Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Sledmere - 1890 ( Sketch of Iron Masts for Sledmere, 2 October 1890 1890, Pumping Arrangement for Sledmere, 6 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 22 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 18 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 3 November 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 20 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 7 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 17 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 4 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 28 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 21 October 1890 1890, Advice note for Blair & Co regarding case of Sledmere, 17 December 1890 1890, Profile of Sledmere, 15 August 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Sledmere, 26 February 1891 1891, Report of Iron or Steel Ship for Sledmere, 25 February 1891 1891, Report of machinery for Sledmere, 23 February 1890 1891, Midship section of Sledmere, 15 August 1890 1899, Note regarding case of Sledmere no date, Report of Ship Forgings for Sledmere no date )
The process of transferring a vessel to water, but not necessarily her completion.
24/01/1891 ( Sketch of Iron Masts for Sledmere, 2 October 1890 1890, Pumping Arrangement for Sledmere, 6 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 22 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 18 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 3 November 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 20 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 7 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 17 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 4 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 28 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 21 October 1890 1890, Advice note for Blair & Co regarding case of Sledmere, 17 December 1890 1890, Profile of Sledmere, 15 August 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Sledmere, 26 February 1891 1891, Report of Iron or Steel Ship for Sledmere, 25 February 1891 1891, Report of machinery for Sledmere, 23 February 1890 1891, Midship section of Sledmere, 15 August 1890 1899, Note regarding case of Sledmere no date, Report of Ship Forgings for Sledmere no date )
Unique identifier for a given ship, it is assigned by a builder.
382 ( Sketch of Iron Masts for Sledmere, 2 October 1890 1890, Pumping Arrangement for Sledmere, 6 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 22 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 18 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 3 November 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 20 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 7 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 17 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 4 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 28 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 21 October 1890 1890, Advice note for Blair & Co regarding case of Sledmere, 17 December 1890 1890, Profile of Sledmere, 15 August 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Sledmere, 26 February 1891 1891, Report of Iron or Steel Ship for Sledmere, 25 February 1891 1891, Report of machinery for Sledmere, 23 February 1890 1891, Midship section of Sledmere, 15 August 1890 1899, Note regarding case of Sledmere no date, Report of Ship Forgings for Sledmere no date )
The country in which the vessel’s construction took place, at the time of writing.
United Kingdom ( Sketch of Iron Masts for Sledmere, 2 October 1890 1890, Pumping Arrangement for Sledmere, 6 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 22 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 18 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 3 November 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 20 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 7 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 17 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 4 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 28 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 21 October 1890 1890, Advice note for Blair & Co regarding case of Sledmere, 17 December 1890 1890, Profile of Sledmere, 15 August 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Sledmere, 26 February 1891 1891, Report of Iron or Steel Ship for Sledmere, 25 February 1891 1891, Report of machinery for Sledmere, 23 February 1890 1891, Midship section of Sledmere, 15 August 1890 1899, Note regarding case of Sledmere no date, Report of Ship Forgings for Sledmere no date )
Broad categories and subdivisions of vessels related to their purpose or function.
Cargo ( Sketch of Iron Masts for Sledmere, 2 October 1890 1890, Pumping Arrangement for Sledmere, 6 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 22 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 18 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 3 November 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 20 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 7 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 17 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 4 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 28 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 21 October 1890 1890, Advice note for Blair & Co regarding case of Sledmere, 17 December 1890 1890, Profile of Sledmere, 15 August 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Sledmere, 26 February 1891 1891, Report of Iron or Steel Ship for Sledmere, 25 February 1891 1891, Report of machinery for Sledmere, 23 February 1890 1891, Midship section of Sledmere, 15 August 1890 1899, Note regarding case of Sledmere no date, Report of Ship Forgings for Sledmere no date )
Is the steamer assisted by sail?
