Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
11/03/1875
The year in which a vessel’s construction is completed.
1863
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Gibson
The country in which the vessel’s construction took place, at the time of writing.
United Kingdom
The country (flag) that a vessel is registered to, at the time of writing.
United Kingdom
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Location where the document is written.
London
Physical arrangement of a ship’s masts, sails and rigging.
S - Ship
Type of fuel used onboard a vessel.
Sail - Rigs
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Recorded information relating the specific cargo being conveyed.
petroleum
Pertinent, useful or interesting recorded content.
Ship has been referred to as 'Ramsay' in many references even by surveyors, unable to verify if she ever carried this spelling, hence including it in previous names in order that researchers may find her under either name.
Name of ship as recorded on the record
Ramsey
The process of transferring a vessel to water, but not necessarily her completion.
31/01/1863
The port or place in which the vessel’s construction took place, at the time of writing.
Ramsey, Isle of Man
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Tonnage
The listed port to which a given vessel belongs.
London
The individual and/or organisation listed
Taylor, Bethell & Roberts
Broad categories and subdivisions of vessels related to their purpose or function.
Cargo
A vessel’s means of propulsion.
Sail
Predominant material(s) utilised in a vessel’s construction.
Iron
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
821
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.