Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
War Aryan ( Ship Forgings Form for War Aryan, 15th November 1917 1917, Report on Electric Lighting Installation for War Aryan, 8th November 1918 1918, Report of Survey for Repairs, &c for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for War Aryan, 14th December 1918 1918, Memo to the Chief Ship Surveyor regarding classification for War Aryan, with reference to repairs, 21st November 1918 1918, Steel Steamer Report for War Aryan, 8th November 1918 1918, Form for Vessels of 100 Tons & Upwards for War Aryan, 30th October 1918 1918, Report on Machinery for War Aryan, 8th November 1918 1918, Report on Boilers for War Aryan, 8th November 1918 1918, Ship Castings Form for War Aryan, 19th February 1918 1918, Ship Forgings Form for War Aryan, 3rd August 1918 1918, Ship Forgings Form for War Aryan, 16th August 1918 1918, Half Midship Section Plan for War Aryan, 21st May 1918 1918, Memo regarding deferral of Classification Certificate for War Aryan, 23rd May 1919 1919, Letter from J MacArthur Morisey, for the Controller General of Merchant Shipbuilding, London, to the Secretary for Lloyd's Register, London, acknowledging receipt of a letter regarding HP cylinder liner for War Aryan, 9th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary enclosing a copy of a letter regarding the machinery for War Aryan, 7th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Memo regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, transmitting a letter regarding the machinery for War Aryan, 5th April 1919 1919, Letter from James Easthope, Glasgow Surveyor, to the Secretary for Lloyd's Register, Glasgow, regarding examination of HP cylinder liner for War Aryan, 4th April 1919 1919, Letter from D McLean, Manager of the Shipping Department of Anglo American Oil Co Ltd, London, to the Controller General of Merchant Shipbuilding, London, regarding HP cylinder liner for War Aryan, 29th March 1919 1919, Memo to the Chief Ship Surveyor regarding the carriage of grain for War Aryan, 27th January 1919 1919, Copy of a memo from Genoa requesting an update on Marzocco, 13th March 1940 1940, Certificate of Examination for War Aryan, Undated no date, Plan of Cylinders for War Aryan, Undated no date )
Kamboye ( Plan of Profile for Kamboye, 17th October 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Kamboye, 27th May 1927 1927 )
Aryan ( Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, acknowledging receipt of a letter regarding the machinery for Aryan, 2nd April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary requesting a sketch of HP cylinder liner & remarks concerning the machinery of Aryan, 2nd April 1919 1919, Letter from James Lithgow, for the Controller General of Merchant Shipbuilding, Ministry of Shipping, London, to the Secretary for Lloyd's Register, London, regarding HP cylinder liner for Aryan, 31st March 1919 1919 )
Nervier ( Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, enclosing midship section for Nervier, 26th August 1919 1919, Half Midship Section Plan for Nervier, 25th August 1919 1919, Profile & Deck Plan for Nervier, 11th September 1926 1926, Profile & Deck Plan for Nervier, 11th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Plan of Proposed Alteration to Hatch Side Coamings for Nervier, 17th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Letter from Lloyd's Register, London, to the Antwerp Surveyors regarding approval of alternative arrangement of hatch side girders for Nervier, 20th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding proposed new second deck for Nervier, 18th September 1926 1926, Letter from the Chief Draughtsman for the Antwerp Engineering Co, Hoboken, to Lloyd\'s Register, Antwerp, regarding additional tweendeck for Nervier, 17th September 1926 1926, Letter from the Secretary for Lloyd's Register, London, to the Antwerp Surveyors regarding approval of deck plan & profile & detail plan showing proposed second deck for Nervier, 17th September 1926 1926, Memo regarding the fitting of the second deck for Nervier, 17th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding the forwarding of deck plan & profile & detail plan showing proposed second deck for Nervier, 15th September 1926 1926, Plan of Pillars & Framing in Way of Suppressed Shell Magazine between Frames 12 & 17 for Nervier, 22nd February 1927 1927, Engine Forgings or Castings Form for Nervier, 14th May 1927 1927 )
Kambove ( Memo to the Chief Ship Surveyor regarding repairs & partly held Special Survey No 2 for Kambove, 16th July 1927 1927, Letter from C H L Pilditch, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, enclosing a letter regarding future voyage for Kambove, 15th June 1927 1927, Letter from William Lenen, General Superintendent for Compagnie Africaine De Navigation Societe Anonyme, Antwerp, to the Antwerp Surveyors requesting permission for Kambove to make another voyage before completion of survey, 14th July 1927 1927, Report on Masts, Spars, & Rigging for Kambove, 16th May 1927 1927, Report of Survey for Repairs, &c for Kambove, 27th May 1927 1927, Certificate of Survey of Temporary & Permanent Repairs for Kambove, 13th May 1927 1927, Certificate of Survey of Damage & Repairs for Kambove, 18th May 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Kambove, 16th May 1927 1927, Report on Electric Fittings for Kambove, 27th August 1927 1927 )
Marzocco ( Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 8th December 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Marzocco, 1st November 1939 1939, Report of Survey for Repairs, &c for Marzocco, 23rd September 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding completion of Special Survey of Boilers of Marzocco, 2nd November 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Marzocco, 23rd September 1939 1939, Letter from J Davey, for the Aberdeen Surveyors, to the Secretary for Lloyd\'s Register, Wokingham, regarding the running aground of Marzocco, 21st June 1940 1940, Letter from J Davey, Aberdeen Surveyor, to the Secretary, London, returning report for Marzocco, 21st June 1940 1940, Letter from the Secretary for Lloyd's Register, Wokingham, to the Aberdeen Surveyors enclosing deferred reports on Marzocco, 15th June 1940 1940, Memo requesting the forwarding of particulars of outstanding requirements for Marzocco, 15th June 1940 1940, Copy of a memo from Genoa requesting a reply regarding the completion of 2nd Special Survey No 2 for Marzocco, 17th April 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding deferral of action concerning Marzocco, 19th January 1940 1940, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 10th January 1940 1940, Report of Total Loss, Casualty, &c for Marzocco, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
24/09/1918 ( Ship Forgings Form for War Aryan, 15th November 1917 1917, Report on Electric Lighting Installation for War Aryan, 8th November 1918 1918, Report of Survey for Repairs, &c for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for War Aryan, 14th December 1918 1918, Memo to the Chief Ship Surveyor regarding classification for War Aryan, with reference to repairs, 21st November 1918 1918, Steel Steamer Report for War Aryan, 8th November 1918 1918, Form for Vessels of 100 Tons & Upwards for War Aryan, 30th October 1918 1918, Report on Machinery for War Aryan, 8th November 1918 1918, Report on Boilers for War Aryan, 8th November 1918 1918, Ship Castings Form for War Aryan, 19th February 1918 1918, Ship Forgings Form for War Aryan, 3rd August 1918 1918, Ship Forgings Form for War Aryan, 16th August 1918 1918, Half Midship Section Plan for War Aryan, 21st May 1918 1918, Plan of Profile for Kamboye, 17th October 1918 1918, Memo regarding deferral of Classification Certificate for War Aryan, 23rd May 1919 1919, Letter from J MacArthur Morisey, for the Controller General of Merchant Shipbuilding, London, to the Secretary for Lloyd's Register, London, acknowledging receipt of a letter regarding HP cylinder liner for War Aryan, 9th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary enclosing a copy of a letter regarding the machinery for War Aryan, 7th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Memo regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, transmitting a letter regarding the machinery for War Aryan, 5th April 1919 1919, Letter from James Easthope, Glasgow Surveyor, to the Secretary for Lloyd's Register, Glasgow, regarding examination of HP cylinder liner for War Aryan, 4th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, acknowledging receipt of a letter regarding the machinery for Aryan, 2nd April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary requesting a sketch of HP cylinder liner & remarks concerning the machinery of Aryan, 2nd April 1919 1919, Letter from James Lithgow, for the Controller General of Merchant Shipbuilding, Ministry of Shipping, London, to the Secretary for Lloyd's Register, London, regarding HP cylinder liner for Aryan, 31st March 1919 1919, Letter from D McLean, Manager of the Shipping Department of Anglo American Oil Co Ltd, London, to the Controller General of Merchant Shipbuilding, London, regarding HP cylinder liner for War Aryan, 29th March 1919 1919, Memo to the Chief Ship Surveyor regarding the carriage of grain for War Aryan, 27th January 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, enclosing midship section for Nervier, 26th August 1919 1919, Half Midship Section Plan for Nervier, 25th August 1919 1919, Profile & Deck Plan for Nervier, 11th September 1926 1926, Profile & Deck Plan for Nervier, 11th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Plan of Proposed Alteration to Hatch Side Coamings for Nervier, 17th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Letter from Lloyd's Register, London, to the Antwerp Surveyors regarding approval of alternative arrangement of hatch side girders for Nervier, 20th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding proposed new second deck for Nervier, 18th September 1926 1926, Letter from the Chief Draughtsman for the Antwerp Engineering Co, Hoboken, to Lloyd\'s Register, Antwerp, regarding additional tweendeck for Nervier, 17th September 1926 1926, Letter from the Secretary for Lloyd's Register, London, to the Antwerp Surveyors regarding approval of deck plan & profile & detail plan showing proposed second deck for Nervier, 17th September 1926 1926, Memo regarding the fitting of the second deck for Nervier, 17th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding the forwarding of deck plan & profile & detail plan showing proposed second deck for Nervier, 15th September 1926 1926, Plan of Pillars & Framing in Way of Suppressed Shell Magazine between Frames 12 & 17 for Nervier, 22nd February 1927 1927, Memo to the Chief Ship Surveyor regarding repairs & partly held Special Survey No 2 for Kambove, 16th July 1927 1927, Letter from C H L Pilditch, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, enclosing a letter regarding future voyage for Kambove, 15th June 1927 1927, Letter from William Lenen, General Superintendent for Compagnie Africaine De Navigation Societe Anonyme, Antwerp, to the Antwerp Surveyors requesting permission for Kambove to make another voyage before completion of survey, 14th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Kamboye, 27th May 1927 1927, Report on Masts, Spars, & Rigging for Kambove, 16th May 1927 1927, Report of Survey for Repairs, &c for Kambove, 27th May 1927 1927, Certificate of Survey of Temporary & Permanent Repairs for Kambove, 13th May 1927 1927, Certificate of Survey of Damage & Repairs for Kambove, 18th May 1927 1927, Engine Forgings or Castings Form for Nervier, 14th May 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Kambove, 16th May 1927 1927, Report on Electric Fittings for Kambove, 27th August 1927 1927, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 8th December 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Marzocco, 1st November 1939 1939, Report of Survey for Repairs, &c for Marzocco, 23rd September 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding completion of Special Survey of Boilers of Marzocco, 2nd November 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Marzocco, 23rd September 1939 1939, Letter from J Davey, for the Aberdeen Surveyors, to the Secretary for Lloyd\'s Register, Wokingham, regarding the running aground of Marzocco, 21st June 1940 1940, Letter from J Davey, Aberdeen Surveyor, to the Secretary, London, returning report for Marzocco, 21st June 1940 1940, Letter from the Secretary for Lloyd's Register, Wokingham, to the Aberdeen Surveyors enclosing deferred reports on Marzocco, 15th June 1940 1940, Memo requesting the forwarding of particulars of outstanding requirements for Marzocco, 15th June 1940 1940, Copy of a memo from Genoa requesting a reply regarding the completion of 2nd Special Survey No 2 for Marzocco, 17th April 1940 1940, Copy of a memo from Genoa requesting an update on Marzocco, 13th March 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding deferral of action concerning Marzocco, 19th January 1940 1940, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 10th January 1940 1940, Report of Total Loss, Casualty, &c for Marzocco, Undated no date, Certificate of Examination for War Aryan, Undated no date, Plan of Cylinders for War Aryan, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
528 ( Ship Forgings Form for War Aryan, 15th November 1917 1917, Report on Electric Lighting Installation for War Aryan, 8th November 1918 1918, Report of Survey for Repairs, &c for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for War Aryan, 14th December 1918 1918, Memo to the Chief Ship Surveyor regarding classification for War Aryan, with reference to repairs, 21st November 1918 1918, Steel Steamer Report for War Aryan, 8th November 1918 1918, Form for Vessels of 100 Tons & Upwards for War Aryan, 30th October 1918 1918, Report on Machinery for War Aryan, 8th November 1918 1918, Report on Boilers for War Aryan, 8th November 1918 1918, Ship Castings Form for War Aryan, 19th February 1918 1918, Ship Forgings Form for War Aryan, 3rd August 1918 1918, Ship Forgings Form for War Aryan, 16th August 1918 1918, Half Midship Section Plan for War Aryan, 21st May 1918 1918, Plan of Profile for Kamboye, 17th October 1918 1918, Memo regarding deferral of Classification Certificate for War Aryan, 23rd May 1919 1919, Letter from J MacArthur Morisey, for the Controller General of Merchant Shipbuilding, London, to the Secretary for Lloyd's Register, London, acknowledging receipt of a letter regarding HP cylinder liner for War Aryan, 9th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary enclosing a copy of a letter regarding the machinery for War Aryan, 7th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Memo regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, transmitting a letter regarding the machinery for War Aryan, 5th April 1919 1919, Letter from James Easthope, Glasgow Surveyor, to the Secretary for Lloyd's Register, Glasgow, regarding examination of HP cylinder liner for War Aryan, 4th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, acknowledging receipt of a letter regarding the machinery for Aryan, 2nd April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary requesting a sketch of HP cylinder liner & remarks concerning the machinery of Aryan, 2nd April 1919 1919, Letter from James Lithgow, for the Controller General of Merchant Shipbuilding, Ministry of Shipping, London, to the Secretary for Lloyd's Register, London, regarding HP cylinder liner for Aryan, 31st March 1919 1919, Letter from D McLean, Manager of the Shipping Department of Anglo American Oil Co Ltd, London, to the Controller General of Merchant Shipbuilding, London, regarding HP cylinder liner for War Aryan, 29th March 1919 1919, Memo to the Chief Ship Surveyor regarding the carriage of grain for War Aryan, 27th January 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, enclosing midship section for Nervier, 26th August 1919 1919, Half Midship Section Plan for Nervier, 25th August 1919 1919, Profile & Deck Plan for Nervier, 11th September 1926 1926, Profile & Deck Plan for Nervier, 11th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Plan of Proposed Alteration to Hatch Side Coamings for Nervier, 17th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Letter from Lloyd's Register, London, to the Antwerp Surveyors regarding approval of alternative arrangement of hatch side girders for Nervier, 20th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding proposed new second deck for Nervier, 18th September 1926 1926, Letter from the Chief Draughtsman for the Antwerp Engineering Co, Hoboken, to Lloyd\'s Register, Antwerp, regarding additional tweendeck for Nervier, 17th September 1926 1926, Letter from the Secretary for Lloyd's Register, London, to the Antwerp Surveyors regarding approval of deck plan & profile & detail plan showing proposed second deck for Nervier, 17th September 1926 1926, Memo regarding the fitting of the second deck for Nervier, 17th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding the forwarding of deck plan & profile & detail plan showing proposed second deck for Nervier, 15th September 1926 1926, Plan of Pillars & Framing in Way of Suppressed Shell Magazine between Frames 12 & 17 for Nervier, 22nd February 1927 1927, Memo to the Chief Ship Surveyor regarding repairs & partly held Special Survey No 2 for Kambove, 16th July 1927 1927, Letter from C H L Pilditch, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, enclosing a letter regarding future voyage for Kambove, 15th June 1927 1927, Letter from William Lenen, General Superintendent for Compagnie Africaine De Navigation Societe Anonyme, Antwerp, to the Antwerp Surveyors requesting permission for Kambove to make another voyage before completion of survey, 14th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Kamboye, 27th May 1927 1927, Report on Masts, Spars, & Rigging for Kambove, 16th May 1927 1927, Report of Survey for Repairs, &c for Kambove, 27th May 1927 1927, Certificate of Survey of Temporary & Permanent Repairs for Kambove, 13th May 1927 1927, Certificate of Survey of Damage & Repairs for Kambove, 18th May 1927 1927, Engine Forgings or Castings Form for Nervier, 14th May 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Kambove, 16th May 1927 1927, Report on Electric Fittings for Kambove, 27th August 1927 1927, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 8th December 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Marzocco, 1st November 1939 1939, Report of Survey for Repairs, &c for Marzocco, 23rd September 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding completion of Special Survey of Boilers of Marzocco, 2nd November 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Marzocco, 23rd September 1939 1939, Letter from J Davey, for the Aberdeen Surveyors, to the Secretary for Lloyd\'s Register, Wokingham, regarding the running aground of Marzocco, 21st June 1940 1940, Letter from J Davey, Aberdeen Surveyor, to the Secretary, London, returning report for Marzocco, 21st June 1940 1940, Letter from the Secretary for Lloyd's Register, Wokingham, to the Aberdeen Surveyors enclosing deferred reports on Marzocco, 15th June 1940 1940, Memo requesting the forwarding of particulars of outstanding requirements for Marzocco, 15th June 1940 1940, Copy of a memo from Genoa requesting a reply regarding the completion of 2nd Special Survey No 2 for Marzocco, 17th April 1940 1940, Copy of a memo from Genoa requesting an update on Marzocco, 13th March 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding deferral of action concerning Marzocco, 19th January 1940 1940, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 10th January 1940 1940, Report of Total Loss, Casualty, &c for Marzocco, Undated no date, Certificate of Examination for War Aryan, Undated no date, Plan of Cylinders for War Aryan, Undated no date )
Name of surveyor.
