Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
The year in which a vessel’s construction is completed.
1913 ( Request for Special Survey of Boiler of Shabonee, 16th May 1912 1912, Upper Deck Plan for Shabonee, 17th December 1912 1912, Plan of Boiler for Shabonee, 6th August 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 8th October 1912 1912, Plan of Steel Boiler for Shabonee, 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 26th September 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 3rd October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd November 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th November 1912 1912, Profile Plan for Shabonee, 29th April 1912 1912, Half Midship Section Plan for Shabonee, 29th April 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Shabonee, 30th October 1913 1913, Steel Steamer Report for Shabonee, 29th October 1913 1913, Report on Machinery for Shabonee, 21st October 1913 1913, Report on Boilers for Shabonee, 14th August 1913 1913, Form for Vessels of 100 Tons & Upwards for Shabonee, 20th October 1913 1913, Report on Electric Lighting Installation for Shabonee, 21st October 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 6th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th January 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 24th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd April 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 14th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 13th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 19th March 1913 1913, Certificate of Survey of Boilers for Shabonee, 27th November 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Shabonee, 25th November 1931 1931, Report of Total Loss, Casualty, &c for Shabonee, 7th November 1932 1932, Letter from G H Macdonald, Lloyd\'s Register, Shanghai, to the Secretary, London, regarding Shabonee, 27th September 1932 1932, Copy of Letter from pro Secretary, to G H Macdonald, Shanghai, regarding Shabonee, 11th August 1932 1932, Copy of Letter from James French, Chief Surveyor, U S A & Canada, to the Secretary, London, regarding Shabonee, 13th January 1932 1932 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Sir James Laing & Sons Ltd ( Request for Special Survey of Boiler of Shabonee, 16th May 1912 1912, Upper Deck Plan for Shabonee, 17th December 1912 1912, Plan of Boiler for Shabonee, 6th August 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 8th October 1912 1912, Plan of Steel Boiler for Shabonee, 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 26th September 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 3rd October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd November 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th November 1912 1912, Profile Plan for Shabonee, 29th April 1912 1912, Half Midship Section Plan for Shabonee, 29th April 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Shabonee, 30th October 1913 1913, Steel Steamer Report for Shabonee, 29th October 1913 1913, Report on Machinery for Shabonee, 21st October 1913 1913, Report on Boilers for Shabonee, 14th August 1913 1913, Form for Vessels of 100 Tons & Upwards for Shabonee, 20th October 1913 1913, Report on Electric Lighting Installation for Shabonee, 21st October 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 6th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th January 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 24th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd April 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 14th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 13th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 19th March 1913 1913, Certificate of Survey of Boilers for Shabonee, 27th November 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Shabonee, 25th November 1931 1931, Report of Total Loss, Casualty, &c for Shabonee, 7th November 1932 1932, Letter from G H Macdonald, Lloyd\'s Register, Shanghai, to the Secretary, London, regarding Shabonee, 27th September 1932 1932, Copy of Letter from pro Secretary, to G H Macdonald, Shanghai, regarding Shabonee, 11th August 1932 1932, Copy of Letter from James French, Chief Surveyor, U S A & Canada, to the Secretary, London, regarding Shabonee, 13th January 1932 1932 )
The port or place in which the vessel’s construction took place, at the time of writing.
