Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Narva ( Half Midship Section Plan for Narva, 31st March 1941 1941, Plan of Fly to Midship Section for Narva, 4th June 1941 1941, Profile & Decks & Shell Expansion Plan for Narva, 31st March 1941 1941, Fly Plan of Profile, Decks & Shell Expansion for Narva, 4th June 1941 1941, Plan in Swedish Language of Stern Frame for Narva, 29th October 1941 1941, Plan in Swedish Language of Simplex Balanced Rudder for Narva, 7th May 1942 1942, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 29th November 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 20th November 1947 1947, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 11th August 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 28th July 1947 1947, Memo to the Chief Ship Surveyor regarding Classification Damage Repairs & Equipment for Narva, 8th July 1947 1947, Steel Steamer Report for Narva, 9th June 1947 1947, Report on Boilers for Narva, 30th May 1947 1947, Report on Steam Reciprocating Engine Machinery for Narva, 30th May 1947 1947, Copy of a Certificate of Inspection for Narva, 16th April 1947 1947, Memo to the Chief Engineer Surveyor regarding Narva, 18th July 1947 1947, Report of Survey for Repairs, &c for Narva, 9th June 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 30th May 1947 1947, Report on Electrical Equipment for Narva, 14th May 1947 1947, Report C.11 Continued, Memorandum of Alterations Since Ship Surveyed for Assignment of Load Lines for Narva, 6th June 1949 1949, Copy of a Certificate of Survey of Part Machinery for Narva, 12th August 1957 1957, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 13th August 1957 1957, Copy of a Letter from pro Secretary, to Glen & Co Ltd, Glasgow, regarding Narva, 6th January 1958 1958, Report of Total Loss, Casualty, &c for Narva, 23rd January 1958 1958 )
Empire Conference ( Report of Surveys for Freeboard for Empire Conference, 29th October 1945 1945, Report of Surveys for Freeboard-Conditons of Assignment for Empire Conference, 4th September 1945 1945, Report on Masts, Spars, & Rigging for Empire Conference, 22nd April 1947 1947 )
The process of transferring a vessel to water, but not necessarily her completion.
__/__/1943 ( Half Midship Section Plan for Narva, 31st March 1941 1941, Plan of Fly to Midship Section for Narva, 4th June 1941 1941, Profile & Decks & Shell Expansion Plan for Narva, 31st March 1941 1941, Fly Plan of Profile, Decks & Shell Expansion for Narva, 4th June 1941 1941, Plan in Swedish Language of Stern Frame for Narva, 29th October 1941 1941, Plan in Swedish Language of Simplex Balanced Rudder for Narva, 7th May 1942 1942, Report of Surveys for Freeboard for Empire Conference, 29th October 1945 1945, Report of Surveys for Freeboard-Conditons of Assignment for Empire Conference, 4th September 1945 1945, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 29th November 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 20th November 1947 1947, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 11th August 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 28th July 1947 1947, Memo to the Chief Ship Surveyor regarding Classification Damage Repairs & Equipment for Narva, 8th July 1947 1947, Report on Masts, Spars, & Rigging for Empire Conference, 22nd April 1947 1947, Steel Steamer Report for Narva, 9th June 1947 1947, Report on Boilers for Narva, 30th May 1947 1947, Report on Steam Reciprocating Engine Machinery for Narva, 30th May 1947 1947, Copy of a Certificate of Inspection for Narva, 16th April 1947 1947, Memo to the Chief Engineer Surveyor regarding Narva, 18th July 1947 1947, Report of Survey for Repairs, &c for Narva, 9th June 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 30th May 1947 1947, Report on Electrical Equipment for Narva, 14th May 1947 1947, Report C.11 Continued, Memorandum of Alterations Since Ship Surveyed for Assignment of Load Lines for Narva, 6th June 1949 1949, Copy of a Certificate of Survey of Part Machinery for Narva, 12th August 1957 1957, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 13th August 1957 1957, Copy of a Letter from pro Secretary, to Glen & Co Ltd, Glasgow, regarding Narva, 6th January 1958 1958, Report of Total Loss, Casualty, &c for Narva, 23rd January 1958 1958 )
The port or place in which the vessel’s construction took place, at the time of writing.
