Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Nephrite ( Midship Section Plan for Nephrite, 19th August 1895 1895, Profile & Deck Plan for Nephrite, 19th August 1895 1895, Pumping Plan for Nephrite, 18th October 1895 1895, Plan of Marine Boiler for Nephrite, 11th September 1895 1895, Ship Forgings Form for Nephrite, 16th October 1895 1895, Steel Steamer Report for Nephrite, 6th March 1896 1896, Report of Machinery for Nephrite, 29th February 1896 1896, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Nephrite, 6th March 1896 1896, Ship Forgings Form for Nephrite, 10th January 1896 1896, Report on Electric Lighting Installation for Nephrite, 29th February 1896 1896, Report of Survey for Repairs, &c for Nephrite, 6th December 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Nephrite, 3rd December 1897 1897, Report of total loss and casualty for Nephrite, 8 August 1927 1927, Remarks to the Chief Ship Surveyor regarding damage to Nephrite, 28 April 1927 1927, Report of survey for repairs for Nephrite, 00 April 1927 1927 )
The process of transferring a vessel to water, but not necessarily her completion.
15/02/1896 ( Midship Section Plan for Nephrite, 19th August 1895 1895, Profile & Deck Plan for Nephrite, 19th August 1895 1895, Pumping Plan for Nephrite, 18th October 1895 1895, Plan of Marine Boiler for Nephrite, 11th September 1895 1895, Ship Forgings Form for Nephrite, 16th October 1895 1895, Steel Steamer Report for Nephrite, 6th March 1896 1896, Report of Machinery for Nephrite, 29th February 1896 1896, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Nephrite, 6th March 1896 1896, Ship Forgings Form for Nephrite, 10th January 1896 1896, Report on Electric Lighting Installation for Nephrite, 29th February 1896 1896, Report of Survey for Repairs, &c for Nephrite, 6th December 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Nephrite, 3rd December 1897 1897, Report of total loss and casualty for Nephrite, 8 August 1927 1927, Remarks to the Chief Ship Surveyor regarding damage to Nephrite, 28 April 1927 1927, Report of survey for repairs for Nephrite, 00 April 1927 1927 )
Unique identifier for a given ship, it is assigned by a builder.
116 ( Midship Section Plan for Nephrite, 19th August 1895 1895, Profile & Deck Plan for Nephrite, 19th August 1895 1895, Pumping Plan for Nephrite, 18th October 1895 1895, Plan of Marine Boiler for Nephrite, 11th September 1895 1895, Ship Forgings Form for Nephrite, 16th October 1895 1895, Steel Steamer Report for Nephrite, 6th March 1896 1896, Report of Machinery for Nephrite, 29th February 1896 1896, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Nephrite, 6th March 1896 1896, Ship Forgings Form for Nephrite, 10th January 1896 1896, Report on Electric Lighting Installation for Nephrite, 29th February 1896 1896, Report of Survey for Repairs, &c for Nephrite, 6th December 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Nephrite, 3rd December 1897 1897, Report of total loss and casualty for Nephrite, 8 August 1927 1927, Remarks to the Chief Ship Surveyor regarding damage to Nephrite, 28 April 1927 1927, Report of survey for repairs for Nephrite, 00 April 1927 1927 )
Location where a vessel’s survey was undertaken.
Bowling Glasgow ( Midship Section Plan for Nephrite, 19th August 1895 1895, Profile & Deck Plan for Nephrite, 19th August 1895 1895 )
Bowling ( Pumping Plan for Nephrite, 18th October 1895 1895, Report of survey for repairs for Nephrite, 00 April 1927 1927 )
Glasgow ( Plan of Marine Boiler for Nephrite, 11th September 1895 1895, Ship Forgings Form for Nephrite, 16th October 1895 1895, Report of Machinery for Nephrite, 29th February 1896 1896, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Nephrite, 6th March 1896 1896, Ship Forgings Form for Nephrite, 10th January 1896 1896, Report on Electric Lighting Installation for Nephrite, 29th February 1896 1896, Report of Survey for Repairs, &c for Nephrite, 6th December 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Nephrite, 3rd December 1897 1897 )
Bowling; Glasgow ( Steel Steamer Report for Nephrite, 6th March 1896 1896 )
A vessel’s means of propulsion.
