Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

The year in which a vessel’s construction is completed.

Year of ship completion

1929 ( Request for Special Survey for Pacific Ranger, 19th July 1928 1928, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 6th February 1928 1928, Plan of Shafts for Pacific Ranger, 26th October 1928 1928, Midship Section Plan for Pacific Ranger, 21st April 1928 1928, Profile Plan for Pacific Ranger, 21st April 1928 1928, Letter from F R Palmer Surveyor to Lloyds Register of Shipping to The Secretary, Lloyd's Register of Shipping, London, regarding thickness of double bulb angles for Pacific Ranger, 28th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Pacific Ranger, 25th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Pacific Ranger, 20th September 1929 1929, Freeboard Verification form for Steamers for Pacific Ranger, 16th August 1929 1929, Steel Motorship Report for Pacific Ranger, 16th September 1929 1929, Form of Vessels of 100 Tons & Upwards for Pacific Ranger, 30th August 1929 1929, Memo regarding classification for Pacific Ranger, 19th September 1929 1929, Report on Oil Engine Machinery for Pacific Ranger, 11th September 1929 1929, Report on Boilers for Pacific Ranger, 27th March 1929 1929, Report on Electric Fittings for Pacific Ranger, 11th September 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by J Pringle at The Park Gate Iron & Steel Co Ltd, 28th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 4th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 30th January 1929 1929, Plan of Clarkson Waste Heat Boiler for Pacific Ranger, 30th January 1929 1929, Midship Section Plan for Pacific Ranger, 3rd September 1929 1929, Profile Plan for Pacific Ranger, 3rd September 1929 1929, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd, London, to The Secretary, Lloyd's Register, London, regarding plan of plating over tunnels for Pacific Ranger, 9th September 1931 1931, Letter from Secretary of Lloyd's Register, London, to Furness Withy & Co Ltd, London, regarding approval & return of plans of insulation of hold for Pacific Ranger, 7th September 1931 1931, Letter from Secretary, Lloyd's Register, to Furness, Withy & Co Ltd, London, regarding approval & return of plan of insulation for Pacific Ranger, 7th September 1931 1931, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd to Secretary, Lloyd's Register of Shipping, London, regarding submission of plan of alterations for Pacific Ranger, 2nd September 1931 1931, Plan of No 3 Hold Shewing Compensation for Omission of Steel Bulkhead for Pacific Ranger, 2nd September 1931 1931, Memo to the Chief Ship Surveyor regarding damage & alterations to Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c for Pacific Ranger, 28th June 1932 1932, Enclosure form for plans regarding Pacific Ranger, 6th July 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Memo to the Chief Engineer Surveyor regarding a continuous survey partly held for Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 30th June 1932 1932, Report on Oil Engine Electric Generator Sets for Pacific Ranger, 21st June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding the continuous survey advanced for Pacific Ranger, 15th October 1940 1940, Certificate of Survey of Machinery for Pacific Ranger, 27th August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 26th August 1940 1940, Report of Total Loss, Casualty, &c for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Note regarding Steel Advice Tests for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Akt Burmeister & Wain ( Request for Special Survey for Pacific Ranger, 19th July 1928 1928, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 6th February 1928 1928, Plan of Shafts for Pacific Ranger, 26th October 1928 1928, Midship Section Plan for Pacific Ranger, 21st April 1928 1928, Profile Plan for Pacific Ranger, 21st April 1928 1928, Letter from F R Palmer Surveyor to Lloyds Register of Shipping to The Secretary, Lloyd's Register of Shipping, London, regarding thickness of double bulb angles for Pacific Ranger, 28th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Pacific Ranger, 25th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Pacific Ranger, 20th September 1929 1929, Freeboard Verification form for Steamers for Pacific Ranger, 16th August 1929 1929, Steel Motorship Report for Pacific Ranger, 16th September 1929 1929, Form of Vessels of 100 Tons & Upwards for Pacific Ranger, 30th August 1929 1929, Memo regarding classification for Pacific Ranger, 19th September 1929 1929, Report on Oil Engine Machinery for Pacific Ranger, 11th September 1929 1929, Report on Boilers for Pacific Ranger, 27th March 1929 1929, Report on Electric Fittings for Pacific Ranger, 11th September 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by J Pringle at The Park Gate Iron & Steel Co Ltd, 28th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 4th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 30th January 1929 1929, Plan of Clarkson Waste Heat Boiler for Pacific Ranger, 30th January 1929 1929, Midship Section Plan for Pacific Ranger, 3rd September 1929 1929, Profile Plan for Pacific Ranger, 3rd September 1929 1929, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd, London, to The Secretary, Lloyd's Register, London, regarding plan of plating over tunnels for Pacific Ranger, 9th September 1931 1931, Letter from Secretary of Lloyd's Register, London, to Furness Withy & Co Ltd, London, regarding approval & return of plans of insulation of hold for Pacific Ranger, 7th September 1931 1931, Letter from Secretary, Lloyd's Register, to Furness, Withy & Co Ltd, London, regarding approval & return of plan of insulation for Pacific Ranger, 7th September 1931 1931, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd to Secretary, Lloyd's Register of Shipping, London, regarding submission of plan of alterations for Pacific Ranger, 2nd September 1931 1931, Plan of No 3 Hold Shewing Compensation for Omission of Steel Bulkhead for Pacific Ranger, 2nd September 1931 1931, Memo to the Chief Ship Surveyor regarding damage & alterations to Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c for Pacific Ranger, 28th June 1932 1932, Enclosure form for plans regarding Pacific Ranger, 6th July 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Memo to the Chief Engineer Surveyor regarding a continuous survey partly held for Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 30th June 1932 1932, Report on Oil Engine Electric Generator Sets for Pacific Ranger, 21st June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding the continuous survey advanced for Pacific Ranger, 15th October 1940 1940, Certificate of Survey of Machinery for Pacific Ranger, 27th August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 26th August 1940 1940, Report of Total Loss, Casualty, &c for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Note regarding Steel Advice Tests for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Copenhagen ( Request for Special Survey for Pacific Ranger, 19th July 1928 1928, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 6th February 1928 1928, Plan of Shafts for Pacific Ranger, 26th October 1928 1928, Midship Section Plan for Pacific Ranger, 21st April 1928 1928, Profile Plan for Pacific Ranger, 21st April 1928 1928, Letter from F R Palmer Surveyor to Lloyds Register of Shipping to The Secretary, Lloyd's Register of Shipping, London, regarding thickness of double bulb angles for Pacific Ranger, 28th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Pacific Ranger, 25th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Pacific Ranger, 20th September 1929 1929, Freeboard Verification form for Steamers for Pacific Ranger, 16th August 1929 1929, Steel Motorship Report for Pacific Ranger, 16th September 1929 1929, Form of Vessels of 100 Tons & Upwards for Pacific Ranger, 30th August 1929 1929, Memo regarding classification for Pacific Ranger, 19th September 1929 1929, Report on Oil Engine Machinery for Pacific Ranger, 11th September 1929 1929, Report on Boilers for Pacific Ranger, 27th March 1929 1929, Report on Electric Fittings for Pacific Ranger, 11th September 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by J Pringle at The Park Gate Iron & Steel Co Ltd, 28th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 4th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 30th January 1929 1929, Plan of Clarkson Waste Heat Boiler for Pacific Ranger, 30th January 1929 1929, Midship Section Plan for Pacific Ranger, 3rd September 1929 1929, Profile Plan for Pacific Ranger, 3rd September 1929 1929, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd, London, to The Secretary, Lloyd's Register, London, regarding plan of plating over tunnels for Pacific Ranger, 9th September 1931 1931, Letter from Secretary of Lloyd's Register, London, to Furness Withy & Co Ltd, London, regarding approval & return of plans of insulation of hold for Pacific Ranger, 7th September 1931 1931, Letter from Secretary, Lloyd's Register, to Furness, Withy & Co Ltd, London, regarding approval & return of plan of insulation for Pacific Ranger, 7th September 1931 1931, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd to Secretary, Lloyd's Register of Shipping, London, regarding submission of plan of alterations for Pacific Ranger, 2nd September 1931 1931, Plan of No 3 Hold Shewing Compensation for Omission of Steel Bulkhead for Pacific Ranger, 2nd September 1931 1931, Memo to the Chief Ship Surveyor regarding damage & alterations to Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c for Pacific Ranger, 28th June 1932 1932, Enclosure form for plans regarding Pacific Ranger, 6th July 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Memo to the Chief Engineer Surveyor regarding a continuous survey partly held for Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 30th June 1932 1932, Report on Oil Engine Electric Generator Sets for Pacific Ranger, 21st June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding the continuous survey advanced for Pacific Ranger, 15th October 1940 1940, Certificate of Survey of Machinery for Pacific Ranger, 27th August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 26th August 1940 1940, Report of Total Loss, Casualty, &c for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Note regarding Steel Advice Tests for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Copenhagen ( Request for Special Survey for Pacific Ranger, 19th July 1928 1928, Plan of Shafts for Pacific Ranger, 26th October 1928 1928, Midship Section Plan for Pacific Ranger, 21st April 1928 1928, Profile Plan for Pacific Ranger, 21st April 1928 1928, Letter from F R Palmer Surveyor to Lloyds Register of Shipping to The Secretary, Lloyd's Register of Shipping, London, regarding thickness of double bulb angles for Pacific Ranger, 28th September 1929 1929, Freeboard Verification form for Steamers for Pacific Ranger, 16th August 1929 1929, Steel Motorship Report for Pacific Ranger, 16th September 1929 1929, Report on Oil Engine Machinery for Pacific Ranger, 11th September 1929 1929, Report on Electric Fittings for Pacific Ranger, 11th September 1929 1929, Midship Section Plan for Pacific Ranger, 3rd September 1929 1929, Profile Plan for Pacific Ranger, 3rd September 1929 1929, Plan of Crankshaft for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date )