Gavle ( Half Midship Section Plan for Narva, 31st March 1941 1941, Plan of Fly to Midship Section for Narva, 4th June 1941 1941, Profile & Decks & Shell Expansion Plan for Narva, 31st March 1941 1941, Fly Plan of Profile, Decks & Shell Expansion for Narva, 4th June 1941 1941, Plan in Swedish Language of Stern Frame for Narva, 29th October 1941 1941, Plan in Swedish Language of Simplex Balanced Rudder for Narva, 7th May 1942 1942, Report of Surveys for Freeboard for Empire Conference, 29th October 1945 1945, Report of Surveys for Freeboard-Conditons of Assignment for Empire Conference, 4th September 1945 1945, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 29th November 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 20th November 1947 1947, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 11th August 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 28th July 1947 1947, Memo to the Chief Ship Surveyor regarding Classification Damage Repairs & Equipment for Narva, 8th July 1947 1947, Report on Masts, Spars, & Rigging for Empire Conference, 22nd April 1947 1947, Steel Steamer Report for Narva, 9th June 1947 1947, Report on Boilers for Narva, 30th May 1947 1947, Report on Steam Reciprocating Engine Machinery for Narva, 30th May 1947 1947, Copy of a Certificate of Inspection for Narva, 16th April 1947 1947, Memo to the Chief Engineer Surveyor regarding Narva, 18th July 1947 1947, Report of Survey for Repairs, &c for Narva, 9th June 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 30th May 1947 1947, Report on Electrical Equipment for Narva, 14th May 1947 1947, Report C.11 Continued, Memorandum of Alterations Since Ship Surveyed for Assignment of Load Lines for Narva, 6th June 1949 1949, Copy of a Certificate of Survey of Part Machinery for Narva, 12th August 1957 1957, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 13th August 1957 1957, Copy of a Letter from pro Secretary, to Glen & Co Ltd, Glasgow, regarding Narva, 6th January 1958 1958, Report of Total Loss, Casualty, &c for Narva, 23rd January 1958 1958 )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Half Midship Section Plan for Narva, 31st March 1941 1941, Plan of Fly to Midship Section for Narva, 4th June 1941 1941, Profile & Decks & Shell Expansion Plan for Narva, 31st March 1941 1941, Fly Plan of Profile, Decks & Shell Expansion for Narva, 4th June 1941 1941, Plan in Swedish Language of Stern Frame for Narva, 29th October 1941 1941, Plan in Swedish Language of Simplex Balanced Rudder for Narva, 7th May 1942 1942, Report of Surveys for Freeboard-Conditons of Assignment for Empire Conference, 4th September 1945 1945, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 29th November 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 20th November 1947 1947, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 11th August 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 28th July 1947 1947, Memo to the Chief Ship Surveyor regarding Classification Damage Repairs & Equipment for Narva, 8th July 1947 1947, Report on Masts, Spars, & Rigging for Empire Conference, 22nd April 1947 1947, Steel Steamer Report for Narva, 9th June 1947 1947, Report on Boilers for Narva, 30th May 1947 1947, Report on Steam Reciprocating Engine Machinery for Narva, 30th May 1947 1947, Copy of a Certificate of Inspection for Narva, 16th April 1947 1947, Memo to the Chief Engineer Surveyor regarding Narva, 18th July 1947 1947, Report of Survey for Repairs, &c for Narva, 9th June 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 30th May 1947 1947, Report on Electrical Equipment for Narva, 14th May 1947 1947, Report C.11 Continued, Memorandum of Alterations Since Ship Surveyed for Assignment of Load Lines for Narva, 6th June 1949 1949, Copy of a Certificate of Survey of Part Machinery for Narva, 12th August 1957 1957, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 13th August 1957 1957, Copy of a Letter from pro Secretary, to Glen & Co Ltd, Glasgow, regarding Narva, 6th January 1958 1958, Report of Total Loss, Casualty, &c for Narva, 23rd January 1958 1958 )
Trawler ( Report of Surveys for Freeboard for Empire Conference, 29th October 1945 1945 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Half Midship Section Plan for Narva, 31st March 1941 1941, Plan of Fly to Midship Section for Narva, 4th June 1941 1941, Profile & Decks & Shell Expansion Plan for Narva, 31st March 1941 1941, Fly Plan of Profile, Decks & Shell Expansion for Narva, 4th June 1941 1941, Plan in Swedish Language of Stern Frame for Narva, 29th October 1941 1941, Plan in Swedish Language of Simplex Balanced Rudder for Narva, 7th May 1942 1942, Report of Surveys for Freeboard for Empire Conference, 29th October 1945 1945, Report of Surveys for Freeboard-Conditons of Assignment for Empire Conference, 4th September 1945 1945, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 29th November 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 20th November 1947 1947, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 11th August 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 28th July 1947 1947, Memo to the Chief Ship Surveyor regarding Classification Damage Repairs & Equipment for Narva, 8th July 1947 1947, Report on Masts, Spars, & Rigging for Empire Conference, 22nd April 1947 1947, Steel Steamer Report for Narva, 9th June 1947 1947, Report on Boilers for Narva, 30th May 1947 1947, Report on Steam Reciprocating Engine Machinery for Narva, 30th May 1947 1947, Copy of a Certificate of Inspection for Narva, 16th April 1947 1947, Memo to the Chief Engineer Surveyor regarding Narva, 18th July 1947 1947, Report of Survey for Repairs, &c for Narva, 9th June 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 30th May 1947 1947, Report on Electrical Equipment for Narva, 14th May 1947 1947, Report C.11 Continued, Memorandum of Alterations Since Ship Surveyed for Assignment of Load Lines for Narva, 6th June 1949 1949, Copy of a Certificate of Survey of Part Machinery for Narva, 12th August 1957 1957, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 13th August 1957 1957, Copy of a Letter from pro Secretary, to Glen & Co Ltd, Glasgow, regarding Narva, 6th January 1958 1958, Report of Total Loss, Casualty, &c for Narva, 23rd January 1958 1958 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Half Midship Section Plan for Narva, 31st March 1941 1941, Plan of Fly to Midship Section for Narva, 4th June 1941 1941, Profile & Decks & Shell Expansion Plan for Narva, 31st March 1941 1941, Fly Plan of Profile, Decks & Shell Expansion for Narva, 4th June 1941 1941, Plan in Swedish Language of Stern Frame for Narva, 29th October 1941 1941, Plan in Swedish Language of Simplex Balanced Rudder for Narva, 7th May 1942 1942, Report of Surveys for Freeboard for Empire Conference, 29th October 1945 1945, Report of Surveys for Freeboard-Conditons of Assignment for Empire Conference, 4th September 1945 1945, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 29th November 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 20th November 1947 1947, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 11th August 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 28th July 1947 1947, Memo to the Chief Ship Surveyor regarding Classification Damage Repairs & Equipment for Narva, 8th July 1947 1947, Report on Masts, Spars, & Rigging for Empire Conference, 22nd April 1947 1947, Steel Steamer Report for Narva, 9th June 1947 1947, Report on Boilers for Narva, 30th May 1947 1947, Report on Steam Reciprocating Engine Machinery for Narva, 30th May 1947 1947, Copy of a Certificate of Inspection for Narva, 16th April 1947 1947, Memo to the Chief Engineer Surveyor regarding Narva, 18th July 1947 1947, Report of Survey for Repairs, &c for Narva, 9th June 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 30th May 1947 1947, Report on Electrical Equipment for Narva, 14th May 1947 1947, Report C.11 Continued, Memorandum of Alterations Since Ship Surveyed for Assignment of Load Lines for Narva, 6th June 1949 1949, Copy of a Certificate of Survey of Part Machinery for Narva, 12th August 1957 1957, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 13th August 1957 1957, Copy of a Letter from pro Secretary, to Glen & Co Ltd, Glasgow, regarding Narva, 6th January 1958 1958, Report of Total Loss, Casualty, &c for Narva, 23rd January 1958 1958 )
Does the vessel possess an auxiliary power source?
