Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
The year in which a vessel’s construction is completed.
1924 ( Letter from H Taylor, Director, for Craig Taylor & Co Ltd, to Lloyd's Register, Middlesbrough, regarding Paddington, 21st December 1923 1923, Request for Special Survey for Paddington, 17th December 1923 1923, Plan of Boiler for Paddington, 19th December 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Paddington, 4th June 1924 1924, Steel Steamer Report for Paddington, 2nd June 1924 1924, Form for Vessels of 100 Tons & Upwards for Paddington, 23rd May 1924 1924, Report on Machinery for Paddington, 9th May 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Paddington, 3rd February 1928 1928, Report of Survey for Repairs for Paddington, 23rd January 1928 1928, Report of Survey for Repairs of Engines & Boilers for Paddington, 23rd January 1928 1928, Report of Total Loss & Casualty for Paddington, 25th February 1929 1929, Letter from Director, H Harrison Shipping Ltd, to Lloyd's Register, London, regarding Paddington, 22nd February 1902 1929, Report on Electric Fittings for Paddington, Undated no date, Note Concerning Plan of Boiler for Paddington, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Craig Taylor & Co Ltd ( Letter from H Taylor, Director, for Craig Taylor & Co Ltd, to Lloyd's Register, Middlesbrough, regarding Paddington, 21st December 1923 1923, Request for Special Survey for Paddington, 17th December 1923 1923, Plan of Boiler for Paddington, 19th December 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Paddington, 4th June 1924 1924, Steel Steamer Report for Paddington, 2nd June 1924 1924, Form for Vessels of 100 Tons & Upwards for Paddington, 23rd May 1924 1924, Report on Machinery for Paddington, 9th May 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Paddington, 3rd February 1928 1928, Report of Survey for Repairs for Paddington, 23rd January 1928 1928, Report of Survey for Repairs of Engines & Boilers for Paddington, 23rd January 1928 1928, Report of Total Loss & Casualty for Paddington, 25th February 1929 1929, Letter from Director, H Harrison Shipping Ltd, to Lloyd's Register, London, regarding Paddington, 22nd February 1902 1929, Report on Electric Fittings for Paddington, Undated no date, Note Concerning Plan of Boiler for Paddington, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Stockton on Tees ( Letter from H Taylor, Director, for Craig Taylor & Co Ltd, to Lloyd's Register, Middlesbrough, regarding Paddington, 21st December 1923 1923, Request for Special Survey for Paddington, 17th December 1923 1923, Plan of Boiler for Paddington, 19th December 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Paddington, 4th June 1924 1924, Steel Steamer Report for Paddington, 2nd June 1924 1924, Form for Vessels of 100 Tons & Upwards for Paddington, 23rd May 1924 1924, Report on Machinery for Paddington, 9th May 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Paddington, 3rd February 1928 1928, Report of Survey for Repairs for Paddington, 23rd January 1928 1928, Report of Survey for Repairs of Engines & Boilers for Paddington, 23rd January 1928 1928, Report of Total Loss & Casualty for Paddington, 25th February 1929 1929, Letter from Director, H Harrison Shipping Ltd, to Lloyd's Register, London, regarding Paddington, 22nd February 1902 1929, Report on Electric Fittings for Paddington, Undated no date, Note Concerning Plan of Boiler for Paddington, Undated no date )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Letter from H Taylor, Director, for Craig Taylor & Co Ltd, to Lloyd's Register, Middlesbrough, regarding Paddington, 21st December 1923 1923, Plan of Boiler for Paddington, 19th December 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Paddington, 4th June 1924 1924, Steel Steamer Report for Paddington, 2nd June 1924 1924, Report on Machinery for Paddington, 9th May 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Paddington, 3rd February 1928 1928, Report of Survey for Repairs for Paddington, 23rd January 1928 1928, Report of Survey for Repairs of Engines & Boilers for Paddington, 23rd January 1928 1928, Report of Total Loss & Casualty for Paddington, 25th February 1929 1929, Letter from Director, H Harrison Shipping Ltd, to Lloyd's Register, London, regarding Paddington, 22nd February 1902 1929, Note Concerning Plan of Boiler for Paddington, Undated no date )