Sunderland ( Request for Special Survey of Boiler of Shabonee, 16th May 1912 1912, Upper Deck Plan for Shabonee, 17th December 1912 1912, Plan of Boiler for Shabonee, 6th August 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 8th October 1912 1912, Plan of Steel Boiler for Shabonee, 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 26th September 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 3rd October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd November 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th November 1912 1912, Profile Plan for Shabonee, 29th April 1912 1912, Half Midship Section Plan for Shabonee, 29th April 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Shabonee, 30th October 1913 1913, Steel Steamer Report for Shabonee, 29th October 1913 1913, Report on Machinery for Shabonee, 21st October 1913 1913, Report on Boilers for Shabonee, 14th August 1913 1913, Form for Vessels of 100 Tons & Upwards for Shabonee, 20th October 1913 1913, Report on Electric Lighting Installation for Shabonee, 21st October 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 6th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th January 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 24th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd April 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 14th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 13th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 19th March 1913 1913, Certificate of Survey of Boilers for Shabonee, 27th November 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Shabonee, 25th November 1931 1931, Report of Total Loss, Casualty, &c for Shabonee, 7th November 1932 1932, Letter from G H Macdonald, Lloyd\'s Register, Shanghai, to the Secretary, London, regarding Shabonee, 27th September 1932 1932, Copy of Letter from pro Secretary, to G H Macdonald, Shanghai, regarding Shabonee, 11th August 1932 1932, Copy of Letter from James French, Chief Surveyor, U S A & Canada, to the Secretary, London, regarding Shabonee, 13th January 1932 1932 )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Request for Special Survey of Boiler of Shabonee, 16th May 1912 1912, Upper Deck Plan for Shabonee, 17th December 1912 1912, Plan of Boiler for Shabonee, 6th August 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 8th October 1912 1912, Plan of Steel Boiler for Shabonee, 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 26th September 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 3rd October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd November 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th November 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Shabonee, 30th October 1913 1913, Report on Machinery for Shabonee, 21st October 1913 1913, Report on Boilers for Shabonee, 14th August 1913 1913, Report on Electric Lighting Installation for Shabonee, 21st October 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 6th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th January 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 24th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd April 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 14th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 13th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 19th March 1913 1913, Certificate of Survey of Boilers for Shabonee, 27th November 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Shabonee, 25th November 1931 1931, Report of Total Loss, Casualty, &c for Shabonee, 7th November 1932 1932, Letter from G H Macdonald, Lloyd\'s Register, Shanghai, to the Secretary, London, regarding Shabonee, 27th September 1932 1932, Copy of Letter from pro Secretary, to G H Macdonald, Shanghai, regarding Shabonee, 11th August 1932 1932, Copy of Letter from James French, Chief Surveyor, U S A & Canada, to the Secretary, London, regarding Shabonee, 13th January 1932 1932 )
Screw Steamer ( Profile Plan for Shabonee, 29th April 1912 1912, Half Midship Section Plan for Shabonee, 29th April 1912 1912, Steel Steamer Report for Shabonee, 29th October 1913 1913 )
Cargo ( Form for Vessels of 100 Tons & Upwards for Shabonee, 20th October 1913 1913 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Request for Special Survey of Boiler of Shabonee, 16th May 1912 1912, Upper Deck Plan for Shabonee, 17th December 1912 1912, Plan of Boiler for Shabonee, 6th August 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 8th October 1912 1912, Plan of Steel Boiler for Shabonee, 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 26th September 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 3rd October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd November 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th November 1912 1912, Profile Plan for Shabonee, 29th April 1912 1912, Half Midship Section Plan for Shabonee, 29th April 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Shabonee, 30th October 1913 1913, Steel Steamer Report for Shabonee, 29th October 1913 1913, Report on Machinery for Shabonee, 21st October 1913 1913, Report on Boilers for Shabonee, 14th August 1913 1913, Form for Vessels of 100 Tons & Upwards for Shabonee, 20th October 1913 1913, Report on Electric Lighting Installation for Shabonee, 21st October 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 6th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th January 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 24th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd April 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 14th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 13th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 19th March 1913 1913, Certificate of Survey of Boilers for Shabonee, 27th November 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Shabonee, 25th November 1931 1931, Report of Total Loss, Casualty, &c for Shabonee, 7th November 1932 1932, Letter from G H Macdonald, Lloyd\'s Register, Shanghai, to the Secretary, London, regarding Shabonee, 27th September 1932 1932, Copy of Letter from pro Secretary, to G H Macdonald, Shanghai, regarding Shabonee, 11th August 1932 1932, Copy of Letter from James French, Chief Surveyor, U S A & Canada, to the Secretary, London, regarding Shabonee, 13th January 1932 1932 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Request for Special Survey of Boiler of Shabonee, 16th May 1912 1912, Upper Deck Plan for Shabonee, 17th December 1912 1912, Plan of Boiler for Shabonee, 6th August 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 8th October 1912 1912, Plan of Steel Boiler for Shabonee, 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 26th September 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 3rd October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd November 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th November 1912 1912, Profile Plan for Shabonee, 29th April 1912 1912, Half Midship Section Plan for Shabonee, 29th April 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Shabonee, 30th October 1913 1913, Steel Steamer Report for Shabonee, 29th October 1913 1913, Report on Machinery for Shabonee, 21st October 1913 1913, Report on Boilers for Shabonee, 14th August 1913 1913, Form for Vessels of 100 Tons & Upwards for Shabonee, 20th October 1913 1913, Report on Electric Lighting Installation for Shabonee, 21st October 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 6th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th January 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 24th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd April 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 14th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 13th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 19th March 1913 1913, Certificate of Survey of Boilers for Shabonee, 27th November 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Shabonee, 25th November 1931 1931, Report of Total Loss, Casualty, &c for Shabonee, 7th November 1932 1932, Letter from G H Macdonald, Lloyd\'s Register, Shanghai, to the Secretary, London, regarding Shabonee, 27th September 1932 1932, Copy of Letter from pro Secretary, to G H Macdonald, Shanghai, regarding Shabonee, 11th August 1932 1932, Copy of Letter from James French, Chief Surveyor, U S A & Canada, to the Secretary, London, regarding Shabonee, 13th January 1932 1932 )
Does the vessel possess an auxiliary power source?