No ( Half Midship Section Plan for Narva, 31st March 1941 1941, Plan of Fly to Midship Section for Narva, 4th June 1941 1941, Profile & Decks & Shell Expansion Plan for Narva, 31st March 1941 1941, Fly Plan of Profile, Decks & Shell Expansion for Narva, 4th June 1941 1941, Plan in Swedish Language of Stern Frame for Narva, 29th October 1941 1941, Plan in Swedish Language of Simplex Balanced Rudder for Narva, 7th May 1942 1942, Report of Surveys for Freeboard for Empire Conference, 29th October 1945 1945, Report of Surveys for Freeboard-Conditons of Assignment for Empire Conference, 4th September 1945 1945, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 29th November 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 20th November 1947 1947, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 11th August 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 28th July 1947 1947, Memo to the Chief Ship Surveyor regarding Classification Damage Repairs & Equipment for Narva, 8th July 1947 1947, Report on Masts, Spars, & Rigging for Empire Conference, 22nd April 1947 1947, Steel Steamer Report for Narva, 9th June 1947 1947, Report on Boilers for Narva, 30th May 1947 1947, Report on Steam Reciprocating Engine Machinery for Narva, 30th May 1947 1947, Copy of a Certificate of Inspection for Narva, 16th April 1947 1947, Memo to the Chief Engineer Surveyor regarding Narva, 18th July 1947 1947, Report of Survey for Repairs, &c for Narva, 9th June 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 30th May 1947 1947, Report on Electrical Equipment for Narva, 14th May 1947 1947, Report C.11 Continued, Memorandum of Alterations Since Ship Surveyed for Assignment of Load Lines for Narva, 6th June 1949 1949, Copy of a Certificate of Survey of Part Machinery for Narva, 12th August 1957 1957, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 13th August 1957 1957, Copy of a Letter from pro Secretary, to Glen & Co Ltd, Glasgow, regarding Narva, 6th January 1958 1958, Report of Total Loss, Casualty, &c for Narva, 23rd January 1958 1958 )
Is electric lighting fitted to the vessel?
No ( Half Midship Section Plan for Narva, 31st March 1941 1941, Plan of Fly to Midship Section for Narva, 4th June 1941 1941, Profile & Decks & Shell Expansion Plan for Narva, 31st March 1941 1941, Fly Plan of Profile, Decks & Shell Expansion for Narva, 4th June 1941 1941, Plan in Swedish Language of Stern Frame for Narva, 29th October 1941 1941, Plan in Swedish Language of Simplex Balanced Rudder for Narva, 7th May 1942 1942, Report of Surveys for Freeboard for Empire Conference, 29th October 1945 1945, Report of Surveys for Freeboard-Conditons of Assignment for Empire Conference, 4th September 1945 1945, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 29th November 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 20th November 1947 1947, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 11th August 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 28th July 1947 1947, Memo to the Chief Ship Surveyor regarding Classification Damage Repairs & Equipment for Narva, 8th July 1947 1947, Report on Masts, Spars, & Rigging for Empire Conference, 22nd April 1947 1947, Steel Steamer Report for Narva, 9th June 1947 1947, Report on Boilers for Narva, 30th May 1947 1947, Report on Steam Reciprocating Engine Machinery for Narva, 30th May 1947 1947, Copy of a Certificate of Inspection for Narva, 16th April 1947 1947, Memo to the Chief Engineer Surveyor regarding Narva, 18th July 1947 1947, Report of Survey for Repairs, &c for Narva, 9th June 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 30th May 1947 1947, Report on Electrical Equipment for Narva, 14th May 1947 1947, Report C.11 Continued, Memorandum of Alterations Since Ship Surveyed for Assignment of Load Lines for Narva, 6th June 1949 1949, Copy of a Certificate of Survey of Part Machinery for Narva, 12th August 1957 1957, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 13th August 1957 1957, Copy of a Letter from pro Secretary, to Glen & Co Ltd, Glasgow, regarding Narva, 6th January 1958 1958, Report of Total Loss, Casualty, &c for Narva, 23rd January 1958 1958 )
The official record pronounced by the Committee
Foundered ( Half Midship Section Plan for Narva, 31st March 1941 1941, Plan of Fly to Midship Section for Narva, 4th June 1941 1941, Profile & Decks & Shell Expansion Plan for Narva, 31st March 1941 1941, Fly Plan of Profile, Decks & Shell Expansion for Narva, 4th June 1941 1941, Plan in Swedish Language of Stern Frame for Narva, 29th October 1941 1941, Plan in Swedish Language of Simplex Balanced Rudder for Narva, 7th May 1942 1942, Report of Surveys for Freeboard for Empire Conference, 29th October 1945 1945, Report of Surveys for Freeboard-Conditons of Assignment for Empire Conference, 4th September 1945 1945, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 29th November 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 20th November 1947 1947, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 11th August 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 28th July 1947 1947, Memo to the Chief Ship Surveyor regarding Classification Damage Repairs & Equipment for Narva, 8th July 1947 1947, Report on Masts, Spars, & Rigging for Empire Conference, 22nd April 1947 1947, Steel Steamer Report for Narva, 9th June 1947 1947, Report on Boilers for Narva, 