Rotherham ( Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 6th February 1928 1928, Steel Test Certificate for test on Pacific Ranger undertaken by J Pringle at The Park Gate Iron & Steel Co Ltd, 28th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 4th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 30th January 1929 1929 )

Copenhagen; Grimsby ( Report on Boilers for Pacific Ranger, 27th March 1929 1929 )

Lincoln ( Plan of Clarkson Waste Heat Boiler for Pacific Ranger, 30th January 1929 1929 )

London ( Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd, London, to The Secretary, Lloyd's Register, London, regarding plan of plating over tunnels for Pacific Ranger, 9th September 1931 1931, Letter from Secretary of Lloyd's Register, London, to Furness Withy & Co Ltd, London, regarding approval & return of plans of insulation of hold for Pacific Ranger, 7th September 1931 1931, Letter from Secretary, Lloyd's Register, to Furness, Withy & Co Ltd, London, regarding approval & return of plan of insulation for Pacific Ranger, 7th September 1931 1931, Plan of No 3 Hold Shewing Compensation for Omission of Steel Bulkhead for Pacific Ranger, 2nd September 1931 1931 )

London EC 3 ( Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd to Secretary, Lloyd's Register of Shipping, London, regarding submission of plan of alterations for Pacific Ranger, 2nd September 1931 1931 )

Glasgow ( Report of Survey for Repairs, &c for Pacific Ranger, 28th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 30th June 1932 1932, Report on Oil Engine Electric Generator Sets for Pacific Ranger, 21st June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932 )

Vancouver, B C ( Certificate of Survey of Machinery for Pacific Ranger, 27th August 1940 1940 )

North Vancouver BC; Vancouver BC ( Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 26th August 1940 1940 )

A vessel’s means of propulsion.

Propulsion

Motor (internal combustion) ( Request for Special Survey for Pacific Ranger, 19th July 1928 1928, Plan of Shafts for Pacific Ranger, 26th October 1928 1928, Midship Section Plan for Pacific Ranger, 21st April 1928 1928, Profile Plan for Pacific Ranger, 21st April 1928 1928, Letter from F R Palmer Surveyor to Lloyds Register of Shipping to The Secretary, Lloyd's Register of Shipping, London, regarding thickness of double bulb angles for Pacific Ranger, 28th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Pacific Ranger, 20th September 1929 1929, Steel Motorship Report for Pacific Ranger, 16th September 1929 1929, Report on Oil Engine Machinery for Pacific Ranger, 11th September 1929 1929, Report on Boilers for Pacific Ranger, 27th March 1929 1929, Report on Electric Fittings for Pacific Ranger, 11th September 1929 1929, Plan of Clarkson Waste Heat Boiler for Pacific Ranger, 30th January 1929 1929, Midship Section Plan for Pacific Ranger, 3rd September 1929 1929, Profile Plan for Pacific Ranger, 3rd September 1929 1929, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd, London, to The Secretary, Lloyd's Register, London, regarding plan of plating over tunnels for Pacific Ranger, 9th September 1931 1931, Letter from Secretary of Lloyd's Register, London, to Furness Withy & Co Ltd, London, regarding approval & return of plans of insulation of hold for Pacific Ranger, 7th September 1931 1931, Letter from Secretary, Lloyd's Register, to Furness, Withy & Co Ltd, London, regarding approval & return of plan of insulation for Pacific Ranger, 7th September 1931 1931, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd to Secretary, Lloyd's Register of Shipping, London, regarding submission of plan of alterations for Pacific Ranger, 2nd September 1931 1931, Plan of No 3 Hold Shewing Compensation for Omission of Steel Bulkhead for Pacific Ranger, 2nd September 1931 1931, Report of Survey for Repairs, &c for Pacific Ranger, 28th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Memo to the Chief Engineer Surveyor regarding a continuous survey partly held for Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 30th June 1932 1932, Report on Oil Engine Electric Generator Sets for Pacific Ranger, 21st June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Machinery for Pacific Ranger, 27th August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 26th August 1940 1940, Report of Total Loss, Casualty, &c for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date )

undefined ( Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 6th February 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Pacific Ranger, 25th September 1929 1929, Memo regarding classification for Pacific Ranger, 19th September 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by J Pringle at The Park Gate Iron & Steel Co Ltd, 28th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 4th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 30th January 1929 1929, Enclosure form for plans regarding Pacific Ranger, 6th July 1932 1932, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding the continuous survey advanced for Pacific Ranger, 15th October 1940 1940, Fees Information for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Note regarding Steel Advice Tests for Pacific Ranger, Undated no date )