Screw Steamer ( Request for Special Survey for Paddington, 17th December 1923 1923, Report on Electric Fittings for Paddington, Undated no date )
Cargo ( Form for Vessels of 100 Tons & Upwards for Paddington, 23rd May 1924 1924 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Letter from H Taylor, Director, for Craig Taylor & Co Ltd, to Lloyd's Register, Middlesbrough, regarding Paddington, 21st December 1923 1923, Request for Special Survey for Paddington, 17th December 1923 1923, Plan of Boiler for Paddington, 19th December 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Paddington, 4th June 1924 1924, Steel Steamer Report for Paddington, 2nd June 1924 1924, Form for Vessels of 100 Tons & Upwards for Paddington, 23rd May 1924 1924, Report on Machinery for Paddington, 9th May 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Paddington, 3rd February 1928 1928, Report of Survey for Repairs for Paddington, 23rd January 1928 1928, Report of Survey for Repairs of Engines & Boilers for Paddington, 23rd January 1928 1928, Report of Total Loss & Casualty for Paddington, 25th February 1929 1929, Letter from Director, H Harrison Shipping Ltd, to Lloyd's Register, London, regarding Paddington, 22nd February 1902 1929, Report on Electric Fittings for Paddington, Undated no date, Note Concerning Plan of Boiler for Paddington, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Letter from H Taylor, Director, for Craig Taylor & Co Ltd, to Lloyd's Register, Middlesbrough, regarding Paddington, 21st December 1923 1923, Request for Special Survey for Paddington, 17th December 1923 1923, Plan of Boiler for Paddington, 19th December 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Paddington, 4th June 1924 1924, Steel Steamer Report for Paddington, 2nd June 1924 1924, Form for Vessels of 100 Tons & Upwards for Paddington, 23rd May 1924 1924, Report on Machinery for Paddington, 9th May 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Paddington, 3rd February 1928 1928, Report of Survey for Repairs for Paddington, 23rd January 1928 1928, Report of Survey for Repairs of Engines & Boilers for Paddington, 23rd January 1928 1928, Report of Total Loss & Casualty for Paddington, 25th February 1929 1929, Letter from Director, H Harrison Shipping Ltd, to Lloyd's Register, London, regarding Paddington, 22nd February 1902 1929, Report on Electric Fittings for Paddington, Undated no date, Note Concerning Plan of Boiler for Paddington, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Letter from H Taylor, Director, for Craig Taylor & Co Ltd, to Lloyd's Register, Middlesbrough, regarding Paddington, 21st December 1923 1923, Request for Special Survey for Paddington, 17th December 1923 1923, Plan of Boiler for Paddington, 19th December 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Paddington, 4th June 1924 1924, Steel Steamer Report for Paddington, 2nd June 1924 1924, Form for Vessels of 100 Tons & Upwards for Paddington, 23rd May 1924 1924, Report on Machinery for Paddington, 9th May 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Paddington, 3rd February 1928 1928, Report of Survey for Repairs for Paddington, 23rd January 1928 1928, Report of Survey for Repairs of Engines & Boilers for Paddington, 23rd January 1928 1928, Report of Total Loss & Casualty for Paddington, 25th February 1929 1929, Letter from Director, H Harrison Shipping Ltd, to Lloyd's Register, London, regarding Paddington, 22nd February 1902 1929, Report on Electric Fittings for Paddington, Undated no date, Note Concerning Plan of Boiler for Paddington, Undated no date )
Is electric lighting fitted to the vessel?
