Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Tynebridge ( Request for Special Survey for Tynebridge, 17th June 1924 1924, Profile & Deck Plans for Tynebridge, 17th June 1924 1924, Midship Section Plan for Tynebridge, 17th June 1924 1924, Receipt for Boiler Plate manufactured by The Steel Co of Scotland Ltd for Tynebridge, 4th December 1924 1924, Receipt for Boiler Plate manufactured by David Colville & Sons Ltd for Tynebridge, 11th October 1924 1924, Plan of Boiler for Tynebridge, 11th July 1924 1924, Letter from R Fairley, per the Surveyors, Lloyd's Register, Middlesbrough to the Secretary, Lloyd's Register, London, regarding the gusset angles & weather decks of Tynebridge, 25th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Tynebridge, 20th March 1925 1925, Form for Vessels of 100 Tons & Upwards for Tynebridge, 9th March 1925 1925, Report on Steam Reciprocating Engine Machinery for Tynebridge, 6th March 1925 1925, Memo for Tynebridge regarding the surveyors being informed that the heating surface of the front tube plates is not to be included for the purpose of calculating the NHP of the vessel, 23rd March 1925 1925, Report on Boilers for Tynebridge, 6th March 1925 1925, Report on Boilers for Tynebridge, 26th January 1925 1925, Report on Electric Fittings for Tynebridge, 17th March 1925 1925, Plan of Steel Boiler for Tynebridge, 1925 1925, Midship Section Plan for Tynebridge, 18th March 1925 1925, Profile & Deck Plan for Tynebridge, 18th March 1925 1925, Steel Steamer or Motorship Report for Tynebridge, 19th March no date )

W Hendrik ( Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the completion of the special survey of the boilers for W Hendrik, 19th September 1940 1940, Report of Total Loss, Casualty, &c for W Hendrik, Undated no date, Report of Survey for Repairs, &c, of Engines & Boilers for W Hendrik, 9th September no date )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

26/01/1925 ( Request for Special Survey for Tynebridge, 17th June 1924 1924, Profile & Deck Plans for Tynebridge, 17th June 1924 1924, Midship Section Plan for Tynebridge, 17th June 1924 1924, Receipt for Boiler Plate manufactured by The Steel Co of Scotland Ltd for Tynebridge, 4th December 1924 1924, Receipt for Boiler Plate manufactured by David Colville & Sons Ltd for Tynebridge, 11th October 1924 1924, Plan of Boiler for Tynebridge, 11th July 1924 1924, Letter from R Fairley, per the Surveyors, Lloyd's Register, Middlesbrough to the Secretary, Lloyd's Register, London, regarding the gusset angles & weather decks of Tynebridge, 25th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Tynebridge, 20th March 1925 1925, Form for Vessels of 100 Tons & Upwards for Tynebridge, 9th March 1925 1925, Report on Steam Reciprocating Engine Machinery for Tynebridge, 6th March 1925 1925, Memo for Tynebridge regarding the surveyors being informed that the heating surface of the front tube plates is not to be included for the purpose of calculating the NHP of the vessel, 23rd March 1925 1925, Report on Boilers for Tynebridge, 6th March 1925 1925, Report on Boilers for Tynebridge, 26th January 1925 1925, Report on Electric Fittings for Tynebridge, 17th March 1925 1925, Plan of Steel Boiler for Tynebridge, 1925 1925, Midship Section Plan for Tynebridge, 18th March 1925 1925, Profile & Deck Plan for Tynebridge, 18th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the completion of the special survey of the boilers for W Hendrik, 19th September 1940 1940, Report of Total Loss, Casualty, &c for W Hendrik, Undated no date, Report of Survey for Repairs, &c, of Engines & Boilers for W Hendrik, 9th September no date, Steel Steamer or Motorship Report for Tynebridge, 19th March no date )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

78 ( Request for Special Survey for Tynebridge, 17th June 1924 1924, Profile & Deck Plans for Tynebridge, 17th June 1924 1924, Midship Section Plan for Tynebridge, 17th June 1924 1924, Receipt for Boiler Plate manufactured by The Steel Co of Scotland Ltd for Tynebridge, 4th December 1924 1924, Receipt for Boiler Plate manufactured by David Colville & Sons Ltd for Tynebridge, 11th October 1924 1924, Plan of Boiler for Tynebridge, 11th July 1924 1924, Letter from R Fairley, per the Surveyors, Lloyd's Register, Middlesbrough to the Secretary, Lloyd's Register, London, regarding the gusset angles & weather decks of Tynebridge, 25th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Tynebridge, 20th March 1925 1925, Form for Vessels of 100 Tons & Upwards for Tynebridge, 9th March 1925 1925, Report on Steam Reciprocating Engine Machinery for Tynebridge, 6th March 1925 1925, Memo for Tynebridge regarding the surveyors being informed that the heating surface of the front tube plates is not to be included for the purpose of calculating the NHP of the vessel, 23rd March 1925 1925, Report on Boilers for Tynebridge, 6th March 1925 1925, Report on Boilers for Tynebridge, 26th January 1925 1925, Report on Electric Fittings for Tynebridge, 17th March 1925 1925, Plan of Steel Boiler for Tynebridge, 1925 1925, Midship Section Plan for Tynebridge, 18th March 1925 1925, Profile & Deck Plan for Tynebridge, 18th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the completion of the special survey of the boilers for W Hendrik, 19th September 1940 1940, Report of Total Loss, Casualty, &c for W Hendrik, Undated no date, Report of Survey for Repairs, &c, of Engines & Boilers for W Hendrik, 9th September no date, Steel Steamer or Motorship Report for Tynebridge, 19th March no date )