Steam ( Freeboard Verification form for Steamers for Pacific Ranger, 16th August 1929 1929, Form of Vessels of 100 Tons & Upwards for Pacific Ranger, 30th August 1929 1929, Memo to the Chief Ship Surveyor regarding damage & alterations to Pacific Ranger, 7th July 1932 1932 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Request for Special Survey for Pacific Ranger, 19th July 1928 1928, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 6th February 1928 1928, Plan of Shafts for Pacific Ranger, 26th October 1928 1928, Midship Section Plan for Pacific Ranger, 21st April 1928 1928, Profile Plan for Pacific Ranger, 21st April 1928 1928, Letter from F R Palmer Surveyor to Lloyds Register of Shipping to The Secretary, Lloyd's Register of Shipping, London, regarding thickness of double bulb angles for Pacific Ranger, 28th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Pacific Ranger, 25th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Pacific Ranger, 20th September 1929 1929, Freeboard Verification form for Steamers for Pacific Ranger, 16th August 1929 1929, Steel Motorship Report for Pacific Ranger, 16th September 1929 1929, Form of Vessels of 100 Tons & Upwards for Pacific Ranger, 30th August 1929 1929, Memo regarding classification for Pacific Ranger, 19th September 1929 1929, Report on Oil Engine Machinery for Pacific Ranger, 11th September 1929 1929, Report on Boilers for Pacific Ranger, 27th March 1929 1929, Report on Electric Fittings for Pacific Ranger, 11th September 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by J Pringle at The Park Gate Iron & Steel Co Ltd, 28th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 4th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 30th January 1929 1929, Plan of Clarkson Waste Heat Boiler for Pacific Ranger, 30th January 1929 1929, Midship Section Plan for Pacific Ranger, 3rd September 1929 1929, Profile Plan for Pacific Ranger, 3rd September 1929 1929, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd, London, to The Secretary, Lloyd's Register, London, regarding plan of plating over tunnels for Pacific Ranger, 9th September 1931 1931, Letter from Secretary of Lloyd's Register, London, to Furness Withy & Co Ltd, London, regarding approval & return of plans of insulation of hold for Pacific Ranger, 7th September 1931 1931, Letter from Secretary, Lloyd's Register, to Furness, Withy & Co Ltd, London, regarding approval & return of plan of insulation for Pacific Ranger, 7th September 1931 1931, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd to Secretary, Lloyd's Register of Shipping, London, regarding submission of plan of alterations for Pacific Ranger, 2nd September 1931 1931, Plan of No 3 Hold Shewing Compensation for Omission of Steel Bulkhead for Pacific Ranger, 2nd September 1931 1931, Memo to the Chief Ship Surveyor regarding damage & alterations to Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c for Pacific Ranger, 28th June 1932 1932, Enclosure form for plans regarding Pacific Ranger, 6th July 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Memo to the Chief Engineer Surveyor regarding a continuous survey partly held for Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 30th June 1932 1932, Report on Oil Engine Electric Generator Sets for Pacific Ranger, 21st June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding the continuous survey advanced for Pacific Ranger, 15th October 1940 1940, Certificate of Survey of Machinery for Pacific Ranger, 27th August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 26th August 1940 1940, Report of Total Loss, Casualty, &c for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Note regarding Steel Advice Tests for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Request for Special Survey for Pacific Ranger, 19th July 1928 1928, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 6th February 1928 1928, Plan of Shafts for Pacific Ranger, 26th October 1928 1928, Midship Section Plan for Pacific Ranger, 21st April 1928 1928, Profile Plan for Pacific Ranger, 21st April 1928 1928, Letter from F R Palmer Surveyor to Lloyds Register of Shipping to The Secretary, Lloyd's Register of Shipping, London, regarding thickness of double bulb angles for Pacific Ranger, 28th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Pacific Ranger, 25th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Pacific Ranger, 20th September 1929 1929, Freeboard Verification form for Steamers for Pacific Ranger, 16th August 1929 1929, Steel Motorship Report for Pacific Ranger, 16th September 1929 1929, Form of Vessels of 100 Tons & Upwards for Pacific Ranger, 30th August 1929 1929, Memo regarding classification for Pacific Ranger, 19th September 1929 1929, Report on Oil Engine Machinery for Pacific Ranger, 11th September 1929 1929, Report on Boilers for Pacific Ranger, 27th March 1929 1929, Report on Electric Fittings for Pacific Ranger, 11th September 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by J Pringle at The Park Gate Iron & Steel Co Ltd, 28th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 4th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 30th January 1929 1929, Plan of Clarkson Waste Heat Boiler for Pacific Ranger, 30th January 1929 1929, Midship Section Plan for Pacific Ranger, 3rd September 1929 1929, Profile Plan for Pacific Ranger, 3rd September 1929 1929, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd, London, to The Secretary, Lloyd's Register, London, regarding plan of plating over tunnels for Pacific Ranger, 9th September 1931 1931, Letter from Secretary of Lloyd's Register, London, to Furness Withy & Co Ltd, London, regarding approval & return of plans of insulation of hold for Pacific Ranger, 7th September 1931 1931, Letter from Secretary, Lloyd's Register, to Furness, Withy & Co Ltd, London, regarding approval & return of plan of insulation for Pacific Ranger, 7th September 1931 1931, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd to Secretary, Lloyd's Register of Shipping, London, regarding submission of plan of alterations for Pacific Ranger, 2nd September 1931 1931, Plan of No 3 Hold Shewing Compensation for Omission of Steel Bulkhead for Pacific Ranger, 2nd September 1931 1931, Memo to the Chief Ship Surveyor regarding damage & alterations to Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c for Pacific Ranger, 28th June 1932 1932, Enclosure form for plans regarding Pacific Ranger, 6th July 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Memo to the Chief Engineer Surveyor regarding a continuous survey partly held for Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 30th June 1932 1932, Report on Oil Engine Electric Generator Sets for Pacific Ranger, 21st June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding the continuous survey advanced for Pacific Ranger, 15th October 1940 1940, Certificate of Survey of Machinery for Pacific Ranger, 27th August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 26th August 1940 1940, Report of Total Loss, Casualty, &c for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Note regarding Steel Advice Tests for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Request for Special Survey for Pacific Ranger, 19th July 1928 1928, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 6th February 1928 1928, Plan of Shafts for Pacific Ranger, 26th October 1928 1928, Midship Section Plan for Pacific Ranger, 21st April 1928 1928, Profile Plan for Pacific Ranger, 21st April 1928 1928, Letter from F R Palmer Surveyor to Lloyds Register of Shipping to The Secretary, Lloyd's Register of Shipping, London, regarding thickness of double bulb angles for Pacific Ranger, 28th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Pacific Ranger, 25th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Pacific Ranger, 20th September 1929 1929, Freeboard Verification form for Steamers for Pacific Ranger, 16th August 1929 1929, Steel Motorship Report for Pacific Ranger, 16th September 1929 1929, Form of Vessels of 100 Tons & Upwards for Pacific Ranger, 30th August 1929 1929, Memo regarding classification for Pacific Ranger, 19th September 1929 1929, Report on Oil Engine Machinery for Pacific Ranger, 11th September 1929 1929, Report on Boilers for Pacific Ranger, 27th March 1929 1929, Report on Electric Fittings for Pacific Ranger, 11th September 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by J Pringle at The Park Gate Iron & Steel Co Ltd, 28th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 4th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 30th January 1929 1929, Plan of Clarkson Waste Heat Boiler for Pacific Ranger, 30th January 1929 1929, Midship Section Plan for Pacific Ranger, 3rd September 1929 1929, Profile Plan for Pacific Ranger, 3rd September 1929 1929, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd, London, to The Secretary, Lloyd's Register, London, regarding plan of plating over tunnels for Pacific Ranger, 9th September 1931 1931, Letter from Secretary of Lloyd's Register, London, to Furness Withy & Co Ltd, London, regarding approval & return of plans of insulation of hold for Pacific Ranger, 7th September 1931 1931, Letter from Secretary, Lloyd's Register, to Furness, Withy & Co Ltd, London, regarding approval & return of plan of insulation for Pacific Ranger, 7th September 1931 1931, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd to Secretary, Lloyd's Register of Shipping, London, regarding submission of plan of alterations for Pacific Ranger, 2nd September 1931 1931, Plan of No 3 Hold Shewing Compensation for Omission of Steel Bulkhead for Pacific Ranger, 2nd September 1931 1931, Memo to the Chief Ship Surveyor regarding damage & alterations to Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c for Pacific Ranger, 28th June 1932 1932, Enclosure form for plans regarding Pacific Ranger, 6th July 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Memo to the Chief Engineer Surveyor regarding a continuous survey partly held for Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 30th June 1932 1932, Report on Oil Engine Electric Generator Sets for Pacific Ranger, 21st June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding the continuous survey advanced for Pacific Ranger, 15th October 1940 1940, Certificate of Survey of Machinery for Pacific Ranger, 27th August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 26th August 1940 1940, Report of Total Loss, Casualty, &c for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Note regarding Steel Advice Tests for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Request for Special Survey for Pacific Ranger, 19th July 1928 1928, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 6th February 1928 1928, Plan of Shafts for Pacific Ranger, 26th October 1928 1928, Midship Section Plan for Pacific Ranger, 21st April 1928 1928, Profile Plan for Pacific Ranger, 21st April 1928 1928, Letter from F R Palmer Surveyor to Lloyds Register of Shipping to The Secretary, Lloyd's Register of Shipping, London, regarding thickness of double bulb angles for Pacific Ranger, 28th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Pacific Ranger, 25th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Pacific Ranger, 20th September 1929 1929, Freeboard Verification form for Steamers for Pacific Ranger, 16th August 1929 1929, Steel Motorship Report for Pacific Ranger, 16th September 1929 1929, Form of Vessels of 100 Tons & Upwards for Pacific Ranger, 30th August 1929 1929, Memo regarding classification for Pacific Ranger, 19th September 1929 1929, Report on Oil Engine Machinery for Pacific Ranger, 11th September 1929 1929, Report on Boilers for Pacific Ranger, 27th March 1929 1929, Report on Electric Fittings for Pacific Ranger, 11th September 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by J Pringle at The Park Gate Iron & Steel Co Ltd, 28th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 4th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 30th January 1929 1929, Plan of Clarkson Waste Heat Boiler for Pacific Ranger, 30th January 1929 1929, Midship Section Plan for Pacific Ranger, 3rd September 1929 1929, Profile Plan for Pacific Ranger, 3rd September 1929 1929, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd, London, to The Secretary, Lloyd's Register, London, regarding plan of plating over tunnels for Pacific Ranger, 9th September 1931 1931, Letter from Secretary of Lloyd's Register, London, to Furness Withy & Co Ltd, London, regarding approval & return of plans of insulation of hold for Pacific Ranger, 7th September 1931 1931, Letter from Secretary, Lloyd's Register, to Furness, Withy & Co Ltd, London, regarding approval & return of plan of insulation for Pacific Ranger, 7th September 1931 1931, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd to Secretary, Lloyd's Register of Shipping, London, regarding submission of plan of alterations for Pacific Ranger, 2nd September 1931 1931, Plan of No 3 Hold Shewing Compensation for Omission of Steel Bulkhead for Pacific Ranger, 2nd September 1931 1931, Memo to the Chief Ship Surveyor regarding damage & alterations to Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c for Pacific Ranger, 28th June 1932 1932, Enclosure form for plans regarding Pacific Ranger, 6th July 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Memo to the Chief Engineer Surveyor regarding a continuous survey partly held for Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 30th June 1932 1932, Report on Oil Engine Electric Generator Sets for Pacific Ranger, 21st June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding the continuous survey advanced for Pacific Ranger, 15th October 1940 1940, Certificate of Survey of Machinery for Pacific Ranger, 27th August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 26th August 1940 1940, Report of Total Loss, Casualty, &c for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Note regarding Steel Advice Tests for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date )

