Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Ekari ( Sketch of Engine No 519 for Ekari, 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Ekari, 15th May 1920 1920, Copy of a Letter from Secretary, to The Secretary, Glasgow, regarding Ekari, 12th May 1920 1920, Memo for the Chief Ship Surveyor with their annotations regarding Ekari, 4th May 1920 1920, Freeboard Verification Form for Steamers for Ekari, 17th March 1920 1920, Steel Steamer Report for Ekari, 19th April 1920 1920, Form for Vessels of 100 Tons & Upwards for Ekari, 9th April 1920 1920, Memo for Ekari, 6th May 1920 1920, Report on Machinery for Ekari, 7th April 1920 1920, Memo for Ekari, 1st April 1921 1921, Particulars of Engines for Ekari, Undated no date, List of Test Numbers of Forgings for Ekari, Undated no date )

Stanleyville ( Letter from James S Ormiston, the Surveyors to Lloyd's Register to the Secretary, London, regarding LR Private Code for Stanleyville, 5th December 1932 1932, Copy of a Letter from pro Secretary, to The Surveyors, Genoa, regarding Stanleyville, 6th December 1932 1932, Copy of Cablegram in LR Private Code to the Surveyors of Lloyd\'s Register, Genoa, regarding Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Memo for Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Telegram in LR Private Code sent to the Surveyor at Genova for Stanleyville, 5th December 1932 1932, Report of Total Loss, Casualty, &c for Stanleyville, 14th September 1933 1933, Question & Answer Memo between London & Kobe Office regarding Demolition of Stanleyville, 1st August 1933 1933, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Stanleyville, 22nd March 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Stanleyville, 13th March 1933 1933, Report of Survey for Repairs, &c for Stanleyville, 15th February 1933 1933, Certificate of Survey of Repairs for Stanleyville, 23rd February 1933 1933, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the boiler survey of Stanleyville, 17th March 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stanleyville, 2nd March 1933 1933 )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

12/01/1920 ( Sketch of Engine No 519 for Ekari, 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Ekari, 15th May 1920 1920, Copy of a Letter from Secretary, to The Secretary, Glasgow, regarding Ekari, 12th May 1920 1920, Memo for the Chief Ship Surveyor with their annotations regarding Ekari, 4th May 1920 1920, Freeboard Verification Form for Steamers for Ekari, 17th March 1920 1920, Steel Steamer Report for Ekari, 19th April 1920 1920, Form for Vessels of 100 Tons & Upwards for Ekari, 9th April 1920 1920, Memo for Ekari, 6th May 1920 1920, Report on Machinery for Ekari, 7th April 1920 1920, Memo for Ekari, 1st April 1921 1921, Letter from James S Ormiston, the Surveyors to Lloyd's Register to the Secretary, London, regarding LR Private Code for Stanleyville, 5th December 1932 1932, Copy of a Letter from pro Secretary, to The Surveyors, Genoa, regarding Stanleyville, 6th December 1932 1932, Copy of Cablegram in LR Private Code to the Surveyors of Lloyd\'s Register, Genoa, regarding Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Memo for Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Telegram in LR Private Code sent to the Surveyor at Genova for Stanleyville, 5th December 1932 1932, Report of Total Loss, Casualty, &c for Stanleyville, 14th September 1933 1933, Question & Answer Memo between London & Kobe Office regarding Demolition of Stanleyville, 1st August 1933 1933, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Stanleyville, 22nd March 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Stanleyville, 13th March 1933 1933, Report of Survey for Repairs, &c for Stanleyville, 15th February 1933 1933, Certificate of Survey of Repairs for Stanleyville, 23rd February 1933 1933, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the boiler survey of Stanleyville, 17th March 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stanleyville, 2nd March 1933 1933, Particulars of Engines for Ekari, Undated no date, List of Test Numbers of Forgings for Ekari, Undated no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