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Screw Steamer ( Request for Special Survey for Tynebridge, 17th June 1924 1924, Report on Steam Reciprocating Engine Machinery for Tynebridge, 6th March 1925 1925, Report on Boilers for Tynebridge, 6th March 1925 1925 )

undefined ( Profile & Deck Plans for Tynebridge, 17th June 1924 1924, Midship Section Plan for Tynebridge, 17th June 1924 1924, Receipt for Boiler Plate manufactured by The Steel Co of Scotland Ltd for Tynebridge, 4th December 1924 1924, Receipt for Boiler Plate manufactured by David Colville & Sons Ltd for Tynebridge, 11th October 1924 1924, Plan of Boiler for Tynebridge, 11th July 1924 1924, Letter from R Fairley, per the Surveyors, Lloyd's Register, Middlesbrough to the Secretary, Lloyd's Register, London, regarding the gusset angles & weather decks of Tynebridge, 25th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Tynebridge, 20th March 1925 1925, Memo for Tynebridge regarding the surveyors being informed that the heating surface of the front tube plates is not to be included for the purpose of calculating the NHP of the vessel, 23rd March 1925 1925, Report on Boilers for Tynebridge, 26th January 1925 1925, Report on Electric Fittings for Tynebridge, 17th March 1925 1925, Plan of Steel Boiler for Tynebridge, 1925 1925, Midship Section Plan for Tynebridge, 18th March 1925 1925, Profile & Deck Plan for Tynebridge, 18th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the completion of the special survey of the boilers for W Hendrik, 19th September 1940 1940, Report of Total Loss, Casualty, &c for W Hendrik, Undated no date, Report of Survey for Repairs, &c, of Engines & Boilers for W Hendrik, 9th September no date, Steel Steamer or Motorship Report for Tynebridge, 19th March no date )