Steam ( Midship Section Plan for Nephrite, 19th August 1895 1895, Profile & Deck Plan for Nephrite, 19th August 1895 1895, Pumping Plan for Nephrite, 18th October 1895 1895, Plan of Marine Boiler for Nephrite, 11th September 1895 1895, Steel Steamer Report for Nephrite, 6th March 1896 1896, Report of Machinery for Nephrite, 29th February 1896 1896, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Nephrite, 6th March 1896 1896, Report on Electric Lighting Installation for Nephrite, 29th February 1896 1896, Report of Survey for Repairs, &c for Nephrite, 6th December 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Nephrite, 3rd December 1897 1897, Report of total loss and casualty for Nephrite, 8 August 1927 1927, Remarks to the Chief Ship Surveyor regarding damage to Nephrite, 28 April 1927 1927, Report of survey for repairs for Nephrite, 00 April 1927 1927 )
undefined ( Ship Forgings Form for Nephrite, 16th October 1895 1895, Ship Forgings Form for Nephrite, 10th January 1896 1896 )
Is the steamer assisted by sail?
No ( Midship Section Plan for Nephrite, 19th August 1895 1895, Profile & Deck Plan for Nephrite, 19th August 1895 1895, Pumping Plan for Nephrite, 18th October 1895 1895, Plan of Marine Boiler for Nephrite, 11th September 1895 1895, Ship Forgings Form for Nephrite, 16th October 1895 1895, Steel Steamer Report for Nephrite, 6th March 1896 1896, Report of Machinery for Nephrite, 29th February 1896 1896, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Nephrite, 6th March 1896 1896, Ship Forgings Form for Nephrite, 10th January 1896 1896, Report on Electric Lighting Installation for Nephrite, 29th February 1896 1896, Report of Survey for Repairs, &c for Nephrite, 6th December 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Nephrite, 3rd December 1897 1897, Report of total loss and casualty for Nephrite, 8 August 1927 1927, Remarks to the Chief Ship Surveyor regarding damage to Nephrite, 28 April 1927 1927, Report of survey for repairs for Nephrite, 00 April 1927 1927 )
Is machinery fitted at the aft of the vessel?
No ( Midship Section Plan for Nephrite, 19th August 1895 1895, Profile & Deck Plan for Nephrite, 19th August 1895 1895, Pumping Plan for Nephrite, 18th October 1895 1895, Plan of Marine Boiler for Nephrite, 11th September 1895 1895, Ship Forgings Form for Nephrite, 16th October 1895 1895, Steel Steamer Report for Nephrite, 6th March 1896 1896, Report of Machinery for Nephrite, 29th February 1896 1896, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Nephrite, 6th March 1896 1896, Ship Forgings Form for Nephrite, 10th January 1896 1896, Report on Electric Lighting Installation for Nephrite, 29th February 1896 1896, Report of Survey for Repairs, &c for Nephrite, 6th December 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Nephrite, 3rd December 1897 1897, Report of total loss and casualty for Nephrite, 8 August 1927 1927, Remarks to the Chief Ship Surveyor regarding damage to Nephrite, 28 April 1927 1927, Report of survey for repairs for Nephrite, 00 April 1927 1927 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Midship Section Plan for Nephrite, 19th August 1895 1895, Profile & Deck Plan for Nephrite, 19th August 1895 1895, Pumping Plan for Nephrite, 18th October 1895 1895, Plan of Marine Boiler for Nephrite, 11th September 1895 1895, Ship Forgings Form for Nephrite, 16th October 1895 1895, Steel Steamer Report for Nephrite, 6th March 1896 1896, Report of Machinery for Nephrite, 29th February 1896 1896, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Nephrite, 6th March 1896 1896, Ship Forgings Form for Nephrite, 10th January 1896 1896, Report on Electric Lighting Installation for Nephrite, 29th February 1896 1896, Report of Survey for Repairs, &c for Nephrite, 6th December 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Nephrite, 3rd December 1897 1897, Report of total loss and casualty for Nephrite, 8 August 1927 1927, Remarks to the Chief Ship Surveyor regarding damage to Nephrite, 28 April 1927 1927, Report of survey for repairs for Nephrite, 00 April 1927 1927 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Midship Section Plan for Nephrite, 19th August 1895 1895, Profile & Deck Plan for Nephrite, 19th August 1895 1895, Pumping Plan for Nephrite, 18th October 1895 1895, Plan of Marine Boiler for Nephrite, 11th September 1895 1895, Ship Forgings Form for Nephrite, 16th October 1895 1895, Steel Steamer Report for Nephrite, 6th March 1896 1896, Report of Machinery for Nephrite, 29th February 1896 1896, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Nephrite, 6th March 1896 1896, Ship Forgings Form for Nephrite, 10th January 1896 1896, Report on Electric Lighting Installation for Nephrite, 29th February 1896 1896, Report of Survey for Repairs, &c for Nephrite, 6th December 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Nephrite, 3rd December 1897 1897, Report of total loss and casualty for Nephrite, 8 August 1927 1927, Remarks to the Chief Ship Surveyor regarding damage to Nephrite, 28 April 1927 1927, Report of survey for repairs for Nephrite, 00 April 1927 1927 )
The listed port to which a given vessel belongs.