Alexander Fletcher ( Ship Forgings Form for War Aryan, 15th November 1917 1917, Ship Forgings Form for War Aryan, 16th August 1918 1918 )
J S Rankin ( Report on Electric Lighting Installation for War Aryan, 8th November 1918 1918 )
A McKeand ( Report on Boilers for War Aryan, 8th November 1918 1918 )
Peter McGregor ( Ship Castings Form for War Aryan, 19th February 1918 1918 )
William Morrison ( Report of Survey for Repairs, &c for Marzocco, 23rd September 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Marzocco, 23rd September 1939 1939 )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Ship Forgings Form for War Aryan, 15th November 1917 1917, Report on Electric Lighting Installation for War Aryan, 8th November 1918 1918, Memo to the Chief Ship Surveyor regarding classification for War Aryan, with reference to repairs, 21st November 1918 1918, Steel Steamer Report for War Aryan, 8th November 1918 1918, Report on Machinery for War Aryan, 8th November 1918 1918, Report on Boilers for War Aryan, 8th November 1918 1918, Ship Castings Form for War Aryan, 19th February 1918 1918, Ship Forgings Form for War Aryan, 3rd August 1918 1918, Ship Forgings Form for War Aryan, 16th August 1918 1918, Half Midship Section Plan for War Aryan, 21st May 1918 1918, Plan of Profile for Kamboye, 17th October 1918 1918, Memo regarding deferral of Classification Certificate for War Aryan, 23rd May 1919 1919, Letter from J MacArthur Morisey, for the Controller General of Merchant Shipbuilding, London, to the Secretary for Lloyd's Register, London, acknowledging receipt of a letter regarding HP cylinder liner for War Aryan, 9th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary enclosing a copy of a letter regarding the machinery for War Aryan, 7th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Memo regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, transmitting a letter regarding the machinery for War Aryan, 5th April 1919 1919, Letter from James Easthope, Glasgow Surveyor, to the Secretary for Lloyd's Register, Glasgow, regarding examination of HP cylinder liner for War Aryan, 4th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, acknowledging receipt of a letter regarding the machinery for Aryan, 2nd April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary requesting a sketch of HP cylinder liner & remarks concerning the machinery of Aryan, 2nd April 1919 1919, Letter from James Lithgow, for the Controller General of Merchant Shipbuilding, Ministry of Shipping, London, to the Secretary for Lloyd's Register, London, regarding HP cylinder liner for Aryan, 31st March 1919 1919, Letter from D McLean, Manager of the Shipping Department of Anglo American Oil Co Ltd, London, to the Controller General of Merchant Shipbuilding, London, regarding HP cylinder liner for War Aryan, 29th March 1919 1919, Memo to the Chief Ship Surveyor regarding the carriage of grain for War Aryan, 27th January 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, enclosing midship section for Nervier, 26th August 1919 1919, Half Midship Section Plan for Nervier, 25th August 1919 1919, Profile & Deck Plan for Nervier, 11th September 1926 1926, Profile & Deck Plan for Nervier, 11th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Letter from Lloyd's Register, London, to the Antwerp Surveyors regarding approval of alternative arrangement of hatch side girders for Nervier, 20th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding proposed new second deck for Nervier, 18th September 1926 1926, Letter from the Chief Draughtsman for the Antwerp Engineering Co, Hoboken, to Lloyd\'s Register, Antwerp, regarding additional tweendeck for Nervier, 17th September 1926 1926, Letter from the Secretary for Lloyd's Register, London, to the Antwerp Surveyors regarding approval of deck plan & profile & detail plan showing proposed second deck for Nervier, 17th September 1926 1926, Memo regarding the fitting of the second deck for Nervier, 17th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding the forwarding of deck plan & profile & detail plan showing proposed second deck for Nervier, 15th September 1926 1926, Plan of Pillars & Framing in Way of Suppressed Shell Magazine between Frames 12 & 17 for Nervier, 22nd February 1927 1927, Memo to the Chief Ship Surveyor regarding repairs & partly held Special Survey No 2 for Kambove, 16th July 1927 1927, Letter from C H L Pilditch, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, enclosing a letter regarding future voyage for Kambove, 15th June 1927 1927, Letter from William Lenen, General Superintendent for Compagnie Africaine De Navigation Societe Anonyme, Antwerp, to the Antwerp Surveyors requesting permission for Kambove to make another voyage before completion of survey, 14th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Kamboye, 27th May 1927 1927, Report on Masts, Spars, & Rigging for Kambove, 16th May 1927 1927, Report of Survey for Repairs, &c for Kambove, 27th May 1927 1927, Certificate of Survey of Temporary & Permanent Repairs for Kambove, 13th May 1927 1927, Certificate of Survey of Damage & Repairs for Kambove, 18th May 1927 1927, Engine Forgings or Castings Form for Nervier, 14th May 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Kambove, 16th May 1927 1927, Report on Electric Fittings for Kambove, 27th August 1927 1927, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 8th December 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Marzocco, 1st November 1939 1939, Report of Survey for Repairs, &c for Marzocco, 23rd September 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding completion of Special Survey of Boilers of Marzocco, 2nd November 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Marzocco, 23rd September 1939 1939, Letter from J Davey, for the Aberdeen Surveyors, to the Secretary for Lloyd\'s Register, Wokingham, regarding the running aground of Marzocco, 21st June 1940 1940, Letter from J Davey, Aberdeen Surveyor, to the Secretary, London, returning report for Marzocco, 21st June 1940 1940, Letter from the Secretary for Lloyd's Register, Wokingham, to the Aberdeen Surveyors enclosing deferred reports on Marzocco, 15th June 1940 1940, Memo requesting the forwarding of particulars of outstanding requirements for Marzocco, 15th June 1940 1940, Copy of a memo from Genoa requesting a reply regarding the completion of 2nd Special Survey No 2 for Marzocco, 17th April 1940 1940, Copy of a memo from Genoa requesting an update on Marzocco, 13th March 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding deferral of action concerning Marzocco, 19th January 1940 1940, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 10th January 1940 1940, Report of Total Loss, Casualty, &c for Marzocco, Undated no date, Plan of Cylinders for War Aryan, Undated no date )
Screw Steamer ( Report of Survey for Repairs, &c for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for War Aryan, 14th December 1918 1918, Plan of Proposed Alteration to Hatch Side Coamings for Nervier, 17th September 1926 1926, Certificate of Examination for War Aryan, Undated no date )
Cargo ( Form for Vessels of 100 Tons & Upwards for War Aryan, 30th October 1918 1918 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Ship Forgings Form for War Aryan, 15th November 1917 1917, Report on Electric Lighting Installation for War Aryan, 8th November 1918 1918, Report of Survey for Repairs, &c for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for War Aryan, 14th December 1918 1918, Memo to the Chief Ship Surveyor regarding classification for War Aryan, with reference to repairs, 21st November 1918 1918, Steel Steamer Report for War Aryan, 8th November 1918 1918, Form for Vessels of 100 Tons & Upwards for War Aryan, 30th October 1918 1918, Report on Machinery for War Aryan, 8th November 1918 1918, Report on Boilers for War Aryan, 8th November 1918 1918, Ship Castings Form for War Aryan, 19th February 1918 1918, Ship Forgings Form for War Aryan, 3rd August 1918 1918, Ship Forgings Form for War Aryan, 16th August 1918 1918, Half Midship Section Plan for War Aryan, 21st May 1918 1918, Plan of Profile for Kamboye, 17th October 1918 1918, Memo regarding deferral of Classification Certificate for War Aryan, 23rd May 1919 1919, Letter from J MacArthur Morisey, for the Controller General of Merchant Shipbuilding, London, to the Secretary for Lloyd's Register, London, acknowledging receipt of a letter regarding HP cylinder liner for War Aryan, 9th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary enclosing a copy of a letter regarding the machinery for War Aryan, 7th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Memo regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, transmitting a letter regarding the machinery for War Aryan, 5th April 1919 1919, Letter from James Easthope, Glasgow Surveyor, to the Secretary for Lloyd's Register, Glasgow, regarding examination of HP cylinder liner for War Aryan, 4th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, acknowledging receipt of a letter regarding the machinery for Aryan, 2nd April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary requesting a sketch of HP cylinder liner & remarks concerning the machinery of Aryan, 2nd April 1919 1919, Letter from James Lithgow, for the Controller General of Merchant Shipbuilding, Ministry of Shipping, London, to the Secretary for Lloyd's Register, London, regarding HP cylinder liner for Aryan, 31st March 1919 1919, Letter from D McLean, Manager of the Shipping Department of Anglo American Oil Co Ltd, London, to the Controller General of Merchant Shipbuilding, London, regarding HP cylinder liner for War Aryan, 29th March 1919 1919, Memo to the Chief Ship Surveyor regarding the carriage of grain for War Aryan, 27th January 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, enclosing midship section for Nervier, 26th August 1919 1919, Half Midship Section Plan for Nervier, 25th August 1919 1919, Profile & Deck Plan for Nervier, 11th September 1926 1926, Profile & Deck Plan for Nervier, 11th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Plan of Proposed Alteration to Hatch Side Coamings for Nervier, 17th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Letter from Lloyd's Register, London, to the Antwerp Surveyors regarding approval of alternative arrangement of hatch side girders for Nervier, 20th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding proposed new second deck for Nervier, 18th September 1926 1926, Letter from the Chief Draughtsman for the Antwerp Engineering Co, Hoboken, to Lloyd\'s Register, Antwerp, regarding additional tweendeck for Nervier, 17th September 1926 1926, Letter from the Secretary for Lloyd's Register, London, to the Antwerp Surveyors regarding approval of deck plan & profile & detail plan showing proposed second deck for Nervier, 17th September 1926 1926, Memo regarding the fitting of the second deck for Nervier, 17th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding the forwarding of deck plan & profile & detail plan showing proposed second deck for Nervier, 15th September 1926 1926, Plan of Pillars & Framing in Way of Suppressed Shell Magazine between Frames 12 & 17 for Nervier, 22nd February 1927 1927, Memo to the Chief Ship Surveyor regarding repairs & partly held Special Survey No 2 for Kambove, 16th July 1927 1927, Letter from C H L Pilditch, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, enclosing a letter regarding future voyage for Kambove, 15th June 1927 1927, Letter from William Lenen, General Superintendent for Compagnie Africaine De Navigation Societe Anonyme, Antwerp, to the Antwerp Surveyors requesting permission for Kambove to make another voyage before completion of survey, 14th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Kamboye, 27th May 1927 1927, Report on Masts, Spars, & Rigging for Kambove, 16th May 1927 1927, Report of Survey for Repairs, &c for Kambove, 27th May 1927 1927, Certificate of Survey of Temporary & Permanent Repairs for Kambove, 13th May 1927 1927, Certificate of Survey of Damage & Repairs for Kambove, 18th May 1927 1927, Engine Forgings or Castings Form for Nervier, 14th May 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Kambove, 16th May 1927 1927, Report on Electric Fittings for Kambove, 27th August 1927 1927, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 8th December 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Marzocco, 1st November 1939 1939, Report of Survey for Repairs, &c for Marzocco, 23rd September 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding completion of Special Survey of Boilers of Marzocco, 2nd November 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Marzocco, 23rd September 1939 1939, Letter from J Davey, for the Aberdeen Surveyors, to the Secretary for Lloyd\'s Register, Wokingham, regarding the running aground of Marzocco, 21st June 1940 1940, Letter from J Davey, Aberdeen Surveyor, to the Secretary, London, returning report for Marzocco, 21st June 1940 1940, Letter from the Secretary for Lloyd's Register, Wokingham, to the Aberdeen Surveyors enclosing deferred reports on Marzocco, 15th June 1940 1940, Memo requesting the forwarding of particulars of outstanding requirements for Marzocco, 15th June 1940 1940, Copy of a memo from Genoa requesting a reply regarding the completion of 2nd Special Survey No 2 for Marzocco, 17th April 1940 1940, Copy of a memo from Genoa requesting an update on Marzocco, 13th March 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding deferral of action concerning Marzocco, 19th January 1940 1940, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 10th January 1940 1940, Report of Total Loss, Casualty, &c for Marzocco, Undated no date, Certificate of Examination for War Aryan, Undated no date, Plan of Cylinders for War Aryan, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Ship Forgings Form for War Aryan, 15th November 1917 1917, Report on Electric Lighting Installation for War Aryan, 8th November 1918 1918, Report of Survey for Repairs, &c for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for War Aryan, 14th December 1918 1918, Memo to the Chief Ship Surveyor regarding classification for War Aryan, with reference to repairs, 21st November 1918 1918, Steel Steamer Report for War Aryan, 8th November 1918 1918, Form for Vessels of 100 Tons & Upwards for War Aryan, 30th October 1918 1918, Report on Machinery for War Aryan, 8th November 1918 1918, Report on Boilers for War Aryan, 8th November 1918 1918, Ship Castings Form for War Aryan, 19th February 1918 1918, Ship Forgings Form for War Aryan, 3rd August 1918 1918, Ship Forgings Form for War Aryan, 16th August 1918 1918, Half Midship Section Plan for War Aryan, 21st May 1918 1918, Plan of Profile for Kamboye, 17th October 1918 1918, Memo regarding deferral of Classification Certificate for War Aryan, 23rd May 1919 1919, Letter from J MacArthur Morisey, for the Controller General of Merchant Shipbuilding, London, to the Secretary for Lloyd's Register, London, acknowledging receipt of a letter regarding HP cylinder liner for War Aryan, 9th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary enclosing a copy of a letter regarding the machinery for War Aryan, 7th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Memo regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, transmitting a letter regarding the machinery for War Aryan, 5th April 1919 1919, Letter from James Easthope, Glasgow Surveyor, to the Secretary for Lloyd's Register, Glasgow, regarding examination of HP cylinder liner for War Aryan, 4th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, acknowledging receipt of a letter regarding the machinery for Aryan, 2nd April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary requesting a sketch of HP cylinder liner & remarks concerning the machinery of Aryan, 2nd April 1919 1919, Letter from James Lithgow, for the Controller General of Merchant Shipbuilding, Ministry of Shipping, London, to the Secretary for Lloyd's Register, London, regarding HP cylinder liner for Aryan, 31st March 1919 1919, Letter from D McLean, Manager of the Shipping Department of Anglo American Oil Co Ltd, London, to the Controller General of Merchant Shipbuilding, London, regarding HP cylinder liner for War Aryan, 29th March 1919 1919, Memo to the Chief Ship Surveyor regarding the carriage of grain for War Aryan, 27th January 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, enclosing midship section for Nervier, 26th August 1919 1919, Half Midship Section Plan for Nervier, 25th August 1919 1919, Profile & Deck Plan for Nervier, 11th September 1926 1926, Profile & Deck Plan for Nervier, 11th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Plan of Proposed Alteration to Hatch Side Coamings for Nervier, 17th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Letter from Lloyd's Register, London, to the Antwerp Surveyors regarding approval of alternative arrangement of hatch side girders for Nervier, 20th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding proposed new second deck for Nervier, 18th September 1926 1926, Letter from the Chief Draughtsman for the Antwerp Engineering Co, Hoboken, to Lloyd\'s Register, Antwerp, regarding additional tweendeck for Nervier, 17th September 1926 1926, Letter from the Secretary for Lloyd's Register, London, to the Antwerp Surveyors regarding approval of deck plan & profile & detail plan showing proposed second deck for Nervier, 17th September 1926 1926, Memo regarding the fitting of the second deck for Nervier, 17th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding the forwarding of deck plan & profile & detail plan showing proposed second deck for Nervier, 15th September 1926 1926, Plan of Pillars & Framing in Way of Suppressed Shell Magazine between Frames 12 & 17 for Nervier, 22nd February 1927 1927, Memo to the Chief Ship Surveyor regarding repairs & partly held Special Survey No 2 for Kambove, 16th July 1927 1927, Letter from C H L Pilditch, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, enclosing a letter regarding future voyage for Kambove, 15th June 1927 1927, Letter from William Lenen, General Superintendent for Compagnie Africaine De Navigation Societe Anonyme, Antwerp, to the Antwerp Surveyors requesting permission for Kambove to make another voyage before completion of survey, 14th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Kamboye, 27th May 1927 1927, Report on Masts, Spars, & Rigging for Kambove, 16th May 1927 1927, Report of Survey for Repairs, &c for Kambove, 27th May 1927 1927, Certificate of Survey of Temporary & Permanent Repairs for Kambove, 13th May 1927 1927, Certificate of Survey of Damage & Repairs for Kambove, 18th May 1927 1927, Engine Forgings or Castings Form for Nervier, 14th May 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Kambove, 16th May 1927 1927, Report on Electric Fittings for Kambove, 27th August 1927 1927, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 8th December 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Marzocco, 1st November 1939 1939, Report of Survey for Repairs, &c for Marzocco, 23rd September 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding completion of Special Survey of Boilers of Marzocco, 2nd November 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Marzocco, 23rd September 1939 1939, Letter from J Davey, for the Aberdeen Surveyors, to the Secretary for Lloyd\'s Register, Wokingham, regarding the running aground of Marzocco, 21st June 1940 1940, Letter from J Davey, Aberdeen Surveyor, to the Secretary, London, returning report for Marzocco, 21st June 1940 1940, Letter from the Secretary for Lloyd's Register, Wokingham, to the Aberdeen Surveyors enclosing deferred reports on Marzocco, 15th June 1940 1940, Memo requesting the forwarding of particulars of outstanding requirements for Marzocco, 15th June 1940 1940, Copy of a memo from Genoa requesting a reply regarding the completion of 2nd Special Survey No 2 for Marzocco, 17th April 1940 1940, Copy of a memo from Genoa requesting an update on Marzocco, 13th March 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding deferral of action concerning Marzocco, 19th January 1940 