No ( Sketch of Iron Masts for Sledmere, 2 October 1890 1890, Pumping Arrangement for Sledmere, 6 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 22 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 18 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 3 November 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 20 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 7 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 17 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 4 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 28 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 21 October 1890 1890, Advice note for Blair & Co regarding case of Sledmere, 17 December 1890 1890, Profile of Sledmere, 15 August 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Sledmere, 26 February 1891 1891, Report of Iron or Steel Ship for Sledmere, 25 February 1891 1891, Report of machinery for Sledmere, 23 February 1890 1891, Midship section of Sledmere, 15 August 1890 1899, Note regarding case of Sledmere no date, Report of Ship Forgings for Sledmere no date )
Is machinery fitted at the aft of the vessel?
No ( Sketch of Iron Masts for Sledmere, 2 October 1890 1890, Pumping Arrangement for Sledmere, 6 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 22 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 18 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 3 November 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 20 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 7 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 17 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 4 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 28 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 21 October 1890 1890, Advice note for Blair & Co regarding case of Sledmere, 17 December 1890 1890, Profile of Sledmere, 15 August 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Sledmere, 26 February 1891 1891, Report of Iron or Steel Ship for Sledmere, 25 February 1891 1891, Report of machinery for Sledmere, 23 February 1890 1891, Midship section of Sledmere, 15 August 1890 1899, Note regarding case of Sledmere no date, Report of Ship Forgings for Sledmere no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Sketch of Iron Masts for Sledmere, 2 October 1890 1890, Pumping Arrangement for Sledmere, 6 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 22 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 18 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 3 November 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 20 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 7 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 17 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 4 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 28 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 21 October 1890 1890, Advice note for Blair & Co regarding case of Sledmere, 17 December 1890 1890, Profile of Sledmere, 15 August 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Sledmere, 26 February 1891 1891, Report of Iron or Steel Ship for Sledmere, 25 February 1891 1891, Report of machinery for Sledmere, 23 February 1890 1891, Midship section of Sledmere, 15 August 1890 1899, Note regarding case of Sledmere no date, Report of Ship Forgings for Sledmere no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Sketch of Iron Masts for Sledmere, 2 October 1890 1890, Pumping Arrangement for Sledmere, 6 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 22 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 18 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 3 November 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 20 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 7 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 17 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 4 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 28 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 21 October 1890 1890, Advice note for Blair & Co regarding case of Sledmere, 17 December 1890 1890, Profile of Sledmere, 15 August 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Sledmere, 26 February 1891 1891, Report of Iron or Steel Ship for Sledmere, 25 February 1891 1891, Report of machinery for Sledmere, 23 February 1890 1891, Midship section of Sledmere, 15 August 1890 1899, Note regarding case of Sledmere no date, Report of Ship Forgings for Sledmere no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mdb ( Report of Iron or Steel Ship for Sledmere, 25 February 1891 1891, Report of machinery for Sledmere, 23 February 1890 1891 )
The listed port to which a given vessel belongs.
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
R N Padgett ( Report of Iron or Steel Ship for Sledmere, 25 February 1891 1891 )
Padgett ( Report of machinery for Sledmere, 23 February 1890 1891 )
The name of the port/place of destination given.
Cardiff to load ( Report of Iron or Steel Ship for Sledmere, 25 February 1891 1891 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1970 ( Report of Iron or Steel Ship for Sledmere, 25 February 1891 1891, Report of machinery for Sledmere, 23 February 1890 1891 )
Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.
1285 ( Report of Iron or Steel Ship for Sledmere, 25 February 1891 1891, Report of machinery for Sledmere, 23 February 1890 1891 )
Also referred to as extreme breadth. The distance from the extreme starboard side to the extreme port side.
36.7 ( Report of Iron or Steel Ship for Sledmere, 25 February 1891 1891 )
Description/specifications listed of the vessel’s engines and machinery. (The engines/machinery may have been surveyed separately before being assigned to a vessel).
Inverted Direct Acting Triple Expansion ( Report of machinery for Sledmere, 23 February 1890 1891 )
The country, at the time of writing, where a vessel’s engines were constructed.
