Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Rhodesia Castle ( Report of Surveys for Freeboard for Rhodesia Castle, 25th October 1949 1949, Request for Special Survey for Rhodesia Castle, 1st March 1950 1950, Report of Surveys for Freeboard for Rhodesia Castle, 18th May 1950 1950, Half Midship Section Plan for Rhodesia Castle, 3rd September 1951 1951, Framing Profile Plan for Rhodesia Castle, 3rd September 1951 1951, Plan of Steel Decks for Rhodesia Castle, 3rd September 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 7th December 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rhodesia Castle, 27th November 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 9th November 1951 1951, Extract from Freeboard Verification of Marking Form for Rhodesia Castle, 31st October 1951 1951, Letter from Pro Clerk to the Classification Committee, to The Surveyors, London, regarding Rhodesia Castle, 12th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Steel Steamer or Motorship Report for Rhodesia Castle, 7th November 1951 1951, Form for Vessels of 100 Tons & Upwards for Rhodesia Castle, 3rd October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 28th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 5th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 25th October 1951 1951, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Rhodesia Castle, 30th November 1951 1951, Report of Survey for Repairs, &c, of Engines & Boilers for Rhodesia Castle, 31st October 1951 1951, Report on Steam Turbine Machinery for Rhodesia Castle, 8th October 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Steam Turbine Generator Machinery for Rhodesia Castle, 27th August 1951 1951, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, 3rd May 1951 1951, Report on Electrical Equipment for Rhodesia Castle, 26th September 1951 1951, Letter from A Daintith, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 5th December 1951 1951, Certificate of Class for Rhodesia Castle, 4th December 1951 1951, Certificate for Machinery for Rhodesia Castle, 4th December 1951 1951, Report of Surveys for Freeboard for Rhodesia Castle, 9th April 1951 1951, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Rhodesia Castle, 28th December 1960 1960, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Rhodesia Castle, 6th December 1960 1960, Memo to the Chief Ship Surveyor regarding Docking Alterations on Account of Fitting Air Conditioning Plant for Rhodesia Castle, 13th December 1960 1960, Report of Ship Surveys & Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Part Boilers & Part Machinery for Rhodesia Castle, 31st October 1960 1960, Report of Periodical Surveys & Repairs of Machinery for Rhodesia Castle, 31st October 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 8th June 1960 1960, Plan of Modifications to Steelwork in New Accommodation on A Deck for Rhodesia Castle, 24th June 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 10th June 1960 1960, Report on Annual Load Line Survey for Rhodesia Castle, 7th April 1961 1961, Report of Total Loss, Casualty, Breaking Up, etc for Rhodesia Castle, Undated no date, Report on Water Tube Boilers for Rhodesia Castle, Undated no date, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard for Rhodesia Castle, Undated no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

05/04/1951 ( Report of Surveys for Freeboard for Rhodesia Castle, 25th October 1949 1949, Request for Special Survey for Rhodesia Castle, 1st March 1950 1950, Report of Surveys for Freeboard for Rhodesia Castle, 18th May 1950 1950, Half Midship Section Plan for Rhodesia Castle, 3rd September 1951 1951, Framing Profile Plan for Rhodesia Castle, 3rd September 1951 1951, Plan of Steel Decks for Rhodesia Castle, 3rd September 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 7th December 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rhodesia Castle, 27th November 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 9th November 1951 1951, Extract from Freeboard Verification of Marking Form for Rhodesia Castle, 31st October 1951 1951, Letter from Pro Clerk to the Classification Committee, to The Surveyors, London, regarding Rhodesia Castle, 12th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Steel Steamer or Motorship Report for Rhodesia Castle, 7th November 1951 1951, Form for Vessels of 100 Tons & Upwards for Rhodesia Castle, 3rd October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 28th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 5th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 25th October 1951 1951, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Rhodesia Castle, 30th November 1951 1951, Report of Survey for Repairs, &c, of Engines & Boilers for Rhodesia Castle, 31st October 1951 1951, Report on Steam Turbine Machinery for Rhodesia Castle, 8th October 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Steam Turbine Generator Machinery for Rhodesia Castle, 27th August 1951 1951, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, 3rd May 1951 1951, Report on Electrical Equipment for Rhodesia Castle, 26th September 1951 1951, Letter from A Daintith, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 5th December 1951 1951, Certificate of Class for Rhodesia Castle, 4th December 1951 1951, Certificate for Machinery for Rhodesia Castle, 4th December 1951 1951, Report of Surveys for Freeboard for Rhodesia Castle, 9th April 1951 1951, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Rhodesia Castle, 28th December 1960 1960, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Rhodesia Castle, 6th December 1960 1960, Memo to the Chief Ship Surveyor regarding Docking Alterations on Account of Fitting Air Conditioning Plant for Rhodesia Castle, 13th December 1960 1960, Report of Ship Surveys & Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Part Boilers & Part Machinery for Rhodesia Castle, 31st October 1960 1960, Report of Periodical Surveys & Repairs of Machinery for Rhodesia Castle, 31st October 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 8th June 1960 1960, Plan of Modifications to Steelwork in New Accommodation on A Deck for Rhodesia Castle, 24th June 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 10th June 1960 1960, Report on Annual Load Line Survey for Rhodesia Castle, 7th April 1961 1961, Report of Total Loss, Casualty, Breaking Up, etc for Rhodesia Castle, Undated no date, Report on Water Tube Boilers for Rhodesia Castle, Undated no date, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard for Rhodesia Castle, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

1431 ( Report of Surveys for Freeboard for Rhodesia Castle, 25th October 1949 1949, Request for Special Survey for Rhodesia Castle, 1st March 1950 1950, Report of Surveys for Freeboard for Rhodesia Castle, 18th May 1950 1950, Half Midship Section Plan for Rhodesia Castle, 3rd September 1951 1951, Framing Profile Plan for Rhodesia Castle, 3rd September 1951 1951, Plan of Steel Decks for Rhodesia Castle, 3rd September 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 7th December 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rhodesia Castle, 27th November 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 9th November 1951 1951, Extract from Freeboard Verification of Marking Form for Rhodesia Castle, 31st October 1951 1951, Letter from Pro Clerk to the Classification Committee, to The Surveyors, London, regarding Rhodesia Castle, 12th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Steel Steamer or Motorship Report for Rhodesia Castle, 7th November 1951 1951, Form for Vessels of 100 Tons & Upwards for Rhodesia Castle, 3rd October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 28th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 5th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 25th October 1951 1951, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Rhodesia Castle, 30th November 1951 1951, Report of Survey for Repairs, &c, of Engines & Boilers for Rhodesia Castle, 31st October 1951 1951, Report on Steam Turbine Machinery for Rhodesia Castle, 8th October 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Steam Turbine Generator Machinery for Rhodesia Castle, 27th August 1951 1951, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, 3rd May 1951 1951, Report on Electrical Equipment for Rhodesia Castle, 26th September 1951 1951, Letter from A Daintith, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 5th December 1951 1951, Certificate of Class for Rhodesia Castle, 4th December 1951 1951, Certificate for Machinery for Rhodesia Castle, 4th December 1951 1951, Report of Surveys for Freeboard for Rhodesia Castle, 9th April 1951 1951, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Rhodesia Castle, 28th December 1960 1960, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Rhodesia Castle, 6th December 1960 1960, Memo to the Chief Ship Surveyor regarding Docking Alterations on Account of Fitting Air Conditioning Plant for Rhodesia Castle, 13th December 1960 1960, Report of Ship Surveys & Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Part Boilers & Part Machinery for Rhodesia Castle, 31st October 1960 1960, Report of Periodical Surveys & Repairs of Machinery for Rhodesia Castle, 31st October 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 8th June 1960 1960, Plan of Modifications to Steelwork in New Accommodation on A Deck for Rhodesia Castle, 24th June 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 10th June 1960 1960, Report on Annual Load Line Survey for Rhodesia Castle, 7th April 1961 1961, Report of Total Loss, Casualty, Breaking Up, etc for Rhodesia Castle, Undated no date, Report on Water Tube Boilers for Rhodesia Castle, Undated no date, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard for Rhodesia Castle, Undated no date )