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
D McIntyre ( Steel Steamer Report for Nephrite, 6th March 1896 1896, Report of Machinery for Nephrite, 29th February 1896 1896 )
H McKinnon ( Report of Survey for Repairs, &c for Nephrite, 6th December 1897 1897 )
McKerrell ( Report of Survey for Repairs, &c, of Engines & Boilers for Nephrite, 3rd December 1897 1897 )
Captain Jones ( Report of total loss and casualty for Nephrite, 8 August 1927 1927 )
Recorded information related to a vessel’s movements.
Bowling; Coasting ( Steel Steamer Report for Nephrite, 6th March 1896 1896 )
Glasgow; Coasting ( Report of Survey for Repairs, &c for Nephrite, 6th December 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Nephrite, 3rd December 1897 1897 )
Derrybeg, Donegal Coast ( Report of total loss and casualty for Nephrite, 8 August 1927 1927 )
Physical arrangement of a ship’s masts, sails and rigging.
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion Direct Acting ( Report of Machinery for Nephrite, 29th February 1896 1896 )
Date in which construction of a vessel’s engines were completed.
The name of the port/place from which a vessel’s voyage originated.
Ayr ( Report of total loss and casualty for Nephrite, 8 August 1927 1927 )
Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.
Prescribed by flag/registration authorities, and usually excludes a small part of the stern. It is measured from the foreside of the stern at the extreme top to the afterside of the stern post.
Measurement from the underside of the upper deck on the centre line to the upper side of the bottom plating.
The year in which a vessel’s construction is completed.
1896 ( Midship Section Plan for Nephrite, 19th August 1895 1895, Profile & Deck Plan for Nephrite, 19th August 1895 1895, Pumping Plan for Nephrite, 18th October 1895 1895, Plan of Marine Boiler for Nephrite, 11th September 1895 1895, Ship Forgings Form for Nephrite, 16th October 1895 1895, Steel Steamer Report for Nephrite, 6th March 1896 1896, Report of Machinery for Nephrite, 29th February 1896 1896, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Nephrite, 6th March 1896 1896, Ship Forgings Form for Nephrite, 10th January 1896 1896, Report on Electric Lighting Installation for Nephrite, 29th February 1896 1896, Report of Survey for Repairs, &c for Nephrite, 6th December 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Nephrite, 3rd December 1897 1897, Report of total loss and casualty for Nephrite, 8 August 1927 1927, Remarks to the Chief Ship Surveyor regarding damage to Nephrite, 28 April 1927 1927, Report of survey for repairs for Nephrite, 00 April 1927 1927 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Scott & Sons ( Midship Section Plan for Nephrite, 19th August 1895 1895, Profile & Deck Plan for Nephrite, 19th August 1895 1895, Pumping Plan for Nephrite, 18th October 1895 1895, Plan of Marine Boiler for Nephrite, 11th September 1895 1895, Ship Forgings Form for Nephrite, 16th October 1895 1895, Steel Steamer Report for Nephrite, 6th March 1896 1896, Report of Machinery for Nephrite, 29th February 1896 1896, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Nephrite, 6th March 1896 1896, Ship Forgings Form for Nephrite, 10th January 1896 1896, Report on Electric Lighting Installation for Nephrite, 29th February 1896 1896, Report of Survey for Repairs, &c for Nephrite, 6th December 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Nephrite, 3rd December 1897 1897, Report of total loss and casualty for Nephrite, 8 August 1927 1927, Remarks to the Chief Ship Surveyor regarding damage to Nephrite, 28 April 1927 1927, Report of survey for repairs for Nephrite, 00 April 1927 1927 )
The port or place in which the vessel’s construction took place, at the time of writing.