No ( Request for Special Survey of Boiler of Shabonee, 16th May 1912 1912, Upper Deck Plan for Shabonee, 17th December 1912 1912, Plan of Boiler for Shabonee, 6th August 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 8th October 1912 1912, Plan of Steel Boiler for Shabonee, 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 26th September 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 3rd October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd November 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th November 1912 1912, Profile Plan for Shabonee, 29th April 1912 1912, Half Midship Section Plan for Shabonee, 29th April 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Shabonee, 30th October 1913 1913, Steel Steamer Report for Shabonee, 29th October 1913 1913, Report on Machinery for Shabonee, 21st October 1913 1913, Report on Boilers for Shabonee, 14th August 1913 1913, Form for Vessels of 100 Tons & Upwards for Shabonee, 20th October 1913 1913, Report on Electric Lighting Installation for Shabonee, 21st October 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 6th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th January 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 24th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd April 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 14th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 13th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 19th March 1913 1913, Certificate of Survey of Boilers for Shabonee, 27th November 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Shabonee, 25th November 1931 1931, Report of Total Loss, Casualty, &c for Shabonee, 7th November 1932 1932, Letter from G H Macdonald, Lloyd\'s Register, Shanghai, to the Secretary, London, regarding Shabonee, 27th September 1932 1932, Copy of Letter from pro Secretary, to G H Macdonald, Shanghai, regarding Shabonee, 11th August 1932 1932, Copy of Letter from James French, Chief Surveyor, U S A & Canada, to the Secretary, London, regarding Shabonee, 13th January 1932 1932 )
Is electric lighting fitted to the vessel?
No ( Request for Special Survey of Boiler of Shabonee, 16th May 1912 1912, Upper Deck Plan for Shabonee, 17th December 1912 1912, Plan of Boiler for Shabonee, 6th August 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 8th October 1912 1912, Plan of Steel Boiler for Shabonee, 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 26th September 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 3rd October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd November 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th November 1912 1912, Profile Plan for Shabonee, 29th April 1912 1912, Half Midship Section Plan for Shabonee, 29th April 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Shabonee, 30th October 1913 1913, Steel Steamer Report for Shabonee, 29th October 1913 1913, Report on Machinery for Shabonee, 21st October 1913 1913, Report on Boilers for Shabonee, 14th August 1913 1913, Form for Vessels of 100 Tons & Upwards for Shabonee, 20th October 1913 1913, Report on Electric Lighting Installation for Shabonee, 21st October 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 6th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th January 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 24th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd April 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 14th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 13th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 19th March 1913 1913, Certificate of Survey of Boilers for Shabonee, 27th November 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Shabonee, 25th November 1931 1931, Report of Total Loss, Casualty, &c for Shabonee, 7th November 1932 1932, Letter from G H Macdonald, Lloyd\'s Register, Shanghai, to the Secretary, London, regarding Shabonee, 27th September 1932 1932, Copy of Letter from pro Secretary, to G H Macdonald, Shanghai, regarding Shabonee, 11th August 1932 1932, Copy of Letter from James French, Chief Surveyor, U S A & Canada, to the Secretary, London, regarding Shabonee, 13th January 1932 1932 )
The official record pronounced by the Committee
Broken up ( Request for Special Survey of Boiler of Shabonee, 16th May 1912 1912, Upper Deck Plan for Shabonee, 17th December 1912 1912, Plan of Boiler for Shabonee, 6th August 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 8th October 1912 1912, Plan of Steel Boiler for Shabonee, 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 26th September 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 3rd October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd November 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th November 1912 1912, Profile Plan for Shabonee, 29th April 1912 1912, Half Midship Section Plan for Shabonee, 29th April 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Shabonee, 30th October 1913 1913, Steel Steamer Report for Shabonee, 29th October 1913 1913, Report on Machinery for Shabonee, 21st October 1913 1913, Report on Boilers for Shabonee, 14th August 1913 1913, Form for Vessels of 100 Tons & Upwards for Shabonee, 20th October 1913 1913, Report on Electric Lighting Installation for Shabonee, 21st October 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 6th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th January 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 24th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd April 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 14th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 13th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 19th March 1913 1913, Certificate of Survey of Boilers for Shabonee, 27th November 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Shabonee, 25th November 1931 1931, Report of Total Loss, Casualty, &c for Shabonee, 7th November 1932 1932, Letter from G H Macdonald, Lloyd\'s Register, Shanghai, to the Secretary, London, regarding Shabonee, 27th September 1932 1932, Copy of Letter from pro Secretary, to G H Macdonald, Shanghai, regarding Shabonee, 11th August 1932 1932, Copy of Letter from James French, Chief Surveyor, U S A & Canada, to the Secretary, London, regarding Shabonee, 13th January 1932 1932 )
Recorded date for the vessel’s loss or disposal.