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined ( Report of Surveys for Freeboard for Rhodesia Castle, 25th October 1949 1949, Report of Surveys for Freeboard for Rhodesia Castle, 18th May 1950 1950, Half Midship Section Plan for Rhodesia Castle, 3rd September 1951 1951, Framing Profile Plan for Rhodesia Castle, 3rd September 1951 1951, Plan of Steel Decks for Rhodesia Castle, 3rd September 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 7th December 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rhodesia Castle, 27th November 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 9th November 1951 1951, Extract from Freeboard Verification of Marking Form for Rhodesia Castle, 31st October 1951 1951, Letter from Pro Clerk to the Classification Committee, to The Surveyors, London, regarding Rhodesia Castle, 12th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Steel Steamer or Motorship Report for Rhodesia Castle, 7th November 1951 1951, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Rhodesia Castle, 30th November 1951 1951, Report of Survey for Repairs, &c, of Engines & Boilers for Rhodesia Castle, 31st October 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Steam Turbine Generator Machinery for Rhodesia Castle, 27th August 1951 1951, Report on Electrical Equipment for Rhodesia Castle, 26th September 1951 1951, Letter from A Daintith, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 5th December 1951 1951, Report of Surveys for Freeboard for Rhodesia Castle, 9th April 1951 1951, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Rhodesia Castle, 28th December 1960 1960, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Rhodesia Castle, 6th December 1960 1960, Memo to the Chief Ship Surveyor regarding Docking Alterations on Account of Fitting Air Conditioning Plant for Rhodesia Castle, 13th December 1960 1960, Report of Ship Surveys & Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Part Boilers & Part Machinery for Rhodesia Castle, 31st October 1960 1960, Report of Periodical Surveys & Repairs of Machinery for Rhodesia Castle, 31st October 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 8th June 1960 1960, Plan of Modifications to Steelwork in New Accommodation on A Deck for Rhodesia Castle, 24th June 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 10th June 1960 1960, Report on Annual Load Line Survey for Rhodesia Castle, 7th April 1961 1961, Report of Total Loss, Casualty, Breaking Up, etc for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard for Rhodesia Castle, Undated no date )

Cargo ( Request for Special Survey for Rhodesia Castle, 1st March 1950 1950, Form for Vessels of 100 Tons & Upwards for Rhodesia Castle, 3rd October 1951 1951 )