30th May 1947 1947, Report on Steam Reciprocating Engine Machinery for Narva, 30th May 1947 1947, Copy of a Certificate of Inspection for Narva, 16th April 1947 1947, Memo to the Chief Engineer Surveyor regarding Narva, 18th July 1947 1947, Report of Survey for Repairs, &c for Narva, 9th June 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 30th May 1947 1947, Report on Electrical Equipment for Narva, 14th May 1947 1947, Report C.11 Continued, Memorandum of Alterations Since Ship Surveyed for Assignment of Load Lines for Narva, 6th June 1949 1949, Copy of a Certificate of Survey of Part Machinery for Narva, 12th August 1957 1957, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 13th August 1957 1957, Copy of a Letter from pro Secretary, to Glen & Co Ltd, Glasgow, regarding Narva, 6th January 1958 1958, Report of Total Loss, Casualty, &c for Narva, 23rd January 1958 1958 )
Vessel’s place of loss or disposal/last known recorded location.
Lat 57 28N, Long 3E ( Half Midship Section Plan for Narva, 31st March 1941 1941, Plan of Fly to Midship Section for Narva, 4th June 1941 1941, Profile & Decks & Shell Expansion Plan for Narva, 31st March 1941 1941, Fly Plan of Profile, Decks & Shell Expansion for Narva, 4th June 1941 1941, Plan in Swedish Language of Stern Frame for Narva, 29th October 1941 1941, Plan in Swedish Language of Simplex Balanced Rudder for Narva, 7th May 1942 1942, Report of Surveys for Freeboard for Empire Conference, 29th October 1945 1945, Report of Surveys for Freeboard-Conditons of Assignment for Empire Conference, 4th September 1945 1945, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 29th November 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 20th November 1947 1947, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 11th August 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 28th July 1947 1947, Memo to the Chief Ship Surveyor regarding Classification Damage Repairs & Equipment for Narva, 8th July 1947 1947, Report on Masts, Spars, & Rigging for Empire Conference, 22nd April 1947 1947, Steel Steamer Report for Narva, 9th June 1947 1947, Report on Boilers for Narva, 30th May 1947 1947, Report on Steam Reciprocating Engine Machinery for Narva, 30th May 1947 1947, Copy of a Certificate of Inspection for Narva, 16th April 1947 1947, Memo to the Chief Engineer Surveyor regarding Narva, 18th July 1947 1947, Report of Survey for Repairs, &c for Narva, 9th June 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 30th May 1947 1947, Report on Electrical Equipment for Narva, 14th May 1947 1947, Report C.11 Continued, Memorandum of Alterations Since Ship Surveyed for Assignment of Load Lines for Narva, 6th June 1949 1949, Copy of a Certificate of Survey of Part Machinery for Narva, 12th August 1957 1957, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 13th August 1957 1957, Copy of a Letter from pro Secretary, to Glen & Co Ltd, Glasgow, regarding Narva, 6th January 1958 1958, Report of Total Loss, Casualty, &c for Narva, 23rd January 1958 1958 )
The port in which a vessel is registered or permanently based.
Glasgow ( Report of Surveys for Freeboard for Empire Conference, 29th October 1945 1945, Steel Steamer Report for Narva, 9th June 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 30th May 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 13th August 1957 1957 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls ( Steel Steamer Report for Narva, 9th June 1947 1947, Report on Boilers for Narva, 30th May 1947 1947, Report on Steam Reciprocating Engine Machinery for Narva, 30th May 1947 1947, Report of Survey for Repairs, &c for Narva, 9th June 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 30th May 1947 1947, Report on Electrical Equipment for Narva, 14th May 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 13th August 1957 1957 )
The individual and/or organisation listed
Scottish Navigation Co Ltd ( Steel Steamer Report for Narva, 9th June 1947 1947, Report of Survey for Repairs, &c for Narva, 9th June 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 30th May 1947 1947, Report on Electrical Equipment for Narva, 14th May 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 13th August 1957 1957, Report of Total Loss, Casualty, &c for Narva, 23rd January 1958 1958 )
Glen & Co ( Report on Boilers for Narva, 30th May 1947 1947, Report on Steam Reciprocating Engine Machinery for Narva, 30th May 1947 1947 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 5,47; Classed 5,47 (Cd 3); LMC 5,47; Cargo battens not Fitted ( Steel Steamer Report for Narva, 9th June 1947 1947 )
See Accompanying Machinery Report ( Report on Boilers for Narva, 30th May 1947 1947, Report on Steam Reciprocating Engine Machinery for Narva, 30th May 1947 1947, Report on Electrical Equipment for Narva, 14th May 1947 1947 )
See First Entry Report ( Report of Survey for Repairs, &c for Narva, 9th June 1947 1947 )
LMC 5,47 ( Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 30th May 1947 1947 )
+100A1 6,57; SS Gls 5,56; Classed 5/47' Pt EW NS; LMC 6,55; MBS 3,57; TSCL 4,56; SPS 5,56 OF 3,55 ( Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 13th August 1957 1957 )
+100A1 6,57; SS Gls 5,56; Classed 5,47; LMC 6,55; BS M 3,57; Sp 5,56; TS 4,56 CL ( Report of Total Loss, Casualty, &c for Narva, 23rd January 1958 1958 )
Location of construction for a vessel’s engines.