1940, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 10th January 1940 1940, Report of Total Loss, Casualty, &c for Marzocco, Undated no date, Certificate of Examination for War Aryan, Undated no date, Plan of Cylinders for War Aryan, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Ship Forgings Form for War Aryan, 15th November 1917 1917, Report on Electric Lighting Installation for War Aryan, 8th November 1918 1918, Report of Survey for Repairs, &c for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for War Aryan, 14th December 1918 1918, Memo to the Chief Ship Surveyor regarding classification for War Aryan, with reference to repairs, 21st November 1918 1918, Steel Steamer Report for War Aryan, 8th November 1918 1918, Form for Vessels of 100 Tons & Upwards for War Aryan, 30th October 1918 1918, Report on Machinery for War Aryan, 8th November 1918 1918, Report on Boilers for War Aryan, 8th November 1918 1918, Ship Castings Form for War Aryan, 19th February 1918 1918, Ship Forgings Form for War Aryan, 3rd August 1918 1918, Ship Forgings Form for War Aryan, 16th August 1918 1918, Half Midship Section Plan for War Aryan, 21st May 1918 1918, Plan of Profile for Kamboye, 17th October 1918 1918, Memo regarding deferral of Classification Certificate for War Aryan, 23rd May 1919 1919, Letter from J MacArthur Morisey, for the Controller General of Merchant Shipbuilding, London, to the Secretary for Lloyd's Register, London, acknowledging receipt of a letter regarding HP cylinder liner for War Aryan, 9th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary enclosing a copy of a letter regarding the machinery for War Aryan, 7th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Memo regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, transmitting a letter regarding the machinery for War Aryan, 5th April 1919 1919, Letter from James Easthope, Glasgow Surveyor, to the Secretary for Lloyd's Register, Glasgow, regarding examination of HP cylinder liner for War Aryan, 4th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, acknowledging receipt of a letter regarding the machinery for Aryan, 2nd April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary requesting a sketch of HP cylinder liner & remarks concerning the machinery of Aryan, 2nd April 1919 1919, Letter from James Lithgow, for the Controller General of Merchant Shipbuilding, Ministry of Shipping, London, to the Secretary for Lloyd's Register, London, regarding HP cylinder liner for Aryan, 31st March 1919 1919, Letter from D McLean, Manager of the Shipping Department of Anglo American Oil Co Ltd, London, to the Controller General of Merchant Shipbuilding, London, regarding HP cylinder liner for War Aryan, 29th March 1919 1919, Memo to the Chief Ship Surveyor regarding the carriage of grain for War Aryan, 27th January 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, enclosing midship section for Nervier, 26th August 1919 1919, Half Midship Section Plan for Nervier, 25th August 1919 1919, Profile & Deck Plan for Nervier, 11th September 1926 1926, Profile & Deck Plan for Nervier, 11th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Plan of Proposed Alteration to Hatch Side Coamings for Nervier, 17th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Letter from Lloyd's Register, London, to the Antwerp Surveyors regarding approval of alternative arrangement of hatch side girders for Nervier, 20th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding proposed new second deck for Nervier, 18th September 1926 1926, Letter from the Chief Draughtsman for the Antwerp Engineering Co, Hoboken, to Lloyd\'s Register, Antwerp, regarding additional tweendeck for Nervier, 17th September 1926 1926, Letter from the Secretary for Lloyd's Register, London, to the Antwerp Surveyors regarding approval of deck plan & profile & detail plan showing proposed second deck for Nervier, 17th September 1926 1926, Memo regarding the fitting of the second deck for Nervier, 17th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding the forwarding of deck plan & profile & detail plan showing proposed second deck for Nervier, 15th September 1926 1926, Plan of Pillars & Framing in Way of Suppressed Shell Magazine between Frames 12 & 17 for Nervier, 22nd February 1927 1927, Memo to the Chief Ship Surveyor regarding repairs & partly held Special Survey No 2 for Kambove, 16th July 1927 1927, Letter from C H L Pilditch, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, enclosing a letter regarding future voyage for Kambove, 15th June 1927 1927, Letter from William Lenen, General Superintendent for Compagnie Africaine De Navigation Societe Anonyme, Antwerp, to the Antwerp Surveyors requesting permission for Kambove to make another voyage before completion of survey, 14th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Kamboye, 27th May 1927 1927, Report on Masts, Spars, & Rigging for Kambove, 16th May 1927 1927, Report of Survey for Repairs, &c for Kambove, 27th May 1927 1927, Certificate of Survey of Temporary & Permanent Repairs for Kambove, 13th May 1927 1927, Certificate of Survey of Damage & Repairs for Kambove, 18th May 1927 1927, Engine Forgings or Castings Form for Nervier, 14th May 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Kambove, 16th May 1927 1927, Report on Electric Fittings for Kambove, 27th August 1927 1927, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 8th December 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Marzocco, 1st November 1939 1939, Report of Survey for Repairs, &c for Marzocco, 23rd September 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding completion of Special Survey of Boilers of Marzocco, 2nd November 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Marzocco, 23rd September 1939 1939, Letter from J Davey, for the Aberdeen Surveyors, to the Secretary for Lloyd\'s Register, Wokingham, regarding the running aground of Marzocco, 21st June 1940 1940, Letter from J Davey, Aberdeen Surveyor, to the Secretary, London, returning report for Marzocco, 21st June 1940 1940, Letter from the Secretary for Lloyd's Register, Wokingham, to the Aberdeen Surveyors enclosing deferred reports on Marzocco, 15th June 1940 1940, Memo requesting the forwarding of particulars of outstanding requirements for Marzocco, 15th June 1940 1940, Copy of a memo from Genoa requesting a reply regarding the completion of 2nd Special Survey No 2 for Marzocco, 17th April 1940 1940, Copy of a memo from Genoa requesting an update on Marzocco, 13th March 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding deferral of action concerning Marzocco, 19th January 1940 1940, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 10th January 1940 1940, Report of Total Loss, Casualty, &c for Marzocco, Undated no date, Certificate of Examination for War Aryan, Undated no date, Plan of Cylinders for War Aryan, Undated no date )
Is electric lighting fitted to the vessel?
No ( Ship Forgings Form for War Aryan, 15th November 1917 1917, Report on Electric Lighting Installation for War Aryan, 8th November 1918 1918, Report of Survey for Repairs, &c for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for War Aryan, 14th December 1918 1918, Memo to the Chief Ship Surveyor regarding classification for War Aryan, with reference to repairs, 21st November 1918 1918, Steel Steamer Report for War Aryan, 8th November 1918 1918, Form for Vessels of 100 Tons & Upwards for War Aryan, 30th October 1918 1918, Report on Machinery for War Aryan, 8th November 1918 1918, Report on Boilers for War Aryan, 8th November 1918 1918, Ship Castings Form for War Aryan, 19th February 1918 1918, Ship Forgings Form for War Aryan, 3rd August 1918 1918, Ship Forgings Form for War Aryan, 16th August 1918 1918, Half Midship Section Plan for War Aryan, 21st May 1918 1918, Plan of Profile for Kamboye, 17th October 1918 1918, Memo regarding deferral of Classification Certificate for War Aryan, 23rd May 1919 1919, Letter from J MacArthur Morisey, for the Controller General of Merchant Shipbuilding, London, to the Secretary for Lloyd's Register, London, acknowledging receipt of a letter regarding HP cylinder liner for War Aryan, 9th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary enclosing a copy of a letter regarding the machinery for War Aryan, 7th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Memo regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, transmitting a letter regarding the machinery for War Aryan, 5th April 1919 1919, Letter from James Easthope, Glasgow Surveyor, to the Secretary for Lloyd's Register, Glasgow, regarding examination of HP cylinder liner for War Aryan, 4th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, acknowledging receipt of a letter regarding the machinery for Aryan, 2nd April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary requesting a sketch of HP cylinder liner & remarks concerning the machinery of Aryan, 2nd April 1919 1919, Letter from James Lithgow, for the Controller General of Merchant Shipbuilding, Ministry of Shipping, London, to the Secretary for Lloyd's Register, London, regarding HP cylinder liner for Aryan, 31st March 1919 1919, Letter from D McLean, Manager of the Shipping Department of Anglo American Oil Co Ltd, London, to the Controller General of Merchant Shipbuilding, London, regarding HP cylinder liner for War Aryan, 29th March 1919 1919, Memo to the Chief Ship Surveyor regarding the carriage of grain for War Aryan, 27th January 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, enclosing midship section for Nervier, 26th August 1919 1919, Half Midship Section Plan for Nervier, 25th August 1919 1919, Profile & Deck Plan for Nervier, 11th September 1926 1926, Profile & Deck Plan for Nervier, 11th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Plan of Proposed Alteration to Hatch Side Coamings for Nervier, 17th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Letter from Lloyd's Register, London, to the Antwerp Surveyors regarding approval of alternative arrangement of hatch side girders for Nervier, 20th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding proposed new second deck for Nervier, 18th September 1926 1926, Letter from the Chief Draughtsman for the Antwerp Engineering Co, Hoboken, to Lloyd\'s Register, Antwerp, regarding additional tweendeck for Nervier, 17th September 1926 1926, Letter from the Secretary for Lloyd's Register, London, to the Antwerp Surveyors regarding approval of deck plan & profile & detail plan showing proposed second deck for Nervier, 17th September 1926 1926, Memo regarding the fitting of the second deck for Nervier, 17th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding the forwarding of deck plan & profile & detail plan showing proposed second deck for Nervier, 15th September 1926 1926, Plan of Pillars & Framing in Way of Suppressed Shell Magazine between Frames 12 & 17 for Nervier, 22nd February 1927 1927, Memo to the Chief Ship Surveyor regarding repairs & partly held Special Survey No 2 for Kambove, 16th July 1927 1927, Letter from C H L Pilditch, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, enclosing a letter regarding future voyage for Kambove, 15th June 1927 1927, Letter from William Lenen, General Superintendent for Compagnie Africaine De Navigation Societe Anonyme, Antwerp, to the Antwerp Surveyors requesting permission for Kambove to make another voyage before completion of survey, 14th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Kamboye, 27th May 1927 1927, Report on Masts, Spars, & Rigging for Kambove, 16th May 1927 1927, Report of Survey for Repairs, &c for Kambove, 27th May 1927 1927, Certificate of Survey of Temporary & Permanent Repairs for Kambove, 13th May 1927 1927, Certificate of Survey of Damage & Repairs for Kambove, 18th May 1927 1927, Engine Forgings or Castings Form for Nervier, 14th May 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Kambove, 16th May 1927 1927, Report on Electric Fittings for Kambove, 27th August 1927 1927, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 8th December 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Marzocco, 1st November 1939 1939, Report of Survey for Repairs, &c for Marzocco, 23rd September 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding completion of Special Survey of Boilers of Marzocco, 2nd November 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Marzocco, 23rd September 1939 1939, Letter from J Davey, for the Aberdeen Surveyors, to the Secretary for Lloyd\'s Register, Wokingham, regarding the running aground of Marzocco, 21st June 1940 1940, Letter from J Davey, Aberdeen Surveyor, to the Secretary, London, returning report for Marzocco, 21st June 1940 1940, Letter from the Secretary for Lloyd's Register, Wokingham, to the Aberdeen Surveyors enclosing deferred reports on Marzocco, 15th June 1940 1940, Memo requesting the forwarding of particulars of outstanding requirements for Marzocco, 15th June 1940 1940, Copy of a memo from Genoa requesting a reply regarding the completion of 2nd Special Survey No 2 for Marzocco, 17th April 1940 1940, Copy of a memo from Genoa requesting an update on Marzocco, 13th March 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding deferral of action concerning Marzocco, 19th January 1940 1940, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 10th January 1940 1940, Report of Total Loss, Casualty, &c for Marzocco, Undated no date, Certificate of Examination for War Aryan, Undated no date, Plan of Cylinders for War Aryan, Undated no date )
The official record pronounced by the Committee
Abandoned after stranding ( Ship Forgings Form for War Aryan, 15th November 1917 1917, Report on Electric Lighting Installation for War Aryan, 8th November 1918 1918, Report of Survey for Repairs, &c for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for War Aryan, 14th December 1918 1918, Memo to the Chief Ship Surveyor regarding classification for War Aryan, with reference to repairs, 21st November 1918 1918, Steel Steamer Report for War Aryan, 8th November 1918 1918, Form for Vessels of 100 Tons & Upwards for War Aryan, 30th October 1918 1918, Report on Machinery for War Aryan, 8th November 1918 1918, Report on Boilers for War Aryan, 8th November 1918 1918, Ship Castings Form for War Aryan, 19th February 1918 1918, Ship Forgings Form for War Aryan, 3rd August 1918 1918, Ship Forgings Form for War Aryan, 16th August 1918 1918, Half Midship Section Plan for War Aryan, 21st May 1918 1918, Plan of Profile for Kamboye, 17th October 1918 1918, Memo regarding deferral of Classification Certificate for War Aryan, 23rd May 1919 1919, Letter from J MacArthur Morisey, for the Controller General of Merchant Shipbuilding, London, to the Secretary for Lloyd's Register, London, acknowledging receipt of a letter regarding HP cylinder liner for War Aryan, 9th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary enclosing a copy of a letter regarding the machinery for War Aryan, 7th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Memo regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, transmitting a letter regarding the machinery for War Aryan, 5th April 1919 1919, Letter from James Easthope, Glasgow Surveyor, to the Secretary for Lloyd's Register, Glasgow, regarding examination of HP cylinder liner for War Aryan, 4th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, acknowledging receipt of a letter regarding the machinery for Aryan, 2nd April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary requesting a sketch of HP cylinder liner & remarks concerning the machinery of Aryan, 2nd April 1919 1919, Letter from James Lithgow, for the Controller General of Merchant Shipbuilding, Ministry of Shipping, London, to the Secretary for Lloyd's Register, London, regarding HP cylinder liner for Aryan, 31st March 1919 1919, Letter from D McLean, Manager of the Shipping Department of Anglo American Oil Co Ltd, London, to the Controller General of Merchant Shipbuilding, London, regarding HP cylinder liner for War Aryan, 29th March 1919 1919, Memo to the Chief Ship Surveyor regarding the carriage of grain for War Aryan, 27th January 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, enclosing midship section for Nervier, 26th August 1919 1919, Half Midship Section Plan for Nervier, 25th August 1919 1919, Profile & Deck Plan for Nervier, 11th September 1926 1926, Profile & Deck Plan for Nervier, 11th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Plan of Proposed Alteration to Hatch Side Coamings for Nervier, 17th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Letter from Lloyd's Register, London, to the Antwerp Surveyors regarding approval of alternative arrangement of hatch side girders for Nervier, 20th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding proposed new second deck for Nervier, 18th September 1926 1926, Letter from the Chief Draughtsman for the Antwerp Engineering Co, Hoboken, to Lloyd\'s Register, Antwerp, regarding additional tweendeck for Nervier, 17th September 1926 1926, Letter from the Secretary for Lloyd's Register, London, to the Antwerp Surveyors regarding approval of deck plan & profile & detail plan showing proposed second deck for Nervier, 17th September 1926 1926, Memo regarding the fitting of the second deck for Nervier, 17th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding the forwarding of deck plan & profile & detail plan showing proposed second deck for Nervier, 15th September 1926 1926, Plan of Pillars & Framing in Way of Suppressed Shell Magazine between Frames 12 & 17 for Nervier, 22nd February 1927 1927, Memo to the Chief Ship Surveyor regarding repairs & partly held Special Survey No 2 for Kambove, 16th July 1927 1927, Letter from C H L Pilditch, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, enclosing a letter regarding future voyage for Kambove, 15th June 1927 1927, Letter from William Lenen, General Superintendent for Compagnie Africaine De Navigation Societe Anonyme, Antwerp, to the Antwerp Surveyors requesting permission for Kambove to make another voyage before completion of survey, 14th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Kamboye, 27th May 1927 1927, Report on Masts, Spars, & Rigging for Kambove, 16th May 1927 1927, Report of Survey for Repairs, &c for Kambove, 27th May 1927 1927, Certificate of Survey of Temporary & Permanent Repairs for Kambove, 13th May 1927 1927, Certificate of Survey of Damage & Repairs for Kambove, 18th May 1927 1927, Engine Forgings or Castings Form for Nervier, 14th May 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Kambove, 16th May 1927 1927, Report on Electric Fittings for Kambove, 27th August 1927 1927, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 8th December 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Marzocco, 1st November 1939 1939, Report of Survey for Repairs, &c for Marzocco, 23rd September 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding completion of Special Survey of Boilers of Marzocco, 2nd November 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Marzocco, 23rd September 1939 1939, Letter from J Davey, for the Aberdeen Surveyors, to the Secretary for Lloyd\'s Register, Wokingham, regarding the running aground of Marzocco, 21st June 1940 1940, Letter from J Davey, Aberdeen Surveyor, to the Secretary, London, returning report for Marzocco, 21st June 1940 1940, Letter from the Secretary for Lloyd's Register, Wokingham, to the Aberdeen Surveyors enclosing deferred reports on Marzocco, 15th June 1940 1940, Memo requesting the forwarding of particulars of outstanding requirements for Marzocco, 15th June 1940 1940, Copy of a memo from Genoa requesting a reply regarding the completion of 2nd Special Survey No 2 for Marzocco, 17th April 1940 1940, Copy of a memo from Genoa requesting an update on Marzocco, 13th March 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding deferral of action concerning Marzocco, 19th January 1940 1940, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 10th January 1940 1940, Report of Total Loss, Casualty, &c for Marzocco, Undated no date, Certificate of Examination for War Aryan, Undated no date, Plan of Cylinders for War Aryan, Undated no date )
Vessel’s place of loss or disposal/last known recorded location.