Twin Screw Steamer ( Copy of Certificate of Survey for Rhodesia Castle, 28th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 5th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 25th October 1951 1951, Report on Steam Turbine Machinery for Rhodesia Castle, 8th October 1951 1951, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, 3rd May 1951 1951, Certificate of Class for Rhodesia Castle, 4th December 1951 1951, Certificate for Machinery for Rhodesia Castle, 4th December 1951 1951, Copy of Certificate of Survey of Repairs for Rhodesia Castle, 28th November 1960 1960, Report on Water Tube Boilers for Rhodesia Castle, Undated no date, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, Undated no date )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Report of Surveys for Freeboard for Rhodesia Castle, 25th October 1949 1949, Request for Special Survey for Rhodesia Castle, 1st March 1950 1950, Report of Surveys for Freeboard for Rhodesia Castle, 18th May 1950 1950, Half Midship Section Plan for Rhodesia Castle, 3rd September 1951 1951, Framing Profile Plan for Rhodesia Castle, 3rd September 1951 1951, Plan of Steel Decks for Rhodesia Castle, 3rd September 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 7th December 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rhodesia Castle, 27th November 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 9th November 1951 1951, Extract from Freeboard Verification of Marking Form for Rhodesia Castle, 31st October 1951 1951, Letter from Pro Clerk to the Classification Committee, to The Surveyors, London, regarding Rhodesia Castle, 12th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Steel Steamer or Motorship Report for Rhodesia Castle, 7th November 1951 1951, Form for Vessels of 100 Tons & Upwards for Rhodesia Castle, 3rd October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 28th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 5th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 25th October 1951 1951, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Rhodesia Castle, 30th November 1951 1951, Report of Survey for Repairs, &c, of Engines & Boilers for Rhodesia Castle, 31st October 1951 1951, Report on Steam Turbine Machinery for Rhodesia Castle, 8th October 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Steam Turbine Generator Machinery for Rhodesia Castle, 27th August 1951 1951, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, 3rd May 1951 1951, Report on Electrical Equipment for Rhodesia Castle, 26th September 1951 1951, Letter from A Daintith, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 5th December 1951 1951, Certificate of Class for Rhodesia Castle, 4th December 1951 1951, Certificate for Machinery for Rhodesia Castle, 4th December 1951 1951, Report of Surveys for Freeboard for Rhodesia Castle, 9th April 1951 1951, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Rhodesia Castle, 28th December 1960 1960, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Rhodesia Castle, 6th December 1960 1960, Memo to the Chief Ship Surveyor regarding Docking Alterations on Account of Fitting Air Conditioning Plant for Rhodesia Castle, 13th December 1960 1960, Report of Ship Surveys & Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Part Boilers & Part Machinery for Rhodesia Castle, 31st October 1960 1960, Report of Periodical Surveys & Repairs of Machinery for Rhodesia Castle, 31st October 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 8th June 1960 1960, Plan of Modifications to Steelwork in New Accommodation on A Deck for Rhodesia Castle, 24th June 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 10th June 1960 1960, Report on Annual Load Line Survey for Rhodesia Castle, 7th April 1961 1961, Report of Total Loss, Casualty, Breaking Up, etc for Rhodesia Castle, Undated no date, Report on Water Tube Boilers for Rhodesia Castle, Undated no date, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard for Rhodesia Castle, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Report of Surveys for Freeboard for Rhodesia Castle, 25th October 1949 1949, Request for Special Survey for Rhodesia Castle, 1st March 1950 1950, Report of Surveys for Freeboard for Rhodesia Castle, 18th May 1950 1950, Half Midship Section Plan for Rhodesia Castle, 3rd September 1951 1951, Framing Profile Plan for Rhodesia Castle, 3rd September 1951 1951, Plan of Steel Decks for Rhodesia Castle, 3rd September 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 7th December 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rhodesia Castle, 27th November 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 9th November 1951 1951, Extract from Freeboard Verification of Marking Form for Rhodesia Castle, 31st October 1951 1951, Letter from Pro Clerk to the Classification Committee, to The Surveyors, London, regarding Rhodesia Castle, 12th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Steel Steamer or Motorship Report for Rhodesia Castle, 7th November 1951 1951, Form for Vessels of 100 Tons & Upwards for Rhodesia Castle, 3rd October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 28th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 5th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 25th October 1951 1951, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Rhodesia Castle, 30th November 1951 1951, Report of Survey for Repairs, &c, of Engines & Boilers for Rhodesia Castle, 31st October 1951 1951, Report on Steam Turbine Machinery for Rhodesia Castle, 8th October 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Steam Turbine Generator Machinery for Rhodesia Castle, 27th August 1951 1951, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, 3rd May 1951 1951, Report on Electrical Equipment for Rhodesia Castle, 26th September 1951 1951, Letter from A Daintith, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 5th December 1951 1951, Certificate of Class for Rhodesia Castle, 4th December 1951 1951, Certificate for Machinery for Rhodesia Castle, 4th December 1951 1951, Report of Surveys for Freeboard for Rhodesia Castle, 9th April 1951 1951, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Rhodesia Castle, 28th December 1960 1960, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Rhodesia Castle, 6th December 1960 1960, Memo to the Chief Ship Surveyor regarding Docking Alterations on Account of Fitting Air Conditioning Plant for Rhodesia Castle, 13th December 1960 1960, Report of Ship Surveys & Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Part Boilers & Part Machinery for Rhodesia Castle, 31st October 1960 1960, Report of Periodical Surveys & Repairs of Machinery for Rhodesia Castle, 31st October 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 8th June 1960 1960, Plan of Modifications to Steelwork in New Accommodation on A Deck for Rhodesia Castle, 24th June 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 10th June 1960 1960, Report on Annual Load Line Survey for Rhodesia Castle, 7th April 1961 1961, Report of Total Loss, Casualty, Breaking Up, etc for Rhodesia Castle, Undated no date, Report on Water Tube Boilers for Rhodesia Castle, Undated no date, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard for Rhodesia Castle, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Report of Surveys for Freeboard for Rhodesia Castle, 25th October 1949 1949, Request for Special Survey for Rhodesia Castle, 1st March 1950 1950, Report of Surveys for Freeboard for Rhodesia Castle, 18th May 1950 1950, Half Midship Section Plan for Rhodesia Castle, 3rd September 1951 1951, Framing Profile Plan for Rhodesia Castle, 3rd September 1951 1951, Plan of Steel Decks for Rhodesia Castle, 3rd September 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 7th December 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rhodesia Castle, 27th November 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 9th November 1951 1951, Extract from Freeboard Verification of Marking Form for Rhodesia Castle, 31st October 1951 1951, Letter from Pro Clerk to the Classification Committee, to The Surveyors, London, regarding Rhodesia Castle, 12th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Steel Steamer or Motorship Report for Rhodesia Castle, 7th November 1951 1951, Form for Vessels of 100 Tons & Upwards for Rhodesia Castle, 3rd October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 28th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 5th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 25th October 1951 1951, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Rhodesia Castle, 30th November 1951 1951, Report of Survey for Repairs, &c, of Engines & Boilers for Rhodesia Castle, 31st October 1951 1951, Report on Steam Turbine Machinery for Rhodesia Castle, 8th October 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Steam Turbine Generator Machinery for Rhodesia Castle, 27th August 1951 1951, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, 3rd May 1951 1951, Report on Electrical Equipment for Rhodesia Castle, 26th September 1951 1951, Letter from A Daintith, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 5th December 1951 1951, Certificate of Class for Rhodesia Castle, 4th December 1951 1951, Certificate for Machinery for Rhodesia Castle, 4th December 1951 1951, Report of Surveys for Freeboard for Rhodesia Castle, 9th April 1951 1951, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Rhodesia Castle, 28th December 1960 1960, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Rhodesia Castle, 6th December 1960 1960, Memo to the Chief Ship Surveyor regarding Docking Alterations on Account of Fitting Air Conditioning Plant for Rhodesia Castle, 13th December 1960 1960, Report of Ship Surveys & Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Part Boilers & Part Machinery for Rhodesia Castle, 31st October 1960 1960, Report of Periodical Surveys & Repairs of Machinery for Rhodesia Castle, 31st October 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 8th June 1960 1960, Plan of Modifications to Steelwork in New Accommodation on A Deck for Rhodesia Castle, 24th June 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 10th June 1960 1960, Report on Annual Load Line Survey for Rhodesia Castle, 7th April 1961 1961, Report of Total Loss, Casualty, Breaking Up, etc for Rhodesia Castle, Undated no date, Report on Water Tube Boilers for Rhodesia Castle, Undated no date, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard for Rhodesia Castle, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Report of Surveys for Freeboard for Rhodesia Castle, 25th October 1949 1949, Request for Special Survey for Rhodesia Castle, 1st March 1950 1950, Report of Surveys for Freeboard for Rhodesia Castle, 18th May 1950 1950, Half Midship Section Plan for Rhodesia Castle, 3rd September 1951 1951, Framing Profile Plan for Rhodesia Castle, 3rd September 1951 1951, Plan of Steel Decks for Rhodesia Castle, 3rd September 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 7th December 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rhodesia Castle, 27th November 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 9th November 1951 1951, Extract from Freeboard Verification of Marking Form for Rhodesia Castle, 31st October 1951 1951, Letter from Pro Clerk to the Classification Committee, to The Surveyors, London, regarding Rhodesia Castle, 12th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Steel Steamer or Motorship Report for Rhodesia Castle, 7th November 1951 1951, Form for Vessels of 100 Tons & Upwards for Rhodesia Castle, 3rd October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 28th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 5th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 25th October 1951 1951, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Rhodesia Castle, 30th November 1951 1951, Report of Survey for Repairs, &c, of Engines & Boilers for Rhodesia Castle, 31st October 1951 1951, Report on Steam Turbine Machinery for Rhodesia Castle, 8th October 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Steam Turbine Generator Machinery for Rhodesia Castle, 27th August 1951 1951, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, 3rd May 1951 1951, Report on Electrical Equipment for Rhodesia Castle, 26th September 1951 1951, Letter from A Daintith, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 5th December 1951 1951, Certificate of Class for Rhodesia Castle, 4th December 1951 1951, Certificate for Machinery for Rhodesia Castle, 4th December 1951 1951, Report of Surveys for Freeboard for Rhodesia Castle, 9th April 1951 1951, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Rhodesia Castle, 28th December 1960 1960, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Rhodesia Castle, 6th December 1960 1960, Memo to the Chief Ship Surveyor regarding Docking Alterations on Account of Fitting Air Conditioning Plant for Rhodesia Castle, 13th December 1960 1960, Report of Ship Surveys & Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Part Boilers & Part Machinery for Rhodesia Castle, 31st October 1960 1960, Report of Periodical Surveys & Repairs of Machinery for Rhodesia Castle, 31st October 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 8th June 1960 1960, Plan of Modifications to Steelwork in New Accommodation on A Deck for Rhodesia Castle, 24th June 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 10th June 1960 1960, Report on Annual Load Line Survey for Rhodesia Castle, 7th April 1961 1961, Report of Total Loss, Casualty, Breaking Up, etc for Rhodesia Castle, Undated no date, Report on Water Tube Boilers for Rhodesia Castle, Undated no date, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard for Rhodesia Castle, Undated no date )