Hamburg ( Report on Boilers for Narva, 30th May 1947 1947, Report on Steam Reciprocating Engine Machinery for Narva, 30th May 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 30th May 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 13th August 1957 1957 )
The year in which a vessel’s construction is completed.
1943 ( Half Midship Section Plan for Narva, 31st March 1941 1941, Plan of Fly to Midship Section for Narva, 4th June 1941 1941, Profile & Decks & Shell Expansion Plan for Narva, 31st March 1941 1941, Fly Plan of Profile, Decks & Shell Expansion for Narva, 4th June 1941 1941, Plan in Swedish Language of Stern Frame for Narva, 29th October 1941 1941, Plan in Swedish Language of Simplex Balanced Rudder for Narva, 7th May 1942 1942, Report of Surveys for Freeboard for Empire Conference, 29th October 1945 1945, Report of Surveys for Freeboard-Conditons of Assignment for Empire Conference, 4th September 1945 1945, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 29th November 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 20th November 1947 1947, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 11th August 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 28th July 1947 1947, Memo to the Chief Ship Surveyor regarding Classification Damage Repairs & Equipment for Narva, 8th July 1947 1947, Report on Masts, Spars, & Rigging for Empire Conference, 22nd April 1947 1947, Steel Steamer Report for Narva, 9th June 1947 1947, Report on Boilers for Narva, 30th May 1947 1947, Report on Steam Reciprocating Engine Machinery for Narva, 30th May 1947 1947, Copy of a Certificate of Inspection for Narva, 16th April 1947 1947, Memo to the Chief Engineer Surveyor regarding Narva, 18th July 1947 1947, Report of Survey for Repairs, &c for Narva, 9th June 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 30th May 1947 1947, Report on Electrical Equipment for Narva, 14th May 1947 1947, Report C.11 Continued, Memorandum of Alterations Since Ship Surveyed for Assignment of Load Lines for Narva, 6th June 1949 1949, Copy of a Certificate of Survey of Part Machinery for Narva, 12th August 1957 1957, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 13th August 1957 1957, Copy of a Letter from pro Secretary, to Glen & Co Ltd, Glasgow, regarding Narva, 6th January 1958 1958, Report of Total Loss, Casualty, &c for Narva, 23rd January 1958 1958 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Gavle VRVS & Veokstads NYA A/B ( Half Midship Section Plan for Narva, 31st March 1941 1941, Plan of Fly to Midship Section for Narva, 4th June 1941 1941, Profile & Decks & Shell Expansion Plan for Narva, 31st March 1941 1941, Fly Plan of Profile, Decks & Shell Expansion for Narva, 4th June 1941 1941, Plan in Swedish Language of Stern Frame for Narva, 29th October 1941 1941, Plan in Swedish Language of Simplex Balanced Rudder for Narva, 7th May 1942 1942, Report of Surveys for Freeboard for Empire Conference, 29th October 1945 1945, Report of Surveys for Freeboard-Conditons of Assignment for Empire Conference, 4th September 1945 1945, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 29th November 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 20th November 1947 1947, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 11th August 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 28th July 1947 1947, Memo to the Chief Ship Surveyor regarding Classification Damage Repairs & Equipment for Narva, 8th July 1947 1947, Report on Masts, Spars, & Rigging for Empire Conference, 22nd April 1947 1947, Steel Steamer Report for Narva, 9th June 1947 1947, Report on Boilers for Narva, 30th May 1947 1947, Report on Steam Reciprocating Engine Machinery for Narva, 30th May 1947 1947, Copy of a Certificate of Inspection for Narva, 16th April 1947 1947, Memo to the Chief Engineer Surveyor regarding Narva, 18th July 1947 1947, Report of Survey for Repairs, &c for Narva, 9th June 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 30th May 1947 1947, Report on Electrical Equipment for Narva, 14th May 1947 1947, Report C.11 Continued, Memorandum of Alterations Since Ship Surveyed for Assignment of Load Lines for Narva, 6th June 1949 1949, Copy of a Certificate of Survey of Part Machinery for Narva, 12th August 1957 1957, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 13th August 1957 1957, Copy of a Letter from pro Secretary, to Glen & Co Ltd, Glasgow, regarding Narva, 6th January 1958 1958, Report of Total Loss, Casualty, &c for Narva, 23rd January 1958 1958 )
Location where a vessel’s survey was undertaken.