No ( Letter from H Taylor, Director, for Craig Taylor & Co Ltd, to Lloyd's Register, Middlesbrough, regarding Paddington, 21st December 1923 1923, Request for Special Survey for Paddington, 17th December 1923 1923, Plan of Boiler for Paddington, 19th December 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Paddington, 4th June 1924 1924, Steel Steamer Report for Paddington, 2nd June 1924 1924, Form for Vessels of 100 Tons & Upwards for Paddington, 23rd May 1924 1924, Report on Machinery for Paddington, 9th May 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Paddington, 3rd February 1928 1928, Report of Survey for Repairs for Paddington, 23rd January 1928 1928, Report of Survey for Repairs of Engines & Boilers for Paddington, 23rd January 1928 1928, Report of Total Loss & Casualty for Paddington, 25th February 1929 1929, Letter from Director, H Harrison Shipping Ltd, to Lloyd's Register, London, regarding Paddington, 22nd February 1902 1929, Report on Electric Fittings for Paddington, Undated no date, Note Concerning Plan of Boiler for Paddington, Undated no date )
The official record pronounced by the Committee
Sunk by Collision ( Letter from H Taylor, Director, for Craig Taylor & Co Ltd, to Lloyd's Register, Middlesbrough, regarding Paddington, 21st December 1923 1923, Request for Special Survey for Paddington, 17th December 1923 1923, Plan of Boiler for Paddington, 19th December 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Paddington, 4th June 1924 1924, Steel Steamer Report for Paddington, 2nd June 1924 1924, Form for Vessels of 100 Tons & Upwards for Paddington, 23rd May 1924 1924, Report on Machinery for Paddington, 9th May 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Paddington, 3rd February 1928 1928, Report of Survey for Repairs for Paddington, 23rd January 1928 1928, Report of Survey for Repairs of Engines & Boilers for Paddington, 23rd January 1928 1928, Report of Total Loss & Casualty for Paddington, 25th February 1929 1929, Letter from Director, H Harrison Shipping Ltd, to Lloyd's Register, London, regarding Paddington, 22nd February 1902 1929, Report on Electric Fittings for Paddington, Undated no date, Note Concerning Plan of Boiler for Paddington, Undated no date )
Vessel’s place of loss or disposal/last known recorded location.
Flamborough Head ( Letter from H Taylor, Director, for Craig Taylor & Co Ltd, to Lloyd's Register, Middlesbrough, regarding Paddington, 21st December 1923 1923, Request for Special Survey for Paddington, 17th December 1923 1923, Plan of Boiler for Paddington, 19th December 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Paddington, 4th June 1924 1924, Steel Steamer Report for Paddington, 2nd June 1924 1924, Form for Vessels of 100 Tons & Upwards for Paddington, 23rd May 1924 1924, Report on Machinery for Paddington, 9th May 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Paddington, 3rd February 1928 1928, Report of Survey for Repairs for Paddington, 23rd January 1928 1928, Report of Survey for Repairs of Engines & Boilers for Paddington, 23rd January 1928 1928, Report of Total Loss & Casualty for Paddington, 25th February 1929 1929, Letter from Director, H Harrison Shipping Ltd, to Lloyd's Register, London, regarding Paddington, 22nd February 1902 1929, Report on Electric Fittings for Paddington, Undated no date, Note Concerning Plan of Boiler for Paddington, Undated no date )
Recorded date for the vessel’s loss or disposal.
02/02/1929 ( Letter from H Taylor, Director, for Craig Taylor & Co Ltd, to Lloyd's Register, Middlesbrough, regarding Paddington, 21st December 1923 1923, Request for Special Survey for Paddington, 17th December 1923 1923, Plan of Boiler for Paddington, 19th December 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Paddington, 4th June 1924 1924, Steel Steamer Report for Paddington, 2nd June 1924 1924, Form for Vessels of 100 Tons & Upwards for Paddington, 23rd May 1924 1924, Report on Machinery for Paddington, 9th May 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Paddington, 3rd February 1928 1928, Report of Survey for Repairs for Paddington, 23rd January 1928 1928, Report of Survey for Repairs of Engines & Boilers for Paddington, 23rd January 1928 1928, Report of Total Loss & Casualty for Paddington, 25th February 1929 1929, Letter from Director, H Harrison Shipping Ltd, to Lloyd's Register, London, regarding Paddington, 22nd February 1902 1929, Report on Electric Fittings for Paddington, Undated no date, Note Concerning Plan of Boiler for Paddington, Undated no date )
Location of construction for a vessel’s engines.