North of Peterhead ( Ship Forgings Form for War Aryan, 15th November 1917 1917, Report on Electric Lighting Installation for War Aryan, 8th November 1918 1918, Report of Survey for Repairs, &c for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for War Aryan, 14th December 1918 1918, Memo to the Chief Ship Surveyor regarding classification for War Aryan, with reference to repairs, 21st November 1918 1918, Steel Steamer Report for War Aryan, 8th November 1918 1918, Form for Vessels of 100 Tons & Upwards for War Aryan, 30th October 1918 1918, Report on Machinery for War Aryan, 8th November 1918 1918, Report on Boilers for War Aryan, 8th November 1918 1918, Ship Castings Form for War Aryan, 19th February 1918 1918, Ship Forgings Form for War Aryan, 3rd August 1918 1918, Ship Forgings Form for War Aryan, 16th August 1918 1918, Half Midship Section Plan for War Aryan, 21st May 1918 1918, Plan of Profile for Kamboye, 17th October 1918 1918, Memo regarding deferral of Classification Certificate for War Aryan, 23rd May 1919 1919, Letter from J MacArthur Morisey, for the Controller General of Merchant Shipbuilding, London, to the Secretary for Lloyd's Register, London, acknowledging receipt of a letter regarding HP cylinder liner for War Aryan, 9th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary enclosing a copy of a letter regarding the machinery for War Aryan, 7th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Memo regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, transmitting a letter regarding the machinery for War Aryan, 5th April 1919 1919, Letter from James Easthope, Glasgow Surveyor, to the Secretary for Lloyd's Register, Glasgow, regarding examination of HP cylinder liner for War Aryan, 4th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, acknowledging receipt of a letter regarding the machinery for Aryan, 2nd April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary requesting a sketch of HP cylinder liner & remarks concerning the machinery of Aryan, 2nd April 1919 1919, Letter from James Lithgow, for the Controller General of Merchant Shipbuilding, Ministry of Shipping, London, to the Secretary for Lloyd's Register, London, regarding HP cylinder liner for Aryan, 31st March 1919 1919, Letter from D McLean, Manager of the Shipping Department of Anglo American Oil Co Ltd, London, to the Controller General of Merchant Shipbuilding, London, regarding HP cylinder liner for War Aryan, 29th March 1919 1919, Memo to the Chief Ship Surveyor regarding the carriage of grain for War Aryan, 27th January 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, enclosing midship section for Nervier, 26th August 1919 1919, Half Midship Section Plan for Nervier, 25th August 1919 1919, Profile & Deck Plan for Nervier, 11th September 1926 1926, Profile & Deck Plan for Nervier, 11th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Plan of Proposed Alteration to Hatch Side Coamings for Nervier, 17th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Letter from Lloyd's Register, London, to the Antwerp Surveyors regarding approval of alternative arrangement of hatch side girders for Nervier, 20th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding proposed new second deck for Nervier, 18th September 1926 1926, Letter from the Chief Draughtsman for the Antwerp Engineering Co, Hoboken, to Lloyd\'s Register, Antwerp, regarding additional tweendeck for Nervier, 17th September 1926 1926, Letter from the Secretary for Lloyd's Register, London, to the Antwerp Surveyors regarding approval of deck plan & profile & detail plan showing proposed second deck for Nervier, 17th September 1926 1926, Memo regarding the fitting of the second deck for Nervier, 17th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding the forwarding of deck plan & profile & detail plan showing proposed second deck for Nervier, 15th September 1926 1926, Plan of Pillars & Framing in Way of Suppressed Shell Magazine between Frames 12 & 17 for Nervier, 22nd February 1927 1927, Memo to the Chief Ship Surveyor regarding repairs & partly held Special Survey No 2 for Kambove, 16th July 1927 1927, Letter from C H L Pilditch, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, enclosing a letter regarding future voyage for Kambove, 15th June 1927 1927, Letter from William Lenen, General Superintendent for Compagnie Africaine De Navigation Societe Anonyme, Antwerp, to the Antwerp Surveyors requesting permission for Kambove to make another voyage before completion of survey, 14th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Kamboye, 27th May 1927 1927, Report on Masts, Spars, & Rigging for Kambove, 16th May 1927 1927, Report of Survey for Repairs, &c for Kambove, 27th May 1927 1927, Certificate of Survey of Temporary & Permanent Repairs for Kambove, 13th May 1927 1927, Certificate of Survey of Damage & Repairs for Kambove, 18th May 1927 1927, Engine Forgings or Castings Form for Nervier, 14th May 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Kambove, 16th May 1927 1927, Report on Electric Fittings for Kambove, 27th August 1927 1927, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 8th December 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Marzocco, 1st November 1939 1939, Report of Survey for Repairs, &c for Marzocco, 23rd September 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding completion of Special Survey of Boilers of Marzocco, 2nd November 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Marzocco, 23rd September 1939 1939, Letter from J Davey, for the Aberdeen Surveyors, to the Secretary for Lloyd\'s Register, Wokingham, regarding the running aground of Marzocco, 21st June 1940 1940, Letter from J Davey, Aberdeen Surveyor, to the Secretary, London, returning report for Marzocco, 21st June 1940 1940, Letter from the Secretary for Lloyd's Register, Wokingham, to the Aberdeen Surveyors enclosing deferred reports on Marzocco, 15th June 1940 1940, Memo requesting the forwarding of particulars of outstanding requirements for Marzocco, 15th June 1940 1940, Copy of a memo from Genoa requesting a reply regarding the completion of 2nd Special Survey No 2 for Marzocco, 17th April 1940 1940, Copy of a memo from Genoa requesting an update on Marzocco, 13th March 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding deferral of action concerning Marzocco, 19th January 1940 1940, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 10th January 1940 1940, Report of Total Loss, Casualty, &c for Marzocco, Undated no date, Certificate of Examination for War Aryan, Undated no date, Plan of Cylinders for War Aryan, Undated no date )
Recorded date for the vessel’s loss or disposal.
11/06/1940 ( Ship Forgings Form for War Aryan, 15th November 1917 1917, Report on Electric Lighting Installation for War Aryan, 8th November 1918 1918, Report of Survey for Repairs, &c for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for War Aryan, 14th December 1918 1918, Memo to the Chief Ship Surveyor regarding classification for War Aryan, with reference to repairs, 21st November 1918 1918, Steel Steamer Report for War Aryan, 8th November 1918 1918, Form for Vessels of 100 Tons & Upwards for War Aryan, 30th October 1918 1918, Report on Machinery for War Aryan, 8th November 1918 1918, Report on Boilers for War Aryan, 8th November 1918 1918, Ship Castings Form for War Aryan, 19th February 1918 1918, Ship Forgings Form for War Aryan, 3rd August 1918 1918, Ship Forgings Form for War Aryan, 16th August 1918 1918, Half Midship Section Plan for War Aryan, 21st May 1918 1918, Plan of Profile for Kamboye, 17th October 1918 1918, Memo regarding deferral of Classification Certificate for War Aryan, 23rd May 1919 1919, Letter from J MacArthur Morisey, for the Controller General of Merchant Shipbuilding, London, to the Secretary for Lloyd's Register, London, acknowledging receipt of a letter regarding HP cylinder liner for War Aryan, 9th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary enclosing a copy of a letter regarding the machinery for War Aryan, 7th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Memo regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, transmitting a letter regarding the machinery for War Aryan, 5th April 1919 1919, Letter from James Easthope, Glasgow Surveyor, to the Secretary for Lloyd's Register, Glasgow, regarding examination of HP cylinder liner for War Aryan, 4th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, acknowledging receipt of a letter regarding the machinery for Aryan, 2nd April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary requesting a sketch of HP cylinder liner & remarks concerning the machinery of Aryan, 2nd April 1919 1919, Letter from James Lithgow, for the Controller General of Merchant Shipbuilding, Ministry of Shipping, London, to the Secretary for Lloyd's Register, London, regarding HP cylinder liner for Aryan, 31st March 1919 1919, Letter from D McLean, Manager of the Shipping Department of Anglo American Oil Co Ltd, London, to the Controller General of Merchant Shipbuilding, London, regarding HP cylinder liner for War Aryan, 29th March 1919 1919, Memo to the Chief Ship Surveyor regarding the carriage of grain for War Aryan, 27th January 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, enclosing midship section for Nervier, 26th August 1919 1919, Half Midship Section Plan for Nervier, 25th August 1919 1919, Profile & Deck Plan for Nervier, 11th September 1926 1926, Profile & Deck Plan for Nervier, 11th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Plan of Proposed Alteration to Hatch Side Coamings for Nervier, 17th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Letter from Lloyd's Register, London, to the Antwerp Surveyors regarding approval of alternative arrangement of hatch side girders for Nervier, 20th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding proposed new second deck for Nervier, 18th September 1926 1926, Letter from the Chief Draughtsman for the Antwerp Engineering Co, Hoboken, to Lloyd\'s Register, Antwerp, regarding additional tweendeck for Nervier, 17th September 1926 1926, Letter from the Secretary for Lloyd's Register, London, to the Antwerp Surveyors regarding approval of deck plan & profile & detail plan showing proposed second deck for Nervier, 17th September 1926 1926, Memo regarding the fitting of the second deck for Nervier, 17th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding the forwarding of deck plan & profile & detail plan showing proposed second deck for Nervier, 15th September 1926 1926, Plan of Pillars & Framing in Way of Suppressed Shell Magazine between Frames 12 & 17 for Nervier, 22nd February 1927 1927, Memo to the Chief Ship Surveyor regarding repairs & partly held Special Survey No 2 for Kambove, 16th July 1927 1927, Letter from C H L Pilditch, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, enclosing a letter regarding future voyage for Kambove, 15th June 1927 1927, Letter from William Lenen, General Superintendent for Compagnie Africaine De Navigation Societe Anonyme, Antwerp, to the Antwerp Surveyors requesting permission for Kambove to make another voyage before completion of survey, 14th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Kamboye, 27th May 1927 1927, Report on Masts, Spars, & Rigging for Kambove, 16th May 1927 1927, Report of Survey for Repairs, &c for Kambove, 27th May 1927 1927, Certificate of Survey of Temporary & Permanent Repairs for Kambove, 13th May 1927 1927, Certificate of Survey of Damage & Repairs for Kambove, 18th May 1927 1927, Engine Forgings or Castings Form for Nervier, 14th May 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Kambove, 16th May 1927 1927, Report on Electric Fittings for Kambove, 27th August 1927 1927, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 8th December 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Marzocco, 1st November 1939 1939, Report of Survey for Repairs, &c for Marzocco, 23rd September 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding completion of Special Survey of Boilers of Marzocco, 2nd November 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Marzocco, 23rd September 1939 1939, Letter from J Davey, for the Aberdeen Surveyors, to the Secretary for Lloyd\'s Register, Wokingham, regarding the running aground of Marzocco, 21st June 1940 1940, Letter from J Davey, Aberdeen Surveyor, to the Secretary, London, returning report for Marzocco, 21st June 1940 1940, Letter from the Secretary for Lloyd's Register, Wokingham, to the Aberdeen Surveyors enclosing deferred reports on Marzocco, 15th June 1940 1940, Memo requesting the forwarding of particulars of outstanding requirements for Marzocco, 15th June 1940 1940, Copy of a memo from Genoa requesting a reply regarding the completion of 2nd Special Survey No 2 for Marzocco, 17th April 1940 1940, Copy of a memo from Genoa requesting an update on Marzocco, 13th March 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding deferral of action concerning Marzocco, 19th January 1940 1940, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 10th January 1940 1940, Report of Total Loss, Casualty, &c for Marzocco, Undated no date, Certificate of Examination for War Aryan, Undated no date, Plan of Cylinders for War Aryan, Undated no date )
The listed port to which a given vessel belongs.
London ( Report on Electric Lighting Installation for War Aryan, 8th November 1918 1918, Report of Survey for Repairs, &c for War Aryan, 14th December 1918 1918, Steel Steamer Report for War Aryan, 8th November 1918 1918, Report on Machinery for War Aryan, 8th November 1918 1918, Report on Boilers for War Aryan, 8th November 1918 1918 )
Antwerp ( Report of Survey for Repairs, &c for Kambove, 27th May 1927 1927, Report on Electric Fittings for Kambove, 27th August 1927 1927 )
Genoa ( Report of Survey for Repairs, &c for Marzocco, 23rd September 1939 1939 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
Elec Light ( Report on Electric Lighting Installation for War Aryan, 8th November 1918 1918 )
Deferred ( Report of Survey for Repairs, &c for War Aryan, 14th December 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for War Aryan, 14th December 1918 1918 )
+100A1 11,18; Carring fuel oil in bulk F P above 150 F; Lloyds A & CP; +LMC 11,18 ( Steel Steamer Report for War Aryan, 8th November 1918 1918 )
+LMC 11,18 ( Report on Machinery for War Aryan, 8th November 1918 1918 )
See Accompanying report ( Report on Boilers for War Aryan, 8th November 1918 1918 )
Deferred Write ( Report of Survey for Repairs, &c for Kambove, 27th May 1927 1927, Report of Survey for Repairs, &c for Marzocco, 23rd September 1939 1939 )
+LMC 10,26 ( Report of Survey for Repairs, &c, of Engines & Boilers for Kambove, 16th May 1927 1927 )
BS 8,39 ( Report of Survey for Repairs, &c, of Engines & Boilers for Marzocco, 23rd September 1939 1939 )
+100A1 6,38; SS Ant No 3-12-30; SS Ant No 1-35; +LMC MS 2,39; BS 8,39; TS 6,38 CL ( Report of Total Loss, Casualty, &c for Marzocco, Undated no date )
Recorded information related to a vessel’s movements.
Galveston Texas; Falmouth for Orders ( Report of Survey for Repairs, &c for War Aryan, 14th December 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for War Aryan, 14th December 1918 1918 )
Antwerp; East South Africa; Lucy Canal ( Report of Survey for Repairs, &c for Kambove, 27th May 1927 1927 )
Philadelphia; Thames ( Certificate of Survey of Damage & Repairs for Kambove, 18th May 1927 1927 )
Antwerp; East Coast of Africa ( Report of Survey for Repairs, &c, of Engines & Boilers for Kambove, 16th May 1927 1927 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5393 ( Report of Survey for Repairs, &c for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for War Aryan, 14th December 1918 1918, Steel Steamer Report for War Aryan, 8th November 1918 1918, Form for Vessels of 100 Tons & Upwards for War Aryan, 30th October 1918 1918 )
5392 ( Certificate of Survey for War Aryan, 14th December 1918 1918, Certificate of Examination for War Aryan, Undated no date )
5204 ( Report of Survey for Repairs, &c for Kambove, 27th May 1927 1927, Certificate of Survey of Temporary & Permanent Repairs for Kambove, 13th May 1927 1927, Certificate of Survey of Damage & Repairs for Kambove, 18th May 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Kambove, 16th May 1927 1927, Report on Electric Fittings for Kambove, 27th August 1927 1927 )
5106 ( Report of Survey for Repairs, &c for Marzocco, 23rd September 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Marzocco, 23rd September 1939 1939, Report of Total Loss, Casualty, &c for Marzocco, Undated no date )
The port in which a vessel is registered or permanently based.
London ( Report of Survey for Repairs, &c, of Engines & Boilers for War Aryan, 14th December 1918 1918, Form for Vessels of 100 Tons & Upwards for War Aryan, 30th October 1918 1918 )
Antwerp ( Report of Survey for Repairs, &c, of Engines & Boilers for Kambove, 16th May 1927 1927 )
Genoa ( Report of Survey for Repairs, &c, of Engines & Boilers for Marzocco, 23rd September 1939 1939 )
Date in which construction of a vessel’s engines were completed.