__/__/0000 ( Request for Special Survey of Boiler of Shabonee, 16th May 1912 1912, Upper Deck Plan for Shabonee, 17th December 1912 1912, Plan of Boiler for Shabonee, 6th August 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 8th October 1912 1912, Plan of Steel Boiler for Shabonee, 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 26th September 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 3rd October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd November 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th November 1912 1912, Profile Plan for Shabonee, 29th April 1912 1912, Half Midship Section Plan for Shabonee, 29th April 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Shabonee, 30th October 1913 1913, Steel Steamer Report for Shabonee, 29th October 1913 1913, Report on Machinery for Shabonee, 21st October 1913 1913, Report on Boilers for Shabonee, 14th August 1913 1913, Form for Vessels of 100 Tons & Upwards for Shabonee, 20th October 1913 1913, Report on Electric Lighting Installation for Shabonee, 21st October 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 6th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th January 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 24th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd April 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 14th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 13th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 19th March 1913 1913, Certificate of Survey of Boilers for Shabonee, 27th November 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Shabonee, 25th November 1931 1931, Report of Total Loss, Casualty, &c for Shabonee, 7th November 1932 1932, Letter from G H Macdonald, Lloyd\'s Register, Shanghai, to the Secretary, London, regarding Shabonee, 27th September 1932 1932, Copy of Letter from pro Secretary, to G H Macdonald, Shanghai, regarding Shabonee, 11th August 1932 1932, Copy of Letter from James French, Chief Surveyor, U S A & Canada, to the Secretary, London, regarding Shabonee, 13th January 1932 1932 )
Recorded information relating the specific cargo being conveyed.
The listed port to which a given vessel belongs.
Sunderland ( Steel Steamer Report for Shabonee, 29th October 1913 1913, Report on Machinery for Shabonee, 21st October 1913 1913, Report on Boilers for Shabonee, 14th August 1913 1913, Report on Electric Lighting Installation for Shabonee, 21st October 1913 1913 )
Hong Kong ( Report of Survey for Repairs, &c, of Engines & Boilers for Shabonee, 25th November 1931 1931 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
W J Smith ( Steel Steamer Report for Shabonee, 29th October 1913 1913 )
William James Smith ( Form for Vessels of 100 Tons & Upwards for Shabonee, 20th October 1913 1913 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Carrying Petroleum in Bulk; Lloyd\'s A & CP; +LMC 10,13; FD Fitted for Oil Fuel 10,13; Fp Above 150 F ( Steel Steamer Report for Shabonee, 29th October 1913 1913 )
+LMC 10,13; FD; Fitted for Oil Fuel 10,13 FP Above 150 F ( Report on Machinery for Shabonee, 21st October 1913 1913 )
BS 11,31 ( Report of Survey for Repairs, &c, of Engines & Boilers for Shabonee, 25th November 1931 1931 )
+100A1 7,31; Carrying Petroleum in Bulk; Fitted for Oil Fuel 10,13 FP above 150F; SS No 3-7,26; SS No 1,30; +LMC; MS 8,30; MS 11,31 ( Report of Total Loss, Casualty, &c for Shabonee, 7th November 1932 1932 )
The name of the port/place of destination given.
New York ( Steel Steamer Report for Shabonee, 29th October 1913 1913 )
Shanghai ( Report of Survey for Repairs, &c, of Engines & Boilers for Shabonee, 25th November 1931 1931 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5167 ( Steel Steamer Report for Shabonee, 29th October 1913 1913, Report on Machinery for Shabonee, 21st October 1913 1913, Report on Boilers for Shabonee, 14th August 1913 1913, Form for Vessels of 100 Tons & Upwards for Shabonee, 20th October 1913 1913, Certificate of Survey of Boilers for Shabonee, 27th November 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Shabonee, 25th November 1931 1931, Report of Total Loss, Casualty, &c for Shabonee, 7th November 1932 1932 )
Location of construction for a vessel’s engines.
Sunderland ( Report on Machinery for Shabonee, 21st October 1913 1913, Report on Boilers for Shabonee, 14th August 1913 1913, Form for Vessels of 100 Tons & Upwards for Shabonee, 20th October 1913 1913, Report of Survey for Repairs, &c, of Engines & Boilers for Shabonee, 25th November 1931 1931 )
Name of surveyor.