Sunderland ( Request for Special Survey for Paddington, 17th December 1923 1923, Form for Vessels of 100 Tons & Upwards for Paddington, 23rd May 1924 1924, Report on Machinery for Paddington, 9th May 1924 1924, Report of Survey for Repairs of Engines & Boilers for Paddington, 23rd January 1928 1928 )
Physical arrangement of a ship’s masts, sails and rigging.
The listed port to which a given vessel belongs.
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Lloyds A & CP; +LMC 5,24; CL ( Steel Steamer Report for Paddington, 2nd June 1924 1924 )
+LMC 5,24; CL ( Report on Machinery for Paddington, 9th May 1924 1924 )
+100A1; S1,28; Cargo Battens not Fitted ( Report of Survey for Repairs for Paddington, 23rd January 1928 1928 )
+100A1 8,26; +LMC 5,24; TS 8,26; Cargo Battens Not fitted ( Report of Survey for Repairs of Engines & Boilers for Paddington, 23rd January 1928 1928 )
+100A1 1,28; +LMC 5,24 ( Report of Total Loss & Casualty for Paddington, 25th February 1929 1929 )
The port in which a vessel is registered or permanently based.
Type and configuration of the engine(s) supplied for a vessel.
Triple Compound Inverted Cylinders ( Form for Vessels of 100 Tons & Upwards for Paddington, 23rd May 1924 1924 )
Triple Expansion ( Report on Machinery for Paddington, 9th May 1924 1924 )
Name of surveyor.
William Morrison ( Report on Machinery for Paddington, 9th May 1924 1924, Report on Electric Fittings for Paddington, Undated no date )
The name of the port/place of destination given.
The process of transferring a vessel to water, but not necessarily her completion.
17/04/1924 ( Letter from H Taylor, Director, for Craig Taylor & Co Ltd, to Lloyd's Register, Middlesbrough, regarding Paddington, 21st December 1923 1923, Request for Special Survey for Paddington, 17th December 1923 1923, Plan of Boiler for Paddington, 19th December 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Paddington, 4th June 1924 1924, Steel Steamer Report for Paddington, 2nd June 1924 1924, Form for Vessels of 100 Tons & Upwards for Paddington, 23rd May 1924 1924, Report on Machinery for Paddington, 9th May 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Paddington, 3rd February 1928 1928, Report of Survey for Repairs for Paddington, 23rd January 1928 1928, Report of Survey for Repairs of Engines & Boilers for Paddington, 23rd January 1928 1928, Report of Total Loss & Casualty for Paddington, 25th February 1929 1929, Letter from Director, H Harrison Shipping Ltd, to Lloyd's Register, London, regarding Paddington, 22nd February 1902 1929, Report on Electric Fittings for Paddington, Undated no date, Note Concerning Plan of Boiler for Paddington, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
211 ( Letter from H Taylor, Director, for Craig Taylor & Co Ltd, to Lloyd's Register, Middlesbrough, regarding Paddington, 21st December 1923 1923, Request for Special Survey for Paddington, 17th December 1923 1923, Plan of Boiler for Paddington, 19th December 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Paddington, 4th June 1924 1924, Steel Steamer Report for Paddington, 2nd June 1924 1924, Form for Vessels of 100 Tons & Upwards for Paddington, 23rd May 1924 1924, Report on Machinery for Paddington, 9th May 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Paddington, 3rd February 1928 1928, Report of Survey for Repairs for Paddington, 23rd January 1928 1928, Report of Survey for Repairs of Engines & Boilers for Paddington, 23rd January 1928 1928, Report of Total Loss & Casualty for Paddington, 25th February 1929 1929, Letter from Director, H Harrison Shipping Ltd, to Lloyd's Register, London, regarding Paddington, 22nd February 1902 1929, Report on Electric Fittings for Paddington, Undated no date, Note Concerning Plan of Boiler for Paddington, Undated no date )
Location where a vessel’s survey was undertaken.