Vessel’s area of loss or disposal/last known recorded location.

Area of ship loss

West of Ireland ( Request for Special Survey for Pacific Ranger, 19th July 1928 1928, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 6th February 1928 1928, Plan of Shafts for Pacific Ranger, 26th October 1928 1928, Midship Section Plan for Pacific Ranger, 21st April 1928 1928, Profile Plan for Pacific Ranger, 21st April 1928 1928, Letter from F R Palmer Surveyor to Lloyds Register of Shipping to The Secretary, Lloyd's Register of Shipping, London, regarding thickness of double bulb angles for Pacific Ranger, 28th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Pacific Ranger, 25th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Pacific Ranger, 20th September 1929 1929, Freeboard Verification form for Steamers for Pacific Ranger, 16th August 1929 1929, Steel Motorship Report for Pacific Ranger, 16th September 1929 1929, Form of Vessels of 100 Tons & Upwards for Pacific Ranger, 30th August 1929 1929, Memo regarding classification for Pacific Ranger, 19th September 1929 1929, Report on Oil Engine Machinery for Pacific Ranger, 11th September 1929 1929, Report on Boilers for Pacific Ranger, 27th March 1929 1929, Report on Electric Fittings for Pacific Ranger, 11th September 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by J Pringle at The Park Gate Iron & Steel Co Ltd, 28th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 4th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 30th January 1929 1929, Plan of Clarkson Waste Heat Boiler for Pacific Ranger, 30th January 1929 1929, Midship Section Plan for Pacific Ranger, 3rd September 1929 1929, Profile Plan for Pacific Ranger, 3rd September 1929 1929, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd, London, to The Secretary, Lloyd's Register, London, regarding plan of plating over tunnels for Pacific Ranger, 9th September 1931 1931, Letter from Secretary of Lloyd's Register, London, to Furness Withy & Co Ltd, London, regarding approval & return of plans of insulation of hold for Pacific Ranger, 7th September 1931 1931, Letter from Secretary, Lloyd's Register, to Furness, Withy & Co Ltd, London, regarding approval & return of plan of insulation for Pacific Ranger, 7th September 1931 1931, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd to Secretary, Lloyd's Register of Shipping, London, regarding submission of plan of alterations for Pacific Ranger, 2nd September 1931 1931, Plan of No 3 Hold Shewing Compensation for Omission of Steel Bulkhead for Pacific Ranger, 2nd September 1931 1931, Memo to the Chief Ship Surveyor regarding damage & alterations to Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c for Pacific Ranger, 28th June 1932 1932, Enclosure form for plans regarding Pacific Ranger, 6th July 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Memo to the Chief Engineer Surveyor regarding a continuous survey partly held for Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 30th June 1932 1932, Report on Oil Engine Electric Generator Sets for Pacific Ranger, 21st June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding the continuous survey advanced for Pacific Ranger, 15th October 1940 1940, Certificate of Survey of Machinery for Pacific Ranger, 27th August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 26th August 1940 1940, Report of Total Loss, Casualty, &c for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Note regarding Steel Advice Tests for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date )

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

12/10/1940 ( Request for Special Survey for Pacific Ranger, 19th July 1928 1928, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 6th February 1928 1928, Plan of Shafts for Pacific Ranger, 26th October 1928 1928, Midship Section Plan for Pacific Ranger, 21st April 1928 1928, Profile Plan for Pacific Ranger, 21st April 1928 1928, Letter from F R Palmer Surveyor to Lloyds Register of Shipping to The Secretary, Lloyd's Register of Shipping, London, regarding thickness of double bulb angles for Pacific Ranger, 28th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Pacific Ranger, 25th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Pacific Ranger, 20th September 1929 1929, Freeboard Verification form for Steamers for Pacific Ranger, 16th August 1929 1929, Steel Motorship Report for Pacific Ranger, 16th September 1929 1929, Form of Vessels of 100 Tons & Upwards for Pacific Ranger, 30th August 1929 1929, Memo regarding classification for Pacific Ranger, 19th September 1929 1929, Report on Oil Engine Machinery for Pacific Ranger, 11th September 1929 1929, Report on Boilers for Pacific Ranger, 27th March 1929 1929, Report on Electric Fittings for Pacific Ranger, 11th September 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by J Pringle at The Park Gate Iron & Steel Co Ltd, 28th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 4th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 30th January 1929 1929, Plan of Clarkson Waste Heat Boiler for Pacific Ranger, 30th January 1929 1929, Midship Section Plan for Pacific Ranger, 3rd September 1929 1929, Profile Plan for Pacific Ranger, 3rd September 1929 1929, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd, London, to The Secretary, Lloyd's Register, London, regarding plan of plating over tunnels for Pacific Ranger, 9th September 1931 1931, Letter from Secretary of Lloyd's Register, London, to Furness Withy & Co Ltd, London, regarding approval & return of plans of insulation of hold for Pacific Ranger, 7th September 1931 1931, Letter from Secretary, Lloyd's Register, to Furness, Withy & Co Ltd, London, regarding approval & return of plan of insulation for Pacific Ranger, 7th September 1931 1931, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd to Secretary, Lloyd's Register of Shipping, London, regarding submission of plan of alterations for Pacific Ranger, 2nd September 1931 1931, Plan of No 3 Hold Shewing Compensation for Omission of Steel Bulkhead for Pacific Ranger, 2nd September 1931 1931, Memo to the Chief Ship Surveyor regarding damage & alterations to Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c for Pacific Ranger, 28th June 1932 1932, Enclosure form for plans regarding Pacific Ranger, 6th July 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Memo to the Chief Engineer Surveyor regarding a continuous survey partly held for Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 30th June 1932 1932, Report on Oil Engine Electric Generator Sets for Pacific Ranger, 21st June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding the continuous survey advanced for Pacific Ranger, 15th October 1940 1940, Certificate of Survey of Machinery for Pacific Ranger, 27th August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 26th August 1940 1940, Report of Total Loss, Casualty, &c for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Note regarding Steel Advice Tests for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date )