Cargo ( Form for Vessels of 100 Tons & Upwards for Tynebridge, 9th March 1925 1925 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Request for Special Survey for Tynebridge, 17th June 1924 1924, Profile & Deck Plans for Tynebridge, 17th June 1924 1924, Midship Section Plan for Tynebridge, 17th June 1924 1924, Receipt for Boiler Plate manufactured by The Steel Co of Scotland Ltd for Tynebridge, 4th December 1924 1924, Receipt for Boiler Plate manufactured by David Colville & Sons Ltd for Tynebridge, 11th October 1924 1924, Plan of Boiler for Tynebridge, 11th July 1924 1924, Letter from R Fairley, per the Surveyors, Lloyd's Register, Middlesbrough to the Secretary, Lloyd's Register, London, regarding the gusset angles & weather decks of Tynebridge, 25th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Tynebridge, 20th March 1925 1925, Form for Vessels of 100 Tons & Upwards for Tynebridge, 9th March 1925 1925, Report on Steam Reciprocating Engine Machinery for Tynebridge, 6th March 1925 1925, Memo for Tynebridge regarding the surveyors being informed that the heating surface of the front tube plates is not to be included for the purpose of calculating the NHP of the vessel, 23rd March 1925 1925, Report on Boilers for Tynebridge, 6th March 1925 1925, Report on Boilers for Tynebridge, 26th January 1925 1925, Report on Electric Fittings for Tynebridge, 17th March 1925 1925, Plan of Steel Boiler for Tynebridge, 1925 1925, Midship Section Plan for Tynebridge, 18th March 1925 1925, Profile & Deck Plan for Tynebridge, 18th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the completion of the special survey of the boilers for W Hendrik, 19th September 1940 1940, Report of Total Loss, Casualty, &c for W Hendrik, Undated no date, Report of Survey for Repairs, &c, of Engines & Boilers for W Hendrik, 9th September no date, Steel Steamer or Motorship Report for Tynebridge, 19th March no date )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Request for Special Survey for Tynebridge, 17th June 1924 1924, Profile & Deck Plans for Tynebridge, 17th June 1924 1924, Midship Section Plan for Tynebridge, 17th June 1924 1924, Receipt for Boiler Plate manufactured by The Steel Co of Scotland Ltd for Tynebridge, 4th December 1924 1924, Receipt for Boiler Plate manufactured by David Colville & Sons Ltd for Tynebridge, 11th October 1924 1924, Plan of Boiler for Tynebridge, 11th July 1924 1924, Letter from R Fairley, per the Surveyors, Lloyd's Register, Middlesbrough to the Secretary, Lloyd's Register, London, regarding the gusset angles & weather decks of Tynebridge, 25th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Tynebridge, 20th March 1925 1925, Form for Vessels of 100 Tons & Upwards for Tynebridge, 9th March 1925 1925, Report on Steam Reciprocating Engine Machinery for Tynebridge, 6th March 1925 1925, Memo for Tynebridge regarding the surveyors being informed that the heating surface of the front tube plates is not to be included for the purpose of calculating the NHP of the vessel, 23rd March 1925 1925, Report on Boilers for Tynebridge, 6th March 1925 1925, Report on Boilers for Tynebridge, 26th January 1925 1925, Report on Electric Fittings for Tynebridge, 17th March 1925 1925, Plan of Steel Boiler for Tynebridge, 1925 1925, Midship Section Plan for Tynebridge, 18th March 1925 1925, Profile & Deck Plan for Tynebridge, 18th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the completion of the special survey of the boilers for W Hendrik, 19th September 1940 1940, Report of Total Loss, Casualty, &c for W Hendrik, Undated no date, Report of Survey for Repairs, &c, of Engines & Boilers for W Hendrik, 9th September no date, Steel Steamer or Motorship Report for Tynebridge, 19th March no date )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Request for Special Survey for Tynebridge, 17th June 1924 1924, Profile & Deck Plans for Tynebridge, 17th June 1924 1924, Midship Section Plan for Tynebridge, 17th June 1924 1924, Receipt for Boiler Plate manufactured by The Steel Co of Scotland Ltd for Tynebridge, 4th December 1924 1924, Receipt for Boiler Plate manufactured by David Colville & Sons Ltd for Tynebridge, 11th October 1924 1924, Plan of Boiler for Tynebridge, 11th July 1924 1924, Letter from R Fairley, per the Surveyors, Lloyd's Register, Middlesbrough to the Secretary, Lloyd's Register, London, regarding the gusset angles & weather decks of Tynebridge, 25th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Tynebridge, 20th March 1925 1925, Form for Vessels of 100 Tons & Upwards for Tynebridge, 9th March 1925 1925, Report on Steam Reciprocating Engine Machinery for Tynebridge, 6th March 1925 1925, Memo for Tynebridge regarding the surveyors being informed that the heating surface of the front tube plates is not to be included for the purpose of calculating the NHP of the vessel, 23rd March 1925 1925, Report on Boilers for Tynebridge, 6th March 1925 1925, Report on Boilers for Tynebridge, 26th January 1925 1925, Report on Electric Fittings for Tynebridge, 17th March 1925 1925, Plan of Steel Boiler for Tynebridge, 1925 1925, Midship Section Plan for Tynebridge, 18th March 1925 1925, Profile & Deck Plan for Tynebridge, 18th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the completion of the special survey of the boilers for W Hendrik, 19th September 1940 1940, Report of Total Loss, Casualty, &c for W Hendrik, Undated no date, Report of Survey for Repairs, &c, of Engines & Boilers for W Hendrik, 9th September no date, Steel Steamer or Motorship Report for Tynebridge, 19th March no date )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Request for Special Survey for Tynebridge, 17th June 1924 1924, Profile & Deck Plans for Tynebridge, 17th June 1924 1924, Midship Section Plan for Tynebridge, 17th June 1924 1924, Receipt for Boiler Plate manufactured by The Steel Co of Scotland Ltd for Tynebridge, 4th December 1924 1924, Receipt for Boiler Plate manufactured by David Colville & Sons Ltd for Tynebridge, 11th October 1924 1924, Plan of Boiler for Tynebridge, 11th July 1924 1924, Letter from R Fairley, per the Surveyors, Lloyd's Register, Middlesbrough to the Secretary, Lloyd's Register, London, regarding the gusset angles & weather decks of Tynebridge, 25th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Tynebridge, 20th March 1925 1925, Form for Vessels of 100 Tons & Upwards for Tynebridge, 9th March 1925 1925, Report on Steam Reciprocating Engine Machinery for Tynebridge, 6th March 1925 1925, Memo for Tynebridge regarding the surveyors being informed that the heating surface of the front tube plates is not to be included for the purpose of calculating the NHP of the vessel, 23rd March 1925 1925, Report on Boilers for Tynebridge, 6th March 1925 1925, Report on Boilers for Tynebridge, 26th January 1925 1925, Report on Electric Fittings for Tynebridge, 17th March 1925 1925, Plan of Steel Boiler for Tynebridge, 1925 1925, Midship Section Plan for Tynebridge, 18th March 1925 1925, Profile & Deck Plan for Tynebridge, 18th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the completion of the special survey of the boilers for W Hendrik, 19th September 1940 1940, Report of Total Loss, Casualty, &c for W Hendrik, Undated no date, Report of Survey for Repairs, &c, of Engines & Boilers for W Hendrik, 9th September no date, Steel Steamer or Motorship Report for Tynebridge, 19th March no date )