Stockton on Tees ( Letter from H Taylor, Director, for Craig Taylor & Co Ltd, to Lloyd's Register, Middlesbrough, regarding Paddington, 21st December 1923 1923, Request for Special Survey for Paddington, 17th December 1923 1923 )
Sunderland ( Plan of Boiler for Paddington, 19th December 1923 1923, Report on Machinery for Paddington, 9th May 1924 1924 )
London ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Paddington, 4th June 1924 1924, Form for Vessels of 100 Tons & Upwards for Paddington, 23rd May 1924 1924, Letter from Director, H Harrison Shipping Ltd, to Lloyd's Register, London, regarding Paddington, 22nd February 1902 1929 )
Stockton on Tees; Middlesbrough ( Steel Steamer Report for Paddington, 2nd June 1924 1924 )
Blyth; Newcastle ( Report of Survey for Repairs for Paddington, 23rd January 1928 1928, Report of Survey for Repairs of Engines & Boilers for Paddington, 23rd January 1928 1928 )
Stockton; Middlesbrough ( Report on Electric Fittings for Paddington, Undated no date )
A vessel’s means of propulsion.
Steam ( Letter from H Taylor, Director, for Craig Taylor & Co Ltd, to Lloyd's Register, Middlesbrough, regarding Paddington, 21st December 1923 1923, Request for Special Survey for Paddington, 17th December 1923 1923, Plan of Boiler for Paddington, 19th December 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Paddington, 4th June 1924 1924, Steel Steamer Report for Paddington, 2nd June 1924 1924, Form for Vessels of 100 Tons & Upwards for Paddington, 23rd May 1924 1924, Report on Machinery for Paddington, 9th May 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Paddington, 3rd February 1928 1928, Report of Survey for Repairs for Paddington, 23rd January 1928 1928, Report of Survey for Repairs of Engines & Boilers for Paddington, 23rd January 1928 1928, Report of Total Loss & Casualty for Paddington, 25th February 1929 1929, Letter from Director, H Harrison Shipping Ltd, to Lloyd's Register, London, regarding Paddington, 22nd February 1902 1929, Report on Electric Fittings for Paddington, Undated no date, Note Concerning Plan of Boiler for Paddington, Undated no date )
Is the steamer assisted by sail?
No ( Letter from H Taylor, Director, for Craig Taylor & Co Ltd, to Lloyd's Register, Middlesbrough, regarding Paddington, 21st December 1923 1923, Request for Special Survey for Paddington, 17th December 1923 1923, Plan of Boiler for Paddington, 19th December 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Paddington, 4th June 1924 1924, Steel Steamer Report for Paddington, 2nd June 1924 1924, Form for Vessels of 100 Tons & Upwards for Paddington, 23rd May 1924 1924, Report on Machinery for Paddington, 9th May 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Paddington, 3rd February 1928 1928, Report of Survey for Repairs for Paddington, 23rd January 1928 1928, Report of Survey for Repairs of Engines & Boilers for Paddington, 23rd January 1928 1928, Report of Total Loss & Casualty for Paddington, 25th February 1929 1929, Letter from Director, H Harrison Shipping Ltd, to Lloyd's Register, London, regarding Paddington, 22nd February 1902 1929, Report on Electric Fittings for Paddington, Undated no date, Note Concerning Plan of Boiler for Paddington, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Letter from H Taylor, Director, for Craig Taylor & Co Ltd, to Lloyd's Register, Middlesbrough, regarding Paddington, 21st December 1923 1923, Request for Special Survey for Paddington, 17th December 1923 1923, Plan of Boiler for Paddington, 19th December 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Paddington, 4th June 1924 1924, Steel Steamer Report for Paddington, 2nd June 1924 1924, Form for Vessels of 100 Tons & Upwards for Paddington, 23rd May 1924 1924, Report on Machinery for Paddington, 9th May 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Paddington, 3rd February 1928 1928, Report of Survey for Repairs for