William Morrison ( Report on Boilers for Shabonee, 14th August 1913 1913 )
James French ( Copy of Letter from James French, Chief Surveyor, U S A & Canada, to the Secretary, London, regarding Shabonee, 13th January 1932 1932 )
The port in which a vessel is registered or permanently based.
Sunderland ( Form for Vessels of 100 Tons & Upwards for Shabonee, 20th October 1913 1913 )
The process of transferring a vessel to water, but not necessarily her completion.
18/09/1913 ( Request for Special Survey of Boiler of Shabonee, 16th May 1912 1912, Upper Deck Plan for Shabonee, 17th December 1912 1912, Plan of Boiler for Shabonee, 6th August 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 8th October 1912 1912, Plan of Steel Boiler for Shabonee, 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 26th September 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 3rd October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd November 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th November 1912 1912, Profile Plan for Shabonee, 29th April 1912 1912, Half Midship Section Plan for Shabonee, 29th April 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Shabonee, 30th October 1913 1913, Steel Steamer Report for Shabonee, 29th October 1913 1913, Report on Machinery for Shabonee, 21st October 1913 1913, Report on Boilers for Shabonee, 14th August 1913 1913, Form for Vessels of 100 Tons & Upwards for Shabonee, 20th October 1913 1913, Report on Electric Lighting Installation for Shabonee, 21st October 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 6th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th January 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 24th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd April 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 14th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 13th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 19th March 1913 1913, Certificate of Survey of Boilers for Shabonee, 27th November 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Shabonee, 25th November 1931 1931, Report of Total Loss, Casualty, &c for Shabonee, 7th November 1932 1932, Letter from G H Macdonald, Lloyd\'s Register, Shanghai, to the Secretary, London, regarding Shabonee, 27th September 1932 1932, Copy of Letter from pro Secretary, to G H Macdonald, Shanghai, regarding Shabonee, 11th August 1932 1932, Copy of Letter from James French, Chief Surveyor, U S A & Canada, to the Secretary, London, regarding Shabonee, 13th January 1932 1932 )
Unique identifier for a given ship, it is assigned by a builder.
643 ( Request for Special Survey of Boiler of Shabonee, 16th May 1912 1912, Upper Deck Plan for Shabonee, 17th December 1912 1912, Plan of Boiler for Shabonee, 6th August 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 8th October 1912 1912, Plan of Steel Boiler for Shabonee, 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 26th September 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 3rd October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd November 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th November 1912 1912, Profile Plan for Shabonee, 29th April 1912 1912, Half Midship Section Plan for Shabonee, 29th April 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Shabonee, 30th October 1913 1913, Steel Steamer Report for Shabonee, 29th October 1913 1913, Report on Machinery for Shabonee, 21st October 1913 1913, Report on Boilers for Shabonee, 14th August 1913 1913, Form for Vessels of 100 Tons & Upwards for Shabonee, 20th October 1913 1913, Report on Electric Lighting Installation for Shabonee, 21st October 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 6th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th January 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 24th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd April 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 14th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 13th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 19th March 1913 1913, Certificate of Survey of Boilers for Shabonee, 27th November 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Shabonee, 25th November 1931 1931, Report of Total Loss, Casualty, &c for Shabonee, 7th November 1932 1932, Letter from G H Macdonald, Lloyd\'s Register, Shanghai, to the Secretary, London, regarding Shabonee, 27th September 1932 1932, Copy of Letter from pro Secretary, to G H Macdonald, Shanghai, regarding Shabonee, 11th August 1932 1932, Copy of Letter from James French, Chief Surveyor, U S A & Canada, to the Secretary, London, regarding Shabonee, 13th January 1932 1932 )
Location where a vessel’s survey was undertaken.
Stockton on Tees ( Request for Special Survey of Boiler of Shabonee, 16th May 1912 1912, Plan of Steel Boiler for Shabonee, 1912 1912 )
Sunderland ( Upper Deck Plan for Shabonee, 17th December 1912 1912, Plan of Boiler for Shabonee, 6th August 1912 1912, Profile Plan for Shabonee, 29th April 1912 1912, Half Midship Section Plan for Shabonee, 29th April 1912 1912, Steel Steamer Report for Shabonee, 29th October 1913 1913, Report on Machinery for Shabonee, 21st October 1913 1913, Form for Vessels of 100 Tons & Upwards for Shabonee, 20th October 1913 1913, Report on Electric Lighting Installation for Shabonee, 21st October 1913 1913 )
Newcastle on Tyne; Sunderland ( Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 8th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 6th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th January 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 24th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd April 1913 1913 )
Newcastle on Tyne; Stockton on Tees ( Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 26th September 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 14th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 13th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 19th March 1913 1913 )
Newcastle on Tyne; Stockton ( Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 3rd October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd November 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th November 1912 1912 )
Stockton on Tees; Middlesbrough ( Report on Boilers for Shabonee, 14th August 1913 1913 )
Los Angeles; California; (San Pedro) ( Certificate of Survey of Boilers for Shabonee, 27th November 1931 1931 )
Long Beach California San Pedro; Los Angeles; Los Angeles California ( Report of Survey for Repairs, &c, of Engines & Boilers for Shabonee, 25th November 1931 1931 )
A vessel’s means of propulsion.