The official record pronounced by the Committee

Loss or disposal

To be broken up ( Report of Surveys for Freeboard for Rhodesia Castle, 25th October 1949 1949, Request for Special Survey for Rhodesia Castle, 1st March 1950 1950, Report of Surveys for Freeboard for Rhodesia Castle, 18th May 1950 1950, Half Midship Section Plan for Rhodesia Castle, 3rd September 1951 1951, Framing Profile Plan for Rhodesia Castle, 3rd September 1951 1951, Plan of Steel Decks for Rhodesia Castle, 3rd September 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 7th December 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rhodesia Castle, 27th November 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 9th November 1951 1951, Extract from Freeboard Verification of Marking Form for Rhodesia Castle, 31st October 1951 1951, Letter from Pro Clerk to the Classification Committee, to The Surveyors, London, regarding Rhodesia Castle, 12th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Steel Steamer or Motorship Report for Rhodesia Castle, 7th November 1951 1951, Form for Vessels of 100 Tons & Upwards for Rhodesia Castle, 3rd October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 28th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 5th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 25th October 1951 1951, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Rhodesia Castle, 30th November 1951 1951, Report of Survey for Repairs, &c, of Engines & Boilers for Rhodesia Castle, 31st October 1951 1951, Report on Steam Turbine Machinery for Rhodesia Castle, 8th October 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Steam Turbine Generator Machinery for Rhodesia Castle, 27th August 1951 1951, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, 3rd May 1951 1951, Report on Electrical Equipment for Rhodesia Castle, 26th September 1951 1951, Letter from A Daintith, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 5th December 1951 1951, Certificate of Class for Rhodesia Castle, 4th December 1951 1951, Certificate for Machinery for Rhodesia Castle, 4th December 1951 1951, Report of Surveys for Freeboard for Rhodesia Castle, 9th April 1951 1951, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Rhodesia Castle, 28th December 1960 1960, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Rhodesia Castle, 6th December 1960 1960, Memo to the Chief Ship Surveyor regarding Docking Alterations on Account of Fitting Air Conditioning Plant for Rhodesia Castle, 13th December 1960 1960, Report of Ship Surveys & Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Part Boilers & Part Machinery for Rhodesia Castle, 31st October 1960 1960, Report of Periodical Surveys & Repairs of Machinery for Rhodesia Castle, 31st October 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 8th June 1960 1960, Plan of Modifications to Steelwork in New Accommodation on A Deck for Rhodesia Castle, 24th June 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 10th June 1960 1960, Report on Annual Load Line Survey for Rhodesia Castle, 7th April 1961 1961, Report of Total Loss, Casualty, Breaking Up, etc for Rhodesia Castle, Undated no date, Report on Water Tube Boilers for Rhodesia Castle, Undated no date, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard for Rhodesia Castle, Undated no date )

Vessel’s place of loss or disposal/last known recorded location.

Place of ship loss

Kaohsiung ( Report of Surveys for Freeboard for Rhodesia Castle, 25th October 1949 1949, Request for Special Survey for Rhodesia Castle, 1st March 1950 1950, Report of Surveys for Freeboard for Rhodesia Castle, 18th May 1950 1950, Half Midship Section Plan for Rhodesia Castle, 3rd September 1951 1951, Framing Profile Plan for Rhodesia Castle, 3rd September 1951 1951, Plan of Steel Decks for Rhodesia Castle, 3rd September 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 7th December 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rhodesia Castle, 27th November 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 9th November 1951 1951, Extract from Freeboard Verification of Marking Form for Rhodesia Castle, 31st October 1951 1951, Letter from Pro Clerk to the Classification Committee, to The Surveyors, London, regarding Rhodesia Castle, 12th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Steel Steamer or Motorship Report for Rhodesia Castle, 7th November 1951 1951, Form for Vessels of 100 Tons & Upwards for Rhodesia Castle, 3rd October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 28th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 5th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 25th October 1951 1951, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Rhodesia Castle, 30th November 1951 1951, Report of Survey for Repairs, &c, of Engines & Boilers for Rhodesia Castle, 31st October 1951 1951, Report on Steam Turbine Machinery for Rhodesia Castle, 8th October 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Steam Turbine Generator Machinery for Rhodesia Castle, 27th August 1951 1951, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, 3rd May 1951 1951, Report on Electrical Equipment for Rhodesia Castle, 26th September 1951 1951, Letter from A Daintith, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 5th December 1951 1951, Certificate of Class for Rhodesia Castle, 4th December 1951 1951, Certificate for Machinery for Rhodesia Castle, 4th December 1951 1951, Report of Surveys for Freeboard for Rhodesia Castle, 9th April 1951 1951, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Rhodesia Castle, 28th December 1960 1960, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Rhodesia Castle, 6th December 1960 1960, Memo to the Chief Ship Surveyor regarding Docking Alterations on Account of Fitting Air Conditioning Plant for Rhodesia Castle, 13th December 1960 1960, Report of Ship Surveys & Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Part Boilers & Part Machinery for Rhodesia Castle, 31st October 1960 1960, Report of Periodical Surveys & Repairs of Machinery for Rhodesia Castle, 31st October 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 8th June 1960 1960, Plan of Modifications to Steelwork in New Accommodation on A Deck for Rhodesia Castle, 24th June 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 10th June 1960 1960, Report on Annual Load Line Survey for Rhodesia Castle, 7th April 1961 1961, Report of Total Loss, Casualty, Breaking Up, etc for Rhodesia Castle, Undated no date, Report on Water Tube Boilers for Rhodesia Castle, Undated no date, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard for Rhodesia Castle, Undated no date )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

Contemplated ( Report of Surveys for Freeboard for Rhodesia Castle, 18th May 1950 1950 )

+100A1; 8,51 Bel; Fitted for Oil Fuel 11,51; FP Above 150 F; Lloyds A & CP; +LMC 11,51; FD CL; 3 WTB 495 Ib(Spt 485Ib); 2DB 100 Ib ( Steel Steamer or Motorship Report for Rhodesia Castle, 7th November 1951 1951 )

See Minute on Bel FE Rpt 15283 ( Report of Survey for Repairs, &c, of Engines & Boilers for Rhodesia Castle, 31st October 1951 1951 )

+LMC 11,51; FD; CL; Fitted for Oil Fuel 11,51 Flash Point above 150 F; 3 WTB 495lb (Spt 485lb) 2 DB 100lb ( Report on Steam Turbine Machinery for Rhodesia Castle, 8th October 1951 1951 )

See FE Mchy Rpt Bel 15283 ( Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Steam Turbine Generator Machinery for Rhodesia Castle, 27th August 1951 1951, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, 3rd May 1951 1951 )

See FE Mchy Rpt ( Report on Electrical Equipment for Rhodesia Castle, 26th September 1951 1951, Report on Water Tube Boilers for Rhodesia Castle, Undated no date, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, Undated no date )

+100A1; Fitted Oil Fuel 11,51 Flash Point Above 150F ( Certificate of Class for Rhodesia Castle, 4th December 1951 1951 )

DS 9,60; STS (CL) 9,60 ( Report of Ship Surveys & Repairs for Rhodesia Castle, 28th November 1960 1960 )

S TS(CL) 9,60 ( Report of Periodical Surveys & Repairs of Machinery for Rhodesia Castle, 31st October 1960 1960 )

+100A1 8,66; SS 9,64; +LMC CS 12,63; M 8,66; BS D 2,67; SP 3,64; TS P 10,65 (4); S 8,64 (4); CL ( Report of Total Loss, Casualty, Breaking Up, etc for Rhodesia Castle, Undated no date )

+100A1 With Freeboard ( Report of Surveys for Freeboard for Rhodesia Castle, Undated no date )

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

The year in which a vessel’s construction is completed.