1918 ( Report of Survey for Repairs, &c, of Engines & Boilers for War Aryan, 14th December 1918 1918, Form for Vessels of 100 Tons & Upwards for War Aryan, 30th October 1918 1918, Report on Machinery for War Aryan, 8th November 1918 1918, Report on Boilers for War Aryan, 8th November 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for Kambove, 16th May 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Marzocco, 23rd September 1939 1939 )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
JVNC ( Form for Vessels of 100 Tons & Upwards for War Aryan, 30th October 1918 1918 )
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion Direct Acting Inverted ( Form for Vessels of 100 Tons & Upwards for War Aryan, 30th October 1918 1918 )
Triple Expansion ( Report on Machinery for War Aryan, 8th November 1918 1918 )
Compound Wound Direct Current ( Report on Electric Fittings for Kambove, 27th August 1927 1927 )
The year in which a vessel’s construction is completed.
1918 ( Ship Forgings Form for War Aryan, 15th November 1917 1917, Report on Electric Lighting Installation for War Aryan, 8th November 1918 1918, Report of Survey for Repairs, &c for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for War Aryan, 14th December 1918 1918, Memo to the Chief Ship Surveyor regarding classification for War Aryan, with reference to repairs, 21st November 1918 1918, Steel Steamer Report for War Aryan, 8th November 1918 1918, Form for Vessels of 100 Tons & Upwards for War Aryan, 30th October 1918 1918, Report on Machinery for War Aryan, 8th November 1918 1918, Report on Boilers for War Aryan, 8th November 1918 1918, Ship Castings Form for War Aryan, 19th February 1918 1918, Ship Forgings Form for War Aryan, 3rd August 1918 1918, Ship Forgings Form for War Aryan, 16th August 1918 1918, Half Midship Section Plan for War Aryan, 21st May 1918 1918, Plan of Profile for Kamboye, 17th October 1918 1918, Memo regarding deferral of Classification Certificate for War Aryan, 23rd May 1919 1919, Letter from J MacArthur Morisey, for the Controller General of Merchant Shipbuilding, London, to the Secretary for Lloyd's Register, London, acknowledging receipt of a letter regarding HP cylinder liner for War Aryan, 9th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary enclosing a copy of a letter regarding the machinery for War Aryan, 7th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Memo regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, transmitting a letter regarding the machinery for War Aryan, 5th April 1919 1919, Letter from James Easthope, Glasgow Surveyor, to the Secretary for Lloyd's Register, Glasgow, regarding examination of HP cylinder liner for War Aryan, 4th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, acknowledging receipt of a letter regarding the machinery for Aryan, 2nd April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary requesting a sketch of HP cylinder liner & remarks concerning the machinery of Aryan, 2nd April 1919 1919, Letter from James Lithgow, for the Controller General of Merchant Shipbuilding, Ministry of Shipping, London, to the Secretary for Lloyd's Register, London, regarding HP cylinder liner for Aryan, 31st March 1919 1919, Letter from D McLean, Manager of the Shipping Department of Anglo American Oil Co Ltd, London, to the Controller General of Merchant Shipbuilding, London, regarding HP cylinder liner for War Aryan, 29th March 1919 1919, Memo to the Chief Ship Surveyor regarding the carriage of grain for War Aryan, 27th January 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, enclosing midship section for Nervier, 26th August 1919 1919, Half Midship Section Plan for Nervier, 25th August 1919 1919, Profile & Deck Plan for Nervier, 11th September 1926 1926, Profile & Deck Plan for Nervier, 11th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Plan of Proposed Alteration to Hatch Side Coamings for Nervier, 17th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Letter from Lloyd's Register, London, to the Antwerp Surveyors regarding approval of alternative arrangement of hatch side girders for Nervier, 20th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding proposed new second deck for Nervier, 18th September 1926 1926, Letter from the Chief Draughtsman for the Antwerp Engineering Co, Hoboken, to Lloyd\'s Register, Antwerp, regarding additional tweendeck for Nervier, 17th September 1926 1926, Letter from the Secretary for Lloyd's Register, London, to the Antwerp Surveyors regarding approval of deck plan & profile & detail plan showing proposed second deck for Nervier, 17th September 1926 1926, Memo regarding the fitting of the second deck for Nervier, 17th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding the forwarding of deck plan & profile & detail plan showing proposed second deck for Nervier, 15th September 1926 1926, Plan of Pillars & Framing in Way of Suppressed Shell Magazine between Frames 12 & 17 for Nervier, 22nd February 1927 1927, Memo to the Chief Ship Surveyor regarding repairs & partly held Special Survey No 2 for Kambove, 16th July 1927 1927, Letter from C H L Pilditch, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, enclosing a letter regarding future voyage for Kambove, 15th June 1927 1927, Letter from William Lenen, General Superintendent for Compagnie Africaine De Navigation Societe Anonyme, Antwerp, to the Antwerp Surveyors requesting permission for Kambove to make another voyage before completion of survey, 14th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Kamboye, 27th May 1927 1927, Report on Masts, Spars, & Rigging for Kambove, 16th May 1927 1927, Report of Survey for Repairs, &c for Kambove, 27th May 1927 1927, Certificate of Survey of Temporary & Permanent Repairs for Kambove, 13th May 1927 1927, Certificate of Survey of Damage & Repairs for Kambove, 18th May 1927 1927, Engine Forgings or Castings Form for Nervier, 14th May 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Kambove, 16th May 1927 1927, Report on Electric Fittings for Kambove, 27th August 1927 1927, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 8th December 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Marzocco, 1st November 1939 1939, Report of Survey for Repairs, &c for Marzocco, 23rd September 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding completion of Special Survey of Boilers of Marzocco, 2nd November 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Marzocco, 23rd September 1939 1939, Letter from J Davey, for the Aberdeen Surveyors, to the Secretary for Lloyd\'s Register, Wokingham, regarding the running aground of Marzocco, 21st June 1940 1940, Letter from J Davey, Aberdeen Surveyor, to the Secretary, London, returning report for Marzocco, 21st June 1940 1940, Letter from the Secretary for Lloyd's Register, Wokingham, to the Aberdeen Surveyors enclosing deferred reports on Marzocco, 15th June 1940 1940, Memo requesting the forwarding of particulars of outstanding requirements for Marzocco, 15th June 1940 1940, Copy of a memo from Genoa requesting a reply regarding the completion of 2nd Special Survey No 2 for Marzocco, 17th April 1940 1940, Copy of a memo from Genoa requesting an update on Marzocco, 13th March 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding deferral of action concerning Marzocco, 19th January 1940 1940, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 10th January 1940 1940, Report of Total Loss, Casualty, &c for Marzocco, Undated no date, Certificate of Examination for War Aryan, Undated no date, Plan of Cylinders for War Aryan, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Harland & Wolff Ltd ( Ship Forgings Form for War Aryan, 15th November 1917 1917, Report on Electric Lighting Installation for War Aryan, 8th November 1918 1918, Report of Survey for Repairs, &c for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for War Aryan, 14th December 1918 1918, Memo to the Chief Ship Surveyor regarding classification for War Aryan, with reference to repairs, 21st November 1918 1918, Steel Steamer Report for War Aryan, 8th November 1918 1918, Form for Vessels of 100 Tons & Upwards for War Aryan, 30th October 1918 1918, Report on Machinery for War Aryan, 8th November 1918 1918, Report on Boilers for War Aryan, 8th November 1918 1918, Ship Castings Form for War Aryan, 19th February 1918 1918, Ship Forgings Form for War Aryan, 3rd August 1918 1918, Ship Forgings Form for War Aryan, 16th August 1918 1918, Half Midship Section Plan for War Aryan, 21st May 1918 1918, Plan of Profile for Kamboye, 17th October 1918 1918, Memo regarding deferral of Classification Certificate for War Aryan, 23rd May 1919 1919, Letter from J MacArthur Morisey, for the Controller General of Merchant Shipbuilding, London, to the Secretary for Lloyd's Register, London, acknowledging receipt of a letter regarding HP cylinder liner for War Aryan, 9th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary enclosing a copy of a letter regarding the machinery for War Aryan, 7th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Memo regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, transmitting a letter regarding the machinery for War Aryan, 5th April 1919 1919, Letter from James Easthope, Glasgow Surveyor, to the Secretary for Lloyd's Register, Glasgow, regarding examination of HP cylinder liner for War Aryan, 4th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, acknowledging receipt of a letter regarding the machinery for Aryan, 2nd April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary requesting a sketch of HP cylinder liner & remarks concerning the machinery of Aryan, 2nd April 1919 1919, Letter from James Lithgow, for the Controller General of Merchant Shipbuilding, Ministry of Shipping, London, to the Secretary for Lloyd's Register, London, regarding HP cylinder liner for Aryan, 31st March 1919 1919, Letter from D McLean, Manager of the Shipping Department of Anglo American Oil Co Ltd, London, to the Controller General of Merchant Shipbuilding, London, regarding HP cylinder liner for War Aryan, 29th March 1919 1919, Memo to the Chief Ship Surveyor regarding the carriage of grain for War Aryan, 27th January 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, enclosing midship section for Nervier, 26th August 1919 1919, Half Midship Section Plan for Nervier, 25th August 1919 1919, Profile & Deck Plan for Nervier, 11th September 1926 1926, Profile & Deck Plan for Nervier, 11th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Plan of Proposed Alteration to Hatch Side Coamings for Nervier, 17th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Letter from Lloyd's Register, London, to the Antwerp Surveyors regarding approval of alternative arrangement of hatch side girders for Nervier, 20th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding proposed new second deck for Nervier, 18th September 1926 1926, Letter from the Chief Draughtsman for the Antwerp Engineering Co, Hoboken, to Lloyd\'s Register, Antwerp, regarding additional tweendeck for Nervier, 17th September 1926 1926, Letter from the Secretary for Lloyd's Register, London, to the Antwerp Surveyors regarding approval of deck plan & profile & detail plan showing proposed second deck for Nervier, 17th September 1926 1926, Memo regarding the fitting of the second deck for Nervier, 17th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding the forwarding of deck plan & profile & detail plan showing proposed second deck for Nervier, 15th September 1926 1926, Plan of Pillars & Framing in Way of Suppressed Shell Magazine between Frames 12 & 17 for Nervier, 22nd February 1927 1927, Memo to the Chief Ship Surveyor regarding repairs & partly held Special Survey No 2 for Kambove, 16th July 1927 1927, Letter from C H L Pilditch, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, enclosing a letter regarding future voyage for Kambove, 15th June 1927 1927, Letter from William Lenen, General Superintendent for Compagnie Africaine De Navigation Societe Anonyme, Antwerp, to the Antwerp Surveyors requesting permission for Kambove to make another voyage before completion of survey, 14th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Kamboye, 27th May 1927 1927, Report on Masts, Spars, & Rigging for Kambove, 16th May 1927 1927, Report of Survey for Repairs, &c for Kambove, 27th May 1927 1927, Certificate of Survey of Temporary & Permanent Repairs for Kambove, 13th May 1927 1927, Certificate of Survey of Damage & Repairs for Kambove, 18th May 1927 1927, Engine Forgings or Castings Form for Nervier, 14th May 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Kambove, 16th May 1927 1927, Report on Electric Fittings for Kambove, 27th August 1927 1927, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 8th December 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Marzocco, 1st November 1939 1939, Report of Survey for Repairs, &c for Marzocco, 23rd September 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding completion of Special Survey of Boilers of Marzocco, 2nd November 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Marzocco, 23rd September 1939 1939, Letter from J Davey, for the Aberdeen Surveyors, to the Secretary for Lloyd\'s Register, Wokingham, regarding the running aground of Marzocco, 21st June 1940 1940, Letter from J Davey, Aberdeen Surveyor, to the Secretary, London, returning report for Marzocco, 21st June 1940 1940, Letter from the Secretary for Lloyd's Register, Wokingham, to the Aberdeen Surveyors enclosing deferred reports on Marzocco, 15th June 1940 1940, Memo requesting the forwarding of particulars of outstanding requirements for Marzocco, 15th June 1940 1940, Copy of a memo from Genoa requesting a reply regarding the completion of 2nd Special Survey No 2 for Marzocco, 17th April 1940 1940, Copy of a memo from Genoa requesting an update on Marzocco, 13th March 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding deferral of action concerning Marzocco, 19th January 1940 1940, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 10th January 1940 1940, Report of Total Loss, Casualty, &c for Marzocco, Undated no date, Certificate of Examination for War Aryan, Undated no date, Plan of Cylinders for War Aryan, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Glasgow ( Ship Forgings Form for War Aryan, 15th November 1917 1917, Report on Electric Lighting Installation for War Aryan, 8th November 1918 1918, Report of Survey for Repairs, &c for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for War Aryan, 14th December 1918 1918, Memo to the Chief Ship Surveyor regarding classification for War Aryan, with reference to repairs, 21st November 1918 1918, Steel Steamer Report for War Aryan, 8th November 1918 1918, Form for Vessels of 100 Tons & Upwards for War Aryan, 30th October 1918 1918, Report on Machinery for War Aryan, 8th November 1918 1918, Report on Boilers for War Aryan, 8th November 1918 1918, Ship Castings Form for War Aryan, 19th February 1918 1918, Ship Forgings Form for War Aryan, 3rd August 1918 1918, Ship Forgings Form for War Aryan, 16th August 1918 1918, Half Midship Section Plan for War Aryan, 21st May 1918 1918, Plan of Profile for Kamboye, 17th October 1918 1918, Memo regarding deferral of Classification Certificate for War Aryan, 23rd May 1919 1919, Letter from J MacArthur Morisey, for the Controller General of Merchant Shipbuilding, London, to the Secretary for Lloyd's Register, London, acknowledging receipt of a letter regarding HP cylinder liner for War Aryan, 9th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary enclosing a copy of a letter regarding the machinery for War Aryan, 7th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Memo regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, transmitting a letter regarding the machinery for War Aryan, 5th April 1919 1919, Letter from James Easthope, Glasgow Surveyor, to the Secretary for Lloyd's Register, Glasgow, regarding examination of HP cylinder liner for War Aryan, 4th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, acknowledging receipt of a letter regarding the machinery for Aryan, 2nd April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary requesting a sketch of HP cylinder liner & remarks concerning the machinery of Aryan, 2nd April 1919 1919, Letter from James Lithgow, for the Controller General of Merchant Shipbuilding, Ministry of Shipping, London, to the Secretary for Lloyd's Register, London, regarding HP cylinder liner for Aryan, 31st March 1919 1919, Letter from D McLean, Manager of the Shipping Department of Anglo American Oil Co Ltd, London, to the Controller General of Merchant Shipbuilding, London, regarding HP cylinder liner for War Aryan, 29th March 1919 1919, Memo to the Chief Ship Surveyor regarding the carriage of grain for War Aryan, 27th January 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, enclosing midship section for Nervier, 26th August 1919 1919, Half Midship Section Plan for Nervier, 25th August 1919 1919, Profile & Deck Plan for Nervier, 11th September 1926 1926, Profile & Deck Plan for Nervier, 11th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Plan of Proposed Alteration to Hatch Side Coamings for Nervier, 17th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Letter from Lloyd's Register, London, to the Antwerp Surveyors regarding approval of alternative arrangement of hatch side girders for Nervier, 20th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding proposed new second deck for Nervier, 18th September 1926 1926, Letter from the Chief Draughtsman for the Antwerp Engineering Co, Hoboken, to Lloyd\'s Register, Antwerp, regarding additional tweendeck for Nervier, 17th September 1926 1926, Letter from the Secretary for Lloyd's Register, London, to the Antwerp Surveyors regarding approval of deck plan & profile & detail plan showing proposed second deck for Nervier, 17th September 1926 1926, Memo regarding the fitting of the second deck for Nervier, 17th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding the forwarding of deck plan & profile & detail plan showing proposed second deck for Nervier, 15th September 1926 1926, Plan of Pillars & Framing in Way of Suppressed Shell Magazine between Frames 12 & 17 for Nervier, 22nd February 1927 1927, Memo to the Chief Ship Surveyor regarding repairs & partly held Special Survey No 2 for Kambove, 16th July 1927 1927, Letter from C H L Pilditch, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, enclosing a letter regarding future voyage for Kambove, 15th June 1927 1927, Letter from William Lenen, General Superintendent for Compagnie Africaine De Navigation Societe Anonyme, Antwerp, to the Antwerp Surveyors requesting permission for Kambove to make another voyage before completion of survey, 14th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Kamboye, 27th May 1927 1927, Report on Masts, Spars, & Rigging for Kambove, 16th May 1927 1927, Report of Survey for Repairs, &c for Kambove, 27th May 1927 1927, Certificate of Survey of Temporary & Permanent Repairs for Kambove, 13th May 1927 1927, Certificate of Survey of Damage & Repairs for Kambove, 18th May 1927 1927, Engine Forgings or Castings Form for Nervier, 14th May 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Kambove, 16th May 1927 1927, Report on Electric Fittings for Kambove, 27th August 1927 1927, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 8th December 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Marzocco, 1st November 1939 1939, Report of Survey for Repairs, &c for Marzocco, 23rd September 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding completion of Special Survey of Boilers of Marzocco, 2nd November 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Marzocco, 23rd September 1939 1939, Letter from J Davey, for the Aberdeen Surveyors, to the Secretary for Lloyd\'s Register, Wokingham, regarding the running aground of Marzocco, 21st June 1940 1940, Letter from J Davey, Aberdeen Surveyor, to the Secretary, London, returning report for Marzocco, 21st June 1940 1940, Letter from the Secretary for Lloyd's Register, Wokingham, to the Aberdeen Surveyors enclosing deferred reports on Marzocco, 15th June 1940 1940, Memo requesting the forwarding of particulars of outstanding requirements for Marzocco, 15th June 1940 1940, Copy of a memo from Genoa requesting a reply regarding the completion of 2nd Special Survey No 2 for Marzocco, 17th April 1940 1940, Copy of a memo from Genoa requesting an update on Marzocco, 13th March 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding deferral of action concerning Marzocco, 19th January 1940 1940, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 10th January 1940 1940, Report of Total Loss, Casualty, &c for Marzocco, Undated no date, Certificate of Examination for War Aryan, Undated no date, Plan of Cylinders for War Aryan, Undated no date )
Location where a vessel’s survey was undertaken.