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Bombed & Sunk ( Request for Special Survey for Tynebridge, 17th June 1924 1924, Profile & Deck Plans for Tynebridge, 17th June 1924 1924, Midship Section Plan for Tynebridge, 17th June 1924 1924, Receipt for Boiler Plate manufactured by The Steel Co of Scotland Ltd for Tynebridge, 4th December 1924 1924, Receipt for Boiler Plate manufactured by David Colville & Sons Ltd for Tynebridge, 11th October 1924 1924, Plan of Boiler for Tynebridge, 11th July 1924 1924, Letter from R Fairley, per the Surveyors, Lloyd's Register, Middlesbrough to the Secretary, Lloyd's Register, London, regarding the gusset angles & weather decks of Tynebridge, 25th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Tynebridge, 20th March 1925 1925, Form for Vessels of 100 Tons & Upwards for Tynebridge, 9th March 1925 1925, Report on Steam Reciprocating Engine Machinery for Tynebridge, 6th March 1925 1925, Memo for Tynebridge regarding the surveyors being informed that the heating surface of the front tube plates is not to be included for the purpose of calculating the NHP of the vessel, 23rd March 1925 1925, Report on Boilers for Tynebridge, 6th March 1925 1925, Report on Boilers for Tynebridge, 26th January 1925 1925, Report on Electric Fittings for Tynebridge, 17th March 1925 1925, Plan of Steel Boiler for Tynebridge, 1925 1925, Midship Section Plan for Tynebridge, 18th March 1925 1925, Profile & Deck Plan for Tynebridge, 18th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the completion of the special survey of the boilers for W Hendrik, 19th September 1940 1940, Report of Total Loss, Casualty, &c for W Hendrik, Undated no date, Report of Survey for Repairs, &c, of Engines & Boilers for W Hendrik, 9th September no date, Steel Steamer or Motorship Report for Tynebridge, 19th March no date )

The country or national waters where a vessel is lost/disposed of, or last recorded.

Country of loss or disposal

Ireland ( Request for Special Survey for Tynebridge, 17th June 1924 1924, Profile & Deck Plans for Tynebridge, 17th June 1924 1924, Midship Section Plan for Tynebridge, 17th June 1924 1924, Receipt for Boiler Plate manufactured by The Steel Co of Scotland Ltd for Tynebridge, 4th December 1924 1924, Receipt for Boiler Plate manufactured by David Colville & Sons Ltd for Tynebridge, 11th October 1924 1924, Plan of Boiler for Tynebridge, 11th July 1924 1924, Letter from R Fairley, per the Surveyors, Lloyd's Register, Middlesbrough to the Secretary, Lloyd's Register, London, regarding the gusset angles & weather decks of Tynebridge, 25th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Tynebridge, 20th March 1925 1925, Form for Vessels of 100 Tons & Upwards for Tynebridge, 9th March 1925 1925, Report on Steam Reciprocating Engine Machinery for Tynebridge, 6th March 1925 1925, Memo for Tynebridge regarding the surveyors being informed that the heating surface of the front tube plates is not to be included for the purpose of calculating the NHP of the vessel, 23rd March 1925 1925, Report on Boilers for Tynebridge, 6th March 1925 1925, Report on Boilers for Tynebridge, 26th January 1925 1925, Report on Electric Fittings for Tynebridge, 17th March 1925 1925, Plan of Steel Boiler for Tynebridge, 1925 1925, Midship Section Plan for Tynebridge, 18th March 1925 1925, Profile & Deck Plan for Tynebridge, 18th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the completion of the special survey of the boilers for W Hendrik, 19th September 1940 1940, Report of Total Loss, Casualty, &c for W Hendrik, Undated no date, Report of Survey for Repairs, &c, of Engines & Boilers for W Hendrik, 9th September no date, Steel Steamer or Motorship Report for Tynebridge, 19th March no date )

Type and configuration of the engine(s) supplied for a vessel.

The year in which a vessel’s construction is completed.