519C ( Sketch of Engine No 519 for Ekari, 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Ekari, 15th May 1920 1920, Copy of a Letter from Secretary, to The Secretary, Glasgow, regarding Ekari, 12th May 1920 1920, Memo for the Chief Ship Surveyor with their annotations regarding Ekari, 4th May 1920 1920, Freeboard Verification Form for Steamers for Ekari, 17th March 1920 1920, Steel Steamer Report for Ekari, 19th April 1920 1920, Form for Vessels of 100 Tons & Upwards for Ekari, 9th April 1920 1920, Memo for Ekari, 6th May 1920 1920, Report on Machinery for Ekari, 7th April 1920 1920, Memo for Ekari, 1st April 1921 1921, Letter from James S Ormiston, the Surveyors to Lloyd's Register to the Secretary, London, regarding LR Private Code for Stanleyville, 5th December 1932 1932, Copy of a Letter from pro Secretary, to The Surveyors, Genoa, regarding Stanleyville, 6th December 1932 1932, Copy of Cablegram in LR Private Code to the Surveyors of Lloyd\'s Register, Genoa, regarding Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Memo for Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Telegram in LR Private Code sent to the Surveyor at Genova for Stanleyville, 5th December 1932 1932, Report of Total Loss, Casualty, &c for Stanleyville, 14th September 1933 1933, Question & Answer Memo between London & Kobe Office regarding Demolition of Stanleyville, 1st August 1933 1933, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Stanleyville, 22nd March 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Stanleyville, 13th March 1933 1933, Report of Survey for Repairs, &c for Stanleyville, 15th February 1933 1933, Certificate of Survey of Repairs for Stanleyville, 23rd February 1933 1933, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the boiler survey of Stanleyville, 17th March 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stanleyville, 2nd March 1933 1933, Particulars of Engines for Ekari, Undated no date, List of Test Numbers of Forgings for Ekari, Undated no date )

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined ( Sketch of Engine No 519 for Ekari, 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Ekari, 15th May 1920 1920, Copy of a Letter from Secretary, to The Secretary, Glasgow, regarding Ekari, 12th May 1920 1920, Memo for the Chief Ship Surveyor with their annotations regarding Ekari, 4th May 1920 1920, Freeboard Verification Form for Steamers for Ekari, 17th March 1920 1920, Steel Steamer Report for Ekari, 19th April 1920 1920, Memo for Ekari, 6th May 1920 1920, Report on Machinery for Ekari, 7th April 1920 1920, Memo for Ekari, 1st April 1921 1921, Letter from James S Ormiston, the Surveyors to Lloyd's Register to the Secretary, London, regarding LR Private Code for Stanleyville, 5th December 1932 1932, Copy of a Letter from pro Secretary, to The Surveyors, Genoa, regarding Stanleyville, 6th December 1932 1932, Copy of Cablegram in LR Private Code to the Surveyors of Lloyd\'s Register, Genoa, regarding Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Memo for Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Telegram in LR Private Code sent to the Surveyor at Genova for Stanleyville, 5th December 1932 1932, Report of Total Loss, Casualty, &c for Stanleyville, 14th September 1933 1933, Question & Answer Memo between London & Kobe Office regarding Demolition of Stanleyville, 1st August 1933 1933, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Stanleyville, 22nd March 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Stanleyville, 13th March 1933 1933, Report of Survey for Repairs, &c for Stanleyville, 15th February 1933 1933, Certificate of Survey of Repairs for Stanleyville, 23rd February 1933 1933, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the boiler survey of Stanleyville, 17th March 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stanleyville, 2nd March 1933 1933, Particulars of Engines for Ekari, Undated no date, List of Test Numbers of Forgings for Ekari, Undated no date )