Glasgow ( Ship Forgings Form for War Aryan, 15th November 1917 1917, Report on Electric Lighting Installation for War Aryan, 8th November 1918 1918, Steel Steamer Report for War Aryan, 8th November 1918 1918, Report on Machinery for War Aryan, 8th November 1918 1918, Report on Boilers for War Aryan, 8th November 1918 1918, Ship Castings Form for War Aryan, 19th February 1918 1918, Ship Forgings Form for War Aryan, 16th August 1918 1918, Half Midship Section Plan for War Aryan, 21st May 1918 1918, Plan of Profile for Kamboye, 17th October 1918 1918, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, transmitting a letter regarding the machinery for War Aryan, 5th April 1919 1919, Letter from James Easthope, Glasgow Surveyor, to the Secretary for Lloyd's Register, Glasgow, regarding examination of HP cylinder liner for War Aryan, 4th April 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, enclosing midship section for Nervier, 26th August 1919 1919, Half Midship Section Plan for Nervier, 25th August 1919 1919 )
Galveston Texas; Galveston, Texas ( Report of Survey for Repairs, &c for War Aryan, 14th December 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for War Aryan, 14th December 1918 1918 )
Galveston Texas ( Certificate of Survey for War Aryan, 14th December 1918 1918 )
London ( Form for Vessels of 100 Tons & Upwards for War Aryan, 30th October 1918 1918, Letter from J MacArthur Morisey, for the Controller General of Merchant Shipbuilding, London, to the Secretary for Lloyd's Register, London, acknowledging receipt of a letter regarding HP cylinder liner for War Aryan, 9th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary enclosing a copy of a letter regarding the machinery for War Aryan, 7th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, acknowledging receipt of a letter regarding the machinery for Aryan, 2nd April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary requesting a sketch of HP cylinder liner & remarks concerning the machinery of Aryan, 2nd April 1919 1919, Letter from James Lithgow, for the Controller General of Merchant Shipbuilding, Ministry of Shipping, London, to the Secretary for Lloyd's Register, London, regarding HP cylinder liner for Aryan, 31st March 1919 1919, Letter from D McLean, Manager of the Shipping Department of Anglo American Oil Co Ltd, London, to the Controller General of Merchant Shipbuilding, London, regarding HP cylinder liner for War Aryan, 29th March 1919 1919, Letter from Lloyd's Register, London, to the Antwerp Surveyors regarding approval of alternative arrangement of hatch side girders for Nervier, 20th September 1926 1926, Letter from the Secretary for Lloyd's Register, London, to the Antwerp Surveyors regarding approval of deck plan & profile & detail plan showing proposed second deck for Nervier, 17th September 1926 1926 )
Sunderland ( Ship Forgings Form for War Aryan, 3rd August 1918 1918 )
Hoboken Lez Anvers ( Profile & Deck Plan for Nervier, 11th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Plan of Proposed Alteration to Hatch Side Coamings for Nervier, 17th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Plan of Pillars & Framing in Way of Suppressed Shell Magazine between Frames 12 & 17 for Nervier, 22nd February 1927 1927 )
Antwerp ( Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding proposed new second deck for Nervier, 18th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding the forwarding of deck plan & profile & detail plan showing proposed second deck for Nervier, 15th September 1926 1926, Letter from C H L Pilditch, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, enclosing a letter regarding future voyage for Kambove, 15th June 1927 1927, Letter from William Lenen, General Superintendent for Compagnie Africaine De Navigation Societe Anonyme, Antwerp, to the Antwerp Surveyors requesting permission for Kambove to make another voyage before completion of survey, 14th July 1927 1927, Report on Masts, Spars, & Rigging for Kambove, 16th May 1927 1927, Report of Survey for Repairs, &c for Kambove, 27th May 1927 1927, Certificate of Survey of Temporary & Permanent Repairs for Kambove, 13th May 1927 1927, Certificate of Survey of Damage & Repairs for Kambove, 18th May 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Kambove, 16th May 1927 1927, Report on Electric Fittings for Kambove, 27th August 1927 1927 )
Rotterdam ( Engine Forgings or Castings Form for Nervier, 14th May 1927 1927 )
Wokingham ( Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 8th December 1939 1939, Letter from the Secretary for Lloyd's Register, Wokingham, to the Aberdeen Surveyors enclosing deferred reports on Marzocco, 15th June 1940 1940, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 10th January 1940 1940 )
Venice; Trieste ( Report of Survey for Repairs, &c for Marzocco, 23rd September 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Marzocco, 23rd September 1939 1939 )
Aberdeen ( Letter from J Davey, for the Aberdeen Surveyors, to the Secretary for Lloyd\'s Register, Wokingham, regarding the running aground of Marzocco, 21st June 1940 1940, Letter from J Davey, Aberdeen Surveyor, to the Secretary, London, returning report for Marzocco, 21st June 1940 1940 )
Genoa ( Copy of a memo from Genoa requesting a reply regarding the completion of 2nd Special Survey No 2 for Marzocco, 17th April 1940 1940, Copy of a memo from Genoa requesting an update on Marzocco, 13th March 1940 1940 )
A vessel’s means of propulsion.
Steam ( Ship Forgings Form for War Aryan, 15th November 1917 1917, Report of Survey for Repairs, &c for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for War Aryan, 14th December 1918 1918, Memo to the Chief Ship Surveyor regarding classification for War Aryan, with reference to repairs, 21st November 1918 1918, Steel Steamer Report for War Aryan, 8th November 1918 1918, Form for Vessels of 100 Tons & Upwards for War Aryan, 30th October 1918 1918, Report on Machinery for War Aryan, 8th November 1918 1918, Report on Boilers for War Aryan, 8th November 1918 1918, Ship Castings Form for War Aryan, 19th February 1918 1918, Ship Forgings Form for War Aryan, 3rd August 1918 1918, Ship Forgings Form for War Aryan, 16th August 1918 1918, Half Midship Section Plan for War Aryan, 21st May 1918 1918, Plan of Profile for Kamboye, 17th October 1918 1918, Memo regarding deferral of Classification Certificate for War Aryan, 23rd May 1919 1919, Letter from J MacArthur Morisey, for the Controller General of Merchant Shipbuilding, London, to the Secretary for Lloyd's Register, London, acknowledging receipt of a letter regarding HP cylinder liner for War Aryan, 9th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary enclosing a copy of a letter regarding the machinery for War Aryan, 7th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Memo regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, transmitting a letter regarding the machinery for War Aryan, 5th April 1919 1919, Letter from James Easthope, Glasgow Surveyor, to the Secretary for Lloyd's Register, Glasgow, regarding examination of HP cylinder liner for War Aryan, 4th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, acknowledging receipt of a letter regarding the machinery for Aryan, 2nd April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary requesting a sketch of HP cylinder liner & remarks concerning the machinery of Aryan, 2nd April 1919 1919, Letter from James Lithgow, for the Controller General of Merchant Shipbuilding, Ministry of Shipping, London, to the Secretary for Lloyd's Register, London, regarding HP cylinder liner for Aryan, 31st March 1919 1919, Letter from D McLean, Manager of the Shipping Department of Anglo American Oil Co Ltd, London, to the Controller General of Merchant Shipbuilding, London, regarding HP cylinder liner for War Aryan, 29th March 1919 1919, Memo to the Chief Ship Surveyor regarding the carriage of grain for War Aryan, 27th January 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, enclosing midship section for Nervier, 26th August 1919 1919, Half Midship Section Plan for Nervier, 25th August 1919 1919, Profile & Deck Plan for Nervier, 11th September 1926 1926, Profile & Deck Plan for Nervier, 11th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Plan of Proposed Alteration to Hatch Side Coamings for Nervier, 17th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Letter from Lloyd's Register, London, to the Antwerp Surveyors regarding approval of alternative arrangement of hatch side girders for Nervier, 20th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding proposed new second deck for Nervier, 18th September 1926 1926, Letter from the Chief Draughtsman for the Antwerp Engineering Co, Hoboken, to Lloyd\'s Register, Antwerp, regarding additional tweendeck for Nervier, 17th September 1926 1926, Letter from the Secretary for Lloyd's Register, London, to the Antwerp Surveyors regarding approval of deck plan & profile & detail plan showing proposed second deck for Nervier, 17th September 1926 1926, Memo regarding the fitting of the second deck for Nervier, 17th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding the forwarding of deck plan & profile & detail plan showing proposed second deck for Nervier, 15th September 1926 1926, Plan of Pillars & Framing in Way of Suppressed Shell Magazine between Frames 12 & 17 for Nervier, 22nd February 1927 1927, Memo to the Chief Ship Surveyor regarding repairs & partly held Special Survey No 2 for Kambove, 16th July 1927 1927, Letter from C H L Pilditch, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, enclosing a letter regarding future voyage for Kambove, 15th June 1927 1927, Letter from William Lenen, General Superintendent for Compagnie Africaine De Navigation Societe Anonyme, Antwerp, to the Antwerp Surveyors requesting permission for Kambove to make another voyage before completion of survey, 14th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Kamboye, 27th May 1927 1927, Report on Masts, Spars, & Rigging for Kambove, 16th May 1927 1927, Report of Survey for Repairs, &c for Kambove, 27th May 1927 1927, Certificate of Survey of Temporary & Permanent Repairs for Kambove, 13th May 1927 1927, Certificate of Survey of Damage & Repairs for Kambove, 18th May 1927 1927, Engine Forgings or Castings Form for Nervier, 14th May 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Kambove, 16th May 1927 1927, Report on Electric Fittings for Kambove, 27th August 1927 1927, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 8th December 1939 1939, Report of Survey for Repairs, &c for Marzocco, 23rd September 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Marzocco, 23rd September 1939 1939, Letter from the Secretary for Lloyd's Register, Wokingham, to the Aberdeen Surveyors enclosing deferred reports on Marzocco, 15th June 1940 1940, Memo requesting the forwarding of particulars of outstanding requirements for Marzocco, 15th June 1940 1940, Copy of a memo from Genoa requesting a reply regarding the completion of 2nd Special Survey No 2 for Marzocco, 17th April 1940 1940, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 10th January 1940 1940, Report of Total Loss, Casualty, &c for Marzocco, Undated no date, Certificate of Examination for War Aryan, Undated no date )
undefined ( Report on Electric Lighting Installation for War Aryan, 8th November 1918 1918, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Marzocco, 1st November 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding completion of Special Survey of Boilers of Marzocco, 2nd November 1939 1939, Letter from J Davey, for the Aberdeen Surveyors, to the Secretary for Lloyd\'s Register, Wokingham, regarding the running aground of Marzocco, 21st June 1940 1940, Letter from J Davey, Aberdeen Surveyor, to the Secretary, London, returning report for Marzocco, 21st June 1940 1940, Copy of a memo from Genoa requesting an update on Marzocco, 13th March 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding deferral of action concerning Marzocco, 19th January 1940 1940, Plan of Cylinders for War Aryan, Undated no date )
Is the steamer assisted by sail?
No ( Ship Forgings Form for War Aryan, 15th November 1917 1917, Report on Electric Lighting Installation for War Aryan, 8th November 1918 1918, Report of Survey for Repairs, &c for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for War Aryan, 14th December 1918 1918, Memo to the Chief Ship Surveyor regarding classification for War Aryan, with reference to repairs, 21st November 1918 1918, Steel Steamer Report for War Aryan, 8th November 1918 1918, Form for Vessels of 100 Tons & Upwards for War Aryan, 30th October 1918 1918, Report on Machinery for War Aryan, 8th November 1918 1918, Report on Boilers for War Aryan, 8th November 1918 1918, Ship Castings Form for War Aryan, 19th February 1918 1918, Ship Forgings Form for War Aryan, 3rd August 1918 1918, Ship Forgings Form for War Aryan, 16th August 1918 1918, Half Midship Section Plan for War Aryan, 21st May 1918 1918, Plan of Profile for Kamboye, 17th October 1918 1918, Memo regarding deferral of Classification Certificate for War Aryan, 23rd May 1919 1919, Letter from J MacArthur Morisey, for the Controller General of Merchant Shipbuilding, London, to the Secretary for Lloyd's Register, London, acknowledging receipt of a letter regarding HP cylinder liner for War Aryan, 9th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary enclosing a copy of a letter regarding the machinery for War Aryan, 7th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Memo regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, transmitting a letter regarding the machinery for War Aryan, 5th April 1919 1919, Letter from James Easthope, Glasgow Surveyor, to the Secretary for Lloyd's Register, Glasgow, regarding examination of HP cylinder liner for War Aryan, 4th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, acknowledging receipt of a letter regarding the machinery for Aryan, 2nd April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary requesting a sketch of HP cylinder liner & remarks concerning the machinery of Aryan, 2nd April 1919 1919, Letter from James Lithgow, for the Controller General of Merchant Shipbuilding, Ministry of Shipping, London, to the Secretary for Lloyd's Register, London, regarding HP cylinder liner for Aryan, 31st March 1919 1919, Letter from D McLean, Manager of the Shipping Department of Anglo American Oil Co Ltd, London, to the Controller General of Merchant Shipbuilding, London, regarding HP cylinder liner for War Aryan, 29th March 1919 1919, Memo to the Chief Ship Surveyor regarding the carriage of grain for War Aryan, 27th January 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, enclosing midship section for Nervier, 26th August 1919 1919, Half Midship Section Plan for Nervier, 25th August 1919 1919, Profile & Deck Plan for Nervier, 11th September 1926 1926, Profile & Deck Plan for Nervier, 11th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Plan of Proposed Alteration to Hatch Side Coamings for Nervier, 17th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Letter from Lloyd's Register, London, to the Antwerp Surveyors regarding approval of alternative arrangement of hatch side girders for Nervier, 20th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding proposed new second deck for Nervier, 18th September 1926 1926, Letter from the Chief Draughtsman for the Antwerp Engineering Co, Hoboken, to Lloyd\'s Register, Antwerp, regarding additional tweendeck for Nervier, 17th September 1926 1926, Letter from the Secretary for Lloyd's Register, London, to the Antwerp Surveyors regarding approval of deck plan & profile & detail plan showing proposed second deck for Nervier, 17th September 1926 1926, Memo regarding the fitting of the second deck for Nervier, 17th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding the forwarding of deck plan & profile & detail plan showing proposed second deck for Nervier, 15th September 1926 1926, Plan of Pillars & Framing in Way of Suppressed Shell Magazine between Frames 12 & 17 for Nervier, 22nd February 1927 1927, Memo to the Chief Ship Surveyor regarding repairs & partly held Special Survey No 2 for Kambove, 16th July 1927 1927, Letter from C H L Pilditch, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, enclosing a letter regarding future voyage for Kambove, 15th June 1927 1927, Letter from William Lenen, General Superintendent for Compagnie Africaine De Navigation Societe Anonyme, Antwerp, to the Antwerp Surveyors requesting permission for Kambove to make another voyage before completion of survey, 14th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Kamboye, 27th May 1927 1927, Report on Masts, Spars, & Rigging for Kambove, 16th May 1927 1927, Report of Survey for Repairs, &c for Kambove, 27th May 1927 1927, Certificate of Survey of Temporary & Permanent Repairs for Kambove, 13th May 1927 1927, Certificate of Survey of Damage & Repairs for Kambove, 18th May 1927 1927, Engine Forgings or Castings Form for Nervier, 14th May 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Kambove, 16th May 1927 1927, Report on Electric Fittings for Kambove, 27th August 1927 1927, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 8th December 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Marzocco, 1st November 1939 1939, Report of Survey for Repairs, &c for Marzocco, 23rd September 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding completion of Special Survey of Boilers of Marzocco, 2nd November 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Marzocco, 23rd September 1939 1939, Letter from J Davey, for the Aberdeen Surveyors, to the Secretary for Lloyd\'s Register, Wokingham, regarding the running aground of Marzocco, 21st June 1940 1940, Letter from J Davey, Aberdeen Surveyor, to the Secretary, London, returning report for Marzocco, 21st June 1940 1940, Letter from the Secretary for Lloyd's Register, Wokingham, to the Aberdeen Surveyors enclosing deferred reports on Marzocco, 15th June 1940 1940, Memo requesting the forwarding of particulars of outstanding requirements for Marzocco, 15th June 1940 1940, Copy of a memo from Genoa requesting a reply regarding the completion of 2nd Special Survey No 2 for Marzocco, 17th April 1940 1940, Copy of a memo from Genoa requesting an update on Marzocco, 13th March 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding deferral of action concerning Marzocco, 19th January 1940 1940, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 10th January 1940 1940, Report of Total Loss, Casualty, &c for Marzocco, Undated no date, Certificate of Examination for War Aryan, Undated no date, Plan of Cylinders for War Aryan, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Ship Forgings Form for War Aryan, 15th November 1917 1917, Report on Electric Lighting Installation for War Aryan, 8th November 1918 1918, Report of Survey for Repairs, &c for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for War Aryan, 14th December 1918 1918, Memo to the Chief Ship Surveyor regarding classification for War Aryan, with reference to repairs, 21st November 1918 1918, Steel Steamer Report for War Aryan, 8th November 1918 1918, Form for Vessels of 100 Tons & Upwards for War Aryan, 30th October 1918 1918, Report on Machinery for War Aryan, 8th November 1918 