Bowling ( Midship Section Plan for Nephrite, 19th August 1895 1895, Profile & Deck Plan for Nephrite, 19th August 1895 1895, Pumping Plan for Nephrite, 18th October 1895 1895, Plan of Marine Boiler for Nephrite, 11th September 1895 1895, Ship Forgings Form for Nephrite, 16th October 1895 1895, Steel Steamer Report for Nephrite, 6th March 1896 1896, Report of Machinery for Nephrite, 29th February 1896 1896, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Nephrite, 6th March 1896 1896, Ship Forgings Form for Nephrite, 10th January 1896 1896, Report on Electric Lighting Installation for Nephrite, 29th February 1896 1896, Report of Survey for Repairs, &c for Nephrite, 6th December 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Nephrite, 3rd December 1897 1897, Report of total loss and casualty for Nephrite, 8 August 1927 1927, Remarks to the Chief Ship Surveyor regarding damage to Nephrite, 28 April 1927 1927, Report of survey for repairs for Nephrite, 00 April 1927 1927 )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Midship Section Plan for Nephrite, 19th August 1895 1895, Profile & Deck Plan for Nephrite, 19th August 1895 1895, Pumping Plan for Nephrite, 18th October 1895 1895, Plan of Marine Boiler for Nephrite, 11th September 1895 1895, Ship Forgings Form for Nephrite, 16th October 1895 1895, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Nephrite, 6th March 1896 1896, Ship Forgings Form for Nephrite, 10th January 1896 1896, Report on Electric Lighting Installation for Nephrite, 29th February 1896 1896 )
Cargo ( Report of total loss and casualty for Nephrite, 8 August 1927 1927, Remarks to the Chief Ship Surveyor regarding damage to Nephrite, 28 April 1927 1927, Report of survey for repairs for Nephrite, 00 April 1927 1927 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Midship Section Plan for Nephrite, 19th August 1895 1895, Profile & Deck Plan for Nephrite, 19th August 1895 1895, Pumping Plan for Nephrite, 18th October 1895 1895, Plan of Marine Boiler for Nephrite, 11th September 1895 1895, Ship Forgings Form for Nephrite, 16th October 1895 1895, Steel Steamer Report for Nephrite, 6th March 1896 1896, Report of Machinery for Nephrite, 29th February 1896 1896, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Nephrite, 6th March 1896 1896, Ship Forgings Form for Nephrite, 10th January 1896 1896, Report on Electric Lighting Installation for Nephrite, 29th February 1896 1896, Report of Survey for Repairs, &c for Nephrite, 6th December 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Nephrite, 3rd December 1897 1897, Report of survey for repairs for Nephrite, 00 April 1927 1927 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Midship Section Plan for Nephrite, 19th August 1895 1895, Profile & Deck Plan for Nephrite, 19th August 1895 1895, Pumping Plan for Nephrite, 18th October 1895 1895, Plan of Marine Boiler for Nephrite, 11th September 1895 1895, Ship Forgings Form for Nephrite, 16th October 1895 1895, Steel Steamer Report for Nephrite, 6th March 1896 1896, Report of Machinery for Nephrite, 29th February 1896 1896, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Nephrite, 6th March 1896 1896, Ship Forgings Form for Nephrite, 10th January 1896 1896, Report on Electric Lighting Installation for Nephrite, 29th February 1896 1896, Report of Survey for Repairs, &c for Nephrite, 6th December 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Nephrite, 3rd December 1897 1897, Report of total loss and casualty for Nephrite, 8 August 1927 1927, Remarks to the Chief Ship Surveyor regarding damage to Nephrite, 28 April 1927 1927, Report of survey for repairs for Nephrite, 00 April 1927 1927 )
Does the vessel possess an auxiliary power source?
No ( Midship Section Plan for Nephrite, 19th August 1895 1895, Profile & Deck Plan for Nephrite, 19th August 1895 1895, Pumping Plan for Nephrite, 18th October 1895 1895, Plan of Marine Boiler for Nephrite, 11th September 1895 1895, Ship Forgings Form for Nephrite, 16th October 1895 1895, Steel Steamer Report for Nephrite, 6th March 1896 1896, Report of Machinery for Nephrite, 29th February 1896 1896, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Nephrite, 6th March 1896 1896, Ship Forgings Form for Nephrite, 10th January 1896 1896, Report on Electric Lighting Installation for Nephrite, 29th February 1896 1896, Report of Survey for Repairs, &c for Nephrite, 6th December 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Nephrite, 3rd December 1897 1897, Report of total loss and casualty for Nephrite, 8 August 1927 1927, Remarks to the Chief Ship Surveyor regarding damage to Nephrite, 28 April 1927 1927, Report of survey for repairs for Nephrite, 00 April 1927 1927 )
Is electric lighting fitted to the vessel?