undefined ( Request for Special Survey of Boiler of Shabonee, 16th May 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 8th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 26th September 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 3rd October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd November 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th November 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 6th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th January 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 24th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd April 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 14th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 13th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 19th March 1913 1913 )
Steam ( Upper Deck Plan for Shabonee, 17th December 1912 1912, Plan of Boiler for Shabonee, 6th August 1912 1912, Plan of Steel Boiler for Shabonee, 1912 1912, Profile Plan for Shabonee, 29th April 1912 1912, Half Midship Section Plan for Shabonee, 29th April 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Shabonee, 30th October 1913 1913, Steel Steamer Report for Shabonee, 29th October 1913 1913, Report on Machinery for Shabonee, 21st October 1913 1913, Report on Boilers for Shabonee, 14th August 1913 1913, Form for Vessels of 100 Tons & Upwards for Shabonee, 20th October 1913 1913, Report on Electric Lighting Installation for Shabonee, 21st October 1913 1913, Certificate of Survey of Boilers for Shabonee, 27th November 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Shabonee, 25th November 1931 1931, Report of Total Loss, Casualty, &c for Shabonee, 7th November 1932 1932, Letter from G H Macdonald, Lloyd\'s Register, Shanghai, to the Secretary, London, regarding Shabonee, 27th September 1932 1932, Copy of Letter from pro Secretary, to G H Macdonald, Shanghai, regarding Shabonee, 11th August 1932 1932, Copy of Letter from James French, Chief Surveyor, U S A & Canada, to the Secretary, London, regarding Shabonee, 13th January 1932 1932 )
Is the steamer assisted by sail?
No ( Request for Special Survey of Boiler of Shabonee, 16th May 1912 1912, Upper Deck Plan for Shabonee, 17th December 1912 1912, Plan of Boiler for Shabonee, 6th August 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 8th October 1912 1912, Plan of Steel Boiler for Shabonee, 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 26th September 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 3rd October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd November 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th November 1912 1912, Profile Plan for Shabonee, 29th April 1912 1912, Half Midship Section Plan for Shabonee, 29th April 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Shabonee, 30th October 1913 1913, Steel Steamer Report for Shabonee, 29th October 1913 1913, Report on Machinery for Shabonee, 21st October 1913 1913, Report on Boilers for Shabonee, 14th August 1913 1913, Form for Vessels of 100 Tons & Upwards for Shabonee, 20th October 1913 1913, Report on Electric Lighting Installation for Shabonee, 21st October 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 6th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th January 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 24th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd April 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 14th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 13th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 19th March 1913 1913, Certificate of Survey of Boilers for Shabonee, 27th November 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Shabonee, 25th November 1931 1931, Report of Total Loss, Casualty, &c for Shabonee, 7th November 1932 1932, Letter from G H Macdonald, Lloyd\'s Register, Shanghai, to the Secretary, London, regarding Shabonee, 27th September 1932 1932, Copy of Letter from pro Secretary, to G H Macdonald, Shanghai, regarding Shabonee, 11th August 1932 1932, Copy of Letter from James French, Chief Surveyor, U S A & Canada, to the Secretary, London, regarding Shabonee, 13th January 1932 1932 )
Is machinery fitted at the aft of the vessel?