Year of ship completion

1925 ( Request for Special Survey for Tynebridge, 17th June 1924 1924, Profile & Deck Plans for Tynebridge, 17th June 1924 1924, Midship Section Plan for Tynebridge, 17th June 1924 1924, Receipt for Boiler Plate manufactured by The Steel Co of Scotland Ltd for Tynebridge, 4th December 1924 1924, Receipt for Boiler Plate manufactured by David Colville & Sons Ltd for Tynebridge, 11th October 1924 1924, Plan of Boiler for Tynebridge, 11th July 1924 1924, Letter from R Fairley, per the Surveyors, Lloyd's Register, Middlesbrough to the Secretary, Lloyd's Register, London, regarding the gusset angles & weather decks of Tynebridge, 25th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Tynebridge, 20th March 1925 1925, Form for Vessels of 100 Tons & Upwards for Tynebridge, 9th March 1925 1925, Report on Steam Reciprocating Engine Machinery for Tynebridge, 6th March 1925 1925, Memo for Tynebridge regarding the surveyors being informed that the heating surface of the front tube plates is not to be included for the purpose of calculating the NHP of the vessel, 23rd March 1925 1925, Report on Boilers for Tynebridge, 6th March 1925 1925, Report on Boilers for Tynebridge, 26th January 1925 1925, Report on Electric Fittings for Tynebridge, 17th March 1925 1925, Plan of Steel Boiler for Tynebridge, 1925 1925, Midship Section Plan for Tynebridge, 18th March 1925 1925, Profile & Deck Plan for Tynebridge, 18th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the completion of the special survey of the boilers for W Hendrik, 19th September 1940 1940, Report of Total Loss, Casualty, &c for W Hendrik, Undated no date, Report of Survey for Repairs, &c, of Engines & Boilers for W Hendrik, 9th September no date, Steel Steamer or Motorship Report for Tynebridge, 19th March no date )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Furness Shipbuilding Co Ltd ( Request for Special Survey for Tynebridge, 17th June 1924 1924, Profile & Deck Plans for Tynebridge, 17th June 1924 1924, Midship Section Plan for Tynebridge, 17th June 1924 1924, Receipt for Boiler Plate manufactured by The Steel Co of Scotland Ltd for Tynebridge, 4th December 1924 1924, Receipt for Boiler Plate manufactured by David Colville & Sons Ltd for Tynebridge, 11th October 1924 1924, Plan of Boiler for Tynebridge, 11th July 1924 1924, Letter from R Fairley, per the Surveyors, Lloyd's Register, Middlesbrough to the Secretary, Lloyd's Register, London, regarding the gusset angles & weather decks of Tynebridge, 25th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Tynebridge, 20th March 1925 1925, Form for Vessels of 100 Tons & Upwards for Tynebridge, 9th March 1925 1925, Report on Steam Reciprocating Engine Machinery for Tynebridge, 6th March 1925 1925, Memo for Tynebridge regarding the surveyors being informed that the heating surface of the front tube plates is not to be included for the purpose of calculating the NHP of the vessel, 23rd March 1925 1925, Report on Boilers for Tynebridge, 6th March 1925 1925, Report on Boilers for Tynebridge, 26th January 1925 1925, Report on Electric Fittings for Tynebridge, 17th March 1925 1925, Plan of Steel Boiler for Tynebridge, 1925 1925, Midship Section Plan for Tynebridge, 18th March 1925 1925, Profile & Deck Plan for Tynebridge, 18th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the completion of the special survey of the boilers for W Hendrik, 19th September 1940 1940, Report of Total Loss, Casualty, &c for W Hendrik, Undated no date, Report of Survey for Repairs, &c, of Engines & Boilers for W Hendrik, 9th September no date, Steel Steamer or Motorship Report for Tynebridge, 19th March no date )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Haverton Hill in Tees ( Request for Special Survey for Tynebridge, 17th June 1924 1924, Profile & Deck Plans for Tynebridge, 17th June 1924 1924, Midship Section Plan for Tynebridge, 17th June 1924 1924, Receipt for Boiler Plate manufactured by The Steel Co of Scotland Ltd for Tynebridge, 4th December 1924 1924, Receipt for Boiler Plate manufactured by David Colville & Sons Ltd for Tynebridge, 11th October 1924 1924, Plan of Boiler for Tynebridge, 11th July 1924 1924, Letter from R Fairley, per the Surveyors, Lloyd's Register, Middlesbrough to the Secretary, Lloyd's Register, London, regarding the gusset angles & weather decks of Tynebridge, 25th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Tynebridge, 20th March 1925 1925, Form for Vessels of 100 Tons & Upwards for Tynebridge, 9th March 1925 1925, Report on Steam Reciprocating Engine Machinery for Tynebridge, 6th March 1925 1925, Memo for Tynebridge regarding the surveyors being informed that the heating surface of the front tube plates is not to be included for the purpose of calculating the NHP of the vessel, 23rd March 1925 1925, Report on Boilers for Tynebridge, 6th March 1925 1925, Report on Boilers for Tynebridge, 26th January 1925 1925, Report on Electric Fittings for Tynebridge, 17th March 1925 1925, Plan of Steel Boiler for Tynebridge, 1925 1925, Midship Section Plan for Tynebridge, 18th March 1925 1925, Profile & Deck Plan for Tynebridge, 18th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the completion of the special survey of the boilers for W Hendrik, 19th September 1940 1940, Report of Total Loss, Casualty, &c for W Hendrik, Undated no date, Report of Survey for Repairs, &c, of Engines & Boilers for W Hendrik, 9th September no date, Steel Steamer or Motorship Report for Tynebridge, 19th March no date )

Location where a vessel’s survey was undertaken.