Hamburg ( Half Midship Section Plan for Narva, 31st March 1941 1941, Profile & Decks & Shell Expansion Plan for Narva, 31st March 1941 1941 )
Gavle ( Fly Plan of Profile, Decks & Shell Expansion for Narva, 4th June 1941 1941 )
Gavle, Sweden ( Plan in Swedish Language of Simplex Balanced Rudder for Narva, 7th May 1942 1942 )
Glasgow ( Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 29th November 1947 1947, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 11th August 1947 1947, Copy of a Certificate of Inspection for Narva, 16th April 1947 1947, Copy of a Certificate of Survey of Part Machinery for Narva, 12th August 1957 1957 )
London ( Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 20th November 1947 1947, Copy of a Letter from pro Secretary, to Glen & Co Ltd, Glasgow, regarding Narva, 6th January 1958 1958 )
Ardrossan ( Report on Masts, Spars, & Rigging for Empire Conference, 22nd April 1947 1947 )
Ardrossan; Glasgow ( Steel Steamer Report for Narva, 9th June 1947 1947, Report on Boilers for Narva, 30th May 1947 1947, Report on Steam Reciprocating Engine Machinery for Narva, 30th May 1947 1947, Report of Survey for Repairs, &c for Narva, 9th June 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 30th May 1947 1947, Report on Electrical Equipment for Narva, 14th May 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 13th August 1957 1957 )
A vessel’s means of propulsion.
Steam ( Half Midship Section Plan for Narva, 31st March 1941 1941, Profile & Decks & Shell Expansion Plan for Narva, 31st March 1941 1941, Plan in Swedish Language of Stern Frame for Narva, 29th October 1941 1941, Plan in Swedish Language of Simplex Balanced Rudder for Narva, 7th May 1942 1942, Report of Surveys for Freeboard-Conditons of Assignment for Empire Conference, 4th September 1945 1945, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 29th November 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 20th November 1947 1947, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 11th August 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 28th July 1947 1947, Memo to the Chief Ship Surveyor regarding Classification Damage Repairs & Equipment for Narva, 8th July 1947 1947, Steel Steamer Report for Narva, 9th June 1947 1947, Copy of a Certificate of Inspection for Narva, 16th April 1947 1947, Report on Electrical Equipment for Narva, 14th May 1947 1947, Copy of a Certificate of Survey of Part Machinery for Narva, 12th August 1957 1957, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 13th August 1957 1957, Copy of a Letter from pro Secretary, to Glen & Co Ltd, Glasgow, regarding Narva, 6th January 1958 1958, Report of Total Loss, Casualty, &c for Narva, 23rd January 1958 1958 )
undefined ( Plan of Fly to Midship Section for Narva, 4th June 1941 1941, Fly Plan of Profile, Decks & Shell Expansion for Narva, 4th June 1941 1941, Report of Surveys for Freeboard for Empire Conference, 29th October 1945 1945, Report on Masts, Spars, & Rigging for Empire Conference, 22nd April 1947 1947, Report on Boilers for Narva, 30th May 1947 1947, Report on Steam Reciprocating Engine Machinery for Narva, 30th May 1947 1947, Memo to the Chief Engineer Surveyor regarding Narva, 18th July 1947 1947, Report of Survey for Repairs, &c for Narva, 9th June 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 30th May 1947 1947, Report C.11 Continued, Memorandum of Alterations Since Ship Surveyed for Assignment of Load Lines for Narva, 6th June 1949 1949 )
Is the steamer assisted by sail?
No ( Half Midship Section Plan for Narva, 31st March 1941 1941, Plan of Fly to Midship Section for Narva, 4th June 1941 1941, Profile & Decks & Shell Expansion Plan for Narva, 31st March 1941 1941, Fly Plan of Profile, Decks & Shell Expansion for Narva, 4th June 1941 1941, Plan in Swedish Language of Stern Frame for Narva, 29th October 1941 1941, Plan in Swedish Language of Simplex Balanced Rudder for Narva, 7th May 1942 1942, Report of Surveys for Freeboard for Empire Conference, 29th October 1945 1945, Report of Surveys for Freeboard-Conditons of Assignment for Empire Conference, 4th September 1945 1945, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 29th November 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 20th November 1947 1947, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 11th August 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 28th July 1947 1947, Memo to the Chief Ship Surveyor regarding Classification Damage Repairs & Equipment for Narva, 8th July 1947 1947, Report on Masts, Spars, & Rigging for Empire Conference, 22nd April 1947 1947, Steel Steamer Report for Narva, 9th June 1947 1947, Report on Boilers for Narva, 30th May 1947 1947, Report on Steam Reciprocating Engine Machinery for Narva, 30th May 1947 1947, Copy of a Certificate of Inspection for Narva, 16th April 1947 1947, Memo to the Chief Engineer Surveyor regarding Narva, 18th July 1947 1947, Report of Survey for Repairs, &c for Narva, 9th June 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 30th May 1947 1947, Report on Electrical Equipment for Narva, 14th May 1947 1947, Report C.11 Continued, Memorandum of Alterations Since Ship Surveyed for Assignment of Load Lines for Narva, 6th June 1949 1949, Copy of a Certificate of Survey of Part Machinery for Narva, 12th August 1957 1957, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 13th August 1957 1957, Copy of a Letter from pro Secretary, to Glen & Co Ltd, Glasgow, regarding Narva, 6th January 1958 1958, Report of Total Loss, Casualty, &c for Narva, 23rd January 1958 1958 )
Is machinery fitted at the aft of the vessel?