Name of ship as recorded on the record

Ship name

Pacific Ranger ( Plan of Shafts for Pacific Ranger, 26th October 1928 1928, Midship Section Plan for Pacific Ranger, 21st April 1928 1928, Profile Plan for Pacific Ranger, 21st April 1928 1928, Letter from F R Palmer Surveyor to Lloyds Register of Shipping to The Secretary, Lloyd's Register of Shipping, London, regarding thickness of double bulb angles for Pacific Ranger, 28th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Pacific Ranger, 25th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Pacific Ranger, 20th September 1929 1929, Freeboard Verification form for Steamers for Pacific Ranger, 16th August 1929 1929, Steel Motorship Report for Pacific Ranger, 16th September 1929 1929, Form of Vessels of 100 Tons & Upwards for Pacific Ranger, 30th August 1929 1929, Memo regarding classification for Pacific Ranger, 19th September 1929 1929, Report on Oil Engine Machinery for Pacific Ranger, 11th September 1929 1929, Report on Boilers for Pacific Ranger, 27th March 1929 1929, Report on Electric Fittings for Pacific Ranger, 11th September 1929 1929, Plan of Clarkson Waste Heat Boiler for Pacific Ranger, 30th January 1929 1929, Midship Section Plan for Pacific Ranger, 3rd September 1929 1929, Profile Plan for Pacific Ranger, 3rd September 1929 1929, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd, London, to The Secretary, Lloyd's Register, London, regarding plan of plating over tunnels for Pacific Ranger, 9th September 1931 1931, Letter from Secretary of Lloyd's Register, London, to Furness Withy & Co Ltd, London, regarding approval & return of plans of insulation of hold for Pacific Ranger, 7th September 1931 1931, Letter from Secretary, Lloyd's Register, to Furness, Withy & Co Ltd, London, regarding approval & return of plan of insulation for Pacific Ranger, 7th September 1931 1931, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd to Secretary, Lloyd's Register of Shipping, London, regarding submission of plan of alterations for Pacific Ranger, 2nd September 1931 1931, Plan of No 3 Hold Shewing Compensation for Omission of Steel Bulkhead for Pacific Ranger, 2nd September 1931 1931, Memo to the Chief Ship Surveyor regarding damage & alterations to Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c for Pacific Ranger, 28th June 1932 1932, Enclosure form for plans regarding Pacific Ranger, 6th July 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Memo to the Chief Engineer Surveyor regarding a continuous survey partly held for Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 30th June 1932 1932, Report on Oil Engine Electric Generator Sets for Pacific Ranger, 21st June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding the continuous survey advanced for Pacific Ranger, 15th October 1940 1940, Certificate of Survey of Machinery for Pacific Ranger, 27th August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 26th August 1940 1940, Report of Total Loss, Casualty, &c for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Note regarding Steel Advice Tests for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date )

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

12/06/1929 ( Request for Special Survey for Pacific Ranger, 19th July 1928 1928, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 6th February 1928 1928, Plan of Shafts for Pacific Ranger, 26th October 1928 1928, Midship Section Plan for Pacific Ranger, 21st April 1928 1928, Profile Plan for Pacific Ranger, 21st April 1928 1928, Letter from F R Palmer Surveyor to Lloyds Register of Shipping to The Secretary, Lloyd's Register of Shipping, London, regarding thickness of double bulb angles for Pacific Ranger, 28th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Pacific Ranger, 25th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Pacific Ranger, 20th September 1929 1929, Freeboard Verification form for Steamers for Pacific Ranger, 16th August 1929 1929, Steel Motorship Report for Pacific Ranger, 16th September 1929 1929, Form of Vessels of 100 Tons & Upwards for Pacific Ranger, 30th August 1929 1929, Memo regarding classification for Pacific Ranger, 19th September 1929 1929, Report on Oil Engine Machinery for Pacific Ranger, 11th September 1929 1929, Report on Boilers for Pacific Ranger, 27th March 1929 1929, Report on Electric Fittings for Pacific Ranger, 11th September 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by J Pringle at The Park Gate Iron & Steel Co Ltd, 28th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 4th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 30th January 1929 1929, Plan of Clarkson Waste Heat Boiler for Pacific Ranger, 30th January 1929 1929, Midship Section Plan for Pacific Ranger, 3rd September 1929 1929, Profile Plan for Pacific Ranger, 3rd September 1929 1929, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd, London, to The Secretary, Lloyd's Register, London, regarding plan of plating over tunnels for Pacific Ranger, 9th September 1931 1931, Letter from Secretary of Lloyd's Register, London, to Furness Withy & Co Ltd, London, regarding approval & return of plans of insulation of hold for Pacific Ranger, 7th September 1931 1931, Letter from Secretary, Lloyd's Register, to Furness, Withy & Co Ltd, London, regarding approval & return of plan of insulation for Pacific Ranger, 7th September 1931 1931, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd to Secretary, Lloyd's Register of Shipping, London, regarding submission of plan of alterations for Pacific Ranger, 2nd September 1931 1931, Plan of No 3 Hold Shewing Compensation for Omission of Steel Bulkhead for Pacific Ranger, 2nd September 1931 1931, Memo to the Chief Ship Surveyor regarding damage & alterations to Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c for Pacific Ranger, 28th June 1932 1932, Enclosure form for plans regarding Pacific Ranger, 6th July 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Memo to the Chief Engineer Surveyor regarding a continuous survey partly held for Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 30th June 1932 1932, Report on Oil Engine Electric Generator Sets for Pacific Ranger, 21st June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding the continuous survey advanced for Pacific Ranger, 15th October 1940 1940, Certificate of Survey of Machinery for Pacific Ranger, 27th August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 26th August 1940 1940, Report of Total Loss, Casualty, &c for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Note regarding Steel Advice Tests for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

561 ( Request for Special Survey for Pacific Ranger, 19th July 1928 1928, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 6th February 1928 1928, Plan of Shafts for Pacific Ranger, 26th October 1928 1928, Midship Section Plan for Pacific Ranger, 21st April 1928 1928, Profile Plan for Pacific Ranger, 21st April 1928 1928, Letter from F R Palmer Surveyor to Lloyds Register of Shipping to The Secretary, Lloyd's Register of Shipping, London, regarding thickness of double bulb angles for Pacific Ranger, 28th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Pacific Ranger, 25th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Pacific Ranger, 20th September 1929 1929, Freeboard Verification form for Steamers for Pacific Ranger, 16th August 1929 1929, Steel Motorship Report for Pacific Ranger, 16th September 1929 1929, Form of Vessels of 100 Tons & Upwards for Pacific Ranger, 30th August 1929 1929, Memo regarding classification for Pacific Ranger, 19th September 1929 1929, Report on Oil Engine Machinery for Pacific Ranger, 11th September 1929 1929, Report on Boilers for Pacific Ranger, 27th March 1929 1929, Report on Electric Fittings for Pacific Ranger, 11th September 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by J Pringle at The Park Gate Iron & Steel Co Ltd, 28th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 4th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 30th January 1929 1929, Plan of Clarkson Waste Heat Boiler for Pacific Ranger, 30th January 1929 1929, Midship Section Plan for Pacific Ranger, 3rd September 1929 1929, Profile Plan for Pacific Ranger, 3rd September 1929 1929, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd, London, to The Secretary, Lloyd's Register, London, regarding plan of plating over tunnels for Pacific Ranger, 9th September 1931 1931, Letter from Secretary of Lloyd's Register, London, to Furness Withy & Co Ltd, London, regarding approval & return of plans of insulation of hold for Pacific Ranger, 7th September 1931 1931, Letter from Secretary, Lloyd's Register, to Furness, Withy & Co Ltd, London, regarding approval & return of plan of insulation for Pacific Ranger, 7th September 1931 1931, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd to Secretary, Lloyd's Register of Shipping, London, regarding submission of plan of alterations for Pacific Ranger, 2nd September 1931 1931, Plan of No 3 Hold Shewing Compensation for Omission of Steel Bulkhead for Pacific Ranger, 2nd September 1931 1931, Memo to the Chief Ship Surveyor regarding damage & alterations to Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c for Pacific Ranger, 28th June 1932 1932, Enclosure form for plans regarding Pacific Ranger, 6th July 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Memo to the Chief Engineer Surveyor regarding a continuous survey partly held for Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 30th June 1932 1932, Report on Oil Engine Electric Generator Sets for Pacific Ranger, 21st June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding the continuous survey advanced for Pacific Ranger, 15th October 1940 1940, Certificate of Survey of Machinery for Pacific Ranger, 27th August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 26th August 1940 1940, Report of Total Loss, Casualty, &c for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Note regarding Steel Advice Tests for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date )