Year of ship completion

1951 ( Report of Surveys for Freeboard for Rhodesia Castle, 25th October 1949 1949, Request for Special Survey for Rhodesia Castle, 1st March 1950 1950, Report of Surveys for Freeboard for Rhodesia Castle, 18th May 1950 1950, Half Midship Section Plan for Rhodesia Castle, 3rd September 1951 1951, Framing Profile Plan for Rhodesia Castle, 3rd September 1951 1951, Plan of Steel Decks for Rhodesia Castle, 3rd September 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 7th December 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rhodesia Castle, 27th November 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 9th November 1951 1951, Extract from Freeboard Verification of Marking Form for Rhodesia Castle, 31st October 1951 1951, Letter from Pro Clerk to the Classification Committee, to The Surveyors, London, regarding Rhodesia Castle, 12th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Steel Steamer or Motorship Report for Rhodesia Castle, 7th November 1951 1951, Form for Vessels of 100 Tons & Upwards for Rhodesia Castle, 3rd October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 28th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 5th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 25th October 1951 1951, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Rhodesia Castle, 30th November 1951 1951, Report of Survey for Repairs, &c, of Engines & Boilers for Rhodesia Castle, 31st October 1951 1951, Report on Steam Turbine Machinery for Rhodesia Castle, 8th October 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Steam Turbine Generator Machinery for Rhodesia Castle, 27th August 1951 1951, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, 3rd May 1951 1951, Report on Electrical Equipment for Rhodesia Castle, 26th September 1951 1951, Letter from A Daintith, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 5th December 1951 1951, Certificate of Class for Rhodesia Castle, 4th December 1951 1951, Certificate for Machinery for Rhodesia Castle, 4th December 1951 1951, Report of Surveys for Freeboard for Rhodesia Castle, 9th April 1951 1951, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Rhodesia Castle, 28th December 1960 1960, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Rhodesia Castle, 6th December 1960 1960, Memo to the Chief Ship Surveyor regarding Docking Alterations on Account of Fitting Air Conditioning Plant for Rhodesia Castle, 13th December 1960 1960, Report of Ship Surveys & Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Part Boilers & Part Machinery for Rhodesia Castle, 31st October 1960 1960, Report of Periodical Surveys & Repairs of Machinery for Rhodesia Castle, 31st October 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 8th June 1960 1960, Plan of Modifications to Steelwork in New Accommodation on A Deck for Rhodesia Castle, 24th June 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 10th June 1960 1960, Report on Annual Load Line Survey for Rhodesia Castle, 7th April 1961 1961, Report of Total Loss, Casualty, Breaking Up, etc for Rhodesia Castle, Undated no date, Report on Water Tube Boilers for Rhodesia Castle, Undated no date, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard for Rhodesia Castle, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Harland & Wolff Ltd ( Report of Surveys for Freeboard for Rhodesia Castle, 25th October 1949 1949, Request for Special Survey for Rhodesia Castle, 1st March 1950 1950, Report of Surveys for Freeboard for Rhodesia Castle, 18th May 1950 1950, Half Midship Section Plan for Rhodesia Castle, 3rd September 1951 1951, Framing Profile Plan for Rhodesia Castle, 3rd September 1951 1951, Plan of Steel Decks for Rhodesia Castle, 3rd September 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 7th December 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rhodesia Castle, 27th November 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 9th November 1951 1951, Extract from Freeboard Verification of Marking Form for Rhodesia Castle, 31st October 1951 1951, Letter from Pro Clerk to the Classification Committee, to The Surveyors, London, regarding Rhodesia Castle, 12th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Steel Steamer or Motorship Report for Rhodesia Castle, 7th November 1951 1951, Form for Vessels of 100 Tons & Upwards for Rhodesia Castle, 3rd October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 28th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 5th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 25th October 1951 1951, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Rhodesia Castle, 30th November 1951 1951, Report of Survey for Repairs, &c, of Engines & Boilers for Rhodesia Castle, 31st October 1951 1951, Report on Steam Turbine Machinery for Rhodesia Castle, 8th October 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Steam Turbine Generator Machinery for Rhodesia Castle, 27th August 1951 1951, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, 3rd May 1951 1951, Report on Electrical Equipment for Rhodesia Castle, 26th September 1951 1951, Letter from A Daintith, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 5th December 1951 1951, Certificate of Class for Rhodesia Castle, 4th December 1951 1951, Certificate for Machinery for Rhodesia Castle, 4th December 1951 1951, Report of Surveys for Freeboard for Rhodesia Castle, 9th April 1951 1951, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Rhodesia Castle, 28th December 1960 1960, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Rhodesia Castle, 6th December 1960 1960, Memo to the Chief Ship Surveyor regarding Docking Alterations on Account of Fitting Air Conditioning Plant for Rhodesia Castle, 13th December 1960 1960, Report of Ship Surveys & Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Part Boilers & Part Machinery for Rhodesia Castle, 31st October 1960 1960, Report of Periodical Surveys & Repairs of Machinery for Rhodesia Castle, 31st October 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 8th June 1960 1960, Plan of Modifications to Steelwork in New Accommodation on A Deck for Rhodesia Castle, 24th June 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 10th June 1960 1960, Report on Annual Load Line Survey for Rhodesia Castle, 7th April 1961 1961, Report of Total Loss, Casualty, Breaking Up, etc for Rhodesia Castle, Undated no date, Report on Water Tube Boilers for Rhodesia Castle, Undated no date, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard for Rhodesia Castle, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Belfast ( Report of Surveys for Freeboard for Rhodesia Castle, 25th October 1949 1949, Request for Special Survey for Rhodesia Castle, 1st March 1950 1950, Report of Surveys for Freeboard for Rhodesia Castle, 18th May 1950 1950, Half Midship Section Plan for Rhodesia Castle, 3rd September 1951 1951, Framing Profile Plan for Rhodesia Castle, 3rd September 1951 1951, Plan of Steel Decks for Rhodesia Castle, 3rd September 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 7th December 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rhodesia Castle, 27th November 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 9th November 1951 1951, Extract from Freeboard Verification of Marking Form for Rhodesia Castle, 31st October 1951 1951, Letter from Pro Clerk to the Classification Committee, to The Surveyors, London, regarding Rhodesia Castle, 12th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Steel Steamer or Motorship Report for Rhodesia Castle, 7th November 1951 1951, Form for Vessels of 100 Tons & Upwards for Rhodesia Castle, 3rd October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 28th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 5th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 25th October 1951 1951, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Rhodesia Castle, 30th November 1951 1951, Report of Survey for Repairs, &c, of Engines & Boilers for Rhodesia Castle, 31st October 1951 1951, Report on Steam Turbine Machinery for Rhodesia Castle, 8th October 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Steam Turbine Generator Machinery for Rhodesia Castle, 27th August 1951 1951, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, 3rd May 1951 1951, Report on Electrical Equipment for Rhodesia Castle, 26th September 1951 1951, Letter from A Daintith, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 5th December 1951 1951, Certificate of Class for Rhodesia Castle, 4th December 1951 1951, Certificate for Machinery for Rhodesia Castle, 4th December 1951 1951, Report of Surveys for Freeboard for Rhodesia Castle, 9th April 1951 1951, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Rhodesia Castle, 28th December 1960 1960, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Rhodesia Castle, 6th December 1960 1960, Memo to the Chief Ship Surveyor regarding Docking Alterations on Account of Fitting Air Conditioning Plant for Rhodesia Castle, 13th December 1960 1960, Report of Ship Surveys & Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Part Boilers & Part Machinery for Rhodesia Castle, 31st October 1960 1960, Report of Periodical Surveys & Repairs of Machinery for Rhodesia Castle, 31st October 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 8th June 1960 1960, Plan of Modifications to Steelwork in New Accommodation on A Deck for Rhodesia Castle, 24th June 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 10th June 1960 1960, Report on Annual Load Line Survey for Rhodesia Castle, 7th April 1961 1961, Report of Total Loss, Casualty, Breaking Up, etc for Rhodesia Castle, Undated no date, Report on Water Tube Boilers for Rhodesia Castle, Undated no date, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard for Rhodesia Castle, Undated no date )

A vessel’s means of propulsion.

