretary of Glasgow Committee of Lloyd's Register, to Secretary of Lloyd's Register, Wokingham, regarding Glasgow Report requesting part of fee for the Continuous Survey of oil engines to be charged for Maloja, 6th October 1942 1942, Letter from Secretary of Glasgow Committee of Lloyd's Register to Norwegian Shipping & Trade Mission, London, recommending stern gland stuffing box in way be specially examined & renewal of repaired bottom cylinder flange for Maloja, 6th October 1942 1942 )

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.