1918, Report on Boilers for War Aryan, 8th November 1918 1918, Ship Castings Form for War Aryan, 19th February 1918 1918, Ship Forgings Form for War Aryan, 3rd August 1918 1918, Ship Forgings Form for War Aryan, 16th August 1918 1918, Half Midship Section Plan for War Aryan, 21st May 1918 1918, Plan of Profile for Kamboye, 17th October 1918 1918, Memo regarding deferral of Classification Certificate for War Aryan, 23rd May 1919 1919, Letter from J MacArthur Morisey, for the Controller General of Merchant Shipbuilding, London, to the Secretary for Lloyd's Register, London, acknowledging receipt of a letter regarding HP cylinder liner for War Aryan, 9th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary enclosing a copy of a letter regarding the machinery for War Aryan, 7th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Memo regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, transmitting a letter regarding the machinery for War Aryan, 5th April 1919 1919, Letter from James Easthope, Glasgow Surveyor, to the Secretary for Lloyd's Register, Glasgow, regarding examination of HP cylinder liner for War Aryan, 4th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, acknowledging receipt of a letter regarding the machinery for Aryan, 2nd April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary requesting a sketch of HP cylinder liner & remarks concerning the machinery of Aryan, 2nd April 1919 1919, Letter from James Lithgow, for the Controller General of Merchant Shipbuilding, Ministry of Shipping, London, to the Secretary for Lloyd's Register, London, regarding HP cylinder liner for Aryan, 31st March 1919 1919, Letter from D McLean, Manager of the Shipping Department of Anglo American Oil Co Ltd, London, to the Controller General of Merchant Shipbuilding, London, regarding HP cylinder liner for War Aryan, 29th March 1919 1919, Memo to the Chief Ship Surveyor regarding the carriage of grain for War Aryan, 27th January 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, enclosing midship section for Nervier, 26th August 1919 1919, Half Midship Section Plan for Nervier, 25th August 1919 1919, Profile & Deck Plan for Nervier, 11th September 1926 1926, Profile & Deck Plan for Nervier, 11th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Plan of Proposed Alteration to Hatch Side Coamings for Nervier, 17th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Letter from Lloyd's Register, London, to the Antwerp Surveyors regarding approval of alternative arrangement of hatch side girders for Nervier, 20th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding proposed new second deck for Nervier, 18th September 1926 1926, Letter from the Chief Draughtsman for the Antwerp Engineering Co, Hoboken, to Lloyd\'s Register, Antwerp, regarding additional tweendeck for Nervier, 17th September 1926 1926, Letter from the Secretary for Lloyd's Register, London, to the Antwerp Surveyors regarding approval of deck plan & profile & detail plan showing proposed second deck for Nervier, 17th September 1926 1926, Memo regarding the fitting of the second deck for Nervier, 17th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding the forwarding of deck plan & profile & detail plan showing proposed second deck for Nervier, 15th September 1926 1926, Plan of Pillars & Framing in Way of Suppressed Shell Magazine between Frames 12 & 17 for Nervier, 22nd February 1927 1927, Memo to the Chief Ship Surveyor regarding repairs & partly held Special Survey No 2 for Kambove, 16th July 1927 1927, Letter from C H L Pilditch, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, enclosing a letter regarding future voyage for Kambove, 15th June 1927 1927, Letter from William Lenen, General Superintendent for Compagnie Africaine De Navigation Societe Anonyme, Antwerp, to the Antwerp Surveyors requesting permission for Kambove to make another voyage before completion of survey, 14th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Kamboye, 27th May 1927 1927, Report on Masts, Spars, & Rigging for Kambove, 16th May 1927 1927, Report of Survey for Repairs, &c for Kambove, 27th May 1927 1927, Certificate of Survey of Temporary & Permanent Repairs for Kambove, 13th May 1927 1927, Certificate of Survey of Damage & Repairs for Kambove, 18th May 1927 1927, Engine Forgings or Castings Form for Nervier, 14th May 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Kambove, 16th May 1927 1927, Report on Electric Fittings for Kambove, 27th August 1927 1927, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 8th December 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Marzocco, 1st November 1939 1939, Report of Survey for Repairs, &c for Marzocco, 23rd September 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding completion of Special Survey of Boilers of Marzocco, 2nd November 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Marzocco, 23rd September 1939 1939, Letter from J Davey, for the Aberdeen Surveyors, to the Secretary for Lloyd\'s Register, Wokingham, regarding the running aground of Marzocco, 21st June 1940 1940, Letter from J Davey, Aberdeen Surveyor, to the Secretary, London, returning report for Marzocco, 21st June 1940 1940, Letter from the Secretary for Lloyd's Register, Wokingham, to the Aberdeen Surveyors enclosing deferred reports on Marzocco, 15th June 1940 1940, Memo requesting the forwarding of particulars of outstanding requirements for Marzocco, 15th June 1940 1940, Copy of a memo from Genoa requesting a reply regarding the completion of 2nd Special Survey No 2 for Marzocco, 17th April 1940 1940, Copy of a memo from Genoa requesting an update on Marzocco, 13th March 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding deferral of action concerning Marzocco, 19th January 1940 1940, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 10th January 1940 1940, Report of Total Loss, Casualty, &c for Marzocco, Undated no date, Certificate of Examination for War Aryan, Undated no date, Plan of Cylinders for War Aryan, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Ship Forgings Form for War Aryan, 15th November 1917 1917, Report on Electric Lighting Installation for War Aryan, 8th November 1918 1918, Report of Survey for Repairs, &c for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for War Aryan, 14th December 1918 1918, Memo to the Chief Ship Surveyor regarding classification for War Aryan, with reference to repairs, 21st November 1918 1918, Steel Steamer Report for War Aryan, 8th November 1918 1918, Form for Vessels of 100 Tons & Upwards for War Aryan, 30th October 1918 1918, Report on Machinery for War Aryan, 8th November 1918 1918, Report on Boilers for War Aryan, 8th November 1918 1918, Ship Castings Form for War Aryan, 19th February 1918 1918, Ship Forgings Form for War Aryan, 3rd August 1918 1918, Ship Forgings Form for War Aryan, 16th August 1918 1918, Half Midship Section Plan for War Aryan, 21st May 1918 1918, Plan of Profile for Kamboye, 17th October 1918 1918, Memo regarding deferral of Classification Certificate for War Aryan, 23rd May 1919 1919, Letter from J MacArthur Morisey, for the Controller General of Merchant Shipbuilding, London, to the Secretary for Lloyd's Register, London, acknowledging receipt of a letter regarding HP cylinder liner for War Aryan, 9th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary enclosing a copy of a letter regarding the machinery for War Aryan, 7th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Memo regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, transmitting a letter regarding the machinery for War Aryan, 5th April 1919 1919, Letter from James Easthope, Glasgow Surveyor, to the Secretary for Lloyd's Register, Glasgow, regarding examination of HP cylinder liner for War Aryan, 4th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, acknowledging receipt of a letter regarding the machinery for Aryan, 2nd April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary requesting a sketch of HP cylinder liner & remarks concerning the machinery of Aryan, 2nd April 1919 1919, Letter from James Lithgow, for the Controller General of Merchant Shipbuilding, Ministry of Shipping, London, to the Secretary for Lloyd's Register, London, regarding HP cylinder liner for Aryan, 31st March 1919 1919, Letter from D McLean, Manager of the Shipping Department of Anglo American Oil Co Ltd, London, to the Controller General of Merchant Shipbuilding, London, regarding HP cylinder liner for War Aryan, 29th March 1919 1919, Memo to the Chief Ship Surveyor regarding the carriage of grain for War Aryan, 27th January 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, enclosing midship section for Nervier, 26th August 1919 1919, Half Midship Section Plan for Nervier, 25th August 1919 1919, Profile & Deck Plan for Nervier, 11th September 1926 1926, Profile & Deck Plan for Nervier, 11th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Plan of Proposed Alteration to Hatch Side Coamings for Nervier, 17th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Letter from Lloyd's Register, London, to the Antwerp Surveyors regarding approval of alternative arrangement of hatch side girders for Nervier, 20th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding proposed new second deck for Nervier, 18th September 1926 1926, Letter from the Chief Draughtsman for the Antwerp Engineering Co, Hoboken, to Lloyd\'s Register, Antwerp, regarding additional tweendeck for Nervier, 17th September 1926 1926, Letter from the Secretary for Lloyd's Register, London, to the Antwerp Surveyors regarding approval of deck plan & profile & detail plan showing proposed second deck for Nervier, 17th September 1926 1926, Memo regarding the fitting of the second deck for Nervier, 17th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding the forwarding of deck plan & profile & detail plan showing proposed second deck for Nervier, 15th September 1926 1926, Plan of Pillars & Framing in Way of Suppressed Shell Magazine between Frames 12 & 17 for Nervier, 22nd February 1927 1927, Memo to the Chief Ship Surveyor regarding repairs & partly held Special Survey No 2 for Kambove, 16th July 1927 1927, Letter from C H L Pilditch, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, enclosing a letter regarding future voyage for Kambove, 15th June 1927 1927, Letter from William Lenen, General Superintendent for Compagnie Africaine De Navigation Societe Anonyme, Antwerp, to the Antwerp Surveyors requesting permission for Kambove to make another voyage before completion of survey, 14th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Kamboye, 27th May 1927 1927, Report on Masts, Spars, & Rigging for Kambove, 16th May 1927 1927, Report of Survey for Repairs, &c for Kambove, 27th May 1927 1927, Certificate of Survey of Temporary & Permanent Repairs for Kambove, 13th May 1927 1927, Certificate of Survey of Damage & Repairs for Kambove, 18th May 1927 1927, Engine Forgings or Castings Form for Nervier, 14th May 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Kambove, 16th May 1927 1927, Report on Electric Fittings for Kambove, 27th August 1927 1927, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 8th December 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Marzocco, 1st November 1939 1939, Report of Survey for Repairs, &c for Marzocco, 23rd September 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding completion of Special Survey of Boilers of Marzocco, 2nd November 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Marzocco, 23rd September 1939 1939, Letter from J Davey, for the Aberdeen Surveyors, to the Secretary for Lloyd\'s Register, Wokingham, regarding the running aground of Marzocco, 21st June 1940 1940, Letter from J Davey, Aberdeen Surveyor, to the Secretary, London, returning report for Marzocco, 21st June 1940 1940, Letter from the Secretary for Lloyd's Register, Wokingham, to the Aberdeen Surveyors enclosing deferred reports on Marzocco, 15th June 1940 1940, Memo requesting the forwarding of particulars of outstanding requirements for Marzocco, 15th June 1940 1940, Copy of a memo from Genoa requesting a reply regarding the completion of 2nd Special Survey No 2 for Marzocco, 17th April 1940 1940, Copy of a memo from Genoa requesting an update on Marzocco, 13th March 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding deferral of action concerning Marzocco, 19th January 1940 1940, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 10th January 1940 1940, Report of Total Loss, Casualty, &c for Marzocco, Undated no date, Certificate of Examination for War Aryan, Undated no date, Plan of Cylinders for War Aryan, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Ship Forgings Form for War Aryan, 15th November 1917 1917, Report on Electric Lighting Installation for War Aryan, 8th November 1918 1918, Report of Survey for Repairs, &c for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for War Aryan, 14th December 1918 1918, Memo to the Chief Ship Surveyor regarding classification for War Aryan, with reference to repairs, 21st November 1918 1918, Steel Steamer Report for War Aryan, 8th November 1918 1918, Form for Vessels of 100 Tons & Upwards for War Aryan, 30th October 1918 1918, Report on Machinery for War Aryan, 8th November 1918 1918, Report on Boilers for War Aryan, 8th November 1918 1918, Ship Castings Form for War Aryan, 19th February 1918 1918, Ship Forgings Form for War Aryan, 3rd August 1918 1918, Ship Forgings Form for War Aryan, 16th August 1918 1918, Half Midship Section Plan for War Aryan, 21st May 1918 1918, Plan of Profile for Kamboye, 17th October 1918 1918, Memo regarding deferral of Classification Certificate for War Aryan, 23rd May 1919 1919, Letter from J MacArthur Morisey, for the Controller General of Merchant Shipbuilding, London, to the Secretary for Lloyd's Register, London, acknowledging receipt of a letter regarding HP cylinder liner for War Aryan, 9th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary enclosing a copy of a letter regarding the machinery for War Aryan, 7th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Memo regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, transmitting a letter regarding the machinery for War Aryan, 5th April 1919 1919, Letter from James Easthope, Glasgow Surveyor, to the Secretary for Lloyd's Register, Glasgow, regarding examination of HP cylinder liner for War Aryan, 4th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, acknowledging receipt of a letter regarding the machinery for Aryan, 2nd April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary requesting a sketch of HP cylinder liner & remarks concerning the machinery of Aryan, 2nd April 1919 1919, Letter from James Lithgow, for the Controller General of Merchant Shipbuilding, Ministry of Shipping, London, to the Secretary for Lloyd's Register, London, regarding HP cylinder liner for Aryan, 31st March 1919 1919, Letter from D McLean, Manager of the Shipping Department of Anglo American Oil Co Ltd, London, to the Controller General of Merchant Shipbuilding, London, regarding HP cylinder liner for War Aryan, 29th March 1919 1919, Memo to the Chief Ship Surveyor regarding the carriage of grain for War Aryan, 27th January 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, enclosing midship section for Nervier, 26th August 1919 1919, Half Midship Section Plan for Nervier, 25th August 1919 1919, Profile & Deck Plan for Nervier, 11th September 1926 1926, Profile & Deck Plan for Nervier, 11th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Plan of Proposed Alteration to Hatch Side Coamings for Nervier, 17th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Letter from Lloyd's Register, London, to the Antwerp Surveyors regarding approval of alternative arrangement of hatch side girders for Nervier, 20th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding proposed new second deck for Nervier, 18th September 1926 1926, Letter from the Chief Draughtsman for the Antwerp Engineering Co, Hoboken, to Lloyd\'s Register, Antwerp, regarding additional tweendeck for Nervier, 17th September 1926 1926, Letter from the Secretary for Lloyd's Register, London, to the Antwerp Surveyors regarding approval of deck plan & profile & detail plan showing proposed second deck for Nervier, 17th September 1926 1926, Memo regarding the fitting of the second deck for Nervier, 17th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding the forwarding of deck plan & profile & detail plan showing proposed second deck for Nervier, 15th September 1926 1926, Plan of Pillars & Framing in Way of Suppressed Shell Magazine between Frames 12 & 17 for Nervier, 22nd February 1927 1927, Memo to the Chief Ship Surveyor regarding repairs & partly held Special Survey No 2 for Kambove, 16th July 1927 1927, Letter from C H L Pilditch, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, enclosing a letter regarding future voyage for Kambove, 15th June 1927 1927, Letter from William Lenen, General Superintendent for Compagnie Africaine De Navigation Societe Anonyme, Antwerp, to the Antwerp Surveyors requesting permission for Kambove to make another voyage before completion of survey, 14th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Kamboye, 27th May 1927 1927, Report on Masts, Spars, & Rigging for Kambove, 16th May 1927 1927, Report of Survey for Repairs, &c for Kambove, 27th May 1927 1927, Certificate of Survey of Temporary & Permanent Repairs for Kambove, 13th May 1927 1927, Certificate of Survey of Damage & Repairs for Kambove, 18th May 1927 1927, Engine Forgings or Castings Form for Nervier, 14th May 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Kambove, 16th May 1927 1927, Report on Electric Fittings for Kambove, 27th August 1927 1927, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 8th December 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Marzocco, 1st November 1939 1939, Report of Survey for Repairs, &c for Marzocco, 23rd September 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding completion of Special Survey of Boilers of Marzocco, 2nd November 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Marzocco, 23rd September 1939 1939, Letter from J Davey, for the Aberdeen Surveyors, to the Secretary for Lloyd\'s Register, Wokingham, regarding the running aground of Marzocco, 21st June 1940 1940, Letter from J Davey, Aberdeen Surveyor, to the Secretary, London, returning report for Marzocco, 21st June 1940 1940, Letter from the Secretary for Lloyd's Register, Wokingham, to the Aberdeen Surveyors enclosing deferred reports on Marzocco, 15th June 1940 1940, Memo requesting the forwarding of particulars of outstanding requirements for Marzocco, 15th June 1940 1940, Copy of a memo from Genoa requesting a reply regarding the completion of 2nd Special Survey No 2 for Marzocco, 17th April 1940 1940, Copy of a memo from Genoa requesting an update on Marzocco, 13th March 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding deferral of action concerning Marzocco, 19th January 1940 1940, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 10th January 1940 1940, Report of Total Loss, Casualty, &c for Marzocco, Undated no date, Certificate of Examination for War Aryan, Undated no date, Plan of Cylinders for War Aryan, Undated no date )
Contextual information related to the reasons of the vessel’s loss or disposal.