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined ( Request for Special Survey for Pacific Ranger, 19th July 1928 1928, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 6th February 1928 1928, Midship Section Plan for Pacific Ranger, 21st April 1928 1928, Profile Plan for Pacific Ranger, 21st April 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Pacific Ranger, 25th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Pacific Ranger, 20th September 1929 1929, Freeboard Verification form for Steamers for Pacific Ranger, 16th August 1929 1929, Steel Motorship Report for Pacific Ranger, 16th September 1929 1929, Memo regarding classification for Pacific Ranger, 19th September 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by J Pringle at The Park Gate Iron & Steel Co Ltd, 28th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 4th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 30th January 1929 1929, Plan of Clarkson Waste Heat Boiler for Pacific Ranger, 30th January 1929 1929, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd, London, to The Secretary, Lloyd's Register, London, regarding plan of plating over tunnels for Pacific Ranger, 9th September 1931 1931, Letter from Secretary of Lloyd's Register, London, to Furness Withy & Co Ltd, London, regarding approval & return of plans of insulation of hold for Pacific Ranger, 7th September 1931 1931, Letter from Secretary, Lloyd's Register, to Furness, Withy & Co Ltd, London, regarding approval & return of plan of insulation for Pacific Ranger, 7th September 1931 1931, Plan of No 3 Hold Shewing Compensation for Omission of Steel Bulkhead for Pacific Ranger, 2nd September 1931 1931, Memo to the Chief Ship Surveyor regarding damage & alterations to Pacific Ranger, 7th July 1932 1932, Enclosure form for plans regarding Pacific Ranger, 6th July 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Memo to the Chief Engineer Surveyor regarding a continuous survey partly held for Pacific Ranger, 7th July 1932 1932, Report on Oil Engine Electric Generator Sets for Pacific Ranger, 21st June 1932 1932, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding the continuous survey advanced for Pacific Ranger, 15th October 1940 1940, Report of Total Loss, Casualty, &c for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Note regarding Steel Advice Tests for Pacific Ranger, Undated no date )

Screw Motor Vessel ( Plan of Shafts for Pacific Ranger, 26th October 1928 1928 )

Cargo ( Form of Vessels of 100 Tons & Upwards for Pacific Ranger, 30th August 1929 1929 )