Propulsion

undefined ( Report of Surveys for Freeboard for Rhodesia Castle, 25th October 1949 1949, Report of Surveys for Freeboard for Rhodesia Castle, 18th May 1950 1950, Half Midship Section Plan for Rhodesia Castle, 3rd September 1951 1951, Framing Profile Plan for Rhodesia Castle, 3rd September 1951 1951, Plan of Steel Decks for Rhodesia Castle, 3rd September 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 7th December 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 9th November 1951 1951, Extract from Freeboard Verification of Marking Form for Rhodesia Castle, 31st October 1951 1951, Steel Steamer or Motorship Report for Rhodesia Castle, 7th November 1951 1951, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Rhodesia Castle, 30th November 1951 1951, Report on Steam Turbine Generator Machinery for Rhodesia Castle, 27th August 1951 1951, Report on Electrical Equipment for Rhodesia Castle, 26th September 1951 1951, Report of Surveys for Freeboard for Rhodesia Castle, 9th April 1951 1951, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Rhodesia Castle, 6th December 1960 1960, Memo to the Chief Ship Surveyor regarding Docking Alterations on Account of Fitting Air Conditioning Plant for Rhodesia Castle, 13th December 1960 1960, Report on Annual Load Line Survey for Rhodesia Castle, 7th April 1961 1961, Report of Surveys for Freeboard - Conditions of Assignment for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard for Rhodesia Castle, Undated no date )