No ( Request for Special Survey of Boiler of Shabonee, 16th May 1912 1912, Upper Deck Plan for Shabonee, 17th December 1912 1912, Plan of Boiler for Shabonee, 6th August 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 8th October 1912 1912, Plan of Steel Boiler for Shabonee, 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 26th September 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 3rd October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd November 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th November 1912 1912, Profile Plan for Shabonee, 29th April 1912 1912, Half Midship Section Plan for Shabonee, 29th April 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Shabonee, 30th October 1913 1913, Steel Steamer Report for Shabonee, 29th October 1913 1913, Report on Machinery for Shabonee, 21st October 1913 1913, Report on Boilers for Shabonee, 14th August 1913 1913, Form for Vessels of 100 Tons & Upwards for Shabonee, 20th October 1913 1913, Report on Electric Lighting Installation for Shabonee, 21st October 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 6th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th January 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 24th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd April 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 14th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 13th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 19th March 1913 1913, Certificate of Survey of Boilers for Shabonee, 27th November 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Shabonee, 25th November 1931 1931, Report of Total Loss, Casualty, &c for Shabonee, 7th November 1932 1932, Letter from G H Macdonald, Lloyd\'s Register, Shanghai, to the Secretary, London, regarding Shabonee, 27th September 1932 1932, Copy of Letter from pro Secretary, to G H Macdonald, Shanghai, regarding Shabonee, 11th August 1932 1932, Copy of Letter from James French, Chief Surveyor, U S A & Canada, to the Secretary, London, regarding Shabonee, 13th January 1932 1932 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Request for Special Survey of Boiler of Shabonee, 16th May 1912 1912, Upper Deck Plan for Shabonee, 17th December 1912 1912, Plan of Boiler for Shabonee, 6th August 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 8th October 1912 1912, Plan of Steel Boiler for Shabonee, 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 26th September 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 3rd October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd November 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th November 1912 1912, Profile Plan for Shabonee, 29th April 1912 1912, Half Midship Section Plan for Shabonee, 29th April 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Shabonee, 30th October 1913 1913, Steel Steamer Report for Shabonee, 29th October 1913 1913, Report on Machinery for Shabonee, 21st October 1913 1913, Report on Boilers for Shabonee, 14th August 1913 1913, Form for Vessels of 100 Tons & Upwards for Shabonee, 20th October 1913 1913, Report on Electric Lighting Installation for Shabonee, 21st October 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 6th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th January 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 24th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd April 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 14th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 13th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 19th March 1913 1913, Certificate of Survey of Boilers for Shabonee, 27th November 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Shabonee, 25th November 1931 1931, Report of Total Loss, Casualty, &c for Shabonee, 7th November 1932 1932, Letter from G H Macdonald, Lloyd\'s Register, Shanghai, to the Secretary, London, regarding Shabonee, 27th September 1932 1932, Copy of Letter from pro Secretary, to G H Macdonald, Shanghai, regarding Shabonee, 11th August 1932 1932, Copy of Letter from James French, Chief Surveyor, U S A & Canada, to the Secretary, London, regarding Shabonee, 13th January 1932 1932 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Request for Special Survey of Boiler of Shabonee, 16th May 1912 1912, Upper Deck Plan for Shabonee, 17th December 1912 1912, Plan of Boiler for Shabonee, 6th August 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 8th October 1912 1912, Plan of Steel Boiler for Shabonee, 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 26th September 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 3rd October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd November 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th November 1912 1912, Profile Plan for Shabonee, 29th April 1912 1912, Half Midship Section Plan for Shabonee, 29th April 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Shabonee, 30th October 1913 1913, Steel Steamer Report for Shabonee, 29th October 1913 1913, Report on Machinery for Shabonee, 21st October 1913 1913, Report on Boilers for Shabonee, 14th August 1913 1913, Form for Vessels of 100 Tons & Upwards for Shabonee, 20th October 1913 1913, Report on Electric Lighting Installation for Shabonee, 21st October 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 6th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th January 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 24th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd April 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 14th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 13th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 19th March 1913 1913, Certificate of Survey of Boilers for Shabonee, 27th November 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Shabonee, 25th November 1931 1931, Report of Total Loss, Casualty, &c for Shabonee, 7th November 1932 1932, Letter from G H Macdonald, Lloyd\'s Register, Shanghai, to the Secretary, London, regarding Shabonee, 27th September 1932 1932, Copy of Letter from pro Secretary, to G H Macdonald, Shanghai, regarding Shabonee, 11th August 1932 1932, Copy of Letter from James French, Chief Surveyor, U S A & Canada, to the Secretary, London, regarding Shabonee, 13th January 1932 1932 )
