Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Quorra ( Letter from R Gillespie, regarding Quorra, 23rd June 1883 1883, Profile Plan for Quorra, 11th June 1883 1883, Midship Section Plan for Quorra, 13th June 1883 1883, Press Copy of Advice Note to S Hodge & Sons, regarding Steel Plates for Quorra, 14th August 1883 1883, Plan of Boiler for Quorra, 1883 1883, Press Copy of Advice Note to Samuel Hodge & Son, regarding Bars for Quorra, 3rd September 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Bars for Quorra, 13th October 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Boiler Plates for Quorra, 24th August 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Plate for Quorra, 3rd September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 8th September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 29th October 1883 1883, Steel Ship Report for Quorra, 8th April 1884 1884, Report on Machinery for Quorra, 7th April 1884 1884, Report of Survey for Repairs, &c for Quorra, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Quorra, 3rd March 1886 1886 )
The process of transferring a vessel to water, but not necessarily her completion.
31/12/1883 ( Letter from R Gillespie, regarding Quorra, 23rd June 1883 1883, Profile Plan for Quorra, 11th June 1883 1883, Midship Section Plan for Quorra, 13th June 1883 1883, Press Copy of Advice Note to S Hodge & Sons, regarding Steel Plates for Quorra, 14th August 1883 1883, Plan of Boiler for Quorra, 1883 1883, Press Copy of Advice Note to Samuel Hodge & Son, regarding Bars for Quorra, 3rd September 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Bars for Quorra, 13th October 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Boiler Plates for Quorra, 24th August 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Plate for Quorra, 3rd September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 8th September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 29th October 1883 1883, Steel Ship Report for Quorra, 8th April 1884 1884, Report on Machinery for Quorra, 7th April 1884 1884, Report of Survey for Repairs, &c for Quorra, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Quorra, 3rd March 1886 1886 )
Unique identifier for a given ship, it is assigned by a builder.
2081 ( Letter from R Gillespie, regarding Quorra, 23rd June 1883 1883, Profile Plan for Quorra, 11th June 1883 1883, Midship Section Plan for Quorra, 13th June 1883 1883, Press Copy of Advice Note to S Hodge & Sons, regarding Steel Plates for Quorra, 14th August 1883 1883, Plan of Boiler for Quorra, 1883 1883, Press Copy of Advice Note to Samuel Hodge & Son, regarding Bars for Quorra, 3rd September 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Bars for Quorra, 13th October 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Boiler Plates for Quorra, 24th August 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Plate for Quorra, 3rd September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 8th September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 29th October 1883 1883, Steel Ship Report for Quorra, 8th April 1884 1884, Report on Machinery for Quorra, 7th April 1884 1884, Report of Survey for Repairs, &c for Quorra, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Quorra, 3rd March 1886 1886 )
The port or place in which the vessel’s construction took place, at the time of writing.
London ( Letter from R Gillespie, regarding Quorra, 23rd June 1883 1883, Profile Plan for Quorra, 11th June 1883 1883, Midship Section Plan for Quorra, 13th June 1883 1883, Press Copy of Advice Note to S Hodge & Sons, regarding Steel Plates for Quorra, 14th August 1883 1883, Plan of Boiler for Quorra, 1883 1883, Press Copy of Advice Note to Samuel Hodge & Son, regarding Bars for Quorra, 3rd September 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Bars for Quorra, 13th October 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Boiler Plates for Quorra, 24th August 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Plate for Quorra, 3rd September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 8th September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 29th October 1883 1883 )
Britannia Yard ( Steel Ship Report for Quorra, 8th April 1884 1884, Report on Machinery for Quorra, 7th April 1884 1884, Report of Survey for Repairs, &c for Quorra, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Quorra, 3rd March 1886 1886 )
A vessel’s means of propulsion.