Steam ( Request for Special Survey for Rhodesia Castle, 1st March 1950 1950, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rhodesia Castle, 27th November 1951 1951, Letter from Pro Clerk to the Classification Committee, to The Surveyors, London, regarding Rhodesia Castle, 12th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Form for Vessels of 100 Tons & Upwards for Rhodesia Castle, 3rd October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 28th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 5th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 25th October 1951 1951, Report of Survey for Repairs, &c, of Engines & Boilers for Rhodesia Castle, 31st October 1951 1951, Report on Steam Turbine Machinery for Rhodesia Castle, 8th October 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, 3rd May 1951 1951, Letter from A Daintith, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 5th December 1951 1951, Certificate of Class for Rhodesia Castle, 4th December 1951 1951, Certificate for Machinery for Rhodesia Castle, 4th December 1951 1951, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Rhodesia Castle, 28th December 1960 1960, Report of Ship Surveys & Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Part Boilers & Part Machinery for Rhodesia Castle, 31st October 1960 1960, Report of Periodical Surveys & Repairs of Machinery for Rhodesia Castle, 31st October 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 8th June 1960 1960, Plan of Modifications to Steelwork in New Accommodation on A Deck for Rhodesia Castle, 24th June 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 10th June 1960 1960, Report of Total Loss, Casualty, Breaking Up, etc for Rhodesia Castle, Undated no date, Report on Water Tube Boilers for Rhodesia Castle, Undated no date, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, Undated no date )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Report of Surveys for Freeboard for Rhodesia Castle, 25th October 1949 1949, Request for Special Survey for Rhodesia Castle, 1st March 1950 1950, Report of Surveys for Freeboard for Rhodesia Castle, 18th May 1950 1950, Half Midship Section Plan for Rhodesia Castle, 3rd September 1951 1951, Framing Profile Plan for Rhodesia Castle, 3rd September 1951 1951, Plan of Steel Decks for Rhodesia Castle, 3rd September 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 7th December 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rhodesia Castle, 27th November 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 9th November 1951 1951, Extract from Freeboard Verification of Marking Form for Rhodesia Castle, 31st October 1951 1951, Letter from Pro Clerk to the Classification Committee, to The Surveyors, London, regarding Rhodesia Castle, 12th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Steel Steamer or Motorship Report for Rhodesia Castle, 7th November 1951 1951, Form for Vessels of 100 Tons & Upwards for Rhodesia Castle, 3rd October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 28th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 5th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 25th October 1951 1951, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Rhodesia Castle, 30th November 1951 1951, Report of Survey for Repairs, &c, of Engines & Boilers for Rhodesia Castle, 31st October 1951 1951, Report on Steam Turbine Machinery for Rhodesia Castle, 8th October 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Steam Turbine Generator Machinery for Rhodesia Castle, 27th August 1951 1951, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, 3rd May 1951 1951, Report on Electrical Equipment for Rhodesia Castle, 26th September 1951 1951, Letter from A Daintith, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 5th December 1951 1951, Certificate of Class for Rhodesia Castle, 4th December 1951 1951, Certificate for Machinery for Rhodesia Castle, 4th December 1951 1951, Report of Surveys for Freeboard for Rhodesia Castle, 9th April 1951 1951, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Rhodesia Castle, 28th December 1960 1960, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Rhodesia Castle, 6th December 1960 1960, Memo to the Chief Ship Surveyor regarding Docking Alterations on Account of Fitting Air Conditioning Plant for Rhodesia Castle, 13th December 1960 1960, Report of Ship Surveys & Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Part Boilers & Part Machinery for Rhodesia Castle, 31st October 1960 1960, Report of Periodical Surveys & Repairs of Machinery for Rhodesia Castle, 31st October 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 8th June 1960 1960, Plan of Modifications to Steelwork in New Accommodation on A Deck for Rhodesia Castle, 24th June 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 10th June 1960 1960, Report on Annual Load Line Survey for Rhodesia Castle, 7th April 1961 1961, Report of Total Loss, Casualty, Breaking Up, etc for Rhodesia Castle, Undated no date, Report on Water Tube Boilers for Rhodesia Castle, Undated no date, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard for Rhodesia Castle, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Report of Surveys for Freeboard for Rhodesia Castle, 25th October 1949 1949, Request for Special Survey for Rhodesia Castle, 1st March 1950 1950, Report of Surveys for Freeboard for Rhodesia Castle, 18th May 1950 1950, Half Midship Section Plan for Rhodesia Castle, 3rd September 1951 1951, Framing Profile Plan for Rhodesia Castle, 3rd September 1951 1951, Plan of Steel Decks for Rhodesia Castle, 3rd September 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 7th December 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rhodesia Castle, 27th November 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 9th November 1951 1951, Extract from Freeboard Verification of Marking Form for Rhodesia Castle, 31st October 1951 1951, Letter from Pro Clerk to the Classification Committee, to The Surveyors, London, regarding Rhodesia Castle, 12th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Steel Steamer or Motorship Report for Rhodesia Castle, 7th November 1951 1951, Form for Vessels of 100 Tons & Upwards for Rhodesia Castle, 3rd October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 28th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 5th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 25th October 1951 1951, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Rhodesia Castle, 30th November 1951 1951, Report of Survey for Repairs, &c, of Engines & Boilers for Rhodesia Castle, 31st October 1951 1951, Report on Steam Turbine Machinery for Rhodesia Castle, 8th October 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Steam Turbine Generator Machinery for Rhodesia Castle, 27th August 1951 1951, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, 3rd May 1951 1951, Report on Electrical Equipment for Rhodesia Castle, 26th September 1951 1951, Letter from A Daintith, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 5th December 1951 1951, Certificate of Class for Rhodesia Castle, 4th December 1951 1951, Certificate for Machinery for Rhodesia Castle, 4th December 1951 1951, Report of Surveys for Freeboard for Rhodesia Castle, 9th April 1951 1951, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Rhodesia Castle, 28th December 1960 1960, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Rhodesia Castle, 6th December 1960 1960, Memo to the Chief Ship Surveyor regarding Docking Alterations on Account of Fitting Air Conditioning Plant for Rhodesia Castle, 13th December 1960 1960, Report of Ship Surveys & Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Part Boilers & Part Machinery for Rhodesia Castle, 31st October 1960 1960, Report of Periodical Surveys & Repairs of Machinery for Rhodesia Castle, 31st October 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 8th June 1960 1960, Plan of Modifications to Steelwork in New Accommodation on A Deck for Rhodesia Castle, 24th June 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 10th June 1960 1960, Report on Annual Load Line Survey for Rhodesia Castle, 7th April 1961 1961, Report of Total Loss, Casualty, Breaking Up, etc for Rhodesia Castle, Undated no date, Report on Water Tube Boilers for Rhodesia Castle, Undated no date, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard for Rhodesia Castle, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Report of Surveys for Freeboard for Rhodesia Castle, 25th October 1949 1949, Request for Special Survey for Rhodesia Castle, 1st March 1950 1950, Report of Surveys for Freeboard for Rhodesia Castle, 18th May 1950 1950, Half Midship Section Plan for Rhodesia Castle, 3rd September 1951 1951, Framing Profile Plan for Rhodesia Castle, 3rd September 1951 1951, Plan of Steel Decks for Rhodesia Castle, 3rd September 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 7th December 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rhodesia Castle, 27th November 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 9th November 1951 1951, Extract from Freeboard Verification of Marking Form for Rhodesia Castle, 31st October 1951 1951, Letter from Pro Clerk to the Classification Committee, to The Surveyors, London, regarding Rhodesia Castle, 12th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Steel Steamer or Motorship Report for Rhodesia Castle, 7th November 1951 1951, Form for Vessels of 100 Tons & Upwards for Rhodesia Castle, 3rd October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 28th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 5th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 25th October 1951 1951, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Rhodesia Castle, 30th November 1951 1951, Report of Survey for Repairs, &c, of Engines & Boilers for Rhodesia Castle, 31st October 1951 1951, Report on Steam Turbine Machinery for Rhodesia Castle, 8th October 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Steam Turbine Generator Machinery for Rhodesia Castle, 27th August 1951 1951, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, 3rd May 1951 1951, Report on Electrical Equipment for Rhodesia Castle, 26th September 1951 1951, Letter from A Daintith, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 5th December 1951 1951, Certificate of Class for Rhodesia Castle, 4th December 1951 1951, Certificate for Machinery for Rhodesia Castle, 4th December 1951 1951, Report of Surveys for Freeboard for Rhodesia Castle, 9th April 1951 1951, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Rhodesia Castle, 28th December 1960 1960, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Rhodesia Castle, 6th December 1960 1960, Memo to the Chief Ship Surveyor regarding Docking Alterations on Account of Fitting Air Conditioning Plant for Rhodesia Castle, 13th December 1960 1960, Report of Ship Surveys & Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Part Boilers & Part Machinery for Rhodesia Castle, 31st October 1960 1960, Report of Periodical Surveys & Repairs of Machinery for Rhodesia Castle, 31st October 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 8th June 1960 1960, Plan of Modifications to Steelwork in New Accommodation on A Deck for Rhodesia Castle, 24th June 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 10th June 1960 1960, Report on Annual Load Line Survey for Rhodesia Castle, 7th April 1961 1961, Report of Total Loss, Casualty, Breaking Up, etc for Rhodesia Castle, Undated no date, Report on Water Tube Boilers for Rhodesia Castle, Undated no date, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard for Rhodesia Castle, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Report of Surveys for Freeboard for Rhodesia Castle, 25th October 1949 1949, Request for Special Survey for Rhodesia Castle, 1st March 1950 1950, Report of Surveys for Freeboard for Rhodesia Castle, 18th May 1950 1950, Half Midship Section Plan for Rhodesia Castle, 3rd September 1951 1951, Framing Profile Plan for Rhodesia Castle, 3rd September 1951 1951, Plan of Steel Decks for Rhodesia Castle, 3rd September 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 7th December 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rhodesia Castle, 27th November 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 9th November 1951 1951, Extract from Freeboard Verification of Marking Form for Rhodesia Castle, 31st October 1951 1951, Letter from Pro Clerk to the Classification Committee, to The Surveyors, London, regarding Rhodesia Castle, 12th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Steel Steamer or Motorship Report for Rhodesia Castle, 7th November 1951 1951, Form for Vessels of 100 Tons & Upwards for Rhodesia Castle, 3rd October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 28th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 5th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 25th October 1951 1951, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Rhodesia Castle, 30th November 1951 1951, Report of Survey for Repairs, &c, of Engines & Boilers for Rhodesia Castle, 31st October 1951 1951, Report on Steam Turbine Machinery for Rhodesia Castle, 8th October 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Steam Turbine Generator Machinery for Rhodesia Castle, 27th August 1951 1951, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, 3rd May 1951 1951, Report on Electrical Equipment for Rhodesia Castle, 26th September 1951 1951, Letter from A Daintith, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 5th December 1951 1951, Certificate of Class for Rhodesia Castle, 4th December 1951 1951, Certificate for Machinery for Rhodesia Castle, 4th December 1951 1951, Report of Surveys for Freeboard for Rhodesia Castle, 9th April 1951 1951, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Rhodesia Castle, 28th December 1960 1960, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Rhodesia Castle, 6th December 1960 1960, Memo to the Chief Ship Surveyor regarding Docking Alterations on Account of Fitting Air Conditioning Plant for Rhodesia Castle, 13th December 1960 1960, Report of Ship Surveys & Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Part Boilers & Part Machinery for Rhodesia Castle, 31st October 1960 1960, Report of Periodical Surveys & Repairs of Machinery for Rhodesia Castle, 31st October 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 8th June 1960 1960, Plan of Modifications to Steelwork in New Accommodation on A Deck for Rhodesia Castle, 24th June 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 10th June 1960 1960, Report on Annual Load Line Survey for Rhodesia Castle, 7th April 1961 1961, Report of Total Loss, Casualty, Breaking Up, etc for Rhodesia Castle, Undated no date, Report on Water Tube Boilers for Rhodesia Castle, Undated no date, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard for Rhodesia Castle, Undated no date )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sold to Chin Ho Fa Steel & Iron Co Ltd for Breaking up at Kaohsiung, Taiwan ( Report of Surveys for Freeboard for Rhodesia Castle, 25th October 1949 1949, Request for Special Survey for Rhodesia Castle, 1st March 1950 1950, Report of Surveys for Freeboard for Rhodesia Castle, 18th May 1950 1950, Half Midship Section Plan for Rhodesia Castle, 3rd September 1951 1951, Framing Profile Plan for Rhodesia Castle, 3rd September 1951 1951, Plan of Steel Decks for Rhodesia Castle, 3rd September 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 7th December 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rhodesia Castle, 27th November 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 9th November 1951 1951, Extract from Freeboard Verification of Marking Form for Rhodesia Castle, 31st October 1951 1951, Letter from Pro Clerk to the Classification Committee, to The Surveyors, London, regarding Rhodesia Castle, 12th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Steel Steamer or Motorship Report for Rhodesia Castle, 7th November 1951 1951, Form for Vessels of 100 Tons & Upwards for Rhodesia Castle, 3rd October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 28th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 5th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 25th October 1951 1951, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Rhodesia Castle, 30th November 1951 1951, Report of Survey for Repairs, &c, of Engines & Boilers for Rhodesia Castle, 31st October 1951 1951, Report on Steam Turbine Machinery for Rhodesia Castle, 8th October 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Steam Turbine Generator Machinery for Rhodesia Castle, 27th August 1951 1951, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, 3rd May 1951 1951, Report on Electrical Equipment for Rhodesia Castle, 26th September 1951 1951, Letter from A Daintith, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 5th December 1951 1951, Certificate of Class for Rhodesia Castle, 4th December 1951 1951, Certificate for Machinery for Rhodesia Castle, 4th December 1951 1951, Report of Surveys for Freeboard for Rhodesia Castle, 9th April 1951 1951, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Rhodesia Castle, 28th December 1960 1960, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Rhodesia Castle, 6th December 1960 1960, Memo to the Chief Ship Surveyor regarding Docking Alterations on Account of Fitting Air Conditioning Plant for Rhodesia Castle, 13th December 1960 1960, Report of Ship Surveys & Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Part Boilers & Part Machinery for Rhodesia Castle, 31st October 1960 1960, Report of Periodical Surveys & Repairs of Machinery for Rhodesia Castle, 31st October 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 8th June 1960 1960, Plan of Modifications to Steelwork in New Accommodation on A Deck for Rhodesia Castle, 24th June 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 10th June 1960 1960, Report on Annual Load Line Survey for Rhodesia Castle, 7th April 1961 1961, Report of Total Loss, Casualty, Breaking Up, etc for Rhodesia Castle, Undated no date, Report on Water Tube Boilers for Rhodesia Castle, Undated no date, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard for Rhodesia Castle, Undated no date )

The country or national waters where a vessel is lost/disposed of, or last recorded.