Paddington, 23rd January 1928 1928, Report of Survey for Repairs of Engines & Boilers for Paddington, 23rd January 1928 1928, Report of Total Loss & Casualty for Paddington, 25th February 1929 1929, Letter from Director, H Harrison Shipping Ltd, to Lloyd's Register, London, regarding Paddington, 22nd February 1902 1929, Report on Electric Fittings for Paddington, Undated no date, Note Concerning Plan of Boiler for Paddington, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Letter from H Taylor, Director, for Craig Taylor & Co Ltd, to Lloyd's Register, Middlesbrough, regarding Paddington, 21st December 1923 1923, Request for Special Survey for Paddington, 17th December 1923 1923, Plan of Boiler for Paddington, 19th December 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Paddington, 4th June 1924 1924, Steel Steamer Report for Paddington, 2nd June 1924 1924, Form for Vessels of 100 Tons & Upwards for Paddington, 23rd May 1924 1924, Report on Machinery for Paddington, 9th May 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Paddington, 3rd February 1928 1928, Report of Survey for Repairs for Paddington, 23rd January 1928 1928, Report of Survey for Repairs of Engines & Boilers for Paddington, 23rd January 1928 1928, Report of Total Loss & Casualty for Paddington, 25th February 1929 1929, Letter from Director, H Harrison Shipping Ltd, to Lloyd's Register, London, regarding Paddington, 22nd February 1902 1929, Report on Electric Fittings for Paddington, Undated no date, Note Concerning Plan of Boiler for Paddington, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Letter from H Taylor, Director, for Craig Taylor & Co Ltd, to Lloyd's Register, Middlesbrough, regarding Paddington, 21st December 1923 1923, Request for Special Survey for Paddington, 17th December 1923 1923, Plan of Boiler for Paddington, 19th December 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Paddington, 4th June 1924 1924, Steel Steamer Report for Paddington, 2nd June 1924 1924, Form for Vessels of 100 Tons & Upwards for Paddington, 23rd May 1924 1924, Report on Machinery for Paddington, 9th May 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Paddington, 3rd February 1928 1928, Report of Survey for Repairs for Paddington, 23rd January 1928 1928, Report of Survey for Repairs of Engines & Boilers for Paddington, 23rd January 1928 1928, Report of Total Loss & Casualty for Paddington, 25th February 1929 1929, Letter from Director, H Harrison Shipping Ltd, to Lloyd's Register, London, regarding Paddington, 22nd February 1902 1929, Report on Electric Fittings for Paddington, Undated no date, Note Concerning Plan of Boiler for Paddington, Undated no date )
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk by Collision ( Letter from H Taylor, Director, for Craig Taylor & Co Ltd, to Lloyd's Register, Middlesbrough, regarding Paddington, 21st December 1923 1923, Request for Special Survey for Paddington, 17th December 1923 1923, Plan of Boiler for Paddington, 19th December 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Paddington, 4th June 1924 1924, Steel Steamer Report for Paddington, 2nd June 1924 1924, Form for Vessels of 100 Tons & Upwards for Paddington, 23rd May 1924 1924, Report on Machinery for Paddington, 9th May 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Paddington, 3rd February 1928 1928, Report of Survey for Repairs for Paddington, 23rd January 1928 1928, Report of Survey for Repairs of Engines & Boilers for Paddington, 23rd January 1928 1928, Report of Total Loss & Casualty for Paddington, 25th February 1929 1929, Letter from Director, H Harrison Shipping Ltd, to Lloyd's Register, London, regarding Paddington, 22nd February 1902 1929, Report on Electric Fittings for Paddington, Undated no date, Note Concerning Plan of Boiler for Paddington, Undated no date )
The country or national waters where a vessel is lost/disposed of, or last recorded.