Twin Screw Motor Vessel ( Report on Oil Engine Machinery for Pacific Ranger, 11th September 1929 1929, Report on Boilers for Pacific Ranger, 27th March 1929 1929, Report on Electric Fittings for Pacific Ranger, 11th September 1929 1929, Midship Section Plan for Pacific Ranger, 3rd September 1929 1929, Profile Plan for Pacific Ranger, 3rd September 1929 1929, Report of Survey for Repairs, &c for Pacific Ranger, 28th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Machinery for Pacific Ranger, 27th August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 26th August 1940 1940 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Request for Special Survey for Pacific Ranger, 19th July 1928 1928, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 6th February 1928 1928, Plan of Shafts for Pacific Ranger, 26th October 1928 1928, Midship Section Plan for Pacific Ranger, 21st April 1928 1928, Profile Plan for Pacific Ranger, 21st April 1928 1928, Letter from F R Palmer Surveyor to Lloyds Register of Shipping to The Secretary, Lloyd's Register of Shipping, London, regarding thickness of double bulb angles for Pacific Ranger, 28th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Pacific Ranger, 25th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Pacific Ranger, 20th September 1929 1929, Freeboard Verification form for Steamers for Pacific Ranger, 16th August 1929 1929, Steel Motorship Report for Pacific Ranger, 16th September 1929 1929, Form of Vessels of 100 Tons & Upwards for Pacific Ranger, 30th August 1929 1929, Memo regarding classification for Pacific Ranger, 19th September 1929 1929, Report on Oil Engine Machinery for Pacific Ranger, 11th September 1929 1929, Report on Boilers for Pacific Ranger, 27th March 1929 1929, Report on Electric Fittings for Pacific Ranger, 11th September 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by J Pringle at The Park Gate Iron & Steel Co Ltd, 28th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 4th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 30th January 1929 1929, Plan of Clarkson Waste Heat Boiler for Pacific Ranger, 30th January 1929 1929, Midship Section Plan for Pacific Ranger, 3rd September 1929 1929, Profile Plan for Pacific Ranger, 3rd September 1929 1929, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd, London, to The Secretary, Lloyd's Register, London, regarding plan of plating over tunnels for Pacific Ranger, 9th September 1931 1931, Letter from Secretary of Lloyd's Register, London, to Furness Withy & Co Ltd, London, regarding approval & return of plans of insulation of hold for Pacific Ranger, 7th September 1931 1931, Letter from Secretary, Lloyd's Register, to Furness, Withy & Co Ltd, London, regarding approval & return of plan of insulation for Pacific Ranger, 7th September 1931 1931, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd to Secretary, Lloyd's Register of Shipping, London, regarding submission of plan of alterations for Pacific Ranger, 2nd September 1931 1931, Plan of No 3 Hold Shewing Compensation for Omission of Steel Bulkhead for Pacific Ranger, 2nd September 1931 1931, Memo to the Chief Ship Surveyor regarding damage & alterations to Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c for Pacific Ranger, 28th June 1932 1932, Enclosure form for plans regarding Pacific Ranger, 6th July 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Memo to the Chief Engineer Surveyor regarding a continuous survey partly held for Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 30th June 1932 1932, Report on Oil Engine Electric Generator Sets for Pacific Ranger, 21st June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding the continuous survey advanced for Pacific Ranger, 15th October 1940 1940, Certificate of Survey of Machinery for Pacific Ranger, 27th August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 26th August 1940 1940, Report of Total Loss, Casualty, &c for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Note regarding Steel Advice Tests for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Request for Special Survey for Pacific Ranger, 19th July 1928 1928, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 6th February 1928 1928, Plan of Shafts for Pacific Ranger, 26th October 1928 1928, Midship Section Plan for Pacific Ranger, 21st April 1928 1928, Profile Plan for Pacific Ranger, 21st April 1928 1928, Letter from F R Palmer Surveyor to Lloyds Register of Shipping to The Secretary, Lloyd's Register of Shipping, London, regarding thickness of double bulb angles for Pacific Ranger, 28th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Pacific Ranger, 25th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Pacific Ranger, 20th September 1929 1929, Freeboard Verification form for Steamers for Pacific Ranger, 16th August 1929 1929, Steel Motorship Report for Pacific Ranger, 16th September 1929 1929, Form of Vessels of 100 Tons & Upwards for Pacific Ranger, 30th August 1929 1929, Memo regarding classification for Pacific Ranger, 19th September 1929 1929, Report on Oil Engine Machinery for Pacific Ranger, 11th September 1929 1929, Report on Boilers for Pacific Ranger, 27th March 1929 1929, Report on Electric Fittings for Pacific Ranger, 11th September 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by J Pringle at The Park Gate Iron & Steel Co Ltd, 28th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 4th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 30th January 1929 1929, Plan of Clarkson Waste Heat Boiler for Pacific Ranger, 30th January 1929 1929, Midship Section Plan for Pacific Ranger, 3rd September 1929 1929, Profile Plan for Pacific Ranger, 3rd September 1929 1929, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd, London, to The Secretary, Lloyd's Register, London, regarding plan of plating over tunnels for Pacific Ranger, 9th September 1931 1931, Letter from Secretary of Lloyd's Register, London, to Furness Withy & Co Ltd, London, regarding approval & return of plans of insulation of hold for Pacific Ranger, 7th September 1931 1931, Letter from Secretary, Lloyd's Register, to Furness, Withy & Co Ltd, London, regarding approval & return of plan of insulation for Pacific Ranger, 7th September 1931 1931, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd to Secretary, Lloyd's Register of Shipping, London, regarding submission of plan of alterations for Pacific Ranger, 2nd September 1931 1931, Plan of No 3 Hold Shewing Compensation for Omission of Steel Bulkhead for Pacific Ranger, 2nd September 1931 1931, Memo to the Chief Ship Surveyor regarding damage & alterations to Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c for Pacific Ranger, 28th June 1932 1932, Enclosure form for plans regarding Pacific Ranger, 6th July 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Memo to the Chief Engineer Surveyor regarding a continuous survey partly held for Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 30th June 1932 1932, Report on Oil Engine Electric Generator Sets for Pacific Ranger, 21st June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding the continuous survey advanced for Pacific Ranger, 15th October 1940 1940, Certificate of Survey of Machinery for Pacific Ranger, 27th August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 26th August 1940 1940, Report of Total Loss, Casualty, &c for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Note regarding Steel Advice Tests for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Request for Special Survey for Pacific Ranger, 19th July 1928 1928, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 6th February 1928 1928, Plan of Shafts for Pacific Ranger, 26th October 1928 1928, Midship Section Plan for Pacific Ranger, 21st April 1928 1928, Profile Plan for Pacific Ranger, 21st April 1928 1928, Letter from F R Palmer Surveyor to Lloyds Register of Shipping to The Secretary, Lloyd's Register of Shipping, London, regarding thickness of double bulb angles for Pacific Ranger, 28th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Pacific Ranger, 25th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Pacific Ranger, 20th September 1929 1929, Freeboard Verification form for Steamers for Pacific Ranger, 16th August 1929 1929, Steel Motorship Report for Pacific Ranger, 16th September 1929 1929, Form of Vessels of 100 Tons & Upwards for Pacific Ranger, 30th August 1929 1929, Memo regarding classification for Pacific Ranger, 19th September 1929 1929, Report on Oil Engine Machinery for Pacific Ranger, 11th September 1929 1929, Report on Boilers for Pacific Ranger, 27th March 1929 1929, Report on Electric Fittings for Pacific Ranger, 11th September 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by J Pringle at The Park Gate Iron & Steel Co Ltd, 28th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 4th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 30th January 1929 1929, Plan of Clarkson Waste Heat Boiler for Pacific Ranger, 30th January 1929 1929, Midship Section Plan for Pacific Ranger, 3rd September 1929 1929, Profile Plan for Pacific Ranger, 3rd September 1929 1929, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd, London, to The Secretary, Lloyd's Register, London, regarding plan of plating over tunnels for Pacific Ranger, 9th September 1931 1931, Letter from Secretary of Lloyd's Register, London, to Furness Withy & Co Ltd, London, regarding approval & return of plans of insulation of hold for Pacific Ranger, 7th September 1931 1931, Letter from Secretary, Lloyd's Register, to Furness, Withy & Co Ltd, London, regarding approval & return of plan of insulation for Pacific Ranger, 7th September 1931 1931, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd to Secretary, Lloyd's Register of Shipping, London, regarding submission of plan of alterations for Pacific Ranger, 2nd September 1931 1931, Plan of No 3 Hold Shewing Compensation for Omission of Steel Bulkhead for Pacific Ranger, 2nd September 1931 1931, Memo to the Chief Ship Surveyor regarding damage & alterations to Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c for Pacific Ranger, 28th June 1932 1932, Enclosure form for plans regarding Pacific Ranger, 6th July 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Memo to the Chief Engineer Surveyor regarding a continuous survey partly held for Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 30th June 1932 1932, Report on Oil Engine Electric Generator Sets for Pacific Ranger, 21st June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding the continuous survey advanced for Pacific Ranger, 15th October 1940 1940, Certificate of Survey of Machinery for Pacific Ranger, 27th August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 26th August 1940 1940, Report of Total Loss, Casualty, &c for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Note regarding Steel Advice Tests for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Request for Special Survey for Pacific Ranger, 19th July 1928 1928, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 6th February 1928 1928, Plan of Shafts for Pacific Ranger, 26th October 1928 1928, Midship Section Plan for Pacific Ranger, 21st April 1928 1928, Profile Plan for Pacific Ranger, 21st April 1928 1928, Letter from F R Palmer Surveyor to Lloyds Register of Shipping to The Secretary, Lloyd's Register of Shipping, London, regarding thickness of double bulb angles for Pacific Ranger, 28th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Pacific Ranger, 25th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Pacific Ranger, 20th September 1929 1929, Freeboard Verification form for Steamers for Pacific Ranger, 16th August 1929 1929, Steel Motorship Report for Pacific Ranger, 16th September 1929 1929, Form of Vessels of 100 Tons & Upwards for Pacific Ranger, 30th August 1929 1929, Memo regarding classification for Pacific Ranger, 19th September 1929 1929, Report on Oil Engine Machinery for Pacific Ranger, 11th September 1929 1929, Report on Boilers for Pacific Ranger, 27th March 1929 1929, Report on Electric Fittings for Pacific Ranger, 11th September 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by J Pringle at The Park Gate Iron & Steel Co Ltd, 28th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 4th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 30th January 1929 1929, Plan of Clarkson Waste Heat Boiler for Pacific Ranger, 30th January 1929 1929, Midship Section Plan for Pacific Ranger, 3rd September 1929 1929, Profile Plan for Pacific Ranger, 3rd September 1929 1929, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd, London, to The Secretary, Lloyd's Register, London, regarding plan of plating over tunnels for Pacific Ranger, 9th September 1931 1931, Letter from Secretary of Lloyd's Register, London, to Furness Withy & Co Ltd, London, regarding approval & return of plans of insulation of hold for Pacific Ranger, 7th September 1931 1931, Letter from Secretary, Lloyd's Register, to Furness, Withy & Co Ltd, London, regarding approval & return of plan of insulation for Pacific Ranger, 7th September 1931 1931, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd to Secretary, Lloyd's Register of Shipping, London, regarding submission of plan of alterations for Pacific Ranger, 2nd September 1931 1931, Plan of No 3 Hold Shewing Compensation for Omission of Steel Bulkhead for Pacific Ranger, 2nd September 1931 1931, Memo to the Chief Ship Surveyor regarding damage & alterations to Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c for Pacific Ranger, 28th June 1932 1932, Enclosure form for plans regarding Pacific Ranger, 6th July 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Memo to the Chief Engineer Surveyor regarding a continuous survey partly held for Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 30th June 1932 1932, Report on Oil Engine Electric Generator Sets for Pacific Ranger, 21st June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding the continuous survey advanced for Pacific Ranger, 15th October 1940 1940, Certificate of Survey of Machinery for Pacific Ranger, 27th August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 26th August 1940 1940, Report of Total Loss, Casualty, &c for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Note regarding Steel Advice Tests for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sunk by Submarine ( Request for Special Survey for Pacific Ranger, 19th July 1928 1928, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 6th February 1928 1928, Plan of Shafts for Pacific Ranger, 26th October 1928 1928, Midship Section Plan for Pacific Ranger, 21st April 1928 1928, Profile Plan for Pacific Ranger, 21st April 1928 1928, Letter from F R Palmer Surveyor to Lloyds Register of Shipping to The Secretary, Lloyd's Register of Shipping, London, regarding thickness of double bulb angles for Pacific Ranger, 28th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Pacific Ranger, 25th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Pacific Ranger, 20th September 1929 1929, Freeboard Verification form for Steamers for Pacific Ranger, 16th August 1929 1929, Steel Motorship Report for Pacific Ranger, 16th September 1929 1929, Form of Vessels of 100 Tons & Upwards for Pacific Ranger, 30th August 1929 1929, Memo regarding classification for Pacific Ranger, 19th September 1929 1929, Report on Oil Engine Machinery for Pacific Ranger, 11th September 1929 1929, Report on Boilers for Pacific Ranger, 27th March 1929 1929, Report on Electric Fittings for Pacific Ranger, 11th September 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by J Pringle at The Park Gate Iron & Steel Co Ltd, 28th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 4th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 30th January 1929 1929, Plan of Clarkson Waste Heat Boiler for Pacific Ranger, 30th January 1929 1929, Midship Section Plan for Pacific Ranger, 3rd September 1929 1929, Profile Plan for Pacific Ranger, 3rd September 1929 1929, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd, London, to The Secretary, Lloyd's Register, London, regarding plan of plating over tunnels for Pacific Ranger, 9th September 1931 1931, Letter from Secretary of Lloyd's Register, London, to Furness Withy & Co Ltd, London, regarding approval & return of plans of insulation of hold for Pacific Ranger, 7th September 1931 1931, Letter from Secretary, Lloyd's Register, to Furness, Withy & Co Ltd, London, regarding approval & return of plan of insulation for Pacific Ranger, 7th September 1931 1931, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd to Secretary, Lloyd's Register of Shipping, London, regarding submission of plan of alterations for Pacific Ranger, 2nd September 1931 1931, Plan of No 3 Hold Shewing Compensation for Omission of Steel Bulkhead for Pacific Ranger, 2nd September 1931 1931, Memo to the Chief Ship Surveyor regarding damage & alterations to Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c for Pacific Ranger, 28th June 1932 1932, Enclosure form for plans regarding Pacific Ranger, 6th July 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Memo to the Chief Engineer Surveyor regarding a continuous survey partly held for Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 30th June 1932 1932, Report on Oil Engine Electric Generator Sets for Pacific Ranger, 21st June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding the continuous survey advanced for Pacific Ranger, 15th October 1940 1940, Certificate of Survey of Machinery for Pacific Ranger, 27th August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 26th August 1940 1940, Report of Total Loss, Casualty, &c for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Note regarding Steel Advice Tests for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date, Plan of Crankshaft for Pacific Ranger, Undated no date )