undefined ( Letter from R Gillespie, regarding Quorra, 23rd June 1883 1883, Press Copy of Advice Note to S Hodge & Sons, regarding Steel Plates for Quorra, 14th August 1883 1883, Plan of Boiler for Quorra, 1883 1883, Press Copy of Advice Note to Samuel Hodge & Son, regarding Bars for Quorra, 3rd September 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Bars for Quorra, 13th October 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Plate for Quorra, 3rd September 1883 1883 )
Steam ( Profile Plan for Quorra, 11th June 1883 1883, Midship Section Plan for Quorra, 13th June 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Boiler Plates for Quorra, 24th August 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 8th September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 29th October 1883 1883, Steel Ship Report for Quorra, 8th April 1884 1884, Report on Machinery for Quorra, 7th April 1884 1884, Report of Survey for Repairs, &c, of Engines & Boilers for Quorra, 3rd March 1886 1886 )
Sail ( Report of Survey for Repairs, &c for Quorra, 22nd April 1886 1886 )
Is the steamer assisted by sail?
No ( Letter from R Gillespie, regarding Quorra, 23rd June 1883 1883, Profile Plan for Quorra, 11th June 1883 1883, Midship Section Plan for Quorra, 13th June 1883 1883, Press Copy of Advice Note to S Hodge & Sons, regarding Steel Plates for Quorra, 14th August 1883 1883, Plan of Boiler for Quorra, 1883 1883, Press Copy of Advice Note to Samuel Hodge & Son, regarding Bars for Quorra, 3rd September 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Bars for Quorra, 13th October 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Boiler Plates for Quorra, 24th August 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Plate for Quorra, 3rd September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 8th September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 29th October 1883 1883, Steel Ship Report for Quorra, 8th April 1884 1884, Report on Machinery for Quorra, 7th April 1884 1884, Report of Survey for Repairs, &c for Quorra, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Quorra, 3rd March 1886 1886 )
Is machinery fitted at the aft of the vessel?
No ( Letter from R Gillespie, regarding Quorra, 23rd June 1883 1883, Profile Plan for Quorra, 11th June 1883 1883, Midship Section Plan for Quorra, 13th June 1883 1883, Press Copy of Advice Note to S Hodge & Sons, regarding Steel Plates for Quorra, 14th August 1883 1883, Plan of Boiler for Quorra, 1883 1883, Press Copy of Advice Note to Samuel Hodge & Son, regarding Bars for Quorra, 3rd September 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Bars for Quorra, 13th October 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Boiler Plates for Quorra, 24th August 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Plate for Quorra, 3rd September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 8th September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 29th October 1883 1883, Steel Ship Report for Quorra, 8th April 1884 1884, Report on Machinery for Quorra, 7th April 1884 1884, Report of Survey for Repairs, &c for Quorra, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Quorra, 3rd March 1886 1886 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Letter from R Gillespie, regarding Quorra, 23rd June 1883 1883, Profile Plan for Quorra, 11th June 1883 1883, Midship Section Plan for Quorra, 13th June 1883 1883, Press Copy of Advice Note to S Hodge & Sons, regarding Steel Plates for Quorra, 14th August 1883 1883, Plan of Boiler for Quorra, 1883 1883, Press Copy of Advice Note to Samuel Hodge & Son, regarding Bars for Quorra, 3rd September 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Bars for Quorra, 13th October 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Boiler Plates for Quorra, 24th August 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Plate for Quorra, 3rd September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 8th September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 29th October 1883 1883, Steel Ship Report for Quorra, 8th April 1884 1884, Report on Machinery for Quorra, 7th April 1884 1884, Report of Survey for Repairs, &c for Quorra, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Quorra, 3rd March 1886 1886 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Letter from R Gillespie, regarding Quorra, 23rd June 1883 1883, Profile Plan for Quorra, 11th June 1883 1883, Midship Section Plan for Quorra, 13th June 1883 1883, Press Copy of Advice Note to S Hodge & Sons, regarding Steel Plates for Quorra, 14th August 1883 1883, Plan of Boiler for Quorra, 1883 1883, Press Copy of Advice Note to Samuel Hodge & Son, regarding Bars for Quorra, 3rd September 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Bars for Quorra, 13th October 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Boiler Plates for Quorra, 24th August 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Plate for Quorra, 3rd September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 8th September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 29th October 1883 1883, Steel Ship Report for Quorra, 8th April 1884 1884, Report on Machinery for Quorra, 7th April 1884 1884, Report of Survey for Repairs, &c for Quorra, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Quorra, 3rd March 1886 1886 )
Name of surveyor.