United Kingdom ( Letter from H Taylor, Director, for Craig Taylor & Co Ltd, to Lloyd's Register, Middlesbrough, regarding Paddington, 21st December 1923 1923, Request for Special Survey for Paddington, 17th December 1923 1923, Plan of Boiler for Paddington, 19th December 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Paddington, 4th June 1924 1924, Steel Steamer Report for Paddington, 2nd June 1924 1924, Form for Vessels of 100 Tons & Upwards for Paddington, 23rd May 1924 1924, Report on Machinery for Paddington, 9th May 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Paddington, 3rd February 1928 1928, Report of Survey for Repairs for Paddington, 23rd January 1928 1928, Report of Survey for Repairs of Engines & Boilers for Paddington, 23rd January 1928 1928, Report of Total Loss & Casualty for Paddington, 25th February 1929 1929, Letter from Director, H Harrison Shipping Ltd, to Lloyd's Register, London, regarding Paddington, 22nd February 1902 1929, Report on Electric Fittings for Paddington, Undated no date, Note Concerning Plan of Boiler for Paddington, Undated no date )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1590 ( Request for Special Survey for Paddington, 17th December 1923 1923 )
1545 ( Steel Steamer Report for Paddington, 2nd June 1924 1924, Form for Vessels of 100 Tons & Upwards for Paddington, 23rd May 1924 1924, Report of Survey for Repairs for Paddington, 23rd January 1928 1928, Report of Survey for Repairs of Engines & Boilers for Paddington, 23rd January 1928 1928, Report of Total Loss & Casualty for Paddington, 25th February 1929 1929 )
Name of ship as recorded on the record
Paddington ( Plan of Boiler for Paddington, 19th December 1923 1923, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Paddington, 4th June 1924 1924, Steel Steamer Report for Paddington, 2nd June 1924 1924, Form for Vessels of 100 Tons & Upwards for Paddington, 23rd May 1924 1924, Report on Machinery for Paddington, 9th May 1924 1924, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the SS No 1 partly held for Paddington, 3rd February 1928 1928, Report of Survey for Repairs for Paddington, 23rd January 1928 1928, Report of Survey for Repairs of Engines & Boilers for Paddington, 23rd January 1928 1928, Report of Total Loss & Casualty for Paddington, 25th February 1929 1929, Letter from Director, H Harrison Shipping Ltd, to Lloyd's Register, London, regarding Paddington, 22nd February 1902 1929, Report on Electric Fittings for Paddington, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mdb ( Steel Steamer Report for Paddington, 2nd June 1924 1924, Report on Electric Fittings for Paddington, Undated no date )
Sld ( Report on Machinery for Paddington, 9th May 1924 1924 )
Nwc ( Report of Survey for Repairs for Paddington, 23rd January 1928 1928, Report of Survey for Repairs of Engines & Boilers for Paddington, 23rd January 1928 1928 )
The individual and/or organisation listed
H Harrison Shipping Ltd ( Steel Steamer Report for Paddington, 2nd June 1924 1924, Report of Survey for Repairs for Paddington, 23rd January 1928 1928, Report of Survey for Repairs of Engines & Boilers for Paddington, 23rd January 1928 1928 )
H Harrison (Shipping) Ltd ( Form for Vessels of 100 Tons & Upwards for Paddington, 23rd May 1924 1924, Report of Total Loss & Casualty for Paddington, 25th February 1929 1929 )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
KQSG ( Form for Vessels of 100 Tons & Upwards for Paddington, 23rd May 1924 1924 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Harold Harrison ( Form for Vessels of 100 Tons & Upwards for Paddington, 23rd May 1924 1924 )
Date in which construction of a vessel’s engines were completed.
Recorded information related to a vessel’s movements.
Blyth; Coasting ( Report of Survey for Repairs for Paddington, 23rd January 1928 1928, Report of Survey for Repairs of Engines & Boilers for Paddington, 23rd January 1928 1928 )