United Kingdom ( Report of machinery for Sledmere, 23 February 1890 1891 )
150 ( Report of machinery for Sledmere, 23 February 1890 1891 )
Length of a ship along the summer load line from the vessel’s stem to the sternpost.
The year in which a vessel’s construction is completed.
1891 ( Sketch of Iron Masts for Sledmere, 2 October 1890 1890, Pumping Arrangement for Sledmere, 6 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 22 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 18 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 3 November 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 20 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 7 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 17 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 4 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 28 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 21 October 1890 1890, Advice note for Blair & Co regarding case of Sledmere, 17 December 1890 1890, Profile of Sledmere, 15 August 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Sledmere, 26 February 1891 1891, Report of Iron or Steel Ship for Sledmere, 25 February 1891 1891, Report of machinery for Sledmere, 23 February 1890 1891, Midship section of Sledmere, 15 August 1890 1899, Note regarding case of Sledmere no date, Report of Ship Forgings for Sledmere no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Richardson, Duck & Co ( Sketch of Iron Masts for Sledmere, 2 October 1890 1890, Pumping Arrangement for Sledmere, 6 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 22 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 18 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 3 November 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 20 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 7 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 17 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 4 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 28 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 21 October 1890 1890, Advice note for Blair & Co regarding case of Sledmere, 17 December 1890 1890, Profile of Sledmere, 15 August 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Sledmere, 26 February 1891 1891, Report of Iron or Steel Ship for Sledmere, 25 February 1891 1891, Report of machinery for Sledmere, 23 February 1890 1891, Midship section of Sledmere, 15 August 1890 1899, Note regarding case of Sledmere no date, Report of Ship Forgings for Sledmere no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Stockton ( Sketch of Iron Masts for Sledmere, 2 October 1890 1890, Pumping Arrangement for Sledmere, 6 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 22 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 18 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 3 November 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 20 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 7 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 17 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 4 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 28 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 21 October 1890 1890, Advice note for Blair & Co regarding case of Sledmere, 17 December 1890 1890, Profile of Sledmere, 15 August 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Sledmere, 26 February 1891 1891, Report of Iron or Steel Ship for Sledmere, 25 February 1891 1891, Report of machinery for Sledmere, 23 February 1890 1891, Midship section of Sledmere, 15 August 1890 1899, Note regarding case of Sledmere no date, Report of Ship Forgings for Sledmere no date )
Location where a vessel’s survey was undertaken.
Stockton-on-Tees ( Sketch of Iron Masts for Sledmere, 2 October 1890 1890, Profile of Sledmere, 15 August 1890 1890, Midship section of Sledmere, 15 August 1890 1899 )
Middlesbrough ( Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Sledmere, 26 February 1891 1891 )
Stockton-on-Tees; Middlesbrough ( Report of Iron or Steel Ship for Sledmere, 25 February 1891 1891, Report of machinery for Sledmere, 23 February 1890 1891 )
Sunderland ( Report of Ship Forgings for Sledmere no date )
A vessel’s means of propulsion.
Steam ( Sketch of Iron Masts for Sledmere, 2 October 1890 1890, Pumping Arrangement for Sledmere, 6 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 22 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 18 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 3 November 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 20 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 7 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 17 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 4 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 28 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 21 October 1890 1890, Advice note for Blair & Co regarding case of Sledmere, 17 December 1890 1890, Profile of Sledmere, 15 August 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Sledmere, 26 February 1891 1891, Report of Iron or Steel Ship for Sledmere, 25 February 1891 1891, Report of machinery for Sledmere, 23 February 1890 1891, Midship section of Sledmere, 15 August 1890 1899, Note regarding case of Sledmere no date, Report of Ship Forgings for Sledmere no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Sketch of Iron Masts for Sledmere, 2 October 1890 1890, Pumping Arrangement for Sledmere, 6 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 22 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 18 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 3 November 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 20 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 7 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 17 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 4 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 28 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 21 October 1890 1890, Advice note for Blair & Co regarding case of Sledmere, 17 December 1890 1890, Profile of Sledmere, 15 August 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Sledmere, 26 February 1891 1891, Report of Iron or Steel Ship for Sledmere, 25 February 1891 1891, Report of machinery for Sledmere, 23 February 1890 1891, Midship section of Sledmere, 15 August 1890 1899, Note regarding case of Sledmere no date, Report of Ship Forgings for Sledmere no date )
Does the vessel possess an auxiliary power source?