Cargo ( Form for Vessels of 100 Tons & Upwards for Ekari, 9th April 1920 1920 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Sketch of Engine No 519 for Ekari, 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Ekari, 15th May 1920 1920, Copy of a Letter from Secretary, to The Secretary, Glasgow, regarding Ekari, 12th May 1920 1920, Memo for the Chief Ship Surveyor with their annotations regarding Ekari, 4th May 1920 1920, Freeboard Verification Form for Steamers for Ekari, 17th March 1920 1920, Steel Steamer Report for Ekari, 19th April 1920 1920, Form for Vessels of 100 Tons & Upwards for Ekari, 9th April 1920 1920, Memo for Ekari, 6th May 1920 1920, Report on Machinery for Ekari, 7th April 1920 1920, Memo for Ekari, 1st April 1921 1921, Letter from James S Ormiston, the Surveyors to Lloyd's Register to the Secretary, London, regarding LR Private Code for Stanleyville, 5th December 1932 1932, Copy of a Letter from pro Secretary, to The Surveyors, Genoa, regarding Stanleyville, 6th December 1932 1932, Copy of Cablegram in LR Private Code to the Surveyors of Lloyd\'s Register, Genoa, regarding Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Memo for Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Telegram in LR Private Code sent to the Surveyor at Genova for Stanleyville, 5th December 1932 1932, Report of Total Loss, Casualty, &c for Stanleyville, 14th September 1933 1933, Question & Answer Memo between London & Kobe Office regarding Demolition of Stanleyville, 1st August 1933 1933, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Stanleyville, 22nd March 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Stanleyville, 13th March 1933 1933, Report of Survey for Repairs, &c for Stanleyville, 15th February 1933 1933, Certificate of Survey of Repairs for Stanleyville, 23rd February 1933 1933, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the boiler survey of Stanleyville, 17th March 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stanleyville, 2nd March 1933 1933, Particulars of Engines for Ekari, Undated no date, List of Test Numbers of Forgings for Ekari, Undated no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Sketch of Engine No 519 for Ekari, 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Ekari, 15th May 1920 1920, Copy of a Letter from Secretary, to The Secretary, Glasgow, regarding Ekari, 12th May 1920 1920, Memo for the Chief Ship Surveyor with their annotations regarding Ekari, 4th May 1920 1920, Freeboard Verification Form for Steamers for Ekari, 17th March 1920 1920, Steel Steamer Report for Ekari, 19th April 1920 1920, Form for Vessels of 100 Tons & Upwards for Ekari, 9th April 1920 1920, Memo for Ekari, 6th May 1920 1920, Report on Machinery for Ekari, 7th April 1920 1920, Memo for Ekari, 1st April 1921 1921, Letter from James S Ormiston, the Surveyors to Lloyd's Register to the Secretary, London, regarding LR Private Code for Stanleyville, 5th December 1932 1932, Copy of a Letter from pro Secretary, to The Surveyors, Genoa, regarding Stanleyville, 6th December 1932 1932, Copy of Cablegram in LR Private Code to the Surveyors of Lloyd\'s Register, Genoa, regarding Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Memo for Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Telegram in LR Private Code sent to the Surveyor at Genova for Stanleyville, 5th December 1932 1932, Report of Total Loss, Casualty, &c for Stanleyville, 14th September 1933 1933, Question & Answer Memo between London & Kobe Office regarding Demolition of Stanleyville, 1st August 1933 1933, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Stanleyville, 22nd March 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Stanleyville, 13th March 1933 1933, Report of Survey for Repairs, &c for Stanleyville, 15th February 1933 1933, Certificate of Survey of Repairs for Stanleyville, 23rd February 1933 1933, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the boiler survey of Stanleyville, 17th March 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stanleyville, 2nd March 1933 1933, Particulars of Engines for Ekari, Undated no date, List of Test Numbers of Forgings for Ekari, Undated no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Sketch of Engine No 519 for Ekari, 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Ekari, 15th May 1920 1920, Copy of a Letter from Secretary, to The Secretary, Glasgow, regarding Ekari, 12th May 1920 1920, Memo for the Chief Ship Surveyor with their annotations regarding Ekari, 4th May 1920 1920, Freeboard Verification Form for Steamers for Ekari, 17th March 1920 1920, Steel Steamer Report for Ekari, 19th April 1920 1920, Form for Vessels of 100 Tons & Upwards for Ekari, 9th April 1920 1920, Memo for Ekari, 6th May 1920 1920, Report on Machinery for Ekari, 7th April 1920 1920, Memo for Ekari, 1st April 1921 1921, Letter from James S Ormiston, the Surveyors to Lloyd's Register to the Secretary, London, regarding LR Private Code for Stanleyville, 5th December 1932 1932, Copy of a Letter from pro Secretary, to The Surveyors, Genoa, regarding Stanleyville, 6th December 1932 1932, Copy of Cablegram in LR Private Code to the Surveyors of Lloyd\'s Register, Genoa, regarding Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Memo for Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Telegram in LR Private Code sent to the Surveyor at Genova for Stanleyville, 5th December 1932 1932, Report of Total Loss, Casualty, &c for Stanleyville, 14th September 1933 1933, Question & Answer Memo between London & Kobe Office regarding Demolition of Stanleyville, 1st August 1933 1933, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Stanleyville, 22nd March 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Stanleyville, 13th March 1933 1933, Report of Survey for Repairs, &c for Stanleyville, 15th February 1933 1933, Certificate of Survey of Repairs for Stanleyville, 23rd February 1933 1933, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the boiler survey of Stanleyville, 17th March 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stanleyville, 2nd March 1933 1933, Particulars of Engines for Ekari, Undated no date, List of Test Numbers of Forgings for Ekari, Undated no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Sketch of Engine No 519 for Ekari, 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Ekari, 15th May 1920 1920, Copy of a Letter from Secretary, to The Secretary, Glasgow, regarding Ekari, 12th May 1920 1920, Memo for the Chief Ship Surveyor with their annotations regarding Ekari, 4th May 1920 1920, Freeboard Verification Form for Steamers for Ekari, 17th March 1920 1920, Steel Steamer Report for Ekari, 19th April 1920 1920, Form for Vessels of 100 Tons & Upwards for Ekari, 9th April 1920 1920, Memo for Ekari, 6th May 1920 1920, Report on Machinery for Ekari, 7th April 1920 1920, Memo for Ekari, 1st April 1921 1921, Letter from James S Ormiston, the Surveyors to Lloyd's Register to the Secretary, London, regarding LR Private Code for Stanleyville, 5th December 1932 1932, Copy of a Letter from pro Secretary, to The Surveyors, Genoa, regarding Stanleyville, 6th December 1932 1932, Copy of Cablegram in LR Private Code to the Surveyors of Lloyd\'s Register, Genoa, regarding Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Memo for Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Telegram in LR Private Code sent to the Surveyor at Genova for Stanleyville, 5th December 1932 1932, Report of Total Loss, Casualty, &c for Stanleyville, 14th September 1933 1933, Question & Answer Memo between London & Kobe Office regarding Demolition of Stanleyville, 1st August 1933 1933, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Stanleyville, 22nd March 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Stanleyville, 13th March 1933 1933, Report of Survey for Repairs, &c for Stanleyville, 15th February 1933 1933, Certificate of Survey of Repairs for Stanleyville, 23rd February 1933 1933, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the boiler survey of Stanleyville, 17th March 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stanleyville, 2nd March 1933 1933, Particulars of Engines for Ekari, Undated no date, List of Test Numbers of Forgings for Ekari, Undated no date )