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to be broken up ( Request for Special Survey of Boiler of Shabonee, 16th May 1912 1912, Upper Deck Plan for Shabonee, 17th December 1912 1912, Plan of Boiler for Shabonee, 6th August 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st December 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 8th October 1912 1912, Plan of Steel Boiler for Shabonee, 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 26th September 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 3rd October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 5th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th October 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd November 1912 1912, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th November 1912 1912, Profile Plan for Shabonee, 29th April 1912 1912, Half Midship Section Plan for Shabonee, 29th April 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Shabonee, 30th October 1913 1913, Steel Steamer Report for Shabonee, 29th October 1913 1913, Report on Machinery for Shabonee, 21st October 1913 1913, Report on Boilers for Shabonee, 14th August 1913 1913, Form for Vessels of 100 Tons & Upwards for Shabonee, 20th October 1913 1913, Report on Electric Lighting Installation for Shabonee, 21st October 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 27th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 6th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 30th January 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 18th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 24th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 22nd February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 7th February 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 2nd April 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 31st March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 14th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 13th March 1913 1913, Receipt for Boiler Manufactured by John Spencer & Sons Ltd for Shabonee, 19th March 1913 1913, Certificate of Survey of Boilers for Shabonee, 27th November 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Shabonee, 25th November 1931 1931, Report of Total Loss, Casualty, &c for Shabonee, 7th November 1932 1932, Letter from G H Macdonald, Lloyd\'s Register, Shanghai, to the Secretary, London, regarding Shabonee, 27th September 1932 1932, Copy of Letter from pro Secretary, to G H Macdonald, Shanghai, regarding Shabonee, 11th August 1932 1932, Copy of Letter from James French, Chief Surveyor, U S A & Canada, to the Secretary, London, regarding Shabonee, 13th January 1932 1932 )
Name of ship as recorded on the record
Shabonee ( Upper Deck Plan for Shabonee, 17th December 1912 1912, Plan of Boiler for Shabonee, 6th August 1912 1912, Plan of Steel Boiler for Shabonee, 1912 1912, Profile Plan for Shabonee, 29th April 1912 1912, Half Midship Section Plan for Shabonee, 29th April 1912 1912, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Shabonee, 30th October 1913 1913, Steel Steamer Report for Shabonee, 29th October 1913 1913, Report on Machinery for Shabonee, 21st October 1913 1913, Report on Boilers for Shabonee, 14th August 1913 1913, Form for Vessels of 100 Tons & Upwards for Shabonee, 20th October 1913 1913, Report on Electric Lighting Installation for Shabonee, 21st October 1913 1913, Certificate of Survey of Boilers for Shabonee, 27th November 1931 1931, Report of Survey for Repairs, &c, of Engines & Boilers for Shabonee, 25th November 1931 1931, Report of Total Loss, Casualty, &c for Shabonee, 7th November 1932 1932, Letter from G H Macdonald, Lloyd\'s Register, Shanghai, to the Secretary, London, regarding Shabonee, 27th September 1932 1932, Copy of Letter from pro Secretary, to G H Macdonald, Shanghai, regarding Shabonee, 11th August 1932 1932, Copy of Letter from James French, Chief Surveyor, U S A & Canada, to the Secretary, London, regarding Shabonee, 13th January 1932 1932 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Sld ( Steel Steamer Report for Shabonee, 29th October 1913 1913, Report on Machinery for Shabonee, 21st October 1913 1913, Report on Electric Lighting Installation for Shabonee, 21st October 1913 1913 )
Mdb ( Report on Boilers for Shabonee, 14th August 1913 1913 )
L.An ( Report of Survey for Repairs, &c, of Engines & Boilers for Shabonee, 25th November 1931 1931 )
The individual and/or organisation listed
Tank Storage & Carriage Co Ltd ( Steel Steamer Report for Shabonee, 29th October 1913 1913, Report on Boilers for Shabonee, 14th August 1913 1913, Form for Vessels of 100 Tons & Upwards for Shabonee, 20th October 1913 1913, Report on Electric Lighting Installation for Shabonee, 21st October 1913 1913 )
Tank Storage & Carriage Co Ltd; W J Smith ( Report on Machinery for Shabonee, 21st October 1913 1913 )
Standard Transportation Co Ltd ( Report of Survey for Repairs, &c, of Engines & Boilers for Shabonee, 25th November 1931 1931 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Recorded information related to a vessel’s movements.
Sunderland; New York ( Steel Steamer Report for Shabonee, 29th October 1913 1913 )
Long Beach California, San Pedro; Shanghai ( Report of Survey for Repairs, &c, of Engines & Boilers for Shabonee, 25th November 1931 1931 )
Physical arrangement of a ship’s masts, sails and rigging.
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion ( Report on Machinery for Shabonee, 21st October 1913 1913 )
Triple Expansion Surface Condensing ( Form for Vessels of 100 Tons & Upwards for Shabonee, 20th October 1913 1913 )
Date in which construction of a vessel’s engines were completed.
1913 ( Report on Machinery for Shabonee, 21st October 1913 1913, Report on Boilers for Shabonee, 14th August 1913 1913, Form for Vessels of 100 Tons & Upwards for Shabonee, 20th October 1913 1913, Report of Survey for Repairs, &c, of Engines & Boilers for Shabonee, 25th November 1931 1931 )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
JDHG ( Form for Vessels of 100 Tons & Upwards for Shabonee, 20th October 1913 1913 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.