No ( Midship Section Plan for Nephrite, 19th August 1895 1895, Profile & Deck Plan for Nephrite, 19th August 1895 1895, Pumping Plan for Nephrite, 18th October 1895 1895, Plan of Marine Boiler for Nephrite, 11th September 1895 1895, Ship Forgings Form for Nephrite, 16th October 1895 1895, Steel Steamer Report for Nephrite, 6th March 1896 1896, Report of Machinery for Nephrite, 29th February 1896 1896, Form from Thomas W Douglas, pro Surveyors, to The Secretary, Lloyd\'s Register, London, forwarding Midship Section for Nephrite, 6th March 1896 1896, Ship Forgings Form for Nephrite, 10th January 1896 1896, Report on Electric Lighting Installation for Nephrite, 29th February 1896 1896, Report of Survey for Repairs, &c for Nephrite, 6th December 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Nephrite, 3rd December 1897 1897, Report of total loss and casualty for Nephrite, 8 August 1927 1927, Remarks to the Chief Ship Surveyor regarding damage to Nephrite, 28 April 1927 1927, Report of survey for repairs for Nephrite, 00 April 1927 1927 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls ( Steel Steamer Report for Nephrite, 6th March 1896 1896, Report of Machinery for Nephrite, 29th February 1896 1896, Report on Electric Lighting Installation for Nephrite, 29th February 1896 1896, Report of Survey for Repairs, &c for Nephrite, 6th December 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Nephrite, 3rd December 1897 1897 )
The individual and/or organisation listed
W Robertson ( Steel Steamer Report for Nephrite, 6th March 1896 1896, Report on Electric Lighting Installation for Nephrite, 29th February 1896 1896, Report of Survey for Repairs, &c for Nephrite, 6th December 1897 1897, Report of total loss and casualty for Nephrite, 8 August 1927 1927, Report of survey for repairs for Nephrite, 00 April 1927 1927 )
William Robertson ( Report of Machinery for Nephrite, 29th February 1896 1896 )
W Robertson Esq ( Report of Survey for Repairs, &c, of Engines & Boilers for Nephrite, 3rd December 1897 1897 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 Steel; LA & CP; +LMC 2,96 1Dk (Iron) & Web Frames; Well dk ( Steel Steamer Report for Nephrite, 6th March 1896 1896 )
+LMC 2,96 ( Report of Machinery for Nephrite, 29th February 1896 1896 )
+100A1; A & CP ( Report of Survey for Repairs, &c for Nephrite, 6th December 1897 1897 )
+100A1 2,96; 2,96; +LMC 2,96; 2,96 ( Report of Survey for Repairs, &c, of Engines & Boilers for Nephrite, 3rd December 1897 1897 )
+100A1 2.25; SS 2nd No3 8.21; SS No 1.25; +NB 3.25; +LMC 3.25 ( Report of total loss and casualty for Nephrite, 8 August 1927 1927 )
As now ( Report of survey for repairs for Nephrite, 00 April 1927 1927 )
The name of the port/place of destination given.
Coasting ( Steel Steamer Report for Nephrite, 6th March 1896 1896, Report of Survey for Repairs, &c for Nephrite, 6th December 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Nephrite, 3rd December 1897 1897, Report of survey for repairs for Nephrite, 00 April 1927 1927 )
Galway ( Report of total loss and casualty for Nephrite, 8 August 1927 1927 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
673 ( Steel Steamer Report for Nephrite, 6th March 1896 1896, Report of Machinery for Nephrite, 29th February 1896 1896, Report of Survey for Repairs, &c for Nephrite, 6th December 1897 1897, Report of Survey for Repairs, &c, of Engines & Boilers for Nephrite, 3rd December 1897 1897, Report of total loss and casualty for Nephrite, 8 August 1927 1927, Report of survey for repairs for Nephrite, 00 April 1927 1927 )
Location of construction for a vessel’s engines.
Glasgow ( Report of Machinery for Nephrite, 29th February 1896 1896, Report of Survey for Repairs, &c, of Engines & Boilers for Nephrite, 3rd December 1897 1897 )
The port in which a vessel is registered or permanently based.
Glasgow ( Report of Survey for Repairs, &c, of Engines & Boilers for Nephrite, 3rd December 1897 1897 )
A ship’s total internal capacity of a ship measured in register tons from the top of the floors to the tonnage deck.
Recorded information relating the specific cargo being conveyed.
Also referred to as extreme breadth. The distance from the extreme starboard side to the extreme port side.
Name of surveyor.
Robert Stanley Rowntree ( Report of survey for repairs for Nephrite, 00 April 1927 1927 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.