Herbert W Dove ( Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 29th October 1883 1883 )
Charles Edwards ( Tests of Boiler Steel for Quorra, 8th September 1883 1883 )
John William Miles ( Steel Ship Report for Quorra, 8th April 1884 1884 )
George E Wilkinson ( Report on Machinery for Quorra, 7th April 1884 1884 )
James H Truscott ( Report of Survey for Repairs, &c for Quorra, 22nd April 1886 1886 )
Charles E Stromeyer ( Report of Survey for Repairs, &c, of Engines & Boilers for Quorra, 3rd March 1886 1886 )
The listed port to which a given vessel belongs.
Liverpool ( Steel Ship Report for Quorra, 8th April 1884 1884 )
London ( Report of Survey for Repairs, &c, of Engines & Boilers for Quorra, 3rd March 1886 1886 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Williams ( Steel Ship Report for Quorra, 8th April 1884 1884 )
H Ceaton ( Report of Survey for Repairs, &c for Quorra, 22nd April 1886 1886 )
Recorded information related to a vessel’s movements.
London; Niger ( Steel Ship Report for Quorra, 8th April 1884 1884 )
London; West Coast of Africa ( Report of Survey for Repairs, &c for Quorra, 22nd April 1886 1886 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
Location of construction for a vessel’s engines.
Millwall ( Report on Machinery for Quorra, 7th April 1884 1884 )
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner ( Report of Survey for Repairs, &c for Quorra, 22nd April 1886 1886 )
The year in which a vessel’s construction is completed.
1884 ( Letter from R Gillespie, regarding Quorra, 23rd June 1883 1883, Profile Plan for Quorra, 11th June 1883 1883, Midship Section Plan for Quorra, 13th June 1883 1883, Press Copy of Advice Note to S Hodge & Sons, regarding Steel Plates for Quorra, 14th August 1883 1883, Plan of Boiler for Quorra, 1883 1883, Press Copy of Advice Note to Samuel Hodge & Son, regarding Bars for Quorra, 3rd September 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Bars for Quorra, 13th October 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Boiler Plates for Quorra, 24th August 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Plate for Quorra, 3rd September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 8th September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 29th October 1883 1883 )
1883 ( Steel Ship Report for Quorra, 8th April 1884 1884, Report on Machinery for Quorra, 7th April 1884 1884, Report of Survey for Repairs, &c for Quorra, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Quorra, 3rd March 1886 1886 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Forrestt & Son ( Letter from R Gillespie, regarding Quorra, 23rd June 1883 1883, Profile Plan for Quorra, 11th June 1883 1883, Midship Section Plan for Quorra, 13th June 1883 1883, Press Copy of Advice Note to S Hodge & Sons, regarding Steel Plates for Quorra, 14th August 1883 1883, Plan of Boiler for Quorra, 1883 1883, Press Copy of Advice Note to Samuel Hodge & Son, regarding Bars for Quorra, 3rd September 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Bars for Quorra, 13th October 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Boiler Plates for Quorra, 24th August 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Plate for Quorra, 3rd September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 8th September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 29th October 1883 1883, Steel Ship Report for Quorra, 8th April 1884 1884, Report on Machinery for Quorra, 7th April 1884 1884, Report of Survey for Repairs, &c for Quorra, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Quorra, 3rd March 1886 1886 )
The name of the yard where the vessel was built.