The official record pronounced by the Committee

Loss or disposal

Broken up ( Sketch of Engine No 519 for Ekari, 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Ekari, 15th May 1920 1920, Copy of a Letter from Secretary, to The Secretary, Glasgow, regarding Ekari, 12th May 1920 1920, Memo for the Chief Ship Surveyor with their annotations regarding Ekari, 4th May 1920 1920, Freeboard Verification Form for Steamers for Ekari, 17th March 1920 1920, Steel Steamer Report for Ekari, 19th April 1920 1920, Form for Vessels of 100 Tons & Upwards for Ekari, 9th April 1920 1920, Memo for Ekari, 6th May 1920 1920, Report on Machinery for Ekari, 7th April 1920 1920, Memo for Ekari, 1st April 1921 1921, Letter from James S Ormiston, the Surveyors to Lloyd's Register to the Secretary, London, regarding LR Private Code for Stanleyville, 5th December 1932 1932, Copy of a Letter from pro Secretary, to The Surveyors, Genoa, regarding Stanleyville, 6th December 1932 1932, Copy of Cablegram in LR Private Code to the Surveyors of Lloyd\'s Register, Genoa, regarding Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Memo for Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Telegram in LR Private Code sent to the Surveyor at Genova for Stanleyville, 5th December 1932 1932, Report of Total Loss, Casualty, &c for Stanleyville, 14th September 1933 1933, Question & Answer Memo between London & Kobe Office regarding Demolition of Stanleyville, 1st August 1933 1933, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Stanleyville, 22nd March 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Stanleyville, 13th March 1933 1933, Report of Survey for Repairs, &c for Stanleyville, 15th February 1933 1933, Certificate of Survey of Repairs for Stanleyville, 23rd February 1933 1933, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the boiler survey of Stanleyville, 17th March 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stanleyville, 2nd March 1933 1933, Particulars of Engines for Ekari, Undated no date, List of Test Numbers of Forgings for Ekari, Undated no date )

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

__/__/0000 ( Sketch of Engine No 519 for Ekari, 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Ekari, 15th May 1920 1920, Copy of a Letter from Secretary, to The Secretary, Glasgow, regarding Ekari, 12th May 1920 1920, Memo for the Chief Ship Surveyor with their annotations regarding Ekari, 4th May 1920 1920, Freeboard Verification Form for Steamers for Ekari, 17th March 1920 1920, Steel Steamer Report for Ekari, 19th April 1920 1920, Form for Vessels of 100 Tons & Upwards for Ekari, 9th April 1920 1920, Memo for Ekari, 6th May 1920 1920, Report on Machinery for Ekari, 7th April 1920 1920, Memo for Ekari, 1st April 1921 1921, Letter from James S Ormiston, the Surveyors to Lloyd's Register to the Secretary, London, regarding LR Private Code for Stanleyville, 5th December 1932 1932, Copy of a Letter from pro Secretary, to The Surveyors, Genoa, regarding Stanleyville, 6th December 1932 1932, Copy of Cablegram in LR Private Code to the Surveyors of Lloyd\'s Register, Genoa, regarding Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Memo for Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Telegram in LR Private Code sent to the Surveyor at Genova for Stanleyville, 5th December 1932 1932, Report of Total Loss, Casualty, &c for Stanleyville, 14th September 1933 1933, Question & Answer Memo between London & Kobe Office regarding Demolition of Stanleyville, 1st August 1933 1933, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Stanleyville, 22nd March 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Stanleyville, 13th March 1933 1933, Report of Survey for Repairs, &c for Stanleyville, 15th February 1933 1933, Certificate of Survey of Repairs for Stanleyville, 23rd February 1933 1933, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the boiler survey of Stanleyville, 17th March 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stanleyville, 2nd March 1933 1933, Particulars of Engines for Ekari, Undated no date, List of Test Numbers of Forgings for Ekari, Undated no date )

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

The year in which a vessel’s construction is completed.