No ( Half Midship Section Plan for Narva, 31st March 1941 1941, Plan of Fly to Midship Section for Narva, 4th June 1941 1941, Profile & Decks & Shell Expansion Plan for Narva, 31st March 1941 1941, Fly Plan of Profile, Decks & Shell Expansion for Narva, 4th June 1941 1941, Plan in Swedish Language of Stern Frame for Narva, 29th October 1941 1941, Plan in Swedish Language of Simplex Balanced Rudder for Narva, 7th May 1942 1942, Report of Surveys for Freeboard for Empire Conference, 29th October 1945 1945, Report of Surveys for Freeboard-Conditons of Assignment for Empire Conference, 4th September 1945 1945, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 29th November 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 20th November 1947 1947, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 11th August 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 28th July 1947 1947, Memo to the Chief Ship Surveyor regarding Classification Damage Repairs & Equipment for Narva, 8th July 1947 1947, Report on Masts, Spars, & Rigging for Empire Conference, 22nd April 1947 1947, Steel Steamer Report for Narva, 9th June 1947 1947, Report on Boilers for Narva, 30th May 1947 1947, Report on Steam Reciprocating Engine Machinery for Narva, 30th May 1947 1947, Copy of a Certificate of Inspection for Narva, 16th April 1947 1947, Memo to the Chief Engineer Surveyor regarding Narva, 18th July 1947 1947, Report of Survey for Repairs, &c for Narva, 9th June 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 30th May 1947 1947, Report on Electrical Equipment for Narva, 14th May 1947 1947, Report C.11 Continued, Memorandum of Alterations Since Ship Surveyed for Assignment of Load Lines for Narva, 6th June 1949 1949, Copy of a Certificate of Survey of Part Machinery for Narva, 12th August 1957 1957, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 13th August 1957 1957, Copy of a Letter from pro Secretary, to Glen & Co Ltd, Glasgow, regarding Narva, 6th January 1958 1958, Report of Total Loss, Casualty, &c for Narva, 23rd January 1958 1958 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Half Midship Section Plan for Narva, 31st March 1941 1941, Plan of Fly to Midship Section for Narva, 4th June 1941 1941, Profile & Decks & Shell Expansion Plan for Narva, 31st March 1941 1941, Fly Plan of Profile, Decks & Shell Expansion for Narva, 4th June 1941 1941, Plan in Swedish Language of Stern Frame for Narva, 29th October 1941 1941, Plan in Swedish Language of Simplex Balanced Rudder for Narva, 7th May 1942 1942, Report of Surveys for Freeboard for Empire Conference, 29th October 1945 1945, Report of Surveys for Freeboard-Conditons of Assignment for Empire Conference, 4th September 1945 1945, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 29th November 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 20th November 1947 1947, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 11th August 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 28th July 1947 1947, Memo to the Chief Ship Surveyor regarding Classification Damage Repairs & Equipment for Narva, 8th July 1947 1947, Report on Masts, Spars, & Rigging for Empire Conference, 22nd April 1947 1947, Steel Steamer Report for Narva, 9th June 1947 1947, Report on Boilers for Narva, 30th May 1947 1947, Report on Steam Reciprocating Engine Machinery for Narva, 30th May 1947 1947, Copy of a Certificate of Inspection for Narva, 16th April 1947 1947, Memo to the Chief Engineer Surveyor regarding Narva, 18th July 1947 1947, Report of Survey for Repairs, &c for Narva, 9th June 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 30th May 1947 1947, Report on Electrical Equipment for Narva, 14th May 1947 1947, Report C.11 Continued, Memorandum of Alterations Since Ship Surveyed for Assignment of Load Lines for Narva, 6th June 1949 1949, Copy of a Certificate of Survey of Part Machinery for Narva, 12th August 1957 1957, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 13th August 1957 1957, Copy of a Letter from pro Secretary, to Glen & Co Ltd, Glasgow, regarding Narva, 6th January 1958 1958, Report of Total Loss, Casualty, &c for Narva, 23rd January 1958 1958 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Half Midship Section Plan for Narva, 31st March 1941 1941, Plan of Fly to Midship Section for Narva, 4th June 1941 1941, Profile & Decks & Shell Expansion Plan for Narva, 31st March 1941 1941, Fly Plan of Profile, Decks & Shell Expansion for Narva, 4th June 1941 1941, Plan in Swedish Language of Stern Frame for Narva, 29th October 1941 1941, Plan in Swedish Language of Simplex Balanced Rudder for Narva, 7th May 1942 1942, Report of Surveys for Freeboard for Empire Conference, 29th October 1945 1945, Report of Surveys for Freeboard-Conditons of Assignment for Empire Conference, 4th September 1945 1945, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 29th November 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 20th November 1947 1947, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 11th August 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 28th July 1947 1947, Memo to the Chief Ship Surveyor regarding Classification Damage Repairs & Equipment for Narva, 8th July 1947 1947, Report on Masts, Spars, & Rigging for Empire Conference, 22nd April 1947 1947, Steel Steamer Report for Narva, 9th June 1947 1947, Report on Boilers for Narva, 30th May 1947 1947, Report on Steam Reciprocating Engine Machinery for Narva, 30th May 1947 1947, Copy of a Certificate of Inspection for Narva, 16th April 1947 1947, Memo to the Chief Engineer Surveyor regarding Narva, 18th July 1947 1947, Report of Survey for Repairs, &c for Narva, 9th June 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 30th May 1947 1947, Report on Electrical Equipment for Narva, 14th May 1947 1947, Report C.11 Continued, Memorandum of Alterations Since Ship Surveyed for Assignment of Load Lines for Narva, 6th June 1949 1949, Copy of a Certificate of Survey of Part Machinery for Narva, 12th August 1957 1957, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 13th August 1957 1957, Copy of a Letter from pro Secretary, to Glen & Co Ltd, Glasgow, regarding Narva, 6th January 1958 1958, Report of Total Loss, Casualty, &c for Narva, 23rd January 1958 1958 )
Contextual information related to the reasons of the vessel’s loss or disposal.
