Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
James McMillan ( Report of survey for Mary Sharp, 7 November 1834 1834 )
The port or place in which the vessel’s construction took place, at the time of writing.
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Daniel Brown ( Report of survey for Mary Sharp, 7 November 1834 1834 )
Brown ( Annual Surveys Report for Mary Sharp, 30th July 1836 1836 )
R Mills ( Annual Surveys Report for Mary Sharp, 25th November 1843 1843 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
A1 for 10 years ( Report of survey for Mary Sharp, 7 November 1834 1834 )
Continue Class 10A1 ( Annual Surveys Report for Mary Sharp, 30th July 1836 1836 )
Contd 3A1 ( Annual Surveys Report for Mary Sharp, 25th November 1843 1843 )
Recorded information related to a vessel’s movements.
Clyde ( Report of survey for Mary Sharp, 7 November 1834 1834 )
London; Sidney ( Annual Surveys Report for Mary Sharp, 25th November 1843 1843 )
Broad categories and subdivisions of vessels related to their purpose or function.
Cargo ( Report of survey for Mary Sharp, 7 November 1834 1834 )
A vessel’s means of propulsion.
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
Is machinery fitted at the aft of the vessel?
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
The listed port to which a given vessel belongs.
Greenock ( Annual Surveys Report for Mary Sharp, 30th July 1836 1836 )
undefined ( Annual Surveys Report for Mary Sharp, 25th November 1843 1843 )
The year in which a vessel’s construction is completed.
The name of the yard where the vessel was built.
Cartsdyke ( Report of survey for Mary Sharp, 7 November 1834 1834 )
The individual and/or organisation listed
Daniel Sharp ( Report of survey for Mary Sharp, 7 November 1834 1834 )
D Sharp ( Annual Surveys Report for Mary Sharp, 30th July 1836 1836 )
Marshall ( Annual Surveys Report for Mary Sharp, 25th November 1843 1843 )
Location where a vessel’s survey was undertaken.
Greenock; Clyde Ports ( Report of survey for Mary Sharp, 7 November 1834 1834 )
London ( Annual Surveys Report for Mary Sharp, 30th July 1836 1836, Annual Surveys Report for Mary Sharp, 25th November 1843 1843 )
The name of the port/place from which a vessel’s voyage originated.
Clyde ( Report of survey for Mary Sharp, 7 November 1834 1834 )
The name of the port/place of destination given.
St Thomas; Antigua ( Report of survey for Mary Sharp, 7 November 1834 1834 )
Sidney ( Annual Surveys Report for Mary Sharp, 25th November 1843 1843 )
Physical arrangement of a ship’s masts, sails and rigging.
Is the steamer assisted by sail?
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Report of survey for Mary Sharp, 7 November 1834 1834, Annual Surveys Report for Mary Sharp, 30th July 1836 1836, Annual Surveys Report for Mary Sharp, 25th November 1843 1843 )
Does the vessel possess an auxiliary power source?
Is electric lighting fitted to the vessel?
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Lon ( Annual Surveys Report for Mary Sharp, 30th July 1836 1836, Annual Surveys Report for Mary Sharp, 25th November 1843 1843 )
Name of surveyor.
George Bayley ( Annual Surveys Report for Mary Sharp, 30th July 1836 1836 )
Joseph Horatio Ritchie ( Annual Surveys Report for Mary Sharp, 25th November 1843 1843 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.