Location of Survey

Middlesbrough ( Request for Special Survey for Tynebridge, 17th June 1924 1924, Plan of Boiler for Tynebridge, 11th July 1924 1924, Letter from R Fairley, per the Surveyors, Lloyd's Register, Middlesbrough to the Secretary, Lloyd's Register, London, regarding the gusset angles & weather decks of Tynebridge, 25th March 1925 1925, Report on Steam Reciprocating Engine Machinery for Tynebridge, 6th March 1925 1925, Report on Boilers for Tynebridge, 6th March 1925 1925 )

Haverton Hill on Tees ( Profile & Deck Plans for Tynebridge, 17th June 1924 1924, Midship Section Plan for Tynebridge, 17th June 1924 1924, Midship Section Plan for Tynebridge, 18th March 1925 1925, Profile & Deck Plan for Tynebridge, 18th March 1925 1925 )

Glasgow; Newburn on Tyne ( Receipt for Boiler Plate manufactured by The Steel Co of Scotland Ltd for Tynebridge, 4th December 1924 1924 )

Glasgow; Stockton on Tees ( Receipt for Boiler Plate manufactured by David Colville & Sons Ltd for Tynebridge, 11th October 1924 1924 )

West Hartlepool ( Form for Vessels of 100 Tons & Upwards for Tynebridge, 9th March 1925 1925 )

Stockton on Tees; Middlesbrough ( Report on Boilers for Tynebridge, 26th January 1925 1925 )

Haverton Hill on Tees; Middlesbrough ( Report on Electric Fittings for Tynebridge, 17th March 1925 1925, Steel Steamer or Motorship Report for Tynebridge, 19th March no date )

Stockton on Tees ( Plan of Steel Boiler for Tynebridge, 1925 1925 )

Port Talbot; Swansea ( Report of Survey for Repairs, &c, of Engines & Boilers for W Hendrik, 9th September no date )

A vessel’s means of propulsion.

Propulsion

Steam ( Request for Special Survey for Tynebridge, 17th June 1924 1924, Profile & Deck Plans for Tynebridge, 17th June 1924 1924, Plan of Boiler for Tynebridge, 11th July 1924 1924, Letter from R Fairley, per the Surveyors, Lloyd's Register, Middlesbrough to the Secretary, Lloyd's Register, London, regarding the gusset angles & weather decks of Tynebridge, 25th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Tynebridge, 20th March 1925 1925, Form for Vessels of 100 Tons & Upwards for Tynebridge, 9th March 1925 1925, Report on Steam Reciprocating Engine Machinery for Tynebridge, 6th March 1925 1925, Memo for Tynebridge regarding the surveyors being informed that the heating surface of the front tube plates is not to be included for the purpose of calculating the NHP of the vessel, 23rd March 1925 1925, Report on Boilers for Tynebridge, 6th March 1925 1925, Report on Boilers for Tynebridge, 26th January 1925 1925, Report on Electric Fittings for Tynebridge, 17th March 1925 1925, Plan of Steel Boiler for Tynebridge, 1925 1925, Midship Section Plan for Tynebridge, 18th March 1925 1925, Profile & Deck Plan for Tynebridge, 18th March 1925 1925, Report of Total Loss, Casualty, &c for W Hendrik, Undated no date, Steel Steamer or Motorship Report for Tynebridge, 19th March no date )