Year of ship completion

1920 ( Sketch of Engine No 519 for Ekari, 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Ekari, 15th May 1920 1920, Copy of a Letter from Secretary, to The Secretary, Glasgow, regarding Ekari, 12th May 1920 1920, Memo for the Chief Ship Surveyor with their annotations regarding Ekari, 4th May 1920 1920, Freeboard Verification Form for Steamers for Ekari, 17th March 1920 1920, Steel Steamer Report for Ekari, 19th April 1920 1920, Form for Vessels of 100 Tons & Upwards for Ekari, 9th April 1920 1920, Memo for Ekari, 6th May 1920 1920, Report on Machinery for Ekari, 7th April 1920 1920, Memo for Ekari, 1st April 1921 1921, Letter from James S Ormiston, the Surveyors to Lloyd's Register to the Secretary, London, regarding LR Private Code for Stanleyville, 5th December 1932 1932, Copy of a Letter from pro Secretary, to The Surveyors, Genoa, regarding Stanleyville, 6th December 1932 1932, Copy of Cablegram in LR Private Code to the Surveyors of Lloyd\'s Register, Genoa, regarding Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Memo for Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Telegram in LR Private Code sent to the Surveyor at Genova for Stanleyville, 5th December 1932 1932, Report of Total Loss, Casualty, &c for Stanleyville, 14th September 1933 1933, Question & Answer Memo between London & Kobe Office regarding Demolition of Stanleyville, 1st August 1933 1933, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Stanleyville, 22nd March 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Stanleyville, 13th March 1933 1933, Report of Survey for Repairs, &c for Stanleyville, 15th February 1933 1933, Certificate of Survey of Repairs for Stanleyville, 23rd February 1933 1933, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the boiler survey of Stanleyville, 17th March 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stanleyville, 2nd March 1933 1933, Particulars of Engines for Ekari, Undated no date, List of Test Numbers of Forgings for Ekari, Undated no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

John Brown & Co Ltd ( Sketch of Engine No 519 for Ekari, 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Ekari, 15th May 1920 1920, Copy of a Letter from Secretary, to The Secretary, Glasgow, regarding Ekari, 12th May 1920 1920, Memo for the Chief Ship Surveyor with their annotations regarding Ekari, 4th May 1920 1920, Freeboard Verification Form for Steamers for Ekari, 17th March 1920 1920, Steel Steamer Report for Ekari, 19th April 1920 1920, Form for Vessels of 100 Tons & Upwards for Ekari, 9th April 1920 1920, Memo for Ekari, 6th May 1920 1920, Report on Machinery for Ekari, 7th April 1920 1920, Memo for Ekari, 1st April 1921 1921, Letter from James S Ormiston, the Surveyors to Lloyd's Register to the Secretary, London, regarding LR Private Code for Stanleyville, 5th December 1932 1932, Copy of a Letter from pro Secretary, to The Surveyors, Genoa, regarding Stanleyville, 6th December 1932 1932, Copy of Cablegram in LR Private Code to the Surveyors of Lloyd\'s Register, Genoa, regarding Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Memo for Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Telegram in LR Private Code sent to the Surveyor at Genova for Stanleyville, 5th December 1932 1932, Report of Total Loss, Casualty, &c for Stanleyville, 14th September 1933 1933, Question & Answer Memo between London & Kobe Office regarding Demolition of Stanleyville, 1st August 1933 1933, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Stanleyville, 22nd March 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Stanleyville, 13th March 1933 1933, Report of Survey for Repairs, &c for Stanleyville, 15th February 1933 1933, Certificate of Survey of Repairs for Stanleyville, 23rd February 1933 1933, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the boiler survey of Stanleyville, 17th March 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stanleyville, 2nd March 1933 1933, Particulars of Engines for Ekari, Undated no date, List of Test Numbers of Forgings for Ekari, Undated no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Glasgow ( Sketch of Engine No 519 for Ekari, 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Ekari, 15th May 1920 1920, Copy of a Letter from Secretary, to The Secretary, Glasgow, regarding Ekari, 12th May 1920 1920, Memo for the Chief Ship Surveyor with their annotations regarding Ekari, 4th May 1920 1920, Freeboard Verification Form for Steamers for Ekari, 17th March 1920 1920, Steel Steamer Report for Ekari, 19th April 1920 1920, Form for Vessels of 100 Tons & Upwards for Ekari, 9th April 1920 1920, Memo for Ekari, 6th May 1920 1920, Report on Machinery for Ekari, 7th April 1920 1920, Memo for Ekari, 1st April 1921 1921, Letter from James S Ormiston, the Surveyors to Lloyd's Register to the Secretary, London, regarding LR Private Code for Stanleyville, 5th December 1932 1932, Copy of a Letter from pro Secretary, to The Surveyors, Genoa, regarding Stanleyville, 6th December 1932 1932, Copy of Cablegram in LR Private Code to the Surveyors of Lloyd\'s Register, Genoa, regarding Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Memo for Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Telegram in LR Private Code sent to the Surveyor at Genova for Stanleyville, 5th December 1932 1932, Report of Total Loss, Casualty, &c for Stanleyville, 14th September 1933 1933, Question & Answer Memo between London & Kobe Office regarding Demolition of Stanleyville, 1st August 1933 1933, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Stanleyville, 22nd March 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Stanleyville, 13th March 1933 1933, Report of Survey for Repairs, &c for Stanleyville, 15th February 1933 1933, Certificate of Survey of Repairs for Stanleyville, 23rd February 1933 1933, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the boiler survey of Stanleyville, 17th March 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stanleyville, 2nd March 1933 1933, Particulars of Engines for Ekari, Undated no date, List of Test Numbers of Forgings for Ekari, Undated no date )