Foundered in heavy weather ( Half Midship Section Plan for Narva, 31st March 1941 1941, Plan of Fly to Midship Section for Narva, 4th June 1941 1941, Profile & Decks & Shell Expansion Plan for Narva, 31st March 1941 1941, Fly Plan of Profile, Decks & Shell Expansion for Narva, 4th June 1941 1941, Plan in Swedish Language of Stern Frame for Narva, 29th October 1941 1941, Plan in Swedish Language of Simplex Balanced Rudder for Narva, 7th May 1942 1942, Report of Surveys for Freeboard for Empire Conference, 29th October 1945 1945, Report of Surveys for Freeboard-Conditons of Assignment for Empire Conference, 4th September 1945 1945, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 29th November 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 20th November 1947 1947, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 11th August 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 28th July 1947 1947, Memo to the Chief Ship Surveyor regarding Classification Damage Repairs & Equipment for Narva, 8th July 1947 1947, Report on Masts, Spars, & Rigging for Empire Conference, 22nd April 1947 1947, Steel Steamer Report for Narva, 9th June 1947 1947, Report on Boilers for Narva, 30th May 1947 1947, Report on Steam Reciprocating Engine Machinery for Narva, 30th May 1947 1947, Copy of a Certificate of Inspection for Narva, 16th April 1947 1947, Memo to the Chief Engineer Surveyor regarding Narva, 18th July 1947 1947, Report of Survey for Repairs, &c for Narva, 9th June 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 30th May 1947 1947, Report on Electrical Equipment for Narva, 14th May 1947 1947, Report C.11 Continued, Memorandum of Alterations Since Ship Surveyed for Assignment of Load Lines for Narva, 6th June 1949 1949, Copy of a Certificate of Survey of Part Machinery for Narva, 12th August 1957 1957, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 13th August 1957 1957, Copy of a Letter from pro Secretary, to Glen & Co Ltd, Glasgow, regarding Narva, 6th January 1958 1958, Report of Total Loss, Casualty, &c for Narva, 23rd January 1958 1958 )
Recorded date for the vessel’s loss or disposal.
22/12/1957 ( Half Midship Section Plan for Narva, 31st March 1941 1941, Plan of Fly to Midship Section for Narva, 4th June 1941 1941, Profile & Decks & Shell Expansion Plan for Narva, 31st March 1941 1941, Fly Plan of Profile, Decks & Shell Expansion for Narva, 4th June 1941 1941, Plan in Swedish Language of Stern Frame for Narva, 29th October 1941 1941, Plan in Swedish Language of Simplex Balanced Rudder for Narva, 7th May 1942 1942, Report of Surveys for Freeboard for Empire Conference, 29th October 1945 1945, Report of Surveys for Freeboard-Conditons of Assignment for Empire Conference, 4th September 1945 1945, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 29th November 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 20th November 1947 1947, Letter from C R Willis, Secretary to the Glasgow Committee, to The Secretary, London, regarding Narva, 11th August 1947 1947, Copy of a Letter from Clerk to the Classification Committee, to The Secretary, Glasgow, regarding Narva, 28th July 1947 1947, Memo to the Chief Ship Surveyor regarding Classification Damage Repairs & Equipment for Narva, 8th July 1947 1947, Report on Masts, Spars, & Rigging for Empire Conference, 22nd April 1947 1947, Steel Steamer Report for Narva, 9th June 1947 1947, Report on Boilers for Narva, 30th May 1947 1947, Report on Steam Reciprocating Engine Machinery for Narva, 30th May 1947 1947, Copy of a Certificate of Inspection for Narva, 16th April 1947 1947, Memo to the Chief Engineer Surveyor regarding Narva, 18th July 1947 1947, Report of Survey for Repairs, &c for Narva, 9th June 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 30th May 1947 1947, Report on Electrical Equipment for Narva, 14th May 1947 1947, Report C.11 Continued, Memorandum of Alterations Since Ship Surveyed for Assignment of Load Lines for Narva, 6th June 1949 1949, Copy of a Certificate of Survey of Part Machinery for Narva, 12th August 1957 1957, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 13th August 1957 1957, Copy of a Letter from pro Secretary, to Glen & Co Ltd, Glasgow, regarding Narva, 6th January 1958 1958, Report of Total Loss, Casualty, &c for Narva, 23rd January 1958 1958 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
2027 ( Report of Surveys for Freeboard for Empire Conference, 29th October 1945 1945 )
1991 ( Steel Steamer Report for Narva, 9th June 1947 1947, Report on Boilers for Narva, 30th May 1947 1947, Report on Steam Reciprocating Engine Machinery for Narva, 30th May 1947 1947, Report of Survey for Repairs, &c for Narva, 9th June 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 30th May 1947 1947, Report on Electrical Equipment for Narva, 14th May 1947 1947, Copy of a Certificate of Survey of Part Machinery for Narva, 12th August 1957 1957 )
2044 ( Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 13th August 1957 1957, Report of Total Loss, Casualty, &c for Narva, 23rd January 1958 1958 )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Glen & Co Ltd ( Steel Steamer Report for Narva, 9th June 1947 1947, Report of Survey for Repairs, &c for Narva, 9th June 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 30th May 1947 1947, Report on Electrical Equipment for Narva, 14th May 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 13th August 1957 1957, Report of Total Loss, Casualty, &c for Narva, 23rd January 1958 1958 )
The listed port to which a given vessel belongs.
Date in which construction of a vessel’s engines were completed.
1943 ( Report on Boilers for Narva, 30th May 1947 1947, Report on Steam Reciprocating Engine Machinery for Narva, 30th May 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 30th May 1947 1947, Report of Survey for Repairs, &c, of Engines & Boilers for Narva, 13th August 1957 1957 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.