undefined ( Midship Section Plan for Tynebridge, 17th June 1924 1924, Receipt for Boiler Plate manufactured by The Steel Co of Scotland Ltd for Tynebridge, 4th December 1924 1924, Receipt for Boiler Plate manufactured by David Colville & Sons Ltd for Tynebridge, 11th October 1924 1924, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the completion of the special survey of the boilers for W Hendrik, 19th September 1940 1940, Report of Survey for Repairs, &c, of Engines & Boilers for W Hendrik, 9th September no date )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Request for Special Survey for Tynebridge, 17th June 1924 1924, Profile & Deck Plans for Tynebridge, 17th June 1924 1924, Midship Section Plan for Tynebridge, 17th June 1924 1924, Receipt for Boiler Plate manufactured by The Steel Co of Scotland Ltd for Tynebridge, 4th December 1924 1924, Receipt for Boiler Plate manufactured by David Colville & Sons Ltd for Tynebridge, 11th October 1924 1924, Plan of Boiler for Tynebridge, 11th July 1924 1924, Letter from R Fairley, per the Surveyors, Lloyd's Register, Middlesbrough to the Secretary, Lloyd's Register, London, regarding the gusset angles & weather decks of Tynebridge, 25th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Tynebridge, 20th March 1925 1925, Form for Vessels of 100 Tons & Upwards for Tynebridge, 9th March 1925 1925, Report on Steam Reciprocating Engine Machinery for Tynebridge, 6th March 1925 1925, Memo for Tynebridge regarding the surveyors being informed that the heating surface of the front tube plates is not to be included for the purpose of calculating the NHP of the vessel, 23rd March 1925 1925, Report on Boilers for Tynebridge, 6th March 1925 1925, Report on Boilers for Tynebridge, 26th January 1925 1925, Report on Electric Fittings for Tynebridge, 17th March 1925 1925, Plan of Steel Boiler for Tynebridge, 1925 1925, Midship Section Plan for Tynebridge, 18th March 1925 1925, Profile & Deck Plan for Tynebridge, 18th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the completion of the special survey of the boilers for W Hendrik, 19th September 1940 1940, Report of Total Loss, Casualty, &c for W Hendrik, Undated no date, Report of Survey for Repairs, &c, of Engines & Boilers for W Hendrik, 9th September no date, Steel Steamer or Motorship Report for Tynebridge, 19th March no date )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Request for Special Survey for Tynebridge, 17th June 1924 1924, Profile & Deck Plans for Tynebridge, 17th June 1924 1924, Midship Section Plan for Tynebridge, 17th June 1924 1924, Receipt for Boiler Plate manufactured by The Steel Co of Scotland Ltd for Tynebridge, 4th December 1924 1924, Receipt for Boiler Plate manufactured by David Colville & Sons Ltd for Tynebridge, 11th October 1924 1924, Plan of Boiler for Tynebridge, 11th July 1924 1924, Letter from R Fairley, per the Surveyors, Lloyd's Register, Middlesbrough to the Secretary, Lloyd's Register, London, regarding the gusset angles & weather decks of Tynebridge, 25th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Tynebridge, 20th March 1925 1925, Form for Vessels of 100 Tons & Upwards for Tynebridge, 9th March 1925 1925, Report on Steam Reciprocating Engine Machinery for Tynebridge, 6th March 1925 1925, Memo for Tynebridge regarding the surveyors being informed that the heating surface of the front tube plates is not to be included for the purpose of calculating the NHP of the vessel, 23rd March 1925 1925, Report on Boilers for Tynebridge, 6th March 1925 1925, Report on Boilers for Tynebridge, 26th January 1925 1925, Report on Electric Fittings for Tynebridge, 17th March 1925 1925, Plan of Steel Boiler for Tynebridge, 1925 1925, Midship Section Plan for Tynebridge, 18th March 1925 1925, Profile & Deck Plan for Tynebridge, 18th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the completion of the special survey of the boilers for W Hendrik, 19th September 1940 1940, Report of Total Loss, Casualty, &c for W Hendrik, Undated no date, Report of Survey for Repairs, &c, of Engines & Boilers for W Hendrik, 9th September no date, Steel Steamer or Motorship Report for Tynebridge, 19th March no date )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Request for Special Survey for Tynebridge, 17th June 1924 1924, Profile & Deck Plans for Tynebridge, 17th June 1924 1924, Midship Section Plan for Tynebridge, 17th June 1924 1924, Receipt for Boiler Plate manufactured by The Steel Co of Scotland Ltd for Tynebridge, 4th December 1924 1924, Receipt for Boiler Plate manufactured by David Colville & Sons Ltd for Tynebridge, 11th October 1924 1924, Plan of Boiler for Tynebridge, 11th July 1924 1924, Letter from R Fairley, per the Surveyors, Lloyd's Register, Middlesbrough to the Secretary, Lloyd's Register, London, regarding the gusset angles & weather decks of Tynebridge, 25th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Tynebridge, 20th March 1925 1925, Form for Vessels of 100 Tons & Upwards for Tynebridge, 9th March 1925 1925, Report on Steam Reciprocating Engine Machinery for Tynebridge, 6th March 1925 1925, Memo for Tynebridge regarding the surveyors being informed that the heating surface of the front tube plates is not to be included for the purpose of calculating the NHP of the vessel, 23rd March 1925 1925, Report on Boilers for Tynebridge, 6th March 1925 1925, Report on Boilers for Tynebridge, 26th January 1925 1925, Report on Electric Fittings for Tynebridge, 17th March 1925 1925, Plan of Steel Boiler for Tynebridge, 1925 1925, Midship Section Plan for Tynebridge, 18th March 1925 1925, Profile & Deck Plan for Tynebridge, 18th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the completion of the special survey of the boilers for W Hendrik, 19th September 1940 1940, Report of Total Loss, Casualty, &c for W Hendrik, Undated no date, Report of Survey for Repairs, &c, of Engines & Boilers for W Hendrik, 9th September no date, Steel Steamer or Motorship Report for Tynebridge, 19th March no date )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Request for Special Survey for Tynebridge, 17th June 1924 1924, Profile & Deck Plans for Tynebridge, 17th June 1924 1924, Midship Section Plan for Tynebridge, 17th June 1924 1924, Receipt for Boiler Plate manufactured by The Steel Co of Scotland Ltd for Tynebridge, 4th December 1924 1924, Receipt for Boiler Plate manufactured by David Colville & Sons Ltd for Tynebridge, 11th October 1924 1924, Plan of Boiler for Tynebridge, 11th July 1924 1924, Letter from R Fairley, per the Surveyors, Lloyd's Register, Middlesbrough to the Secretary, Lloyd's Register, London, regarding the gusset angles & weather decks of Tynebridge, 25th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Tynebridge, 20th March 1925 1925, Form for Vessels of 100 Tons & Upwards for Tynebridge, 9th March 1925 1925, Report on Steam Reciprocating Engine Machinery for Tynebridge, 6th March 1925 1925, Memo for Tynebridge regarding the surveyors being informed that the heating surface of the front tube plates is not to be included for the purpose of calculating the NHP of the vessel, 23rd March 1925 1925, Report on Boilers for Tynebridge, 6th March 1925 1925, Report on Boilers for Tynebridge, 26th January 1925 1925, Report on Electric Fittings for Tynebridge, 17th March 1925 1925, Plan of Steel Boiler for Tynebridge, 1925 1925, Midship Section Plan for Tynebridge, 18th March 1925 1925, Profile & Deck Plan for Tynebridge, 18th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the completion of the special survey of the boilers for W Hendrik, 19th September 1940 1940, Report of Total Loss, Casualty, &c for W Hendrik, Undated no date, Report of Survey for Repairs, &c, of Engines & Boilers for W Hendrik, 9th September no date, Steel Steamer or Motorship Report for Tynebridge, 19th March no date )