Britannia Yard ( Letter from R Gillespie, regarding Quorra, 23rd June 1883 1883, Profile Plan for Quorra, 11th June 1883 1883, Midship Section Plan for Quorra, 13th June 1883 1883, Press Copy of Advice Note to S Hodge & Sons, regarding Steel Plates for Quorra, 14th August 1883 1883, Plan of Boiler for Quorra, 1883 1883, Press Copy of Advice Note to Samuel Hodge & Son, regarding Bars for Quorra, 3rd September 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Bars for Quorra, 13th October 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Boiler Plates for Quorra, 24th August 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Plate for Quorra, 3rd September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 8th September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 29th October 1883 1883 )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Letter from R Gillespie, regarding Quorra, 23rd June 1883 1883, Press Copy of Advice Note to S Hodge & Sons, regarding Steel Plates for Quorra, 14th August 1883 1883, Plan of Boiler for Quorra, 1883 1883, Press Copy of Advice Note to Samuel Hodge & Son, regarding Bars for Quorra, 3rd September 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Bars for Quorra, 13th October 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Boiler Plates for Quorra, 24th August 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Plate for Quorra, 3rd September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 8th September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 29th October 1883 1883, Steel Ship Report for Quorra, 8th April 1884 1884, Report on Machinery for Quorra, 7th April 1884 1884, Report of Survey for Repairs, &c for Quorra, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Quorra, 3rd March 1886 1886 )
Twin Screw Steamer ( Profile Plan for Quorra, 11th June 1883 1883 )
Cargo ( Midship Section Plan for Quorra, 13th June 1883 1883 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Letter from R Gillespie, regarding Quorra, 23rd June 1883 1883, Profile Plan for Quorra, 11th June 1883 1883, Midship Section Plan for Quorra, 13th June 1883 1883, Press Copy of Advice Note to S Hodge & Sons, regarding Steel Plates for Quorra, 14th August 1883 1883, Plan of Boiler for Quorra, 1883 1883, Press Copy of Advice Note to Samuel Hodge & Son, regarding Bars for Quorra, 3rd September 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Bars for Quorra, 13th October 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Boiler Plates for Quorra, 24th August 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Plate for Quorra, 3rd September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 8th September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 29th October 1883 1883, Steel Ship Report for Quorra, 8th April 1884 1884, Report on Machinery for Quorra, 7th April 1884 1884, Report of Survey for Repairs, &c for Quorra, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Quorra, 3rd March 1886 1886 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Letter from R Gillespie, regarding Quorra, 23rd June 1883 1883, Profile Plan for Quorra, 11th June 1883 1883, Midship Section Plan for Quorra, 13th June 1883 1883, Press Copy of Advice Note to S Hodge & Sons, regarding Steel Plates for Quorra, 14th August 1883 1883, Plan of Boiler for Quorra, 1883 1883, Press Copy of Advice Note to Samuel Hodge & Son, regarding Bars for Quorra, 3rd September 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Bars for Quorra, 13th October 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Boiler Plates for Quorra, 24th August 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Plate for Quorra, 3rd September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 8th September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 29th October 1883 1883, Steel Ship Report for Quorra, 8th April 1884 1884, Report on Machinery for Quorra, 7th April 1884 1884, Report of Survey for Repairs, &c for Quorra, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Quorra, 3rd March 1886 1886 )
Does the vessel possess an auxiliary power source?
No ( Letter from R Gillespie, regarding Quorra, 23rd June 1883 1883, Profile Plan for Quorra, 11th June 1883 1883, Midship Section Plan for Quorra, 13th June 1883 1883, Press Copy of Advice Note to S Hodge & Sons, regarding Steel Plates for Quorra, 14th August 1883 1883, Plan of Boiler for Quorra, 1883 1883, Press Copy of Advice Note to Samuel Hodge & Son, regarding Bars for Quorra, 3rd September 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Bars for Quorra, 13th October 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Boiler Plates for Quorra, 24th August 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Plate for Quorra, 3rd September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 8th September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 29th October 1883 1883, Steel Ship Report for Quorra, 8th April 1884 1884, Report on Machinery for Quorra, 7th April 1884 1884, Report of Survey for Repairs, &c for Quorra, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Quorra, 3rd March 1886 1886 )
Is electric lighting fitted to the vessel?