A vessel’s means of propulsion.

Propulsion

Steam ( Sketch of Engine No 519 for Ekari, 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Ekari, 15th May 1920 1920, Copy of a Letter from Secretary, to The Secretary, Glasgow, regarding Ekari, 12th May 1920 1920, Memo for the Chief Ship Surveyor with their annotations regarding Ekari, 4th May 1920 1920, Freeboard Verification Form for Steamers for Ekari, 17th March 1920 1920, Steel Steamer Report for Ekari, 19th April 1920 1920, Form for Vessels of 100 Tons & Upwards for Ekari, 9th April 1920 1920, Memo for Ekari, 6th May 1920 1920, Report on Machinery for Ekari, 7th April 1920 1920, Memo for Ekari, 1st April 1921 1921, Copy of a Letter from pro Secretary, to The Surveyors, Genoa, regarding Stanleyville, 6th December 1932 1932, Copy of Cablegram in LR Private Code to the Surveyors of Lloyd\'s Register, Genoa, regarding Stanleyville, 6th December 1932 1932, Memo for Stanleyville, 6th December 1932 1932, Report of Total Loss, Casualty, &c for Stanleyville, 14th September 1933 1933, Question & Answer Memo between London & Kobe Office regarding Demolition of Stanleyville, 1st August 1933 1933, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Stanleyville, 22nd March 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Stanleyville, 13th March 1933 1933, Particulars of Engines for Ekari, Undated no date, List of Test Numbers of Forgings for Ekari, Undated no date )