Country of loss or disposal

Taiwan ( Report of Surveys for Freeboard for Rhodesia Castle, 25th October 1949 1949, Request for Special Survey for Rhodesia Castle, 1st March 1950 1950, Report of Surveys for Freeboard for Rhodesia Castle, 18th May 1950 1950, Half Midship Section Plan for Rhodesia Castle, 3rd September 1951 1951, Framing Profile Plan for Rhodesia Castle, 3rd September 1951 1951, Plan of Steel Decks for Rhodesia Castle, 3rd September 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 7th December 1951 1951, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Rhodesia Castle, 27th November 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 9th November 1951 1951, Extract from Freeboard Verification of Marking Form for Rhodesia Castle, 31st October 1951 1951, Letter from Pro Clerk to the Classification Committee, to The Surveyors, London, regarding Rhodesia Castle, 12th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Steel Steamer or Motorship Report for Rhodesia Castle, 7th November 1951 1951, Form for Vessels of 100 Tons & Upwards for Rhodesia Castle, 3rd October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 28th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 5th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 25th October 1951 1951, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Rhodesia Castle, 30th November 1951 1951, Report of Survey for Repairs, &c, of Engines & Boilers for Rhodesia Castle, 31st October 1951 1951, Report on Steam Turbine Machinery for Rhodesia Castle, 8th October 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Steam Turbine Generator Machinery for Rhodesia Castle, 27th August 1951 1951, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, 3rd May 1951 1951, Report on Electrical Equipment for Rhodesia Castle, 26th September 1951 1951, Letter from A Daintith, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 5th December 1951 1951, Certificate of Class for Rhodesia Castle, 4th December 1951 1951, Certificate for Machinery for Rhodesia Castle, 4th December 1951 1951, Report of Surveys for Freeboard for Rhodesia Castle, 9th April 1951 1951, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Rhodesia Castle, 28th December 1960 1960, Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Rhodesia Castle, 6th December 1960 1960, Memo to the Chief Ship Surveyor regarding Docking Alterations on Account of Fitting Air Conditioning Plant for Rhodesia Castle, 13th December 1960 1960, Report of Ship Surveys & Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Part Boilers & Part Machinery for Rhodesia Castle, 31st October 1960 1960, Report of Periodical Surveys & Repairs of Machinery for Rhodesia Castle, 31st October 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 8th June 1960 1960, Plan of Modifications to Steelwork in New Accommodation on A Deck for Rhodesia Castle, 24th June 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 10th June 1960 1960, Report on Annual Load Line Survey for Rhodesia Castle, 7th April 1961 1961, Report of Total Loss, Casualty, Breaking Up, etc for Rhodesia Castle, Undated no date, Report on Water Tube Boilers for Rhodesia Castle, Undated no date, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard for Rhodesia Castle, Undated no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Belfast ( Request for Special Survey for Rhodesia Castle, 1st March 1950 1950, Half Midship Section Plan for Rhodesia Castle, 3rd September 1951 1951, Framing Profile Plan for Rhodesia Castle, 3rd September 1951 1951, Plan of Steel Decks for Rhodesia Castle, 3rd September 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 7th December 1951 1951, Letter from A S Fletcher, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 9th November 1951 1951, Copy of Letter from J B Smail, per The Surveyors, to The Surveyors, London, regarding Rhodesia Castle, 8th October 1951 1951, Steel Steamer or Motorship Report for Rhodesia Castle, 7th November 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 5th October 1951 1951, Report on Steam Turbine Machinery for Rhodesia Castle, 8th October 1951 1951, Report on Electrical Equipment for Rhodesia Castle, 26th September 1951 1951, Letter from A Daintith, per The Surveyors, to The Secretary, London, regarding Rhodesia Castle, 5th December 1951 1951, Report on Water Tube Boilers for Rhodesia Castle, Undated no date, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard - Conditions of Assignment for Rhodesia Castle, Undated no date, Report of Surveys for Freeboard for Rhodesia Castle, Undated no date )

London ( Form for Vessels of 100 Tons & Upwards for Rhodesia Castle, 3rd October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 28th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 25th October 1951 1951, Report of Survey for Repairs, &c, of Engines & Boilers for Rhodesia Castle, 31st October 1951 1951, Report on Steam Turbine Generator Machinery for Rhodesia Castle, 27th August 1951 1951, Certificate of Class for Rhodesia Castle, 4th December 1951 1951, Certificate for Machinery for Rhodesia Castle, 4th December 1951 1951, Copy of Letter from Deputy Clerk to the Classification Committee, to The Secretary, Liverpool, regarding Rhodesia Castle, 28th December 1960 1960, Report on Annual Load Line Survey for Rhodesia Castle, 7th April 1961 1961 )

Annan; Glasgow ( Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951 )

Glasgow ( Report on Oil Engine Electric Generator Sets for Rhodesia Castle, 3rd May 1951 1951 )

Liverpool ( Letter from C E Peacock, Secretary to the Liverpool Committee, to The Secretary, London, regarding Rhodesia Castle, 6th December 1960 1960, Report of Ship Surveys & Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Part Boilers & Part Machinery for Rhodesia Castle, 31st October 1960 1960, Report of Periodical Surveys & Repairs of Machinery for Rhodesia Castle, 31st October 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 8th June 1960 1960, Plan of Modifications to Steelwork in New Accommodation on A Deck for Rhodesia Castle, 24th June 1960 1960, Plan of New Flat in Tunnel for Refrigerating Machinery for Rhodesia Castle, 10th June 1960 1960 )

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

17041 ( Steel Steamer or Motorship Report for Rhodesia Castle, 7th November 1951 1951, Form for Vessels of 100 Tons & Upwards for Rhodesia Castle, 3rd October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 5th October 1951 1951, Report on Steam Turbine Machinery for Rhodesia Castle, 8th October 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Boilers for Rhodesia Castle, 20th May 1951 1951, Report on Steam Turbine Generator Machinery for Rhodesia Castle, 27th August 1951 1951, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, 3rd May 1951 1951, Report on Electrical Equipment for Rhodesia Castle, 26th September 1951 1951, Certificate of Class for Rhodesia Castle, 4th December 1951 1951, Report of Ship Surveys & Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Repairs for Rhodesia Castle, 28th November 1960 1960, Copy of Certificate of Survey of Part Boilers & Part Machinery for Rhodesia Castle, 31st October 1960 1960, Report of Periodical Surveys & Repairs of Machinery for Rhodesia Castle, 31st October 1960 1960, Report on Water Tube Boilers for Rhodesia Castle, Undated no date, Report on Oil Engine Electric Generator Sets for Rhodesia Castle, Undated no date )

17040 ( Copy of Certificate of Survey for Rhodesia Castle, 28th October 1951 1951, Copy of Certificate of Survey for Rhodesia Castle, 25th October 1951 1951, Report of Surveys for Freeboard for Rhodesia Castle, Undated no date )

17340 ( Report of Survey for Repairs, &c, of Engines & Boilers for Rhodesia Castle, 31st October 1951 1951 )

17038 ( Report of Total Loss, Casualty, Breaking Up, etc for Rhodesia Castle, Undated no date )

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.