No ( Letter from R Gillespie, regarding Quorra, 23rd June 1883 1883, Profile Plan for Quorra, 11th June 1883 1883, Midship Section Plan for Quorra, 13th June 1883 1883, Press Copy of Advice Note to S Hodge & Sons, regarding Steel Plates for Quorra, 14th August 1883 1883, Plan of Boiler for Quorra, 1883 1883, Press Copy of Advice Note to Samuel Hodge & Son, regarding Bars for Quorra, 3rd September 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Bars for Quorra, 13th October 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Boiler Plates for Quorra, 24th August 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Plate for Quorra, 3rd September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 8th September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 29th October 1883 1883, Steel Ship Report for Quorra, 8th April 1884 1884, Report on Machinery for Quorra, 7th April 1884 1884, Report of Survey for Repairs, &c for Quorra, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Quorra, 3rd March 1886 1886 )
Location where a vessel’s survey was undertaken.
London ( Profile Plan for Quorra, 11th June 1883 1883, Midship Section Plan for Quorra, 13th June 1883 1883, Press Copy of Advice Note to S Hodge & Sons, regarding Steel Plates for Quorra, 14th August 1883 1883, Press Copy of Advice Note to Samuel Hodge & Son, regarding Bars for Quorra, 3rd September 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Bars for Quorra, 13th October 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Boiler Plates for Quorra, 24th August 1883 1883, Press Copy of Advice Note to Samuel Hodge & Sons, regarding Plate for Quorra, 3rd September 1883 1883, Steel Ship Report for Quorra, 8th April 1884 1884, Report on Machinery for Quorra, 7th April 1884 1884, Report of Survey for Repairs, &c for Quorra, 22nd April 1886 1886, Report of Survey for Repairs, &c, of Engines & Boilers for Quorra, 3rd March 1886 1886 )
Glasgow ( Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 8th September 1883 1883, Tests of Boiler Steel for Quorra, 12th October 1883 1883, Tests of Boiler Steel for Quorra, 29th October 1883 1883 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
The individual and/or organisation listed
Clement G Morris ( Steel Ship Report for Quorra, 8th April 1884 1884 )
Holt & Moore ( Report of Survey for Repairs, &c for Quorra, 22nd April 1886 1886 )
National African Co ( Report of Survey for Repairs, &c, of Engines & Boilers for Quorra, 3rd March 1886 1886 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
90A1 Steel; LA & CP; +LMC ( Steel Ship Report for Quorra, 8th April 1884 1884 )
+LMC ( Report on Machinery for Quorra, 7th April 1884 1884 )
90A1 ( Report of Survey for Repairs, &c for Quorra, 22nd April 1886 1886 )
The name of the port/place of destination given.
Niger ( Steel Ship Report for Quorra, 8th April 1884 1884 )
West Coast of Africa ( Report of Survey for Repairs, &c for Quorra, 22nd April 1886 1886 )
A vessel’s calculated maximum speed.
1884 ( Steel Ship Report for Quorra, 8th April 1884 1884, Report on Machinery for Quorra, 7th April 1884 1884 )
l 1886 ( Report of Survey for Repairs, &c for Quorra, 22nd April 1886 1886 )
h 1886 ( Report of Survey for Repairs, &c, of Engines & Boilers for Quorra, 3rd March 1886 1886 )
Type and configuration of the engine(s) supplied for a vessel.
Tandem Twin ( Report on Machinery for Quorra, 7th April 1884 1884 )
Date in which construction of a vessel’s engines were completed.
1884 ( Report on Machinery for Quorra, 7th April 1884 1884 )
1883 ( Report of Survey for Repairs, &c, of Engines & Boilers for Quorra, 3rd March 1886 1886 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.