undefined ( Letter from James S Ormiston, the Surveyors to Lloyd's Register to the Secretary, London, regarding LR Private Code for Stanleyville, 5th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Telegram in LR Private Code sent to the Surveyor at Genova for Stanleyville, 5th December 1932 1932, Report of Survey for Repairs, &c for Stanleyville, 15th February 1933 1933, Certificate of Survey of Repairs for Stanleyville, 23rd February 1933 1933, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the boiler survey of Stanleyville, 17th March 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stanleyville, 2nd March 1933 1933 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Sketch of Engine No 519 for Ekari, 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Ekari, 15th May 1920 1920, Copy of a Letter from Secretary, to The Secretary, Glasgow, regarding Ekari, 12th May 1920 1920, Memo for the Chief Ship Surveyor with their annotations regarding Ekari, 4th May 1920 1920, Freeboard Verification Form for Steamers for Ekari, 17th March 1920 1920, Steel Steamer Report for Ekari, 19th April 1920 1920, Form for Vessels of 100 Tons & Upwards for Ekari, 9th April 1920 1920, Memo for Ekari, 6th May 1920 1920, Report on Machinery for Ekari, 7th April 1920 1920, Memo for Ekari, 1st April 1921 1921, Letter from James S Ormiston, the Surveyors to Lloyd's Register to the Secretary, London, regarding LR Private Code for Stanleyville, 5th December 1932 1932, Copy of a Letter from pro Secretary, to The Surveyors, Genoa, regarding Stanleyville, 6th December 1932 1932, Copy of Cablegram in LR Private Code to the Surveyors of Lloyd\'s Register, Genoa, regarding Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Memo for Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Telegram in LR Private Code sent to the Surveyor at Genova for Stanleyville, 5th December 1932 1932, Report of Total Loss, Casualty, &c for Stanleyville, 14th September 1933 1933, Question & Answer Memo between London & Kobe Office regarding Demolition of Stanleyville, 1st August 1933 1933, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Stanleyville, 22nd March 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Stanleyville, 13th March 1933 1933, Report of Survey for Repairs, &c for Stanleyville, 15th February 1933 1933, Certificate of Survey of Repairs for Stanleyville, 23rd February 1933 1933, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the boiler survey of Stanleyville, 17th March 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stanleyville, 2nd March 1933 1933, Particulars of Engines for Ekari, Undated no date, List of Test Numbers of Forgings for Ekari, Undated no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Sketch of Engine No 519 for Ekari, 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Ekari, 15th May 1920 1920, Copy of a Letter from Secretary, to The Secretary, Glasgow, regarding Ekari, 12th May 1920 1920, Memo for the Chief Ship Surveyor with their annotations regarding Ekari, 4th May 1920 1920, Freeboard Verification Form for Steamers for Ekari, 17th March 1920 1920, Steel Steamer Report for Ekari, 19th April 1920 1920, Form for Vessels of 100 Tons & Upwards for Ekari, 9th April 1920 1920, Memo for Ekari, 6th May 1920 1920, Report on Machinery for Ekari, 7th April 1920 1920, Memo for Ekari, 1st April 1921 1921, Letter from James S Ormiston, the Surveyors to Lloyd's Register to the Secretary, London, regarding LR Private Code for Stanleyville, 5th December 1932 1932, Copy of a Letter from pro Secretary, to The Surveyors, Genoa, regarding Stanleyville, 6th December 1932 1932, Copy of Cablegram in LR Private Code to the Surveyors of Lloyd\'s Register, Genoa, regarding Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Memo for Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Telegram in LR Private Code sent to the Surveyor at Genova for Stanleyville, 5th December 1932 1932, Report of Total Loss, Casualty, &c for Stanleyville, 14th September 1933 1933, Question & Answer Memo between London & Kobe Office regarding Demolition of Stanleyville, 1st August 1933 1933, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Stanleyville, 22nd March 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Stanleyville, 13th March 1933 1933, Report of Survey for Repairs, &c for Stanleyville, 15th February 1933 1933, Certificate of Survey of Repairs for Stanleyville, 23rd February 1933 1933, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the boiler survey of Stanleyville, 17th March 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stanleyville, 2nd March 1933 1933, Particulars of Engines for Ekari, Undated no date, List of Test Numbers of Forgings for Ekari, Undated no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Sketch of Engine No 519 for Ekari, 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Ekari, 15th May 1920 1920, Copy of a Letter from Secretary, to The Secretary, Glasgow, regarding Ekari, 12th May 1920 1920, Memo for the Chief Ship Surveyor with their annotations regarding Ekari, 4th May 1920 1920, Freeboard Verification Form for Steamers for Ekari, 17th March 1920 1920, Steel Steamer Report for Ekari, 19th April 1920 1920, Form for Vessels of 100 Tons & Upwards for Ekari, 9th April 1920 1920, Memo for Ekari, 6th May 1920 1920, Report on Machinery for Ekari, 7th April 1920 1920, Memo for Ekari, 1st April 1921 1921, Letter from James S Ormiston, the Surveyors to Lloyd's Register to the Secretary, London, regarding LR Private Code for Stanleyville, 5th December 1932 1932, Copy of a Letter from pro Secretary, to The Surveyors, Genoa, regarding Stanleyville, 6th December 1932 1932, Copy of Cablegram in LR Private