Vessel’s place of loss or disposal/last known recorded location.

Place of ship loss

West Ireland ( Request for Special Survey for Tynebridge, 17th June 1924 1924, Profile & Deck Plans for Tynebridge, 17th June 1924 1924, Midship Section Plan for Tynebridge, 17th June 1924 1924, Receipt for Boiler Plate manufactured by The Steel Co of Scotland Ltd for Tynebridge, 4th December 1924 1924, Receipt for Boiler Plate manufactured by David Colville & Sons Ltd for Tynebridge, 11th October 1924 1924, Plan of Boiler for Tynebridge, 11th July 1924 1924, Letter from R Fairley, per the Surveyors, Lloyd's Register, Middlesbrough to the Secretary, Lloyd's Register, London, regarding the gusset angles & weather decks of Tynebridge, 25th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Tynebridge, 20th March 1925 1925, Form for Vessels of 100 Tons & Upwards for Tynebridge, 9th March 1925 1925, Report on Steam Reciprocating Engine Machinery for Tynebridge, 6th March 1925 1925, Memo for Tynebridge regarding the surveyors being informed that the heating surface of the front tube plates is not to be included for the purpose of calculating the NHP of the vessel, 23rd March 1925 1925, Report on Boilers for Tynebridge, 6th March 1925 1925, Report on Boilers for Tynebridge, 26th January 1925 1925, Report on Electric Fittings for Tynebridge, 17th March 1925 1925, Plan of Steel Boiler for Tynebridge, 1925 1925, Midship Section Plan for Tynebridge, 18th March 1925 1925, Profile & Deck Plan for Tynebridge, 18th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the completion of the special survey of the boilers for W Hendrik, 19th September 1940 1940, Report of Total Loss, Casualty, &c for W Hendrik, Undated no date, Report of Survey for Repairs, &c, of Engines & Boilers for W Hendrik, 9th September no date, Steel Steamer or Motorship Report for Tynebridge, 19th March no date )

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

02/12/1940 ( Request for Special Survey for Tynebridge, 17th June 1924 1924, Profile & Deck Plans for Tynebridge, 17th June 1924 1924, Midship Section Plan for Tynebridge, 17th June 1924 1924, Receipt for Boiler Plate manufactured by The Steel Co of Scotland Ltd for Tynebridge, 4th December 1924 1924, Receipt for Boiler Plate manufactured by David Colville & Sons Ltd for Tynebridge, 11th October 1924 1924, Plan of Boiler for Tynebridge, 11th July 1924 1924, Letter from R Fairley, per the Surveyors, Lloyd's Register, Middlesbrough to the Secretary, Lloyd's Register, London, regarding the gusset angles & weather decks of Tynebridge, 25th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding class of Tynebridge, 20th March 1925 1925, Form for Vessels of 100 Tons & Upwards for Tynebridge, 9th March 1925 1925, Report on Steam Reciprocating Engine Machinery for Tynebridge, 6th March 1925 1925, Memo for Tynebridge regarding the surveyors being informed that the heating surface of the front tube plates is not to be included for the purpose of calculating the NHP of the vessel, 23rd March 1925 1925, Report on Boilers for Tynebridge, 6th March 1925 1925, Report on Boilers for Tynebridge, 26th January 1925 1925, Report on Electric Fittings for Tynebridge, 17th March 1925 1925, Plan of Steel Boiler for Tynebridge, 1925 1925, Midship Section Plan for Tynebridge, 18th March 1925 1925, Profile & Deck Plan for Tynebridge, 18th March 1925 1925, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding the completion of the special survey of the boilers for W Hendrik, 19th September 1940 1940, Report of Total Loss, Casualty, &c for W Hendrik, Undated no date, Report of Survey for Repairs, &c, of Engines & Boilers for W Hendrik, 9th September no date, Steel Steamer or Motorship Report for Tynebridge, 19th March no date )

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.