Ran herself ashore ( Ship Forgings Form for War Aryan, 15th November 1917 1917, Report on Electric Lighting Installation for War Aryan, 8th November 1918 1918, Report of Survey for Repairs, &c for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for War Aryan, 14th December 1918 1918, Memo to the Chief Ship Surveyor regarding classification for War Aryan, with reference to repairs, 21st November 1918 1918, Steel Steamer Report for War Aryan, 8th November 1918 1918, Form for Vessels of 100 Tons & Upwards for War Aryan, 30th October 1918 1918, Report on Machinery for War Aryan, 8th November 1918 1918, Report on Boilers for War Aryan, 8th November 1918 1918, Ship Castings Form for War Aryan, 19th February 1918 1918, Ship Forgings Form for War Aryan, 3rd August 1918 1918, Ship Forgings Form for War Aryan, 16th August 1918 1918, Half Midship Section Plan for War Aryan, 21st May 1918 1918, Plan of Profile for Kamboye, 17th October 1918 1918, Memo regarding deferral of Classification Certificate for War Aryan, 23rd May 1919 1919, Letter from J MacArthur Morisey, for the Controller General of Merchant Shipbuilding, London, to the Secretary for Lloyd's Register, London, acknowledging receipt of a letter regarding HP cylinder liner for War Aryan, 9th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary enclosing a copy of a letter regarding the machinery for War Aryan, 7th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Memo regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, transmitting a letter regarding the machinery for War Aryan, 5th April 1919 1919, Letter from James Easthope, Glasgow Surveyor, to the Secretary for Lloyd's Register, Glasgow, regarding examination of HP cylinder liner for War Aryan, 4th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, acknowledging receipt of a letter regarding the machinery for Aryan, 2nd April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary requesting a sketch of HP cylinder liner & remarks concerning the machinery of Aryan, 2nd April 1919 1919, Letter from James Lithgow, for the Controller General of Merchant Shipbuilding, Ministry of Shipping, London, to the Secretary for Lloyd's Register, London, regarding HP cylinder liner for Aryan, 31st March 1919 1919, Letter from D McLean, Manager of the Shipping Department of Anglo American Oil Co Ltd, London, to the Controller General of Merchant Shipbuilding, London, regarding HP cylinder liner for War Aryan, 29th March 1919 1919, Memo to the Chief Ship Surveyor regarding the carriage of grain for War Aryan, 27th January 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, enclosing midship section for Nervier, 26th August 1919 1919, Half Midship Section Plan for Nervier, 25th August 1919 1919, Profile & Deck Plan for Nervier, 11th September 1926 1926, Profile & Deck Plan for Nervier, 11th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Plan of Proposed Alteration to Hatch Side Coamings for Nervier, 17th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Letter from Lloyd's Register, London, to the Antwerp Surveyors regarding approval of alternative arrangement of hatch side girders for Nervier, 20th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding proposed new second deck for Nervier, 18th September 1926 1926, Letter from the Chief Draughtsman for the Antwerp Engineering Co, Hoboken, to Lloyd\'s Register, Antwerp, regarding additional tweendeck for Nervier, 17th September 1926 1926, Letter from the Secretary for Lloyd's Register, London, to the Antwerp Surveyors regarding approval of deck plan & profile & detail plan showing proposed second deck for Nervier, 17th September 1926 1926, Memo regarding the fitting of the second deck for Nervier, 17th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding the forwarding of deck plan & profile & detail plan showing proposed second deck for Nervier, 15th September 1926 1926, Plan of Pillars & Framing in Way of Suppressed Shell Magazine between Frames 12 & 17 for Nervier, 22nd February 1927 1927, Memo to the Chief Ship Surveyor regarding repairs & partly held Special Survey No 2 for Kambove, 16th July 1927 1927, Letter from C H L Pilditch, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, enclosing a letter regarding future voyage for Kambove, 15th June 1927 1927, Letter from William Lenen, General Superintendent for Compagnie Africaine De Navigation Societe Anonyme, Antwerp, to the Antwerp Surveyors requesting permission for Kambove to make another voyage before completion of survey, 14th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Kamboye, 27th May 1927 1927, Report on Masts, Spars, & Rigging for Kambove, 16th May 1927 1927, Report of Survey for Repairs, &c for Kambove, 27th May 1927 1927, Certificate of Survey of Temporary & Permanent Repairs for Kambove, 13th May 1927 1927, Certificate of Survey of Damage & Repairs for Kambove, 18th May 1927 1927, Engine Forgings or Castings Form for Nervier, 14th May 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Kambove, 16th May 1927 1927, Report on Electric Fittings for Kambove, 27th August 1927 1927, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 8th December 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Marzocco, 1st November 1939 1939, Report of Survey for Repairs, &c for Marzocco, 23rd September 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding completion of Special Survey of Boilers of Marzocco, 2nd November 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Marzocco, 23rd September 1939 1939, Letter from J Davey, for the Aberdeen Surveyors, to the Secretary for Lloyd\'s Register, Wokingham, regarding the running aground of Marzocco, 21st June 1940 1940, Letter from J Davey, Aberdeen Surveyor, to the Secretary, London, returning report for Marzocco, 21st June 1940 1940, Letter from the Secretary for Lloyd's Register, Wokingham, to the Aberdeen Surveyors enclosing deferred reports on Marzocco, 15th June 1940 1940, Memo requesting the forwarding of particulars of outstanding requirements for Marzocco, 15th June 1940 1940, Copy of a memo from Genoa requesting a reply regarding the completion of 2nd Special Survey No 2 for Marzocco, 17th April 1940 1940, Copy of a memo from Genoa requesting an update on Marzocco, 13th March 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding deferral of action concerning Marzocco, 19th January 1940 1940, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 10th January 1940 1940, Report of Total Loss, Casualty, &c for Marzocco, Undated no date, Certificate of Examination for War Aryan, Undated no date, Plan of Cylinders for War Aryan, Undated no date )
The country or national waters where a vessel is lost/disposed of, or last recorded.
United Kingdom ( Ship Forgings Form for War Aryan, 15th November 1917 1917, Report on Electric Lighting Installation for War Aryan, 8th November 1918 1918, Report of Survey for Repairs, &c for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for War Aryan, 14th December 1918 1918, Memo to the Chief Ship Surveyor regarding classification for War Aryan, with reference to repairs, 21st November 1918 1918, Steel Steamer Report for War Aryan, 8th November 1918 1918, Form for Vessels of 100 Tons & Upwards for War Aryan, 30th October 1918 1918, Report on Machinery for War Aryan, 8th November 1918 1918, Report on Boilers for War Aryan, 8th November 1918 1918, Ship Castings Form for War Aryan, 19th February 1918 1918, Ship Forgings Form for War Aryan, 3rd August 1918 1918, Ship Forgings Form for War Aryan, 16th August 1918 1918, Half Midship Section Plan for War Aryan, 21st May 1918 1918, Plan of Profile for Kamboye, 17th October 1918 1918, Memo regarding deferral of Classification Certificate for War Aryan, 23rd May 1919 1919, Letter from J MacArthur Morisey, for the Controller General of Merchant Shipbuilding, London, to the Secretary for Lloyd's Register, London, acknowledging receipt of a letter regarding HP cylinder liner for War Aryan, 9th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary enclosing a copy of a letter regarding the machinery for War Aryan, 7th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Memo regarding examination of HP cylinder liner for War Aryan, 7th April 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, transmitting a letter regarding the machinery for War Aryan, 5th April 1919 1919, Letter from James Easthope, Glasgow Surveyor, to the Secretary for Lloyd's Register, Glasgow, regarding examination of HP cylinder liner for War Aryan, 4th April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Controller General of Merchant Shipbuilding, London, acknowledging receipt of a letter regarding the machinery for Aryan, 2nd April 1919 1919, Letter from the Secretary for Lloyd's Register, London, to the Glasgow Secretary requesting a sketch of HP cylinder liner & remarks concerning the machinery of Aryan, 2nd April 1919 1919, Letter from James Lithgow, for the Controller General of Merchant Shipbuilding, Ministry of Shipping, London, to the Secretary for Lloyd's Register, London, regarding HP cylinder liner for Aryan, 31st March 1919 1919, Letter from D McLean, Manager of the Shipping Department of Anglo American Oil Co Ltd, London, to the Controller General of Merchant Shipbuilding, London, regarding HP cylinder liner for War Aryan, 29th March 1919 1919, Memo to the Chief Ship Surveyor regarding the carriage of grain for War Aryan, 27th January 1919 1919, Letter from P L Warlow, Secretary to the Glasgow Committee, to the Secretary for Lloyd's Register, London, enclosing midship section for Nervier, 26th August 1919 1919, Half Midship Section Plan for Nervier, 25th August 1919 1919, Profile & Deck Plan for Nervier, 11th September 1926 1926, Profile & Deck Plan for Nervier, 11th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Plan of Proposed Alteration to Hatch Side Coamings for Nervier, 17th September 1926 1926, Plan of Details of Additional Tween Deck in Holds for Nervier, 11th September 1926 1926, Letter from Lloyd's Register, London, to the Antwerp Surveyors regarding approval of alternative arrangement of hatch side girders for Nervier, 20th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding proposed new second deck for Nervier, 18th September 1926 1926, Letter from the Chief Draughtsman for the Antwerp Engineering Co, Hoboken, to Lloyd\'s Register, Antwerp, regarding additional tweendeck for Nervier, 17th September 1926 1926, Letter from the Secretary for Lloyd's Register, London, to the Antwerp Surveyors regarding approval of deck plan & profile & detail plan showing proposed second deck for Nervier, 17th September 1926 1926, Memo regarding the fitting of the second deck for Nervier, 17th September 1926 1926, Letter from G O Herbert, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, regarding the forwarding of deck plan & profile & detail plan showing proposed second deck for Nervier, 15th September 1926 1926, Plan of Pillars & Framing in Way of Suppressed Shell Magazine between Frames 12 & 17 for Nervier, 22nd February 1927 1927, Memo to the Chief Ship Surveyor regarding repairs & partly held Special Survey No 2 for Kambove, 16th July 1927 1927, Letter from C H L Pilditch, for the Antwerp Surveyors, to the Secretary for Lloyd\'s Register, London, enclosing a letter regarding future voyage for Kambove, 15th June 1927 1927, Letter from William Lenen, General Superintendent for Compagnie Africaine De Navigation Societe Anonyme, Antwerp, to the Antwerp Surveyors requesting permission for Kambove to make another voyage before completion of survey, 14th July 1927 1927, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Kamboye, 27th May 1927 1927, Report on Masts, Spars, & Rigging for Kambove, 16th May 1927 1927, Report of Survey for Repairs, &c for Kambove, 27th May 1927 1927, Certificate of Survey of Temporary & Permanent Repairs for Kambove, 13th May 1927 1927, Certificate of Survey of Damage & Repairs for Kambove, 18th May 1927 1927, Engine Forgings or Castings Form for Nervier, 14th May 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Kambove, 16th May 1927 1927, Report on Electric Fittings for Kambove, 27th August 1927 1927, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 8th December 1939 1939, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Marzocco, 1st November 1939 1939, Report of Survey for Repairs, &c for Marzocco, 23rd September 1939 1939, Remarks of the Chief Engineer Surveyor to the Classing Committee regarding completion of Special Survey of Boilers of Marzocco, 2nd November 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Marzocco, 23rd September 1939 1939, Letter from J Davey, for the Aberdeen Surveyors, to the Secretary for Lloyd\'s Register, Wokingham, regarding the running aground of Marzocco, 21st June 1940 1940, Letter from J Davey, Aberdeen Surveyor, to the Secretary, London, returning report for Marzocco, 21st June 1940 1940, Letter from the Secretary for Lloyd's Register, Wokingham, to the Aberdeen Surveyors enclosing deferred reports on Marzocco, 15th June 1940 1940, Memo requesting the forwarding of particulars of outstanding requirements for Marzocco, 15th June 1940 1940, Copy of a memo from Genoa requesting a reply regarding the completion of 2nd Special Survey No 2 for Marzocco, 17th April 1940 1940, Copy of a memo from Genoa requesting an update on Marzocco, 13th March 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding deferral of action concerning Marzocco, 19th January 1940 1940, Question & Answer Memo between Wokingham & Genoa Office regarding Special Survey for Marzocco, 10th January 1940 1940, Report of Total Loss, Casualty, &c for Marzocco, Undated no date, Certificate of Examination for War Aryan, Undated no date, Plan of Cylinders for War Aryan, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls ( Report on Electric Lighting Installation for War Aryan, 8th November 1918 1918, Steel Steamer Report for War Aryan, 8th November 1918 1918, Report on Machinery for War Aryan, 8th November 1918 1918, Report on Boilers for War Aryan, 8th November 1918 1918 )
Glv ( Report of Survey for Repairs, &c for War Aryan, 14th December 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for War Aryan, 14th December 1918 1918 )
Ant ( Report of Survey for Repairs, &c for Kambove, 27th May 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Kambove, 16th May 1927 1927, Report on Electric Fittings for Kambove, 27th August 1927 1927 )
Tri ( Report of Survey for Repairs, &c for Marzocco, 23rd September 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Marzocco, 23rd September 1939 1939 )
The individual and/or organisation listed
Shipping Controller ( Report on Electric Lighting Installation for War Aryan, 8th November 1918 1918, Form for Vessels of 100 Tons & Upwards for War Aryan, 30th October 1918 1918, Report on Machinery for War Aryan, 8th November 1918 1918, Report on Boilers for War Aryan, 8th November 1918 1918 )
Anglo American Oil Co Ltd ( Report of Survey for Repairs, &c for War Aryan, 14th December 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for War Aryan, 14th December 1918 1918 )
The Controller of Shipping ( Steel Steamer Report for War Aryan, 8th November 1918 1918 )
Cie Africaine De Navigation ( Report of Survey for Repairs, &c for Kambove, 27th May 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Kambove, 16th May 1927 1927, Report on Electric Fittings for Kambove, 27th August 1927 1927 )
Marino Querci ( Report of Survey for Repairs, &c for Marzocco, 23rd September 1939 1939, Report of Survey for Repairs, &c, of Engines & Boilers for Marzocco, 23rd September 1939 1939, Report of Total Loss, Casualty, &c for Marzocco, Undated no date )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
R Parker ( Report of Survey for Repairs, &c for War Aryan, 14th December 1918 1918, Certificate of Survey for War Aryan, 14th December 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for War Aryan, 14th December 1918 1918, Steel Steamer Report for War Aryan, 8th November 1918 1918 )
The name of the port/place of destination given.
Falmouth for Orders ( Report of Survey for Repairs, &c for War Aryan, 14th December 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for War Aryan, 14th December 1918 1918 )
East South Africa; Lucy Canal ( Report of Survey for Repairs, &c for Kambove, 27th May 1927 1927 )
Thames ( Certificate of Survey of Damage & Repairs for Kambove, 18th May 1927 1927 )
East Coast of Africa ( Report of Survey for Repairs, &c, of Engines & Boilers for Kambove, 16th May 1927 1927 )
Recorded information relating the specific cargo being conveyed.
Grain in bulk ( Certificate of Survey for War Aryan, 14th December 1918 1918, Certificate of Examination for War Aryan, Undated no date )
Oil Fuel in Bulk ( Steel Steamer Report for War Aryan, 8th November 1918 1918 )
Location of construction for a vessel’s engines.
Glasgow ( Report of Survey for Repairs, &c, of Engines & Boilers for War Aryan, 14th December 1918 1918, Form for Vessels of 100 Tons & Upwards for War Aryan, 30th October 1918 1918, Report on Machinery for War Aryan, 8th November 1918 1918, Report on Boilers for War Aryan, 8th November 1918 1918, Report of Survey for Repairs, &c, of Engines & Boilers for Kambove, 16th May 1927 1927, Report of Survey for Repairs, &c, of Engines & Boilers for Marzocco, 23rd September 1939 1939 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
The Anglo American Oil Co Ltd ( Steel Steamer Report for War Aryan, 8th November 1918 1918 )
James Hamilton ( Form for Vessels of 100 Tons & Upwards for War Aryan, 30th October 1918 1918 )
Anglo American Oil Co Ltd ( Report on Machinery for War Aryan, 8th November 1918 1918, Report on Boilers for War Aryan, 8th November 1918 1918 )
The Anglo Steam American Oil Co ( Letter from J MacArthur Morisey, for the Controller General of Merchant Shipbuilding, London, to the Secretary for Lloyd's Register, London, acknowledging receipt of a letter regarding HP cylinder liner for War Aryan, 9th April 1919 1919 )
Physical arrangement of a ship’s masts, sails and rigging.
Sp - Sloop ( Form for Vessels of 100 Tons & Upwards for War Aryan, 30th October 1918 1918 )
The name of the port/place from which a vessel’s voyage originated.
Philadelphia ( Certificate of Survey of Damage & Repairs for Kambove, 18th May 1927 1927 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.