Code to the Surveyors of Lloyd\'s Register, Genoa, regarding Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Memo for Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Telegram in LR Private Code sent to the Surveyor at Genova for Stanleyville, 5th December 1932 1932, Report of Total Loss, Casualty, &c for Stanleyville, 14th September 1933 1933, Question & Answer Memo between London & Kobe Office regarding Demolition of Stanleyville, 1st August 1933 1933, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Stanleyville, 22nd March 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Stanleyville, 13th March 1933 1933, Report of Survey for Repairs, &c for Stanleyville, 15th February 1933 1933, Certificate of Survey of Repairs for Stanleyville, 23rd February 1933 1933, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the boiler survey of Stanleyville, 17th March 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stanleyville, 2nd March 1933 1933, Particulars of Engines for Ekari, Undated no date, List of Test Numbers of Forgings for Ekari, Undated no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Sketch of Engine No 519 for Ekari, 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Ekari, 15th May 1920 1920, Copy of a Letter from Secretary, to The Secretary, Glasgow, regarding Ekari, 12th May 1920 1920, Memo for the Chief Ship Surveyor with their annotations regarding Ekari, 4th May 1920 1920, Freeboard Verification Form for Steamers for Ekari, 17th March 1920 1920, Steel Steamer Report for Ekari, 19th April 1920 1920, Form for Vessels of 100 Tons & Upwards for Ekari, 9th April 1920 1920, Memo for Ekari, 6th May 1920 1920, Report on Machinery for Ekari, 7th April 1920 1920, Memo for Ekari, 1st April 1921 1921, Letter from James S Ormiston, the Surveyors to Lloyd's Register to the Secretary, London, regarding LR Private Code for Stanleyville, 5th December 1932 1932, Copy of a Letter from pro Secretary, to The Surveyors, Genoa, regarding Stanleyville, 6th December 1932 1932, Copy of Cablegram in LR Private Code to the Surveyors of Lloyd\'s Register, Genoa, regarding Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Memo for Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Telegram in LR Private Code sent to the Surveyor at Genova for Stanleyville, 5th December 1932 1932, Report of Total Loss, Casualty, &c for Stanleyville, 14th September 1933 1933, Question & Answer Memo between London & Kobe Office regarding Demolition of Stanleyville, 1st August 1933 1933, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Stanleyville, 22nd March 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Stanleyville, 13th March 1933 1933, Report of Survey for Repairs, &c for Stanleyville, 15th February 1933 1933, Certificate of Survey of Repairs for Stanleyville, 23rd February 1933 1933, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the boiler survey of Stanleyville, 17th March 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stanleyville, 2nd March 1933 1933, Particulars of Engines for Ekari, Undated no date, List of Test Numbers of Forgings for Ekari, Undated no date )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sold to Shipbreakers for Demolition ( Sketch of Engine No 519 for Ekari, 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to The Secretary, London, regarding Ekari, 15th May 1920 1920, Copy of a Letter from Secretary, to The Secretary, Glasgow, regarding Ekari, 12th May 1920 1920, Memo for the Chief Ship Surveyor with their annotations regarding Ekari, 4th May 1920 1920, Freeboard Verification Form for Steamers for Ekari, 17th March 1920 1920, Steel Steamer Report for Ekari, 19th April 1920 1920, Form for Vessels of 100 Tons & Upwards for Ekari, 9th April 1920 1920, Memo for Ekari, 6th May 1920 1920, Report on Machinery for Ekari, 7th April 1920 1920, Memo for Ekari, 1st April 1921 1921, Letter from James S Ormiston, the Surveyors to Lloyd's Register to the Secretary, London, regarding LR Private Code for Stanleyville, 5th December 1932 1932, Copy of a Letter from pro Secretary, to The Surveyors, Genoa, regarding Stanleyville, 6th December 1932 1932, Copy of Cablegram in LR Private Code to the Surveyors of Lloyd\'s Register, Genoa, regarding Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Memo for Stanleyville, 6th December 1932 1932, Cablegram & Translation in LR Private Code to the Surveyor at Genoa, regarding Stanleyville, 6th December 1932 1932, Telegram in LR Private Code sent to the Surveyor at Genova for Stanleyville, 5th December 1932 1932, Report of Total Loss, Casualty, &c for Stanleyville, 14th September 1933 1933, Question & Answer Memo between London & Kobe Office regarding Demolition of Stanleyville, 1st August 1933 1933, Copy of a Letter from Clerk to the Classification Committee, to The Surveyors, Kobe, regarding Stanleyville, 22nd March 1933 1933, Remarks of the Chief Ship Surveyor to the Classing Committee regarding the 1st SS No 3 for Stanleyville, 13th March 1933 1933, Report of Survey for Repairs, &c for Stanleyville, 15th February 1933 1933, Certificate of Survey of Repairs for Stanleyville, 23rd February 1933 1933, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the boiler survey of Stanleyville, 17th March 1933 1933, Report of Survey for Repairs, &c, of Engines & Boilers for Stanleyville, 2nd March 1933 1933, Particulars of Engines for Ekari, Undated no date, List of Test Numbers of Forgings for Ekari, Undated no date )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Rotary Steam Compound Double Reduction Geared Horizontal ( Form for Vessels of 100 Tons & Upwards for Ekari, 9th April 1920 1920 )

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.