The country or national waters where a vessel is lost/disposed of, or last recorded.

Country of loss or disposal

Ireland ( Request for Special Survey for Pacific Ranger, 19th July 1928 1928, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 6th February 1928 1928, Plan of Shafts for Pacific Ranger, 26th October 1928 1928, Midship Section Plan for Pacific Ranger, 21st April 1928 1928, Profile Plan for Pacific Ranger, 21st April 1928 1928, Remarks of the Chief Ship Surveyor to the Classing Committee regarding damage to Pacific Ranger, 25th September 1929 1929, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Pacific Ranger, 20th September 1929 1929, Freeboard Verification form for Steamers for Pacific Ranger, 16th August 1929 1929, Steel Motorship Report for Pacific Ranger, 16th September 1929 1929, Form of Vessels of 100 Tons & Upwards for Pacific Ranger, 30th August 1929 1929, Memo regarding classification for Pacific Ranger, 19th September 1929 1929, Report on Oil Engine Machinery for Pacific Ranger, 11th September 1929 1929, Report on Boilers for Pacific Ranger, 27th March 1929 1929, Report on Electric Fittings for Pacific Ranger, 11th September 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by J Pringle at The Park Gate Iron & Steel Co Ltd, 28th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 4th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 7th February 1929 1929, Steel Test Certificate for test on Pacific Ranger undertaken by R W Fawcett at The Park Gate Iron & Steel Co Ltd, 30th January 1929 1929, Plan of Clarkson Waste Heat Boiler for Pacific Ranger, 30th January 1929 1929, Midship Section Plan for Pacific Ranger, 3rd September 1929 1929, Profile Plan for Pacific Ranger, 3rd September 1929 1929, Letter from E W Harrey, Chief Superintendent, for Furness Withy & Co Ltd, London, to The Secretary, Lloyd's Register, London, regarding plan of plating over tunnels for Pacific Ranger, 9th September 1931 1931, Letter from Secretary of Lloyd's Register, London, to Furness Withy & Co Ltd, London, regarding approval & return of plans of insulation of hold for Pacific Ranger, 7th September 1931 1931, Letter from Secretary, Lloyd's Register, to Furness, Withy & Co Ltd, London, regarding approval & return of plan of insulation for Pacific Ranger, 7th September 1931 1931, Plan of No 3 Hold Shewing Compensation for Omission of Steel Bulkhead for Pacific Ranger, 2nd September 1931 1931, Memo to the Chief Ship Surveyor regarding damage & alterations to Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c for Pacific Ranger, 28th June 1932 1932, Enclosure form for plans regarding Pacific Ranger, 6th July 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Memo to the Chief Engineer Surveyor regarding a continuous survey partly held for Pacific Ranger, 7th July 1932 1932, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 30th June 1932 1932, Report on Oil Engine Electric Generator Sets for Pacific Ranger, 21st June 1932 1932, Certificate of Survey of Damage for Pacific Ranger, 30th June 1932 1932, Remarks of the Chief Engineer Surveyor to The Classing Committee regarding the continuous survey advanced for Pacific Ranger, 15th October 1940 1940, Certificate of Survey of Machinery for Pacific Ranger, 27th August 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 26th August 1940 1940, Report of Total Loss, Casualty, &c for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Oil Engine Surveys for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Fees Information for Pacific Ranger, Undated no date, Note regarding Steel Advice Tests for Pacific Ranger, Undated no date )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1 with Freeboard; Carrying Linseed oil in Deep Tank; Lloyd\'s A & CP; +LMC 9,29; Oil Engines ( Steel Motorship Report for Pacific Ranger, 16th September 1929 1929 )

+LMC 9,29; Oil Engines; CL; DB 100lb ( Report on Oil Engine Machinery for Pacific Ranger, 11th September 1929 1929 )

See Report Copenhagen FE 8079 ( Report on Boilers for Pacific Ranger, 27th March 1929 1929 )

Electric Lighting ( Report on Electric Fittings for Pacific Ranger, 11th September 1929 1929 )

+100A1 with Freeboard 6,32 ( Report of Survey for Repairs, &c for Pacific Ranger, 28th June 1932 1932 )

DBS 6,32; +100A1 with Freeboard 5,31; +LMC 9,29; +Lloyds RMC 8,31; TS CL; Oil Engine ( Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 30th June 1932 1932 )

+LMC ( Report on Oil Engine Electric Generator Sets for Pacific Ranger, 21st June 1932 1932 )

+100A1 With Freeboard 6,40; S S Glasgow No 2, 37; +LMC CS 5,38; DBS 2,40; TS CL 4,39 ( Report of Survey for Repairs, &c, of Engines & Boilers for Pacific Ranger, 26th August 1940 1940 )

+100A1 with Freeboard 6,40; S S Gls No 2-37; Oil Engines; +LMC; CS 5,38; DB S 2,40; +Lloyds RMC 6,40; TS 4,39 CL ( Report of Total Loss, Casualty, &c for Pacific Ranger, Undated no date )

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

Type and configuration of the engine(s) supplied for a vessel.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.