No ( Sketch of Iron Masts for Sledmere, 2 October 1890 1890, Pumping Arrangement for Sledmere, 6 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 22 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 18 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 3 November 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 20 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 7 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 17 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 4 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 28 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 21 October 1890 1890, Advice note for Blair & Co regarding case of Sledmere, 17 December 1890 1890, Profile of Sledmere, 15 August 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Sledmere, 26 February 1891 1891, Report of Iron or Steel Ship for Sledmere, 25 February 1891 1891, Report of machinery for Sledmere, 23 February 1890 1891, Midship section of Sledmere, 15 August 1890 1899, Note regarding case of Sledmere no date, Report of Ship Forgings for Sledmere no date )
Is electric lighting fitted to the vessel?
No ( Sketch of Iron Masts for Sledmere, 2 October 1890 1890, Pumping Arrangement for Sledmere, 6 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 22 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 18 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 3 November 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 20 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 7 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 17 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 4 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 28 October 1890 1890, Receipt to Blair & Co relating to case of Sledmere, 21 October 1890 1890, Advice note for Blair & Co regarding case of Sledmere, 17 December 1890 1890, Profile of Sledmere, 15 August 1890 1890, Letter from R H Dryden, pro the Surveyors at Middlesbrough, to the Secretary, Lloyd's Register, regarding plans of Sledmere, 26 February 1891 1891, Report of Iron or Steel Ship for Sledmere, 25 February 1891 1891, Report of machinery for Sledmere, 23 February 1890 1891, Midship section of Sledmere, 15 August 1890 1899, Note regarding case of Sledmere no date, Report of Ship Forgings for Sledmere no date )
Name of surveyor.
Jesse Williams; Robert Haig ( Report of Iron or Steel Ship for Sledmere, 25 February 1891 1891 )
William Ritchie Austin ( Report of machinery for Sledmere, 23 February 1890 1891 )
Hugh Cameron ( Report of Ship Forgings for Sledmere no date )
The country (flag) that a vessel is registered to, at the time of writing.
United Kingdom ( Report of Iron or Steel Ship for Sledmere, 25 February 1891 1891, Report of machinery for Sledmere, 23 February 1890 1891 )
The individual and/or organisation listed
G R Sanderson & Co ( Report of Iron or Steel Ship for Sledmere, 25 February 1891 1891, Report of machinery for Sledmere, 23 February 1890 1891 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
100A1 steel pt awng deck subject to freeboard; +LMC 2/91; a & cp ( Report of Iron or Steel Ship for Sledmere, 25 February 1891 1891 )
+LMC 2/91 ( Report of machinery for Sledmere, 23 February 1890 1891 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Report of Iron or Steel Ship for Sledmere, 25 February 1891 1891 )
A ship’s total internal capacity of a ship measured in register tons from the top of the floors to the tonnage deck.
1411 ( Report of Iron or Steel Ship for Sledmere, 25 February 1891 1891 )
Prescribed by flag/registration authorities, and usually excludes a small part of the stern. It is measured from the foreside of the stern at the extreme top to the afterside of the stern post.
270 ( Report of Iron or Steel Ship for Sledmere, 25 February 1891 1891 )
Measurement from the underside of the upper deck on the centre line to the upper side of the bottom plating.
16.5 ( Report of Iron or Steel Ship for Sledmere, 25 February 1891 1891 )
Location of construction for a vessel’s engines.
Stockton ( Report of machinery for Sledmere, 23 February 1890 1891 )
Date in which construction of a vessel’s engines were completed.
1891 ( Report of machinery for Sledmere, 23 February 1890 1891 )
Measurement from the extreme outboard point of starboard to the extreme outboard point of port.
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.